500: 436: 31: 1017: 1005: 1029: 1050: 487:, which subsequently happened. SolarReserve also filed a lawsuit, claiming that the Department of Energy was looking to appoint two new members to Tonopah Solar Energy's board of managers, giving the appearance of the Energy Department in complete control of Tonopah directors which comprise the entirety of the Tonopah Board of Managers. An interim outcome in this regard was that SolarReserve took down their website and was believed to have ceased operations permanently. 973:, whose progression, skipping first partial year, is a 40% output the first full year, 57% the second full year, the next year the progression was stopped by a problem in October, but resumes with a 73% the fourth and next year. At Crescent Dunes, it was to be expected a similar progression, but the failure of the storage tanks in 2016, froze the commissioning. Following that, first full production year was delayed to 2018, starting with a 40% (200 over 500) output. 3581: 1064: 3593: 403:
projected cost of less than $ 1 billion. The plant suffered several design, construction and technical problems and, having not produced power since April 2019, its sole customer, NV Energy, subsequently terminated their contract. Bloomberg reported that NV Energy was not allowed to sever its agreement with the plant until after the DoE took over the shuttered plant in August 2019.
523:. Each heliostat is made up of 35 6×6 feet (1.8 m) mirror facets, yielding a heliostat overall usable area of 1,245 square feet (115.7 m). Total solar field aperture adds up to 12,882,015 square feet (1,196,778 m). The molten salt circulates from the tower to a storage tank, where it is then used to produce steam and generate electricity. 475:
off-line in October 2016 due to a leak in a molten salt tank. The owners warned the EPC about flaws in the salt tank foundations (and other matters) with formal comments lodged on the record in March 2012 progress meeting with DOE and its engineer present (the lender did not voice any objection). It returned to operation in July 2017.
491:
less than half of what taxpayers are owed on the outstanding $ 425 million of public debt. Under the settlement agreement and as a function of subsequent repairs, restoration of the plant to power production and acquisition of new long-term customers, ACS Cobra is liable for an additional $ 100 million in otherwise suspended debt.
406:
Since the initial failure of the Crescent Dunes project, SolarReserve took down their website and is believed to have permanently ceased operations. Upon the developer's silence as the involved parties sought legal recourse, the plant's exact status was publicly unknown for some time and was left to
402:
were the original owners of Tonopah Solar Energy LLC, the owner and operator of the Crescent Dunes plant. The Crescent Dunes project was subsequently backed by a $ 737 million in U.S. government loan guarantees and by Tonopah partnering with Cobra Thermosolar Plants, Inc. The overall venture had a
981:
The first three months of 2019 (January, February and March) showed good progression, topping all previous monthly data, but in April the plant was shut down because the project's sole buyer, NV Energy, terminated the Power Purchase Agreement for failure to produce the contracted power production.
526:
Excess thermal energy is stored in the molten salt and could be used to generate power for up to ten hours, including during the evening hours and when direct sunlight is not available. The storage technology thus eliminated the need for any backup fossil fuels, such as natural gas. Melting about
490:
Tonopah Solar Energy filed for bankruptcy on July 30, 2020. Pending the approval of the bankruptcy court, a $ 200 million settlement with the remaining debtors — Tonopah Solar Energy LLC and ACS Cobra — for the return of taxpayer dollars was also announced at the end of July 2020. The amount is
535:
Crescent Dunes was the first large (110 MW) tower CSP with thermal storage. While storage tanks of trough CSP operate at 400 °C (752 °F), Crescent Dunes operated the storage tank at almost 600 °C (1,112 °F), while keeping 280 °C (536 °F) as base (cold) temperature.
474:
Ground was broken on the project in September 2011. Construction terminated at the end of 2013, followed by several months of testing the plant systems. The project entered commissioning phase in February 2014 following completion of construction. It began operation in September 2015, but went
536:
Higher temperatures differences result in a greater expansion of the tank floor, generating greater compressive forces around the floor plate. At very large diameters, as the big tank of Crescent Dunes, that resulted in a high probability of failure under cycling loading.
990:. Truly levelized cost comparisons must include the capacity payments for generating capacity available to supply power during peak hours. By doing so, low-to-high hourly wholesale electricity prices have been shown to vary by up to four orders of magnitude. 982:
The power generated also cost NV Energy about $ 135 per megawatt-hour, compared with less than $ 30 per MWh available from a new Nevada photovoltaic solar farm. But to compare fairly, it must be taken into account that the Tonopah solar project power is
1378:... major decisions — such as bankruptcy proceedings — require a unanimous vote from the managers, the lawsuit alleges that the Energy Department can determine the fate of Tonopah Solar Energy without any representation of SolarReserve on the board 1334:
Bloomberg reports that even though the plant shut down in April 2019, NV Energy was not allowed to sever its agreement with the plant until late in 2019, after the DoE was forced to take over the shuttered plant in August. SolarReserve took the DoE to
478:
The plant having last produced power in April 2019, NV Energy—the project's sole customer—terminated its contract in October 2019 on the basis of the project having "failed to produce." Alleging a takeover of Tonopah Solar Energy by the
544:
Crescent Dunes began operation in September 2015, but went off-line in October 2016 due to a leak in a molten salt tank. It returned to operation in July 2017. While its average monthly production was expected to exceed 40,000
410:
While proceeding through its subsequent bankruptcy proceedings, Tonopah Solar Energy stated that it had hopes for a restart of the Crescent Dunes plant by the end of 2020. According to court documents, Tonopah is owned by
2148: 2114: 390:
and Gemasolar in Spain at 50 MW. As of 2023, it is operated by its new owner; ACS, and in a new contract with NV Energy, it now supplies solar energy at night only, drawing on thermal energy stored each day.
1004: 2338: 1471: 1365: 515:, which carried out the engineering design, procured the equipment and materials necessary, and then constructed and delivered the facility to Tonopah Solar Energy. The project includes 10,347 2255: 2283: 2353: 427:
was confirmed by the court. As one result of this plan's confirmation, Cobra now has operational control of the plant. In July 2021, the project restarted production for NV Energy.
2298: 2293: 2155: 1137: 527:
70,000,000 pounds (32,000,000 kg) of salt took two months. Once melted, the salt stays melted for the life of the plant and is cycled through the receiver for reheating.
1905: 2368: 1787: 2659: 2373: 1452: 2333: 2328: 2118: 1775: 2313: 1506: 1174: 3629: 1934: 1028: 1554: 1016: 1420: 1313: 1834: 339: 1801: 1209: 3597: 2288: 1609: 1353: 969:
of a new thermal plant requires up to four years to achieve 100% operating level, from the first grid connection to full production. As an example the
1421:"The closure of SolarReserve, an isolated case of the concentrated solar power industry | REVE News of the wind sector in Spain and in the world" 1982: 1581: 1434: 1390: 3634: 2323: 1639: 1272: 3251: 2278: 2652: 2050: 329: 2141: 1489: 69: 1758: 1744: 1670: 1537: 3151: 3086: 2308: 2303: 1887: 3585: 2645: 508: 1010:
2012 January – The solar tower under construction as seen from a commercial airliner. The titular Crescent Dunes are at lower right.
