attempting to merge into the centre lane. Another truck travelling in the left lane above speed limit, came up behind them and also attempted to merge to the right, but it failed to either stop behind the stationary vehicles or merge successfully. It then collided with vehicles in both the left and middle lanes, resulting in a multi-vehicle pile up involving 4 cars and three trucks. It is believed an explosion resulted from the ignition of a ruptured fuel tank of a vehicle involved in the crash. Footage of the accident can be viewed in
420:
308:
29:
360:
vehicles were stationed in the Domain Tunnel. A number of fire appliances were transported contra-flow from the exit portal of the tunnel to the crash site. The deluge system was activated instantly and this was deemed by firefighters to have greatly aided in keeping the fire under control. The smoke extraction system functioned as planned and removed toxic fumes from the tunnel and out into the open air. Smoke was vented to the ventilation stack in
Southbank.
356:
lead to separate pedestrian tunnels. Some motorists walked the 1 km back along the roadway to the western tunnel entrance. Approximately 400 people were evacuated, three of whom were taken to hospital. Hundreds waited at the tunnel's west entrance until emergency services advised it was safe to remove their vehicles. The tunnel suffered some damage to cables and other internal infrastructure, but is believed the structure was undamaged by the fire.
355:
The following traffic came to a stop and approximately 200 vehicles became stranded inside the tunnel. The Public
Address & Radio Rebroadcast Systems advised motorists to turn off their ignition, leave the keys in, and to evacuate the tunnel. Emergency exits are located throughout the tunnel and
323:
On 23 March 2007, just before 10 am, a pile-up occurred in the tunnel involving three trucks and four cars. The crash resulted in an explosion and a subsequent fire which reached temperatures in excess of 1,000 °C (1,832 °F) according to firefighters, and forced the evacuation of motorists
286:
The tunnel was opened to traffic on 22 December 2000. The first known person to enter the tunnel as a paying client was Ben
Johnstone during which time the whole process was played out live on 3AW. In February 2001 it was found that a wall panel was cracked with 5 litres of water per second entering
294:
Transurban launched further legal action against the
Transfield Obayashi Joint Venture in 2007, after radar tests indicated the tunnel walls were thinner than that specified in the contract, possibly resulting in the tunnel not lasting for the proposed 100-year design life. Further tunnel leaks were
391:
used. The shaft is today used for ventilation and emergency egress, in addition to a 1,420-metre-long (4,659 ft) pedestrian tunnel that parallels the eastern part of the tunnel. Eight cross passages link the main and emergency tunnels, two more cross connects provide an emergency exit to the
359:
Eighty-four firefighters responded within five minutes of the crash occurring and emergency personnel were able to gain access to the
Burnley tunnel on foot via a separate emergency tunnel linking the Burnley to the Domain tunnel. Fire hoses were carried through to the crash site while emergency
347:
The accident occurred after a truck suffered a blown tyre and stopped in the left lane. Safety systems allegedly closed the left lane and a response vehicle was on its way to assist the broken-down truck. Two cars traveling in the left hand lane had come up behind the broken-down truck and were
403:
A variable speed limit applies to traffic in the tunnel. In normal circumstances the speed limit is 80 km/h (50 mph), but a 40 km/h (25 mph) speed limit applies during maintenance. The speed limit during peak periods is often reduced to 60 km/h (37 mph) to prevent
386:
The
Burnley Tunnel is 3.4 kilometres (2.1 mi) long and comprises 460 metres (1,509 ft) of cut and cover at the west portal, 2.84 km (1.76 mi) of driven tunnel, and 180 m (591 ft) of cut and cover at the east portal. The gradient at the west end is 6.2% downhill for
344:; and Darren Hartley Sporn, a father of two daughters, who owned a plumbing business. Approximately 400 people were advised by the tunnel's safety system to abandon their cars, to leave their keys in the ignition, and to evacuate the tunnel after the collision.
408:. Regular AM and FM radio transmissions can be received while in the tunnel because the tunnel operator has installed re-broadcast transmitters. Normal radio broadcasts can be interrupted by management announcements over all channels.
295:
also discovered in 2007, but were unrelated to the tunnel fire. When
Transurban hands the tunnel over to the Victorian government in 2045 (state government approved an extension to the toll contract from 2034, in order to fund
287:
the tunnel. The cause was later found to be floor sections lifting from water pressure, and modifications to correct this being approved in
November 2001. Also in 2001 Transfield Obayashi Joint Venture agreed to pay Transurban
387:
traffic, then relatively level until a 5.2% grade out of the tunnel. During construction a shaft located at the midpoint of the tunnel was used to speed up work, as it provided another two working faces for the
1032:
400:. It was subject to significant engineering problems and delays during construction due to unexpectedly high water pressures at its maximum depth of 65 m (213 ft).
