232:, who produced a report on 6 February 1808. He described a Cumberland Canal, which would allow sea-going vessels to reach Carlisle, but would also be part of a grander plan to link Carlisle to other parts of the country, and could be incorporated into the coast to coast waterway. He suggested that locks should be at least as big as those on the Forth and Clyde Canal, with a width of 20 feet (6.1 m) and a depth of water of 8 feet (2.4 m) over the lock cills. His canal would leave the Solway Firth about 1 mile (1.6 km) upstream of Bowness-on-Solway to reach Carlisle, and would cost £109,393. In order to provide a water supply, a navigable feeder would continue onwards to Wigton, which would be suitable for 7-foot (2.1 m) wide narrow boats, and would cost an additional £38,139. He also quoted two other prices for narrower canals, but noted that these would require goods to be transferred to smaller boats, with the inherent costs and inconvenience. Chapman suggested that a steam pump would be a better way to supply water, unless the Wigton route was likely to be commercially profitable, and also suggested somewhat smaller locks, at 65 feet (20 m) long, 16 feet (4.9 m) wide with 6 feet (1.8 m) of water over the cills. This would enable Mersey flats to reach Carlisle, without resorting to transhipment. However, no further progress was made at that time.
327:. The sea lock was built so that its top was at the same level as high tides on the lowest neap tides, and there was a second lock nearby, which maintained the level of the canal at 6 inches (15 cm) above the level of the highest tides. Beyond the two locks, the canal ran on a level for 6 miles (9.7 km), and then the remaining six locks were grouped together in the next 1.25 miles (2.01 km), after which the canal ran level again to reach Carlisle. Facilities at Carlisle were improved in 1838 by the construction of a timber pond below the basin. There were no fixed bridges on the route, so that it could be used by coastal vessels, and where crossings were required, they were built using two-leaved drawbridges, similar in style to those on the Forth and Clyde Canal.
319:
had been awarded by early 1820, but relationships between
Chapman, Buck and the committee were not good, and the committee asked Thomas Ferrier from the Forth and Clyde Canal to oversee the works in March. Buck was not happy with this and resigned in July. but Richard Buck stayed on, effectively working for Ferrier. Chapman was not happy with this situation, and in November 1822, when most of the work had been completed, criticised Ferrier's workmanship, and recommended that Buck should be allowed to complete the canal. The committee took exception to this and dismissed him. Two months later, just before the canal was due to open, they dismissed Buck as well, although he did not leave and stayed on until May 1823.
40:
412:
255:
373:. c. lxxii) until a couple more years had past. There was support in Carlisle, and an agreement was reached that the railway would terminate at the canal basin. It opened in stages from 19 July 1836, reaching Redheugh, Gateshead on 18 June 1838, and Newcastle the following year. Through traffic boosted the profits of the canal. Tolls had averaged £2,905 for the three years to 1835, but by 1840, they had reached £6,605. Receipts from the packet boat had also climbed steadily, to £829 in 1850, and the company had been able to pay dividends to shareholders, starting at 1 per cent in 1833, and rising to 4 per cent by 1839.
531:
Firth, although they had initially considered using boats or rafts onto which the loaded railway wagons would be shunted. A second packet boat was obtained from
Paisley in July 1838, and tolls on the canal and railway were reduced in 1838 and 1839, to encourage through traffic. The increase in traffic was sufficient that the men who worked as bridge and lock keepers were paid extra amounts in view of their increased workload. An intermittent traffic was carrying railway locomotives, notably ones built in Newcastle destined to be exported to the USA and some destined for the new
200:, most of which were described as being part of a coast to coast canal which might end at Carlisle or Maryport. The aspirations of the traders of Carlisle were more local, as they wanted improved facilities for ships bringing goods to Carlisle from Liverpool, Ireland, and Scottish ports. In 1795, three ships carrying around 35 tons each were regularly running between Liverpool and Sandsfield, about 3.5 miles (5.6 km) from Carlisle, from where some 1,000 tons of goods per year were carried by road to the city. In 1807,
514:. c. lx), was obtained. It allowed the company to borrow another £40,000, and included powers to light and buoy the Solway Firth. Hartley's plans to start enclosing the dock area in June 1836 were delayed due to objections from Lord Lonsdale, who had rights over the foreshore, but work eventually started in August 1838. The purchase of eighteen new buoys was begun in May 1837, and they were installed during 1838. A lightship was built in 1840, and a lighthouse was constructed at Lees Scar near Silloth.