1597:
Harry Reid, then the Senate majority leader and senior senator from Nevada, cleared the way for the company to build on public land
1290: 424: 3624: 2621: 1860: 519:
that collect and focus the sun's thermal energy to heat molten salt flowing through an approximately 656-foot (200 m) tall
467:, all power generated by the Crescent Dunes project in the next 25 years would have been sold to NV Energy for $ 0.135 per 3141: 1084: 1968: 423:
On September 11, 2020, the bankruptcy court approved Tonopah Solar Energy's disclosure statement. On December 3, 2020, the
3535: 2986: 2078: 1162: 1079: 3545: 3540: 3166: 2745: 1472:"NV Energy sends termination notice to massive Tonopah solar project, developer accuses Energy Department of taking over" 3126: 2444: 2434: 2358: 2225: 1697: 1239: 1213: 1182: 480: 452: 1942: 383: 3121: 2930: 2235: 2230: 1913: 1321: 3231: 3226: 2971: 2668: 2626: 2470: 2465: 3241: 3196: 3011: 3006: 2935: 2220: 2195: 2021: 1111: 970: 3291: 3216: 3061: 3046: 3026: 2459: 2424: 2273: 2240: 2190: 3619: 3131: 3031: 2895: 2860: 2245: 1617: 1523: 3136: 3106: 2940: 2840: 2800: 2562: 3211: 3116: 3091: 2976: 2966: 2900: 2890: 2885: 2865: 2684: 2554: 2439: 2343: 3261: 1647: 3271: 3156: 3081: 3071: 2815: 2730: 2348: 1158: 3399: 3236: 3191: 3111: 3036: 2850: 2845: 2720: 2201: 1726: 1210:"Energy Department Finalizes $ 737 Million Loan Guarantee to Tonopah Solar Energy for Nevada Project" 987: 2054: 3181: 2945: 2905: 2810: 2785: 2449: 1675: 460: 379: 188: 2070: 3639: 3519: 3464: 3101: 3051: 3001: 2925: 2875: 2855: 2830: 2820: 2805: 2795: 2780: 2760: 2735: 2725: 2715: 2498: 1069: 983: 208: 2115:"American Recovery and Reinvestment Act (ARRA) Loans - Award Summary: Tonopah Solar Energy, LLC" 2001:"(PDF) Comparing the Costs of Intermittent and Dispatchable Electricity Generating Technologies" 1260: 499: 435: 308: 30: 3296: 3281: 3161: 3146: 3056: 3041: 2950: 2920: 2825: 2765: 2740: 2710: 2700: 2600: 387: 3414: 3266: 3096: 2981: 2880: 2835: 2775: 2750: 2705: 2592: 2480: 2250: 966: 127: 3561: 3286: 3256: 3171: 3021: 2991: 2910: 2790: 2755: 2508: 2184: 1089: 1055: 549:, as of May 2019 it never reached that value and only exceeded half of it during 9 months. 455:(DOE) and the right to build on public land. The capital stack included $ 170,000,000 in 8: 3332: 2915: 2870: 2770: 2516: 1507:"Post bankruptcy, Crescent Dunes CSP plant owner wants project back online by year's end" 399: 363: 2094: 1802:"Energy Department Poised to Lose Up to $ 225 Million on Solar Project Bankruptcy - WSJ" 3201: 3176: 2531: 2133: 273: 57: 1955:... thermal plants require up to four years to ramp-up to 100% operating level... 2996: 2178: 2000: 1555:"Solar plant near Tonopah producing power for NV Energy after stop during bankruptcy" 520: 375: 201: 3276: 3186: 2637: 2454: 2265: 1034:
2024 August - Crescent Dunes Solar Energy Project as seen from commerical airliner
530: 3322: 3221: 3076: 2605: 2539: 2475: 2363: 1788:"Tonopah solar project part of $ 200M settlement | Las Vegas Review-Journal" 420: 371: 286: 53: 1273:"US Taxpayer Backed Tonopah Solar Energy Files for Bankruptcy Protection - SWFI" 459:
investment through SolarReserve/ACS Cobra partner CMB Regional Centers. Under a
3566: 3434: 3382: 3342: 3337: 3206: 1361: 448: 298: 3613: 3499: 3424: 3347: 3312: 3016: 2544: 2521: 2419: 2414: 2383: 2318: 1835:"No drama as SolarReserve commissions world's largest CSP tower with storage" 468: 84: 71: 1819: 1776:
SOLARRESERVE CSP HOLDINGS vs.TONOPAH SOLAR ENERGY, LLC - Docket No.2019-0791
1453:"EDITORIAL: Future of Crescent Dunes solar plant near Tonopah appears bleak" 1235: 3504: 3469: 3444: 3377: 3362: 3317: 412: 395: 159: 447:
In late September 2011 Tonopah Solar Energy received a $ 737 million
415:, Cobra Energy Investment LLC, a division of Spanish construction company 3509: 3459: 3419: 3394: 3372: 3357: 2679: 2406: 2212: 348: 3409: 3389: 3246: 2490: 2396: 2170: 2025: 1698:"Crescent Dunes Solar Energy Project, Nevada, United States of America" 1391:"America's Concentrated Solar Power Companies Have All but Disappeared" 1291:"DOE Races Against the Clock: Two Solar Loans Closed, Seven More to Go" 484: 3484: 3474: 3449: 3429: 2391: 1138:"VINCI completes the acquisition of ACS's energy business (Cobra IS)" 516: 512: 483:, SolarReserve then raised the possibility of the project filing for 464: 456: 440: 416: 1969:"Salt leak shuts down Crescent Dunes Concentrated Solar Power plant" 1724: 1063: 3489: 3479: 3367: 3327: 1983:"A $ 1 Billion Solar Plant Was Obsolete Before It Ever Went Online" 1582:"A $ 1 Billion Solar Plant Was Obsolete Before It Ever Went Online" 1435:"A $ 1 Billion Solar Plant Was Obsolete Before It Ever Went Online" 367: 279: 170: 1888:"SolarReserve still falling short at flagship solar tower project" 1671:"Nevada solar project to get $ 737 million federal loan guarantee" 1538:"Del. Court Confirms $ 1B Nev. Solar Plant's Ch. 11 Plan - Law360" 1490:"Bankrupt Solar Project Owner Hopes for Year-End Restart - Law360" 1022:
2014 December – Completed site as seen from a commercial airliner.
3439: 3404: 2582: 2577: 2572: 2567: 1759:"Will DOE take the Crescent Dunes solar project into bankruptcy?" 1354:"Tonopah solar plant could end up in bankruptcy, developer says" 3514: 3494: 3454: 3352: 1935:"EuroTrough Helped Cut Ramp-Up Time of China's 100 MW Urat CSP" 531:
The thermal storage high-temperature salt tank buckling failure
266: 386:
technology at full scale (110 MW), following the experimental
1314:"The $ 1 Billion Solar Plant Is an Obsolete, Expensive Flop" 1466: 1464: 1462: 370:(MW) and 1.1 gigawatt-hours of energy storage located near 1725:
National Renewable Energy Laboratory (November 10, 2015).