1047:
647:
367:
emergency medical teams were also put on standby in case the accident was deemed as a major disaster and many more injured and fatalities had arisen.
1042:
283:
Joint
Venture. Prior to its opening to traffic, the tunnel was opened to the public to walk through from Southbank to Burnley, on 16 December 2000.
758:
69:
617:
484:
510:
1027:
1052:
591:
382:
Interchange consisting of the
Burnley Tunnel entrance, Domain Tunnel entrance, Westgate freeway and Power Street/Kings Way ramps
1017:
669:
454:
1002:
299:), after 45 years in service, it must do so with the tunnel in the condition that it will have a 55-year operational life.
695:
751:
562:
1022:
1007:
705:
378:
1012:
900:
349:
370:
The driver of the speeding truck was found guilty of dangerous driving and was sentenced to five years in jail.
890:
744:
1037:
767:
731:
62:
971:
392:
Domain Tunnel, and two emergency refuges are also located in the tunnel. Unlike the shallower and shorter
837:
364:
324:
from both the Burnley and nearby Domain tunnels. Three people died in the accident: Geoff Kennard, 51;
958:
536:
333:
920:
852:
867:
817:
425:
329:
945:
880:
488:
940:
857:
802:
736:
807:
341:
280:
232:
51:
625:
315:
8:
895:
827:
822:
291:
157 million in damages in an out-of-court settlement over late completion of the tunnel.
276:
950:
925:
842:
260:
363:
Metropolitan Ambulance Service Paramedics were sent in to treat evacuees if required.
701:
288:
264:
240:
981:
976:
963:
935:
930:
847:
797:
296:
862:
812:
462:
325:
693:
328:, an Australian cyclist who won a gold medal in the road team time trial at the
915:
905:
405:
244:
996:
910:
875:
832:
433:
393:
307:
84:
71:
419:
885:
782:
621:
28:
397:
256:
787:
388:
252:
160:
771:
236:
228:
55:
47:
311:
Fire suppression system test before tunnel opening in December 2000
248:
112:
595:
267:, the tunnel provides a bypass of the central business district.
224:
648:"Eyewitness accounts of how a broken down truck led to tragedy"
337:
436:, the westbound tunnel running parallel to the Burnley Tunnel.
766:
694:
Jian Zhao, Zhao; J. Nicholas Shirlaw; Rajan Krishnan (2000).
200:
1033:
Buildings and structures in the City of Melbourne (LGA)
487:. tollroadsnews.info. 22 January 2007. Archived from
455:"Mysterious crack floods Melbourne's CityLink tunnel"
415:
275:
The tunnel was constructed between 1996 and 2000 by
461:. www.abc.net.au. 22 February 2001. Archived from
994:
592:"Cars reduced to balls of metal in tunnel fire"
485:"Melbourne CityLink Burnley Tunnel cost fight"
1048:Buildings and structures in the City of Yarra
752:
670:"Truck driver jailed over fatal tunnel crash"
586:
584:
239:, which carries traffic eastbound from the
759:
745:
319:View in December 2000, just before opening
27:
1043:Transport in the City of Melbourne (LGA)
700:. Taylor & Francis. pp. 158–9.