361:, to ferry the passengers from Port Carlisle to Carlisle. They leased it to a local innkeeper, Alexander Cockburn, for £30 per year, and the service began on 1 July 1826. The steamer service to Liverpool began at about the same time, although the packet boat only ran in the summer months to begin with. As well as passengers, the steamer also carried goods, and these were carried along the canal by lighters. The Solway Hotel opened in Port Carlisle soon afterwards.
353:
boat loads, which they sold from the quays at
Carlisle. Suspecting that the reservoir might not be adequate for the number of boats using the canal, they built a feeder from the river, with a water wheel to raise the water to the level of the canal. There were attempts to avoid the tolls on the canal, with some ships carrying timber waiting for favourable tides, and using the river to reach Rockcliffe, where the timber was loaded into carts.
523:
502:£3,700. These supplemented the waterwheel, being used when river levels were too low to drive it, or when the reservoir needed filling. The Admiralty surveyed the Solway Firth in 1835, and were asked for advice on buoys to mark the channel. The berths at Port Carlisle were dredged, and plans for an inner and outer dock were formulated. John Hartley of Liverpool had produced designs by November 1835, and an act of Parliament, the
225:, would cost between £55,000 and £60,000. The larger canal could still be part of a coast to coast route. The options as to the size and destination of the canal were put to subscribers by the committee. In August 1807 Chapman suggested that a ship canal for the Irish, Scottish and Liverpool trade, and a 50-ton canal to Maryport for the coal trade could both be built, with both finding support in the newspapers.
176:, a little further down the coast, and prior to 1720 places along the river were supplied with coal by boats. However, this trade ended in 1720, when duties were levied on all goods carried around the coast by sea, and it became cheaper to transport the coal by land. Three traders from Carlisle, John Hicks, Henry Orme and Thomas Pattinson, sought an
323:
raised the level of the canal by 46 feet (14 m), and at
Carlisle there was a second basin, 450 by 100 feet (137 by 30 m), complete with wharves and a warehouse. The locks were 78 feet (24 m) long and 18.5 feet (5.6 m) wide, and water supply was provided by a reservoir on Mill Beck near
530:
Traffic on the canal increased with the arrival of the railway at
Carlisle basin. This included coal from Lord Carlisle's mines, and also from the Blenkinsopp Coal Company, who were based at Greenhead. The company decided to carry coal in barges, which were towed by a tug when operating on the Solway
330:
While Paget-Tomlinson and
Hadfield & Biddle agree on the number of locks, Priestley, writing in 1831, suggests that there were two locks immediately above the sea lock, each with a rise of 8 feet (2.4 m), and that the top level was 15.5 feet (4.7 m) above the level of the sea lock, this
582:
The Port
Carlisle Dock and Railway Act 1853 wound up the canal company, and created the Port Carlisle Dock and Railway Company. In less than a year, construction was completed, with the line opening for goods traffic on 12 May 1854. Passenger services followed on 22 June. A second act of Parliament,
352:
to
Harrington to fetch some, which they then sold, but decided not to run the coal trade directly. Towing of boats on the canal was organised by a group of men called Trackers, and by the end of the year tolls of £928 had been collected. In 1824, they kick-started a trade in bricks, by importing two
570:
in 1847, and the withdrawal of the steamer service from Port
Carlisle to Annan, passenger traffic remained good, but in April 1850 was affected by the introduction of cheaper fares to Liverpool, using the railway from Carlisle to Whitehaven, and a much shorter sea voyage from there to Liverpool. In
566:
instructed by the shareholders to begin negotiations with that company, or another of the railway companies with lines to
Carlisle. Little progress was made, and the canal company and steamboat companies looked at ways to reduce costs, and thus lower their tolls. Despite the sale of the packet boat
334:
The committee had succeeded in raising £70,600 of the authorised capital, most of it coming from local people. To complete the project, they had borrowed around £10,000, so the total cost was just over the estimated £80,000. The committee consisted of nine proprietors, each of whom was required to
318:
The committee appointed Chapman as consulting engineer, but who held the position of resident engineer is less clear. Richard Buck had helped Chapman with the initial surveys, and it appears that his brother Henry fulfilled that role at the start of the project. Contracts to build the entire canal
501:
To improve the water supply, William Fairbairn was paid £1,391 to construct a new waterwheel and pumps, and these were commissioned in 1835. However, they pumps did not work as well as anticipated, and Harvey's of Hoyle provided a 60-inch (150 cm) steam engine and pumps in 1838, at a cost of
376:
Further progress was made. In early 1832, several shipowners had placed buoys in the Solway Firth, to mark the channel, and started collecting funds from ships to cover their costs. They asked the canal company to take over responsibility for this, and they did so. In 1833, the Carlisle and Annan
364:
In August 1824, there were public meetings in Newcastle, to consider again the idea of a canal to Carlisle, or possibly a railway. William Chapman, who had surveyed a route for a canal in 1796, suggested that the route was also suitable for a railway, and was asked to cost both options. He quoted
322:
The canal was 11.25 miles (18.11 km) long, had a surface width of 54 feet (16 m) and was 8 feet (2.4 m) deep. At Fisher's Cross, a basin 250 by 80 feet (76 by 24 m) had been built, which was connected to the Solway Firth by a sea lock with a long timber jetty. Seven more locks
356:
In 1825 the Carlisle & Liverpool Steam Navigation Company were looking to start a passenger service from Liverpool, and asked for an exclusive berth for their ship. The committee paid for a new berth, the cost to be repaid by the Navigation Company over the next ten years, and also bought a
565:
By the autumn of 1846, the company was seriously considering converting the canal into a railway, and commissioned a report, which was produced in February 1847, and suggested the idea was feasible. They entertained the directors of the Newcastle and Carlisle Railway in May, and in July were
281:
After eight and a half years, another meeting was held at Carlisle on 7 October 1817, and Chapman was asked to produce a survey for a canal suitable for vessels of at least 70 tons. He was to ensure that it could become part of the coast to coast link. His canal started at Fisher's Cross,
331:
being the level reached by an abnormally high tide which was recorded in January 1796. He also says that there were two basins between the locks, known as the Upper and Lower Solway basins, and that the six locks further along raised the level by 46 feet (14 m).
306:. c. xiii) was obtained, which authorised the Carlisle Canal to raise £80,000 in capital, and an extra £40,000 if required. The chairman of the committee, Dr John Heysham, suggested they look at other canals before starting work, and visits were made to the
180:
which would waive the coastwise duties between Ellen Foot, as Maryport was then known, and Bank End, which was located on the river close to Carlisle. The act enabled them to build wharves, cranes and warehouses, and to dredge the river. They obtained the
211:
The idea of a canal gained support locally when a public meeting was held on 21 May 1807. The principal aim was to provide the city with a better and cheaper supply of coal, and a committee was appointed to push the plan forwards. They asked the engineer
286:, although this name had also been applied to Sandsfield in earlier days. It would feature locks 74 by 17 feet (22.6 by 5.2 m), while the channel would be 50 feet (15 m) wide by 8 feet (2.4 m) deep, and would cost £75,392. A link to
216:
to advise them, and he proposed a route from Carlisle to Maryport, which he had also promoted in 1795 as part of a coast to coast route. He estimated that it would cost between £90,000 and £100,000 to build, but conceded that a terminus near
539:, but by 1837 it had been overtaken by more powerful designs. It was moved to the Brampton Railway near Carlisle to end its career in colliery use. Its journey to Brampton included being shipped from Liverpool then along the Carlisle Canal.
343:
The committee set about encouraging trade on the canal, and built a timber yard at Carlisle. Shortly afterwards, the Treasury altered the rules on coastal taxes, and repealed the duties on coal, stone and slate carried between
571:
March 1852 the company decided that the best option was to convert the canal into a railway, raised some money from shareholders and loan holders, and sought an act of Parliament. Work began in June 1853, although the
429:
An Act to enable the Carlisle Canal Company to make a Dock or Docks at Port Carlisle otherwise Fishers Cross, and for amending and enlarging the Powers and Provisions of the Act for making and maintaining the said
377:
Navigation Company asked for a berth at Port Carlisle for their new service to Annan and Liverpool, and one was built. With arrival of the railway imminent, the committee asked William Houston, of the
208:, carrying timber, and in 1818, six boats were engaged in the trade from Liverpool. Access along the river was not ideal, as the boats often had to wait in the estuary until the tide was suitable.