1745:"Nevada solar plant back online after eight-month outage" 546: 2163: 1742: 1459: 1579: 382:(CSP) plant with a central receiver tower and advanced 1352:
Schulz, Bailey (October 7, 2019). Cook, Glenn (ed.).
398:(created via seed funding), US Renewables Group, and 2667: 1045: 1861:"In Tower CSP, thermal storage had issues at first" 1751: 2117:. Recovery.gov. September 21, 2011. Archived from 1383: 1140:(Press release). globalnewswire. December 31, 2021 553:Generation (MW·h) of Crescent Dunes Solar Energy 503:Sunlight heating molten salt in the central tower 3611: 1284: 1282: 1204: 1202: 1200: 993:In July 2021, the project restarted production. 366:project with an installed capacity of 110  3630:Buildings and structures in Nye County, Nevada 1662: 1518: 1516: 1112:"Crescent Dunes 24-Hour Solar Tower Is Online" 2653: 2149: 1580:Chris Martin; Nic Querolo (January 6, 2020). 1501: 1499: 1279: 1212:(Press release). Loan Programs Office (LPO), 1197: 374:, about 190 miles (310 km) northwest of 1415: 1413: 1411: 1236:"Crescent Dunes: Project Under Construction" 16:Solar power station in Nevada, United States 1524:"Tonopah Solar Energy files for bankruptcy" 1513: 2660: 2646: 2156: 2142: 1743:Las Vegas Review-Journal (July 21, 2017). 1496: 1347: 1345: 1343: 1175:"Crescent Dunes Solar Thermal Power Plant" 1668: 1408: 425:Chapter 11 bankruptcy reorganization plan 378:. Crescent Dunes is the first commercial 1106: 1104: 498: 434: 3635:Energy infrastructure completed in 2016 2622:Goodsprings Waste Heat Recovery Station 1669:Tetreault, Steve (September 28, 2011). 1549: 1547: 1340: 1311: 340:Related media on Commons 104:Post-bankruptcy reorganization, restart 3612: 1966: 1906:"Crescent Dunes Solar Energy, Monthly" 1885: 1832: 1351: 1320:. Hearst Digital Media. Archived from 1312:Delbert, Caroline (January 10, 2020). 1305: 1288: 2641: 2137: 2071:"Crescent Dunes Solar Energy Project" 2051:"Crescent Dunes Solar Energy Project" 1738: 1736: 1727:"Crescent Dunes Solar Energy Project" 1720: 1718: 1101: 1085:Renewable energy in the United States 3592: 3536:American Council on Renewable Energy 2164:Energy resource facilities in Nevada 2095:"SolarReserve, LLC (Crescent Dunes)" 2079:National Renewable Energy Laboratory 1544: 1368:from the original on October 8, 2019 1163:National Renewable Energy Laboratory 1080:List of solar thermal power stations 3546:Solar Energy Industries Association 3541:Interstate Renewable Energy Council 2053:. SolarReserve, LLC. Archived from 1289:Wesoff, Eric (September 29, 2011). 1159:Crescent Dunes Solar Energy Project 360:Crescent Dunes Solar Energy Project 24:Crescent Dunes Solar Energy Project 13: 2075:Concentrating Solar Power Projects 1886:Leitch, David (February 8, 2018). 1841:. FC Business Intelligence Limited 1733: 1715: 1261:What happened with Crescent Dunes? 453:United States Department of Energy 14: 3651: 2043: 1914:Energy Information Administration 3591: 3580: 3579: 2669:Solar power in the United States 2627:List of power stations in Nevada 1062: 1048: 1027: 1015: 1003: 29: 2014: 1993: 1975: 1960: 1927: 1898: 1879: 1853: 1839:CSP Today Business Intelligence 1826: 1812: 1794: 1780: 1769: 1690: 1632: 1602: 1573: 1530: 1482: 1445: 1427: 463:(PPA) between SolarReserve and 394:Startup energy venture company 3625:Solar power stations in Nevada 1833:Hashem, Heba (April 4, 2014). 1265: 1254: 1238:. Loan Programs Office (LPO), 1228: 1167: 1152: 1130: 218:Total collector area 1: 2081:(NREL), DOE. January 20, 2011 986:whilst photovoltaic power is 539: 494: 1941:. SolarPACES. Archived from 221:296 acres (1,200,000 m) 7: 2685:Energy in the United States 1610:"Group IX – Crescent Dunes" 1039: 976: 971:Edwardsport production data 303:196 GW·h over 1 year (2018) 299:Annual net output 158:Tonopah Solar Energy, LLC ( 114:; 13 years ago 10: 3656: 996: 794: 430: 384:molten salt energy storage 134:; 8 years ago 3575: 3554: 3528: 3305: 2959: 2693: 2675: 2614: 2591: 2553: 2530: 2507: 2489: 2405: 2382: 2264: 2211: 2202:White Pine Energy Station 2169: 1216:(DOE). September 28, 2011 805: 783: 345: 335: 325: 320: 307: 297: 285: 272: 250: 246: 241: 237:1,670 acres (676 ha) 233: 225: 217: 207: 197: 181: 176: 166: 154: 146: 126: 108: 100: 63: 49: 41: 37: 28: 23: 2279:Blue Mountain Faulkner 1 1910:Electricity Data Browser 1676:Las Vegas Review-Journal 1318:www.popularmechanics.com 1242:(DOE). September 1, 2015 1095: 461:power purchase agreement 380:concentrated solar power 263:Make and model 3520:8minutenergy Renewables 3465:Stirling Energy Systems 2499:Spring Valley Wind Farm 1070:Renewable energy portal 274:Nameplate capacity 109:Construction began 2601:Marketplace substation 1476:The Nevada Independent 1395:www.greentechmedia.com 1181:. 