271:(EPA) notified Cholla that pollution controls were needed for Units 2 through 4. Unit 2 was retired in 2016 as the cost to add pollution controls outweighed the benefits. The remaining units were to be either retired or converted to burn another fuel source by 2025. In January 2020, it was announced that PacifiCorp would close unit 4 by the end of the year. APS announced that while a conversion to natural gas had been an option, it was no longer being considered. A proposal was put forth to convert a unit to burn biomass, however regulators at the 29: 436: 858: 809: 627: 655: 804: 675: 670: 607: 462: 710: 622: 1113: 612: 715: 660: 695: 650: 690: 685: 700: 665: 705: 680: 720: 578: 1108: 1103: 1098: 1093: 63: 410: 1118: 268: 379: 571: 736: 874: 848: 204: 564: 587: 550: 542: 494: 463:"Arizona coal generator to close in 2020, while another given lifeline as decline of plants across West continues" 961: 272: 437:"APS will try to switch coal power plant to burn wood from forest thinning, possibly cutting wildfire risk" 232: 999: 843: 799: 487: 912: 827: 632: 516: 1027: 1022: 972: 966: 267:, until the mine was closed in 2009 after its reserves being leased were exhausted. In 2010, the 387: 897: 884: 853: 819: 781: 240: 133: 907: 791: 103: 776: 546: 260: 236: 51: 8: 1123: 1017: 183: 153: 945: 940: 902: 892: 766: 751: 761: 1087: 1011: 935: 930: 256: 163: 78: 65: 556: 741: 213: 771: 756: 264: 244: 138: 746: 28: 228: 189: 591: 488:"Existing Electric Generating Units in the United States, 2006" 293: 517:"Cholla's PacifiCorp Unit 4 goes offline – The Tribune" 283:
The plant currently consists of the following units:
411:"Plan emerges for fourth unit at Cholla Power Plant" 1114:Buildings and structures in Navajo County, Arizona 255:The coal burned at the plant came mostly from the 1085: 1033:Wellton-Mohawk Irrigation and Drainage District 380:"McKinley Mine to cease operations in December" 239:, United States. The plant is jointly owned by 586: 572: 1071:Sulphur Springs Valley Electric Cooperative 1008:Hohokam Irrigation & Drainage District 579: 565: 16:Coal power plant in Navajo County, Arizona 460: 434: 408: 1109:Energy infrastructure completed in 1981 1104:Energy infrastructure completed in 1980 1099:Energy infrastructure completed in 1978 1094:Energy infrastructure completed in 1962 547:Data on generation and fuel consumption 514: 377: 205:Related media on Commons 1086: 247:. The plant began operations in 1962. 560: 1119:Coal-fired power stations in Arizona 1023:San Carlos Indian Irrigation Project 903:Morenci Water & Electric Company 378:Donovan, Bill (September 24, 2009). 941:City of Safford Electric Department 409:Randazzo, Ryan (October 13, 2014). 13: 1062:Graham County Electric Cooperative 1056:Duncan Valley Electric Cooperative 1047:Arizona Electric Power Cooperative 461:Randazzo, Ryan (January 7, 2020). 14: 1135: 551:Energy Information Administration 535: 497:, U.S. Department of Energy. 2006 495:Energy Information Administration 1005:Harquahala Valley Power District 931:Mesa Energy Resources Department 435:Randazzo, Ryan (April 2, 2019). 145:Thermal power station 27: 269:Environmental Protection Agency 1068:Navopache Electric Cooperative 508: 480: 454: 428: 402: 371: 344:Retirement scheduled for 2025 316:Retirement scheduled for 2025 275:voted down that plan in 2019. 273:Arizona Corporation Commission 1: 1050:Columbus Electric Cooperative 515:Parsons, L (1 January 2021). 