221:
on the Solway Firth would be cheaper. £40,000 would pay for a canal suitable for 45-ton boats, but a larger canal, suitable for 90-ton boats that could cross the Irish Sea or reach the
1020:
579:
c. cxix) was not obtained until 3 August. An omnibus service was used to ferry passengers between Carlisle and the steamers at Port Carlisle, and the canal closed on 1 August 1853.
182:
164:, to facilitate the transport of goods to and from the city. It was a short-lived venture, being replaced in 1854 by a railway which used the canal bed for most of its route.
385:
entered service in 1834. The company purchased an ice-breaker, which enabled the packet service to run all year from the winter of 1836-37. The old packet boat,
189:. c. 14) in February 1722, and could charge tolls on goods for 31 years, but there were no powers to make navigational cuts or build locks to improve the river.
1013:
584:
1006:
592:
366:
686:
389:, was sold for £7 12 shillings (£7.60), and the company also started an omnibus service between Carlisle basin and the town centre.
572:
476:
17:
435:
267:
1354:
717:
650:
631:
290:
could be built on a smaller scale, and another link could be built along the valley of the Eden to serve slate quarries near
365:£888,000 for a canal and £252,488 for a railway. A company was created to build a railway, although they did not obtain the
1426:
378:
196:
westwards from Newburn to Hexham, which was not actioned, but from 1794 there were various schemes to extend or bypass the
1199:
1481:
532:
416:
259:
550:
had been authorised in 1837, but its opening was delayed until 1845 by financial difficulties. It was extended to
1304:
348:
and Carlisle. However, no one could be found to run a trade in coal, so in June the committee sent a boat called
39:
1530:
543:
1219:
700:
608:
547:
542:
However, the boom did not last long, and the company found that it was in competition with the railways. The
493:
1234:
1030:
1467:
1334:
555:
1525:
1520:
1319:
1294:
1224:
213:
172:
The River Eden flows through the city of Carlisle, and into the Solway Firth. There were coal mines at
1139:
596:
1289:
1184:
600:
1074:
660:
Perriam, Denis (May 2021). Peascod, Michael (ed.). "Locomotives Shipped along Carlisle Canal".
998:
710:
A Biographical Dictionary of Civil Engineers in Great Britain and Ireland: Vol 1: 1500 to 1830
1279:
1239:
1134:
1124:
604:
424:
222:
1462:
1421:
1269:
1179:
8:
1411:
1324:
287:
611:
became known as the Port Carlisle Branch, and lasted until 1 June 1932, when it closed.
1254:
1159:
1144:
559:
546:
was authorised in 1844, and was a direct threat to the steamer service and canal. The
1395:
1194:
1164:
1154:
1149:
1114:
713:
694:
673:
646:
627:
218:
177:
44:
The remains of the sea lock at Port Carlisle, where the canal joined the Solway Firth
1441:
1431:
1314:
1309:
1229:
1209:
1189:
1079:
607:
leased both lines in 1862, and they all merged in 1880. The stub from Drumburgh to
595:, with a working capital of £165,000. Their railway left the Port Carlisle line at
588:
576:
511:
440:
687:"Historical Account of the Navigable Rivers, Canals and Railways of Great Britain"
1390:
1374:
1359:
1349:
1339:
1299:
1169:
1069:
536:
307:
192:
On the other side of the country, there was a scheme to extend navigation on the
67:
1457:
1436:
1416:
1364:
1329:
1244:
1089:
1084:
1064:
229:
56:
1514:
1496:
1483:
1369:
1259:
1174:
1119:
1094:
1059:
1054:
1044:
677:
283:
558:, and at the end of the year the Lancaster and Carlisle Railway opened. The
526:
Map of Port Carlisle, after 1854, showing the infilled canal and new railway
1344:
1249:
1204:
453:
205:
161:
1284:
1214:
1129:
1104:
201:
1274:
1109:
562:
opened in February 1848, running northwards from Carlisle to Scotland.
551:
345:
197:
193:
1264:
1049:
759:
370:
324:
303:
291:
272:
522:
186:
173:
157:
959:
947:
935:
887:
875:
863:
183:
Eden River, Cumberland (Temporary Tolls for Improvement) Act 1721
783:
747:
335:
hold at least ten shares, and they were to be elected annually.