2016. Archived from 504: 444: 255:Units operational 147:Construction cost 2509:Natural gas pipelines 1640:"Nhóm XI – ACS Cobra" 1358:www.reviewjournal.com 806:Production suspended 795:Production suspended 784:Production suspended 502: 438: 421:Banco Santander, S.A. 309:Storage capacity 242:Power generation 213:10347 × 115.72 m 3620:Solar thermal energy 3562:Community solar farm 2028:on February 21, 2021 1945:on December 19, 2021 1090:Solar thermal energy 1056:United States portal 287:Capacity factor 229:2,685 kW·h/m/yr 128:Commission date 2532:Petroleum pipelines 2517:Kern River Pipeline 1806:Wall Street Journal 1423:. February 7, 2020. 1324:on January 21, 2021 1118:. February 22, 2016 554: 439:Workers installing 400:United Technologies 364:solar thermal power 321:External links 198:CSP technology 85:38.2333°N 117.367°W 81: /  3232:Silver State South 3227:Silver State North 3127:Imperial SEC South 3067:Crescent Dunes CSP 2555:Transmission lines 2471:Silver State South 2466:Silver State North 2057:on August 14, 2017 1989:. January 6, 2020. 1967:Santamarta, Jose. 1939:www.solarpaces.org 1865:www.solarpaces.org 1765:. October 7, 2019. 1644:www.cmbeb5visa.com 1614:www.cmbeb5visa.com 1561:. October 14, 2021 1478:. October 6, 2019. 1455:. October 9, 2019. 1441:. January 6, 2020. 552: 505: 445: 226:Site resource 58:Nye County, Nevada 3607: 3606: 3122:Imperial SEC West 3032:California Valley 2635: 2634: 2359:Steamboat Springs 2284:Brady Hot Springs 2256:Walter M. Higgins 2179:Ely Energy Center 1650:on March 28, 2017 1620:on March 28, 2017 1509:. August 3, 2020. 1293:. Greentech Media 963: 962: 521:solar power tower 443:at Crescent Dunes 356: 355: 202:Solar power tower 90:38.2333; -117.367 3647: 3595: 3594: 3583: 3582: 3187:Nevada Solar One 3077:Desert Stateline 3027:California Flats 2662: 2655: 2648: 2639: 2638: 2455:Nevada Solar One 2339:Richard Burdette 2289:Clayton Valley 1 2158: 2151: 2144: 2135: 2134: 2130: 2128: 2126: 2121:on July 14, 2014 2110: 2108: 2106: 2090: 2088: 2086: 2066: 2064: 2062: 2038: 2037: 2035: 2033: 2024:. Archived from 2018: 2012: 2011: 2009: 2007: 1997: 1991: 1990: 1979: 1973: 1972: 1964: 1958: 1957: 1952: 1950: 1931: 1925: 1924: 1922: 1920: 1902: 1896: 1895: 1883: 1877: 1876: 1874: 1872: 1857: 1851: 1850: 1848: 1846: 1830: 1824: 1823: 1816: 1810: 1809: 1808:. July 30, 2020. 1798: 1792: 1791: 1790:. July 30, 2020. 1784: 1778: 1773: 1767: 1766: 1755: 1749: 1748: 1740: 1731: 1730: 1722: 1713: 1712: 1710: 1708: 1702:Power Technology 1694: 1688: 1687: 1685: 1683: 1666: 1660: 1659: 1657: 1655: 1646:. Archived from 1636: 1630: 1629: 1627: 1625: 1616:. Archived from 1606: 1600: 1599: 1594: 1592: 1577: 1571: 1570: 1568: 1566: 1551: 1542: 1541: 1534: 1528: 1527: 1526:. July 30, 2020. 1520: 1511: 1510: 1503: 1494: 1493: 1486: 1480: 1479: 1468: 1457: 1456: 1449: 1443: 1442: 1431: 1425: 1424: 1417: 1406: 1405: 1403: 1401: 1387: 1381: 1380: 1375: 1373: 1349: 1338: 1337: 1331: 1329: 1309: 1303: 1302: 1300: 1298: 1286: 1277: 1276: 1269: 1263: 1258: 1252: 1251: 1249: 1247: 1232: 1226: 1225: 1223: 1221: 1206: 1195: 1194: 1192: 1190: 1171: 1165: 1156: 1150: 1149: 1147: 1145: 1134: 1128: 1127: 1125: 1123: 1108: 1072: 1067: 1066: 1058: 1053: 1052: 1051: 1031: 1019: 1007: 555: 551: 349:edit on Wikidata 177:Solar farm 142: 140: 135: 122: 120: 115: 96: 95: 93: 92: 91: 86: 82: 79: 78: 77: 74: 33: 21: 20: 3655: 3654: 3650: 3649: 3648: 3646: 3645: 3644: 3610: 3609: 3608: 3603: 3571: 3550: 3524: 3415:Practical Solar 3301: 3222:Sierra SunTower 3212:San Luis Valley 3132:Imperial Valley 3082:Desert Sunlight 3072:Davidson County 3062:Copper Mountain 2977:Antelope Valley 2955: 2689: 2671: 2666: 2636: 2631: 2610: 2606:Mead substation 2587: 2549: 2540:Calnev Pipeline 2526: 2503: 2485: 2435:Edward W. Clark 2425:Copper Mountain 2401: 2378: 2354:Steamboat Hills 2260: 2226:Edward W. Clark 2207: 2165: 2162: 2124: 2122: 2113: 2104: 2102: 2093: 2084: 2082: 2069: 2060: 2058: 2049: 2046: 2041: 2031: 2029: 2022:"MIT Economics" 2020: 2019: 2015: 2005: 2003: 1999: 1998: 1994: 1981: 1980: 1976: 1965: 1961: 1948: 1946: 1933: 1932: 1928: 1918: 1916: 1904: 1903: 1899: 1884: 1880: 1870: 1868: 1867:. April 4, 2023 1859: 1858: 1854: 1844: 1842: 1831: 1827: 1818: 1817: 1813: 1800: 1799: 1795: 1786: 1785: 1781: 1774: 1770: 1763:pv magazine USA 1757: 1756: 1752: 1741: 1734: 1723: 1716: 1706: 1704: 1696: 1695: 1691: 1681: 1679: 1667: 1663: 1653: 1651: 1638: 1637: 1633: 1623: 1621: 1608: 1607: 1603: 1590: 1588: 