581:
377:
340:, and also represented Australia at the
314:
306:
563:"Transurban to sue over tunnel 'flaws'"
995:
740:
689:
687:
511:"Transurban action over tunnel walls"
618:"Family mourns the loss of Olympian"
13:
697:Tunnels and Underground Structures
684:
144:Roadheader with some cut and cover
33:Driving through the tunnel in 2010
14:
1064:
725:
1028:2000 establishments in Australia
858:Gardiners Creek Trail Footbridge
569:. Fairfax Media. 22 January 2007
418:
624:. 23 March 2007. Archived from
543:. www.news.com.au. 18 July 2007
1053:Transport in the City of Yarra
955:Swan Street/Wallen Road Bridge
926:Ruffey Trail Suspension Bridge
828:Diamond Creek Trail Footbridge
823:Darebin Creek Trail Footbridge
662:
640:
610:
555:
529:
503:
477:
447:
404:unnecessary congestion at the
196:
1:
517:. smh.com.au. 23 January 2007
440:
16:Tunnel in Victoria, Australia
1018:Crossings of the Yarra River
768:Crossings of the Yarra River
672:. ABC News. 1 September 2009
537:"Burnley Tunnel leaks again"
302:
7:
1003:Tunnels in Victoria (state)
982:Westerfolds Park Footbridge
411:
396:, it passes deep under the
365:St John Ambulance Australia
10:
1069:
270:
213:80 km/h (50 mph)
1023:Tunnels completed in 2000
1008:Toll tunnels in Australia
778:
373:
259:and the inner suburbs of
209:
195:
191:3.4 km (2.1 mi)
187:
182:
174:
166:
156:
148:
140:
135:
127:
119:
108:
100:
61:
43:
38:
26:
964:Walmer Street Footbridge
798:Chandler Highway Bridges
650:. The Age. 24 March 2007
1013:Toll roads in Australia
868:Hawthorn Railway Bridge
838:Eastern Freeway Bridges
818:Cremorne Railway Bridge
426:Australian Roads portal
330:1994 Commonwealth Games
946:Spotswood sewer tunnel
901:Manningham Road Bridge
881:Johnston Street Bridge
853:Fitzsimons Lane Bridge
383:
320:
312:
178:Limited access highway
85:37.82444°S 144.98417°E
941:Spencer Street Bridge
872:Heyington Rail Bridge
848:Fairfield Pipe Bridge
803:Charles Grimes Bridge
515:Sydney Morning Herald
381:
318:
310:
808:Church Street Bridge
342:1996 Summer Olympics
281:Obayashi Corporation
255:. Running under the
251:Tollway operated by
247:. It is part of the
90:-37.82444; 144.98417
1038:Southbank, Victoria
896:MacRobertson Bridge
81: /
23:
951:Swan Street Bridge
891:King Street Bridge
843:Evan Walker Bridge
732:news.com.au images
491:on 20 October 2007
384:
321:
313:
21:
990:
989:
968:Warrandyte Bridge
788:Burke Road Bridge
241:West Gate Freeway
217:
216:
115:tollway eastbound
1060:
977:West Gate Bridge
936:Seafarers Bridge
931:Sandridge Bridge
761:
754:
747:
738:
737:
719:
718:
716:
714:
691:
682:
681:
679:
677:
666:
660:
659:
657:
655:
644:
638:
637:
635:
633:
628:on 28 March 2007
614:
608:
607:
605:
603:
588:
579:
578:
576:
574:
559:
553:
552:
550:
548:
533:
527:
526:
524:
522:
507:
501:
500:
498:
496:
481:
475:
474:
472:
470:
465:on 28 March 2007
451:
428:
423:
422:
297:West Gate Tunnel
198:
152:22 December 2000
96:
95:
93:
92:
91:
86:
82:
79:
78:
77:
74:
31:
24:
20:
1068:
1067:
1063:
1062:
1061:
1059:
1058:
1057:
993:
992:
991:
986:
959:Victoria Bridge
863:Hawthorn Bridge
774:
765:
728:
723:
722:
712:
710:
708:
692:
685:
675:
673:
668:
667:
663:
653:
651:
646:
645:
641:
631:
629:
616:
615:
611:
601:
599:
598:. 23 March 2007
590:
589:
582:
572:
570:
561:
560:
556:
546:
544:
535:
534:
530:
520:
518:
509:
508:
504:
494:
492:
483:
482:
478:
468:
466:
453:
452:
448:
443:
424:
417:
414:
376:
326:Damian McDonald
305:
273:
210:Operating speed
89:
87:
83:
80:
75:
72:
70:
68:
67:
34:
17:
12:
11:
5:
1066:
1056:
1055:
1050:
1045:
1040:
1035:
1030:
1025:
1020:
1015:
1010:
1005:
988:
987:
985:
984:
979:
974:
969:
966:
961:
956:
953:
948:
943:
938:
933:
928:
923:
918:
916:Princes Bridge
913:
908:
906:Monash Freeway
903:
898:
893:
888:
883:
878:
873:
870:
865:
860:
855:
850:
845:
840:
835:
830:
825:
820:
815:
813:Collins Bridge
810:
805:
800:
795:
793:Burnley Tunnel
790:
785:
779:
776:
775:
764:
763:
756:
749:
741:
735:
734:
727:
726:External links
724:
721:
720:
706:
683:
661:
639:
609:
580:
554:
528:
502:
476:
445:
444:
442:
439:
438:
437:
430:
429:
413:
410:
406:Monash Freeway
375:
372:
304:
301:
272:
269:
245:Monash Freeway
221:Burnley Tunnel
215:
214:
211:
207:
206:
203:
193:
192:
189:
185:
184:
180:
179:
176:
172:
171:
168:
164:
163:
158:
154:
153:
150:
146:
145:
142:
138:
137:
133:
132:
129:
125:
124:
121:
117:
116:
110:
106:
105:
102:
98:
97:
65:
59:
58:
45:
41:
40:
36:
35:
32:
22:Burnley Tunnel
15:
9:
6:
4:
3:
2:
1065:
1054:
1051:
1049:
1046:
1044:
1041:
1039:
1036:
1034:
1031:
1029:
1026:
1024:
1021:
1019:
1016:
1014:
1011:
1009:
1006:
1004:
1001:
1000:
998:
983:
980:
978:
975:
973:
970:
967:
965:
962:
960:
957:
954:
952:
949:
947:
944:
942:
939:
937:
934:
932:
929:
927:
924:
922:
921:Queens Bridge
919:
917:
914:
912:
911:Morell Bridge
909:
907:
904:
902:
899:
897:
894:
892:
889:
887:
884:
882:
879:
877:
876:Hoddle Bridge
874:
871:
869:
866:
864:
861:
859:
856:
854:
851:
849:
846:
844:
841:
839:
836:
834:
833:Domain Tunnel
831:
829:
826:
824:
821:
819:
816:
814:
811:
809:
806:
804:
801:
799:
796:
794:
791:
789:
786:
784:
781:
780:
777:
773:
769:
762:
757:
755:
750:
748:
743:
742:
739:
733:
730:
729:
709:
707:90-5809-171-6
703:
699:
698:
690:
688:
671:
665:
649:
643:
627:
623:
619:
613:
597:
594:. Melbourne:
593:
587:
585:
568:
564:
558:
542:
538:
532:
516:
512:
506:
490:
486:
480:
464:
460:
456:
450:
446:
435:
434:Domain Tunnel
432:
431:
427:
421:
416:
409:
407:
401:
399:
395:
394:Domain Tunnel
390:
380:
371:
368:
366:
361:
357:
353:
351:
345:
343:
339:
335:
331:
327:
317:
309:
300:
298:
292:
290:
284:
282:
278:
268:
266:
262:
258:
254:
250:
246:
242:
238:
234:
230:
226:
222:
212:
208:
204:
202:
194:
190:
186:
181:
177:
173:
169:
165:
162:
159:
155:
151:
147:
143:
139:
134:
130:
126:
122:
118:
114:
111:
107:
103:
99:
94:
66:
64:
60:
57:
53:
49:
46:
42:
37:
30:
25:
19:
886:Kanes Bridge
792:
783:Bolte Bridge
711:. Retrieved
696:
676:30 September
674:. Retrieved
664:
654:30 September
652:. Retrieved
642:
630:. Retrieved
626:the original
622:News Limited
612:
600:. Retrieved
571:. Retrieved
566:
557:
545:. Retrieved
540:
531:
519:. Retrieved
514:
505:
493:. Retrieved
489:the original
479:
467:. Retrieved
463:the original
458:
449:
402:
385:
369:
362:
358:
354:
346:
322:
293:
285:
274:
220:
218:
18:
972:Webb Bridge
459:7.30 Report
398:Yarra River
389:roadheaders
257:Yarra River
141:Constructed
88: /
76:144°59′03″E
63:Coordinates
997:Categories
541:Herald Sun
441:References
277:Transfield
253:Transurban
227:tunnel in
170:Automotive
161:Transurban
73:37°49′28″S
772:Melbourne
350:this link
303:2007 fire
237:Australia
229:Melbourne
183:Technical
175:Character
136:Operation
123:Southbank
56:Australia
48:Melbourne
632:25 March
602:23 March
573:30 April
412:See also
334:Victoria
261:Richmond
249:CityLink
233:Victoria
157:Operator
113:CityLink
52:Victoria
44:Location
39:Overview
596:The Age
271:History
265:Burnley
243:to the
225:tollway
167:Traffic
131:Burnley
713:8 July
704:
547:8 July
521:8 July
495:8 July
469:8 July
374:Design
338:Canada
188:Length
149:Opened
104:Active
101:Status
567:Drive
231:, in
223:is a
201:lanes
120:Start
109:Route
715:2008
702:ISBN
678:2021
656:2021
634:2007
604:2007
575:2016
549:2008
523:2008
497:2008
471:2008
263:and
219:The
770:in
332:in
199:of
197:No.
128:End
999::
686:^
620:.
583:^
565:.
539:.
513:.
457:.
352:.
336:,
289:$
235:,
54:,
50:,
760:e
753:t
746:v
717:.
680:.
658:.
636:.
606:.
577:.
551:.
525:.
499:.
473:.
279:–
205:3
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.