1028:
826:
824:
822:
669:
468:
971:
911:
899:
836:
381:
to arrange the construction of a faster packet boat, and the
819:
795:
771:
735:
853:
851:
294:. His plan was accepted, money was raised locally, and the
994:
images & map of 3 mile markers from the Carlisle canal
993:
923:
848:
535:. Stephenson's Rocket was a pioneer made famous at the
807:
603:, where a dock to rival Maryport was constructed. The
624:
The Canals of North West England, Vol 2 (pp.241-496)
585:Carlisle and Silloth Bay Railway and Dock Act 1855
593:Carlisle and Silloth Bay Railway and Dock Company
367:Newcastle-upon-Tyne and Carlisle Railway Act 1829
1512:
842:
640:
977:
965:
953:
941:
917:
905:
893:
881:
869:
830:
801:
789:
777:
765:
753:
741:
621:
1014:
689:. Archived from the original on 7 March 2016.
228:The committee sought a second opinion from
1021:
1007:
622:Hadfield, Charles; Biddle, Gordon (1970).
857:
684:
813:
708:Skempton, Sir Alec; et al. (2002).
707:
521:
929:
659:
573:Port Carlisle Dock and Railway Act 1853
477:Port Carlisle Dock and Railway Act 1853
130:Port Carlisle (formerly Fisher's Cross)
14:
1513:
1355:Thorne and Hatfield Moors Peat Canals
1002:
494:Text of statute as originally enacted
1427:Glasgow, Paisley and Johnstone Canal
554:in early 1847 by the opening of the
379:Glasgow, Paisley and Ardrossan Canal
204:regularly made the journey from the
1200:Ivelchester and Langport Navigation
61:78 ft 0 in (23.77 m)
24:
72:18 ft 3 in (5.56 m)
25:
1542:
987:
672:: Cumbrian Railways Association.
641:Paget-Tomlinson, Edward (2006).
533:Liverpool and Manchester Railway
417:Parliament of the United Kingdom
410:
310:and the Forth and Clyde Canael.
260:Parliament of the United Kingdom
253:
38:
1305:Salisbury and Southampton Canal
1031:waterways of the United Kingdom
614:
357:second-hand packet boat called
313:
544:Lancaster and Carlisle Railway
13:
1:
1220:Liskeard and Looe Union Canal
728:
548:Maryport and Carlisle Railway
1235:Mersey and Irwell Navigation
338:
7:
1468:Kidwelly and Llanelly Canal
1335:Stourbridge Extension Canal
643:Canal and River Navigations
556:Whitehaven Junction Railway
517:
506:Port Carlisle Dock Act 1836
399:Port Carlisle Dock Act 1836
10:
1547:
1295:Runcorn to Latchford Canal
1225:London to Portsmouth canal
978:Hadfield & Biddle 1970
966:Hadfield & Biddle 1970
954:Hadfield & Biddle 1970
942:Hadfield & Biddle 1970
918:Hadfield & Biddle 1970
906:Hadfield & Biddle 1970
894:Hadfield & Biddle 1970
882:Hadfield & Biddle 1970
870:Hadfield & Biddle 1970
831:Hadfield & Biddle 1970
802:Hadfield & Biddle 1970
790:Hadfield & Biddle 1970
778:Hadfield & Biddle 1970
766:Hadfield & Biddle 1970
754:Hadfield & Biddle 1970
742:Hadfield & Biddle 1970
685:Priestley, Joseph (1831).
392:United Kingdom legislation
235:United Kingdom legislation
167:
1450:
1404:
1383:
1140:Dorset and Somerset Canal
1037:
699:: CS1 maint: unfit URL (
591:c. cliii) authorised the
492:
485:
467:
462:
452:
447:
434:
423:
409:
404:
397:
266:
252:
247:
240:
142:
134:
126:
121:
113:
105:
97:
92:
84:
76:
65:
54:
49:
37:
32:
27:Former English ship canal
1290:Runcorn and Weston Canal
1185:Hollingwood Common Canal
768:, pp. 337–339, 456.
156:opened in 1823, linking
1320:Sir John Glynne's Canal
645:. Landmark Publishing.