1578: 1574: 1564: 1562: 1553: 1552: 1545: 1536: 1535: 1531: 1522: 1521: 1514: 1505: 1504: 1497: 1488: 1487: 1483: 1470: 1469: 1460: 1451: 1450: 1446: 1433: 1432: 1428: 1419: 1418: 1409: 1399: 1397: 1389: 1388: 1384: 1371: 1369: 1350: 1341: 1327: 1325: 1310: 1306: 1296: 1294: 1287: 1280: 1271: 1270: 1266: 1259: 1255: 1245: 1243: 1240:Dept. of Energy 1234: 1233: 1229: 1219: 1217: 1214:Dept. of Energy 1208: 1207: 1198: 1188: 1186: 1185:on June 4, 2016 1173: 1172: 1168: 1157: 1153: 1143: 1141: 1136: 1135: 1131: 1121: 1119: 1110: 1109: 1102: 1098: 1076: 1075: 1068: 1061: 1054: 1049: 1047: 1042: 1035: 1032: 1023: 1020: 1011: 1008: 999: 979: 542: 533: 497: 433: 352: 316: 292: 291:51.9% (planned) 193: 138: 136: 133: 118: 116: 113: 89: 87: 83: 80: 75: 72: 70: 68: 67: 17: 12: 11: 5: 3653: 3643: 3642: 3640:2016 in Nevada 3637: 3632: 3627: 3622: 3605: 3604: 3602: 3601: 3589: 3576: 3573: 3572: 3570: 3569: 3567:PACE financing 3564: 3558: 3556: 3552: 3551: 3549: 3548: 3543: 3538: 3532: 3530: 3526: 3525: 3523: 3522: 3517: 3512: 3507: 3502: 3497: 3492: 3487: 3482: 3477: 3472: 3467: 3462: 3457: 3452: 3447: 3442: 3437: 3435:Solar Frontier 3432: 3427: 3422: 3417: 3412: 3407: 3402: 3397: 3392: 3387: 3386: 3385: 3375: 3370: 3365: 3360: 3355: 3350: 3345: 3343:Enphase Energy 3340: 3338:Canadian Solar 3335: 3330: 3325: 3320: 3315: 3309: 3307: 3303: 3302: 3300: 3299: 3294: 3289: 3284: 3279: 3274: 3269: 3264: 3259: 3254: 3249: 3244: 3239: 3234: 3229: 3224: 3219: 3214: 3209: 3204: 3199: 3194: 3192:Panoche Valley 3189: 3184: 3179: 3174: 3169: 3164: 3159: 3154: 3149: 3144: 3139: 3134: 3129: 3124: 3119: 3114: 3109: 3104: 3099: 3094: 3089: 3084: 3079: 3074: 3069: 3064: 3059: 3054: 3049: 3044: 3039: 3034: 3029: 3024: 3019: 3014: 3009: 3004: 2999: 2994: 2989: 2984: 2979: 2974: 2969: 2963: 2961: 2957: 2956: 2954: 2953: 2948: 2943: 2938: 2933: 2928: 2923: 2918: 2913: 2908: 2903: 2898: 2896:South Carolina 2893: 2888: 2883: 2878: 2873: 2868: 2863: 2861:North Carolina 2858: 2853: 2848: 2843: 2838: 2833: 2828: 2823: 2818: 2813: 2808: 2803: 2798: 2793: 2788: 2783: 2778: 2773: 2768: 2763: 2758: 2753: 2748: 2743: 2738: 2733: 2728: 2723: 2718: 2713: 2708: 2703: 2697: 2695: 2691: 2690: 2688: 2687: 2682: 2676: 2673: 2672: 2665: 2664: 2657: 2650: 2642: 2633: 2632: 2630: 2629: 2624: 2618: 2616: 2612: 2611: 2609: 2608: 2603: 2597: 2595: 2589: 2588: 2586: 2585: 2580: 2575: 2570: 2565: 2559: 2557: 2551: 2550: 2548: 2547: 2542: 2536: 2534: 2528: 2527: 2525: 2524: 2519: 2513: 2511: 2505: 2504: 2502: 2501: 2495: 2493: 2487: 2486: 2484: 2483: 2478: 2473: 2468: 2463: 2457: 2452: 2447: 2442: 2437: 2432: 2430:Crescent Dunes 2427: 2422: 2417: 2411: 2409: 2403: 2402: 2400: 2399: 2394: 2388: 2386: 2380: 2379: 2377: 2376: 2371: 2366: 2361: 2356: 2351: 2346: 2341: 2336: 2331: 2326: 2324:McGinnis Hills 2321: 2316: 2311: 2306: 2301: 2296: 2291: 2286: 2281: 2276: 2270: 2268: 2262: 2261: 2259: 2258: 2253: 2248: 2243: 2238: 2236:Frank A. Tracy 2233: 2231:Fort Churchill 2228: 2223: 2217: 2215: 2209: 2208: 2206: 2205: 2199: 2193: 2188: 2182: 2175: 2173: 2167: 2166: 2161: 2160: 2153: 2146: 2138: 2132: 2131: 2111: 2091: 2067: 2045: 2044:External links 2042: 2040: 2039: 2013: 1992: 1974: 1959: 1926: 1897: 1878: 1852: 1825: 1820:"POLITICO Pro" 1811: 1793: 1779: 1768: 1750: 1732: 1714: 1689: 1661: 1631: 1601: 1572: 1543: 1529: 1512: 1495: 1481: 1458: 1444: 1426: 1407: 1382: 1362:J. Keith Moyer 1339: 1304: 1278: 1264: 1253: 1227: 1196: 1166: 1151: 1129: 1099: 1097: 1094: 1093: 1092: 1087: 1082: 1074: 1073: 1059: 1044: 1043: 1041: 1038: 1037: 1036: 1033: 1026: 1024: 1021: 1014: 1012: 1009: 1002: 998: 995: 978: 975: 961: 960: 957: 954: 951: 948: 945: 942: 939: 936: 933: 930: 927: 924: 921: 917: 916: 913: 910: 907: 904: 901: 898: 895: 892: 889: 886: 883: 880: 877: 873: 872: 869: 866: 863: 860: 857: 854: 851: 848: 845: 842: 839: 836: 833: 829: 828: 825: 822: 819: 816: 813: 810: 807: 804: 800: 799: 796: 793: 789: 788: 785: 782: 779: 776: 773: 770: 766: 765: 762: 759: 756: 753: 750: 747: 744: 741: 738: 735: 732: 729: 726: 722: 721: 718: 715: 712: 709: 706: 703: 700: 697: 694: 691: 688: 685: 682: 678: 677: 674: 671: 668: 665: 662: 659: 656: 653: 650: 647: 644: 641: 638: 634: 633: 630: 627: 624: 621: 619: 617: 615: 613: 611: 609: 607: 605: 603: 599: 598: 595: 592: 589: 586: 583: 580: 577: 574: 571: 568: 565: 562: 559: 541: 538: 532: 529: 509:EPC Contractor 507:The project's 496: 493: 449:loan guarantee 432: 429: 354: 353: 346: 343: 342: 337: 333: 332: 330:Crescent Dunes 327: 323: 322: 318: 317: 314: 311: 305: 304: 301: 295: 294: 289: 283: 282: 276: 270: 269: 264: 260: 259: 256: 252: 251: 248: 247: 244: 243: 239: 238: 235: 234:Site area 231: 230: 227: 223: 222: 219: 215: 214: 211: 205: 204: 199: 195: 194: 192: 191: 185: 183: 179: 178: 174: 173: 168: 164: 163: 156: 152: 151: 148: 144: 143: 130: 124: 123: 110: 106: 105: 102: 98: 97: 65: 61: 60: 51: 47: 46: 43: 39: 38: 35: 34: 26: 25: 15: 9: 6: 4: 3: 2: 3652: 3641: 3638: 3636: 3633: 3631: 3628: 3626: 3623: 3621: 3618: 3617: 3615: 3600: 3599: 3590: 3588: 3587: 3578: 3577: 3574: 3568: 3565: 3563: 3560: 3559: 3557: 3553: 3547: 3544: 3542: 3539: 3537: 3534: 3533: 3531: 3529:Organizations 3527: 3521: 3518: 3516: 3513: 3511: 3508: 3506: 3503: 3501: 3498: 3496: 3493: 3491: 3488: 3486: 3483: 3481: 3478: 3476: 3473: 3471: 3468: 3466: 3463: 3461: 3458: 3456: 3453: 3451: 3448: 3446: 3443: 3441: 3438: 3436: 3433: 3431: 3428: 3426: 3423: 3421: 3418: 3416: 3413: 3411: 3408: 3406: 3403: 3401: 3398: 3396: 3393: 3391: 3388: 3384: 3381: 3380: 3379: 3376: 3374: 3371: 3369: 3366: 3364: 3361: 3359: 3356: 3354: 3351: 3349: 3348:EnviroMission 3346: 3344: 3341: 3339: 3336: 3334: 3331: 3329: 3326: 3324: 3321: 3319: 3316: 3314: 3311: 3310: 3308: 3304: 3298: 3295: 3293: 3290: 3288: 3285: 3283: 3280: 3278: 3275: 3273: 3270: 3268: 3265: 3263: 3260: 3258: 3255: 3253: 3250: 3248: 3245: 3243: 3240: 3238: 3235: 3233: 3230: 3228: 3225: 3223: 3220: 3218: 3215: 3213: 3210: 3208: 3205: 3203: 3200: 3198: 3195: 3193: 3190: 3188: 3185: 3183: 3180: 3178: 3175: 3173: 3170: 3168: 3165: 3163: 3160: 3158: 3155: 3153: 3150: 3148: 3145: 3143: 3140: 3138: 3135: 3133: 3130: 3128: 3125: 3123: 3120: 3118: 3115: 3113: 3110: 3108: 3105: 3103: 3100: 3098: 3095: 3093: 3090: 3088: 3085: 3083: 3080: 3078: 3075: 3073: 3070: 3068: 3065: 3063: 3060: 3058: 3055: 3053: 3050: 3048: 3045: 3043: 3040: 3038: 3035: 3033: 3030: 3028: 3025: 3023: 3020: 3018: 3015: 3013: 3010: 3008: 3005: 3003: 3000: 2998: 2995: 2993: 2990: 2988: 2985: 2983: 2980: 2978: 2975: 2973: 2970: 2968: 2967:Agua Caliente 2965: 2964: 2962: 2958: 2952: 2949: 2947: 2944: 2942: 2941:West Virginia 2939: 2937: 2934: 2932: 2929: 2927: 2924: 2922: 2919: 2917: 2914: 2912: 2909: 2907: 2904: 2902: 2899: 2897: 2894: 2892: 2889: 2887: 2884: 2882: 2879: 2877: 2874: 2872: 2869: 2867: 2864: 2862: 2859: 2857: 2854: 2852: 2849: 2847: 2844: 2842: 2841:New Hampshire 2839: 2837: 2834: 2832: 2829: 2827: 2824: 2822: 2819: 2817: 2814: 2812: 2809: 2807: 2804: 2802: 2801:Massachusetts 2799: 2797: 2794: 2792: 2789: 2787: 2784: 2782: 2779: 2777: 2774: 2772: 2769: 2767: 2764: 2762: 2759: 2757: 2754: 2752: 2749: 2747: 2744: 2742: 2739: 2737: 2734: 2732: 2729: 2727: 2724: 2722: 2719: 2717: 2714: 2712: 2709: 2707: 2704: 2702: 2699: 2698: 2696: 2692: 2686: 2683: 2681: 2678: 2677: 2674: 2670: 2663: 2658: 2656: 2651: 2649: 2644: 2643: 2640: 2628: 2625: 2623: 2620: 2619: 2617: 2613: 2607: 2604: 2602: 2599: 2598: 2596: 2594: 2590: 2584: 2581: 2579: 2576: 2574: 2571: 2569: 2566: 2564: 2561: 2560: 2558: 2556: 2552: 2546: 2545:Unev pipeline 2543: 2541: 2538: 2537: 2535: 2533: 2529: 2523: 2522:Ruby Pipeline 2520: 2518: 2515: 2514: 2512: 2510: 2506: 2500: 2497: 2496: 2494: 2492: 2488: 2482: 2479: 2477: 2474: 2472: 2469: 2467: 2464: 2461: 2458: 2456: 2453: 2451: 2448: 2446: 2445:Mountain View 2443: 2441: 2438: 2436: 2433: 2431: 2428: 2426: 2423: 2421: 2418: 2416: 2413: 2412: 2410: 2408: 2404: 2398: 2395: 2393: 2390: 2389: 2387: 2385: 2384:Hydroelectric 2381: 2375: 2372: 2370: 2367: 2365: 2362: 2360: 2357: 2355: 2352: 2350: 2347: 2345: 2342: 2340: 2337: 2335: 2332: 2330: 2327: 2325: 2322: 2320: 2319:Jersey Valley 2317: 2315: 2312: 2310: 2307: 2305: 2302: 2300: 2297: 2295: 2292: 2290: 2287: 2285: 2282: 2280: 2277: 2275: 2272: 2271: 2269: 2267: 2263: 2257: 2254: 2252: 2249: 2247: 2244: 2242: 2239: 2237: 2234: 2232: 2229: 2227: 2224: 2222: 2219: 2218: 2216: 2214: 2210: 2203: 2200: 2197: 2194: 2192: 2189: 2186: 2183: 2180: 2177: 2176: 2174: 2172: 2168: 2159: 2154: 2152: 2147: 2145: 2140: 2139: 2136: 2120: 2116: 2112: 2105:September 16, 2100: 2096: 2092: 2085:September 29, 2080: 2076: 2072: 2068: 2056: 2052: 2048: 2047: 2027: 2023: 2017: 2006:September 17, 2002: 1996: 1988: 1984: 1978: 1970: 1963: 1956: 1944: 1940: 1936: 1930: 1915: 1911: 1907: 1901: 1893: 1889: 1882: 1866: 1862: 1856: 1840: 1836: 1829: 1821: 1815: 1807: 1803: 1797: 1789: 1783: 1777: 1772: 1764: 1760: 1754: 1746: 1739: 1737: 1728: 1721: 1719: 1703: 1699: 1693: 1682:September 29, 1678: 1677: 1672: 1665: 1649: 1645: 1641: 1635: 1619: 1615: 1611: 1605: 1598: 1587: 1583: 1576: 1560: 1556: 1550: 1548: 1539: 1533: 1525: 1519: 1517: 1508: 1502: 1500: 1491: 1485: 1477: 1473: 1467: 1465: 1463: 1454: 1448: 1440: 