298:Carlisle Canal Act 1819
242:Carlisle Canal Act 1819
18:Carlisle Canal Act 1819
1075:Beat Bank Branch Canal
527:
1531:Canals opened in 1823
1280:Rochdale Branch Canal
1240:Newport Pagnell Canal
1135:Donnington Wood Canal
1125:Dearne and Dove Canal
626:. David and Charles.
605:North British Railway
525:
223:Forth and Clyde Canal
1463:Glamorganshire Canal
1422:Forth and Cart Canal
1270:River Sow Navigation
1180:Heywood Branch Canal
843:Paget-Tomlinson 2006
1493: /
1412:Aberdeenshire Canal
1325:Somerset Coal Canal
968:, pp. 347–348.
956:, pp. 346–347.
944:, pp. 345–346.
932:, pp. 384–386.
896:, pp. 343–344.
884:, pp. 342–343.
872:, pp. 341–342.
792:, pp. 339–340.
756:, pp. 336–337.
387:Bailie Nicol Jarvie
359:Bailie Nicol Jarvie
288:Newcastle upon Tyne
282:subsequently named
88:replaced by railway
1497:54.9489°N 3.1852°W
1160:Grand Surrey Canal
1145:Douglas Navigation
712:. Thomas Telford.
560:Caledonian Railway
528:
98:Principal engineer
1526:Canals in Cumbria
1521:Canals in England
1476:
1475:
1195:Itchen Navigation
1165:Greasbrough Canal
1155:Glastonbury Canal
1115:Coombe Hill Canal
719:978-0-7277-2939-2
662:Cumbrian Railways
652:978-1-84306-207-3
633:978-0-7153-4992-2
589:18 & 19 Vict.
577:16 & 17 Vict.
512:6 & 7 Will. 4
499:
498:
463:Other legislation
441:6 & 7 Will. 4
405:Act of Parliament
279:
278:
248:Act of Parliament
178:act of Parliament
150:
149:
16:(Redirected from
1538:
1508:
1507:
1505:
1504:
1503:
1502:54.9489; -3.1852
1498:
1494:
1491:
1490:
1489:
1486:
1442:Stevenston Canal
1432:Inverarnan Canal
1384:Northern Ireland
1315:Shropshire Canal
1310:Shrewsbury Canal
1230:Louth Navigation
1210:Leominster Canal
1190:Horncastle Canal
1080:Blyth Navigation
1023:
1016:
1009:
1000:
999:
981:
975:
969:
963:
957:
951:
945:
939:
933:
927:
921:
915:
909:
903:
897:
891:
885:
879:
873:
867:
861:
855:
846:
840:
834:
828:
817:
811:
805:
799:
793:
787:
781:
775:
769:
763:
757:
751:
745:
739:
723:
704:
698:
690:
681:
656:
637:
508:
507:
487:Status: Repealed
414:
413:
400:
395:
394:
300:
299:
257:
256:
243:
238:
237:
42:
30:
29:
21:
1546:
1545:
1541:
1540:
1539:
1537:
1536:
1535:
1511:
1510:
1501:
1499:
1495:
1492:
1487:
1484:
1482:
1480:
1479:
1477:
1472:
1446:
1400:
1391:Broharris Canal
1379:
1375:Wombridge Canal
1360:Ulverston Canal
1350:Tavistock Canal
1340:Stockport Canal
1300:St Columb Canal
1255:Pidcock's Canal
1170:Grosvenor Canal
1070:Baybridge Canal
1033:
1027:
990:
985:
984:
976:
972:
964:
960:
952:
948:
940:
936:
928:
924:
916:
912:
904:
900:
892:
888:
880:
876:
868:
864:
856:
849:
841:
837:
829:
820:
812:
808:
800:
796:
788:
784:
776:
772:
764:
760:
752:
748:
740:
736:
731:
726:
720:
692:
691:
653:
634:
617:
537:Rainhill Trials
520:
505:
504:
488:
481:
419:
411:
398:
393:
341:
316:
308:Lancaster Canal
297:
296:
262:
254:
241:
236:
214:William Chapman
170:
101:William Chapman
45:
28:
23:
22:
15:
12:
11:
5:
1544:
1534:
1533:
1528:
1523:
1474:
1473:
1471:
1470:
1465:
1460:
1458:Aberdare Canal
1454:
1452:
1448:
1447:
1445:
1444:
1439:
1437:Monkland Canal
1434:
1429:
1424:
1419:
1417:Dingwall Canal
1414:
1408:
1406:
1402:
1401:
1399:
1398:
1396:Dukart's Canal
1393:
1387:
1385:
1381:
1380:
1378:
1377:
1372:
1367:
1365:Westport Canal
1362:
1357:
1352:
1347:
1342:
1337:
1332:
1330:Stamford Canal
1327:
1322:
1317:
1312:
1307:
1302:
1297:
1292:
1287:
1282:
1277:
1272:
1267:
1262:
1257:
1252:
1247:
1245:Nutbrook Canal
1242:
1237:
1232:
1227:
1222:
1217:
1212:
1207:
1202:
1197:
1192:
1187:
1182:
1177:
1172:
1167:
1162:
1157:
1152:
1150:Galton's Canal
1147:
1142:
1137:
1132:
1127:
1122:
1117:
1112:
1107:
1102:
1100:Carlisle Canal
1097:
1092:
1090:Braunton Canal
1087:
1085:Bradford Canal
1082:
1077:
1072:
1067:
1065:Barnsley Canal
1062:
1057:
1052:
1047:
1041:
1039:
1035:
1034:
1026:
1025:
1018:
1011:
1003:
997:
996:
989:
988:External links
986:
983:
982:
980:, p. 348.