1439:Bloomberg.com 1436: 1430: 1422: 1416: 1414: 1412: 1400:September 17, 1396: 1392: 1386: 1379: 1367: 1363: 1360:. Las Vegas: 1359: 1355: 1348: 1346: 1344: 1336: 1323: 1319: 1315: 1308: 1297:September 29, 1292: 1285: 1283: 1274: 1268: 1262: 1257: 1241: 1237: 1231: 1215: 1211: 1205: 1203: 1201: 1184: 1180: 1176: 1170: 1164: 1160: 1155: 1139: 1133: 1117: 1116:CleanTechnica 1113: 1107: 1105: 1100: 1091: 1088: 1086: 1083: 1081: 1078: 1077: 1071: 1065: 1060: 1057: 1046: 1030: 1025: 1018: 1013: 1006: 1001: 1000: 994: 991: 989: 985: 974: 972: 968: 967:commissioning 958: 955: 952: 949: 946: 943: 940: 937: 934: 931: 928: 925: 922: 919: 918: 914: 911: 908: 905: 902: 899: 896: 893: 890: 887: 884: 881: 878: 875: 874: 870: 867: 864: 861: 858: 855: 852: 849: 846: 843: 840: 837: 834: 831: 830: 826: 823: 820: 817: 814: 811: 808: 802: 801: 797: 791: 790: 786: 780: 777: 774: 771: 768: 767: 763: 760: 757: 754: 751: 748: 745: 742: 739: 736: 733: 730: 727: 724: 723: 719: 716: 713: 710: 707: 704: 701: 698: 695: 692: 689: 686: 683: 680: 679: 675: 672: 669: 666: 663: 660: 657: 654: 651: 648: 645: 642: 639: 636: 635: 631: 628: 625: 622: 620: 618: 616: 614: 612: 610: 608: 606: 604: 601: 600: 596: 593: 590: 587: 584: 581: 578: 575: 572: 569: 566: 563: 560: 557: 556: 550: 548: 537: 528: 524: 522: 518: 514: 510: 501: 492: 488: 486: 482: 476: 472: 470: 469:kilowatt-hour 466: 462: 458: 454: 450: 442: 437: 428: 426: 422: 418: 414: 408: 404: 401: 397: 392: 389: 385: 381: 377: 373: 369: 365: 361: 350: 344: 341: 338: 334: 331: 328: 324: 319: 312: 310: 306: 302: 300: 296: 290: 288: 284: 281: 277: 275: 271: 268: 265: 262: 261: 257: 254: 253: 249: 245: 240: 236: 232: 228: 224: 220: 216: 212: 210: 206: 203: 200: 196: 190: 187: 186: 184: 180: 175: 172: 169: 165: 161: 157: 153: 150:$ 975 million 149: 145: 131: 129: 125: 111: 107: 103: 99: 94: 66: 62: 59: 55: 52: 48: 45:United States 44: 40: 36: 32: 27: 22: 19: 3596: 3584: 3505:Tesla Energy 3470:Sundog Solar 3445:SolarReserve 3363:Global Solar 3333:BrightSource 3272:Three Cedars 3177:Mount Signal 3066: 2960:Power plants 2901:South Dakota 2891:Rhode Island 2886:Pennsylvania 2866:North Dakota 2429: 2334:Pumpernickel 2329:North Valley 2299:Dixie Valley 2221:Chuck Lenzie 2196:Reid Gardner 2123:. Retrieved 2119:the original 2103:. Retrieved 2098: 2083:. Retrieved 2074: 2059:. Retrieved 2055:the original 2030:. Retrieved 2026:the original 2016: 2004:. Retrieved 1995: 1986: 1977: 1962: 1954: 1947:. Retrieved 1943:the original 1938: 1929: 1919:December 17, 1917:. Retrieved 1909: 1900: 1892:RenewEconomy 1891: 1881: 1869:. Retrieved 1864: 1855: 1843:. Retrieved 1838: 1828: 1814: 1805: 1796: 1782: 1771: 1762: 1753: 1707:December 29, 1705:. Retrieved 1701: 1692: 1680:. Retrieved 1674: 1664: 1652:. Retrieved 1648:the original 1643: 1634: 1622:. Retrieved 1618:the original 1613: 1604: 1596: 1589:. Retrieved 1585: 1575: 1563:. Retrieved 1558: 1532: 1484: 1475: 1447: 1438: 1429: 1398:. Retrieved 1394: 1385: 1377: 1372:February 26, 1370:. Retrieved 1357: 1333: 1326:. Retrieved 1322:the original 1317: 1307: 1295:. Retrieved 1267: 1256: 1244:. Retrieved 1230: 1218:. Retrieved 1187:. Retrieved 1183:the original 1178: 1169: 1154: 1142:. Retrieved 1132: 1120:. Retrieved 1115: 992: 988:intermittent 984:dispatchable 980: 964: 543: 534: 525: 506: 489: 477: 473: 446: 413:SolarReserve 409: 407:conjecture. 405: 396:SolarReserve 393: 359: 357: 293:20.3% (2018) 160:SolarReserve 18: 3460:StratoSolar 3373:Grape Solar 3358:First Solar 3292:White House 3282:Webberville 3252:Space Coast 3147:Long Island 3137:Ivanpah CSP 3037:Campo Verde 3012:Blythe Mesa 2987:Avra Valley 2816:Mississippi 2731:Connecticut 2680:Solar power 2593:Substations 2462:(cancelled) 2314:Homestretch 2294:Desert Peak 2241:Harry Allen 2204:(cancelled) 2191:North Valmy 2181:(cancelled) 2032:January 14, 1949:February 8, 1591:February 5, 1565:November 7, 1328:January 27, 1246:January 17, 1179:Grupo COBRA 167:Operator(s) 88: / 76:117°22′01″W 64:Coordinates 3614:Categories 3390:HelioPower 3247:Solar Star 3237:Solana CSP 3217:San Isabel 3172:Mojave CSP 3152:Martin CSP 3142:Kimberlina 3097:Enterprise 2931:Washington 2851:New Mexico 2846:New Jersey 2721:California 2563:One Nevada 2476:Stillwater 2397:Hoover Dam 2364:Stillwater 2344:San Emidio 2266:Geothermal 2246:Silverhawk 2171:Coal fired 2101:. LPO, DOE 1871:August 10, 540:Production 517:heliostats 495:Technology 485:bankruptcy 441:heliostats 313:1,100 MW·h 209:Collectors 73:38°14′00″N 3485:Sungevity 3475:SunEdison 3450:SoloPower 3430:SolarEdge 3306:Companies 3287:Westlands 3257:Springbok 3197:Red Hills 3102:Escalante 3092:El Dorado 3047:Centinela 3002:Blue Wing 2946:Wisconsin 2906:Tennessee 2811:Minnesota 2786:Louisiana 2460:Sandstone 2440:El Dorado 2392:Davis Dam 2369:Tuscarora 2349:Soda Lake 2213:Gas fired 2061:April 28, 1987:Bloomberg 1654:March 27, 1624:March 27, 1586:Bloomberg 513:ACS Cobra 465:NV Energy 451:from the 417:ACS Group 388:Solar Two 376:Las Vegas 3586:Category 3490:SunPower 3480:Sunetric 3368:GoodLeap 3328:BP Solar 3207:Roserock 3162:Mesquite 3112:Holaniku 3057:Comanche 3052:Cimarron 3042:Catalina 3022:Brockton 2926:Virginia 2876:Oklahoma 2856:New York 2831:Nebraska 2821:Missouri 2806:Michigan 2796:Maryland 2781:Kentucky 2761:Illinois 2736:Delaware 2726:Colorado 2716:Arkansas 2694:By state 2309:Galena 3 2304:Galena 2 2198:(closed) 2187:(closed) 2099:Projects 1366:Archived 1144:July 17, 1122:June 15, 1040:See also 977:Shutdown 871:100,666 764:195,810 676:127,338 368:megawatt 171:Vinci SA 155:Owner(s) 50:Location 3598:Commons 3500:Suntech 3440:Solaren 3425:Skyline 3405:Miasole 3313:Abengoa 3297:Wyandot 3267:Techren 3202:Redwood 3107:Genesis 3017:Boulder 2972:Alamosa 2951:Wyoming 2921:Vermont 2826:Montana 2766:Indiana 2746:Georgia 2741:Florida 2711:Arizona 2701:Alabama 2583:Path 64 2578:Path 62 2573:Path 46 2568:Path 27 2420:Boulder 2374:Wabuska 2274:Beowawe 2125:July 2, 1220:July 2, 1189:May 26, 997:Gallery 915:80,236 827:74,721 787:50,168 720:42,029 431:History 372:Tonopah 336:Commons 326:Website 137: ( 117: ( 54:Tonopah 42:Country 3515:Yingli 3495:Sunrun 3455:Sopogy 3410:Mosaic 3400:Maxeon 3383:Qcells 3378:Hanwha 3353:eSolar 3318:Ascent 3262:Sunset 3182:Nellis 3117:Hooper 3087:DeSoto 3007:Blythe 2992:Beacon 2982:Avenal 2881:Oregon 2836:Nevada 2776:Kansas 2751:Hawaii 2706:Alaska 2481:Toquop 2450:Nellis 2251:Toquop 2185:Mohave 1845:May 6, 1335:court. 938:26,227 935:20,968 932:13,516 912:6,067 909:10,590 906:18,060 903:13,784 900:14,563 868:7,475 865:10,590 862:24,710 859:22,166 838:12,238 835:14,635 824:5,088 821:17,489 818:11,929 815:20,796 812:15,445 778:20,041 775:14,431 772:12,889 761:8,189 755:21,253 752:31,632 749:33,169 746:23,749 743:33,387 740:10,653 737:13,801 708:13,666 664:30,514 661:28,267 658:25,560 652:11,485 632:3,534 597:Total 267:Alstom 162:, LLC) 101:Status 3555:Other 3510:Trina 3420:Sharp 3395:Jinko 3323:Ausra 3277:Topaz 3167:Moapa 3157:McCoy 2997:Bison 2911:Texas 2791:Maine 2756:Idaho 2615:Other 2407:Solar 1096:Notes 929:6,448 926:4,122 923:4,556 920:2024 897:6,649 882:2,086 879:8,437 876:2023 856:8,852 832:2022 809:3,974 803:2021 792:2020 781:2,807 769:2019 758:8,130 734:5,907 731:5,145 725:2018 711:9,263 705:9,192 702:9,420 681:2017 667:5,410 655:6,216 649:2,158 646:7,099 643:9,121 640:1,508 637:2016 626:1,831 623:1,703 602:2015 362:is a 347:[ 3242:SEGS 2936:D.C. 2916:Utah 2871:Ohio 2771:Iowa 2491:Wind 2415:Apex 2127:2014 2107:2014 2087:2011 2063:2015 2034:2021 2008:2023 1951:2022 1921:2021 1873:2023 1847:2014 1709:2016 1684:2011 1656:2017 1626:2017 1593:2020 1567:2021 1559:KLAS 1402:2023 1374:2020 1330:2022 1299:2011 1248:2016 1222:2014 1191:2019 1146:2022 1124:2016 965:The 558:Year 511:was 457:EB-5 419:and 358:The 278:110 182:Type 139:2016 132:2016 119:2011 112:2011 728:795 714:488 594:Dec 591:Nov 588:Oct 585:Sep 582:Aug 579:Jul 576:Jun 573:May 570:Apr 567:Mar 564:Feb 561:Jan 547:MWh 481:DOE 189:CSP 3616:: 2097:. 2077:. 2073:. 1985:. 1953:. 1937:. 1912:. 1908:. 1890:. 1863:. 1837:. 1804:. 1761:. 1735:^ 1717:^ 1700:. 1673:. 1642:. 1612:. 1595:. 1584:. 1557:. 1546:^ 1515:^ 1498:^ 1474:. 1461:^ 1437:. 1410:^ 1393:. 1376:. 1364:. 1356:. 1342:^ 1332:. 1316:. 1281:^ 1199:^ 1177:. 1161:, 1114:. 1103:^ 959:- 956:- 798:0 717:0 673:0 629:0 471:. 280:MW 56:, 2661:e 2654:t 2647:v 2157:e 2150:t 2143:v 2129:. 2109:. 2089:. 2065:. 2036:. 2010:. 1971:. 1923:. 1894:. 1875:. 1849:. 1822:. 1747:. 1729:. 1711:. 1686:. 1658:. 1628:. 1569:. 1540:. 1492:. 1404:. 1301:. 1275:. 1250:. 1224:. 1193:. 1148:. 1126:. 953:- 950:- 947:- 944:- 941:- 894:0 891:0 888:0 885:0 853:0 850:0 847:0 844:0 841:0 699:0 696:0 693:0 690:0 687:0 684:0 670:0 351:] 315:e 258:1 141:) 121:)

Index


Tonopah
Nye County, Nevada
38°14′00″N 117°22′01″W / 38.2333°N 117.367°W / 38.2333; -117.367
Commission date
SolarReserve
Vinci SA
CSP
Solar power tower
Collectors
Alstom
Nameplate capacity
MW
Capacity factor
Annual net output
Storage capacity
Crescent Dunes
Related media on Commons
edit on Wikidata
solar thermal power
megawatt
Tonopah
Las Vegas
concentrated solar power
molten salt energy storage
Solar Two
SolarReserve
United Technologies
SolarReserve
ACS Group

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.