970:
958:
946:
934:
922:
920:, p. 345.
910:
908:, p. 344.
898:
886:
874:
862:
860:, p. 140.
858:Priestley 1831
847:
845:, p. 106.
835:
833:, p. 341.
818:
816:, p. 128.
806:
804:, p. 340.
794:
782:
780:, p. 339.
770:
758:
746:
744:, p. 336.
733:
732:
730:
727:
725:
724:
718:
705:
682:
657:
651:
638:
632:
618:
616:
613:
519:
516:
497:
496:
490:
489:
486:
483:
482:
480:
479:
473:
471:
465:
464:
460:
459:
456:
450:
449:
445:
444:
438:
432:
431:
427:
421:
420:
415:
407:
406:
402:
401:
391:
340:
337:
315:
312:
277:
276:
270:
264:
263:
258:
250:
249:
245:
244:
234:
230:Thomas Telford
169:
166:
154:Carlisle Canal
148:
147:
144:
140:
139:
136:
132:
131:
128:
124:
123:
119:
118:
115:
111:
110:
107:
106:Date completed
103:
102:
99:
95:
94:
90:
89:
86:
82:
81:
78:
74:
73:
70:
63:
62:
59:
52:
51:
50:Specifications
47:
46:
43:
35:
34:
33:Carlisle Canal
26:
9:
6:
4:
3:
2:
1543:
1532:
1529:
1527:
1524:
1522:
1519:
1518:
1516:
1509:
1506:
1469:
1466:
1464:
1461:
1459:
1456:
1455:
1453:
1449:
1443:
1440:
1438:
1435:
1433:
1430:
1428:
1425:
1423:
1420:
1418:
1415:
1413:
1410:
1409:
1407:
1403:
1397:
1394:
1392:
1389:
1388:
1386:
1382:
1376:
1373:
1371:
1370:Wisbech Canal
1368:
1366:
1363:
1361:
1358:
1356:
1353:
1351:
1348:
1346:
1343:
1341:
1338:
1336:
1333:
1331:
1328:
1326:
1323:
1321:
1318:
1316:
1313:
1311:
1308:
1306:
1303:
1301:
1298:
1296:
1293:
1291:
1288:
1286:
1283:
1281:
1278:
1276:
1273:
1271:
1268:
1266:
1263:
1261:
1260:River Gipping
1258:
1256:
1253:
1251:
1248:
1246:
1243:
1241:
1238:
1236:
1233:
1231:
1228:
1226:
1223:
1221:
1218:
1216:
1213:
1211:
1208:
1206:
1203:
1201:
1198:
1196:
1193:
1191:
1188:
1186:
1183:
1181:
1178:
1176:
1175:Hackney Canal
1173:
1171:
1168:
1166:
1163:
1161:
1158:
1156:
1153:
1151:
1148:
1146:
1143:
1141:
1138:
1136:
1133:
1131:
1128:
1126:
1123:
1121:
1120:Croydon Canal
1118:
1116:
1113:
1111:
1108:
1106:
1103:
1101:
1098:
1096:
1095:Caistor Canal
1093:
1091:
1088:
1086:
1083:
1081:
1078:
1076:
1073:
1071:
1068:
1066:
1063:
1061:
1060:Arbury Canals
1058:
1056:
1055:Andover Canal
1053:
1051:
1048:
1046:
1045:Adelphi Canal
1043:
1042:
1040:
1036:
1032:
1024:
1019:
1017:
1012:
1010:
1005:
1004:
1001:
995:
992:
991:
979:
974:
967:
962:
955:
950:
943:
938:
931:
926:
919:
914:
907:
902:
895:
890:
883:
878:
871:
866:
859:
854:
852:
844:
839:
832:
827:
825:
823:
815:
814:Skempton 2002
810:
803:
798:
791:
786:
779:
774:
767:
762:
755:
750:
743:
738:
734:
721:
715:
711:
706:
702:
696:
688:
683:
679:
675:
671:
667:
663:
658:
654:
648:
644:
639:
635:
629:
625:
620:
619:
612:
610:
609:Port Carlisle
606:
602:
598:
594:
590:
586:
580:
578:
574:
569:
563:
561:
557:
553:
549:
545:
540:
538:
534:
524:
515:
513:
509:
495:
491:
484:
478:
475:
474:
472:
470:
466:
461:
457:
455:
451:
446:
442:
439:
437:
433:
428:
426:
422:
418:
408:
403:
396:
390:
388:
384:
380:
374:
372:
368:
362:
360:
354:
351:
347:
336:
332:
328:
326:
320:
311:
309:
305:
301:
293:
289:
285:
284:Port Carlisle
274:
271:
269:
265:
261:
251:
246:
239:
233:
231:
226:
224:
220:
215:
209:
207:
203:
199:
195:
190:
188:
184:
179:
175:
165:
163:
159:
155:
145:
141:
137:
133:
129:
125:
120:
117:1 August 1853
116:
112:
109:12 March 1823
108:
104:
100:
96:
91:
87:
83:
79:
75:
71:
69:
64:
60:
58:
53:
48:
41:
36:
31:
19:
1478:
1345:Stover Canal
1250:Oakham Canal
1205:Ketley Canal
1099:
1029:Unnavigable
973:
961:
949:
937:
930:Perriam 2021
925:
913:
901:
889:
877:
865:
838:
809:
797:
785:
773:
761:
749:
737:
709:
665:
661:
642:
623:
615:Bibliography
581:
567:
564:
541:
529:
503:
500:
454:Royal assent
386:
382:
375:
363:
358:
355:
349:
342:
333:
329:
321:
317:
314:Construction
295:
280:
227:
210:
206:River Mersey
202:Mersey flats
191:
171:
162:Solway Firth
153:
151:
146:Solway Firth
1500: /
1285:Rolle Canal
1215:Leven Canal
1130:Derby Canal
1105:Chard Canal
599:and ran to
469:Repealed by
458:7 June 1836
143:Connects to
127:Start point
114:Date closed
57:boat length
1515:Categories
1485:54°56′56″N
1275:River Tone
1110:City Canal
729:References
552:Whitehaven
425:Long title
346:Whitehaven
198:River Tyne
194:River Tyne
1488:3°11′07″W
1265:River Nar
1050:Aike Beck
678:1466-6812
597:Drumburgh
371:10 Geo. 4
339:Operation
325:Grinsdale
304:59 Geo. 3
292:Ullswater
275:. c. xiii
273:59 Geo. 3
135:End point
122:Geography
68:boat beam
1405:Scotland
695:cite web
568:Clarence
518:Railways
436:Citation
268:Citation
187:8 Geo. 1
174:Maryport
158:Carlisle
138:Carlisle
66:Maximum
55:Maximum
1038:England
601:Silloth
443:. c. lx
219:Bowness
168:History
160:to the
93:History
716:
680:. 178.
676:
670:Pinner
668:(10).
649:
630:
430:Canal.
85:Status
1451:Wales
448:Dates
383:Arrow
77:Locks
714:ISBN
701:link
674:ISSN
647:ISBN
628:ISBN
583:the
350:Mary
152:The
1517::
850:^
821:^
697:}}
693:{{
666:13
664:.
1022:e
1015:t
1008:v
722:.
703:)
655:.
636:.
587:(
575:(
510:(
369:(
302:(
185:(
80:8
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.