364: 358:Retired December 24th, 2020 7: 1065:Mohave Electric Cooperative 1000:Gila River Indian Community 10: 1140: 1074:Trico Electric Cooperative 250: 227:is a 1.02-gigawatt (1,021 1040: 996:Electrical District No. 8 993:Electrical District No. 7 990:Electrical District No. 6 987:Electrical District No. 5 984:Electrical District No. 4 981:Electrical District No. 3 978:Electrical District No. 2 954: 921: 913:UniSource Energy Services 883: 867: 836: 818: 790: 729: 641: 598: 210: 200: 195: 182: 177: 169: 159: 149: 144: 128: 118: 102: 94: 57: 47: 39: 35: 26: 21: 1014:Tribal Utility Authority 967:Ak-Chin Indian Community 553:Electricity Data Browser 278: 962:Aha Macav Power Service 893:Ajo Improvement Company 184:Nameplate capacity 160:Turbine technology 898:Arizona Public Service 885:Investor-owned utility 241:Arizona Public Service 173:Artificial Cholla Lake 134:Arizona Public Service 119:Decommission date 79:34.94028°N 110.30028°W 973:Colorado River Agency 936:Page Electric Utility 908:Tucson Electric Power 178:Power generation 820:Solar thermal plants 292:Nameplate capacity ( 261:Window Rock, Arizona 237:Joseph City, Arizona 104:Commission date 84:34.94028; -110.30028 52:Joseph City, Arizona 975:Electrical Services 955:Government agencies 837:Photovoltaic plants 644:generating stations 601:generating stations 390:on January 26, 2023 330:Retired April 2016 196:External links 170:Cooling source 75: /  1018:Salt River Project 946:Thatcher Utilities 924:municipality owned 782:Theodore Roosevelt 730:Hydroelectric dams 259:, located east of 225:Cholla Power Plant 154:Subbituminous coal 22:Cholla Power Plant 1081: 1080: 1030:Utility Authority 1002:Utility Authority 969:Electric Utility 608:Abitibi Snowflake 362: 361: 221: 220: 150:Primary fuel 1131: 777:Stewart Mountain 656:Arlington Valley 581: 574: 567: 558: 557: 529: 528: 526: 524: 512: 506: 505: 503: 502: 492: 484: 478: 477: 475: 473: 467:Arizona Republic 458: 452: 451: 449: 447: 441:Arizona Republic 432: 426: 425: 423: 421: 415:Arizona Republic 406: 400: 399: 397: 395: 386:. Archived from 375: 286: 285: 233:coal power plant 214:edit on Wikidata 90: 89: 87: 86: 85: 80: 76: 73: 72: 71: 68: 31: 19: 18: 1139: 1138: 1134: 1133: 1132: 1130: 1129: 1128: 1084: 1083: 1082: 1077: 1036: 950: 923: 917: 879: 863: 832: 814: 786: 725: 643: 637: 628:H. Wilson Sundt 600: 594: 585: 538: 533: 532: 522: 520: 513: 509: 500: 498: 490: 486: 485: 481: 471: 469: 459: 455: 445: 443: 433: 429: 419: 417: 407: 403: 393: 391: 376: 372: 367: 281: 253: 217: 136: 123: 113: 111: 109: 83: 81: 77: 74: 69: 66: 64: 62: 61: 17: 12: 11: 5: 1137: 1127: 1126: 1121: 1116: 1111: 1106: 1101: 1096: 1079: 1078: 1076: 1075: 1072: 1069: 1066: 1063: 1060: 1059:Garkane Energy 1057: 1054: 1051: 1048: 1044: 1042: 1038: 1037: 1035: 1034: 1031: 1028:Tohono O’odham 1025: 1020: 1015: 1009: 1006: 1003: 997: 994: 991: 988: 985: 982: 979: 976: 970: 964: 958: 956: 952: 951: 949: 948: 943: 938: 933: 927: 925: 922:Community and 919: 918: 916: 915: 910: 905: 900: 895: 889: 887: 881: 880: 878: 877: 871: 869: 868:Nuclear plants 865: 864: 862: 861: 856: 851: 846: 840: 838: 834: 833: 831: 830: 824: 822: 816: 815: 813: 812: 807: 802: 796: 794: 788: 787: 785: 784: 779: 774: 769: 764: 759: 754: 749: 744: 739: 733: 731: 727: 726: 724: 723: 718: 713: 708: 703: 698: 693: 688: 683: 678: 673: 668: 663: 658: 653: 647: 645: 639: 638: 636: 635: 630: 625: 620: 615: 610: 604: 602: 596: 595: 588:Power stations 584: 583: 576: 569: 561: 555: 554: 544: 537: 536:External links 534: 531: 530: 507: 479: 453: 427: 401: 369: 368: 366: 363: 360: 359: 356: 353: 350: 346: 345: 342: 339: 336: 332: 331: 328: 325: 322: 318: 317: 314: 311: 308: 304: 303: 300: 299:Commissioning 297: 290: 280: 277: 252: 249: 219: 218: 211: 208: 207: 202: 198: 197: 193: 192: 186: 180: 179: 175: 174: 171: 167: 166: 161: 157: 156: 151: 147: 146: 142: 141: 130: 126: 125: 120: 116: 115: 106: 100: 99: 96: 92: 91: 59: 55: 54: 49: 45: 44: 41: 37: 36: 33: 32: 24: 23: 15: 9: 6: 4: 3: 2: 1136: 1125: 1122: 1120: 1117: 1115: 1112: 1110: 1107: 1105: 1102: 1100: 1097: 1095: 1092: 1091: 1089: 1073: 1070: 1067: 1064: 1061: 1058: 1055: 1052: 1049: 1046: 1045: 1043: 1039: 1032: 1029: 1026: 1024: 1021: 1019: 1016: 1013: 1010: 1007: 1004: 1001: 998: 995: 992: 989: 986: 983: 980: 977: 974: 971: 968: 965: 963: 960: 959: 957: 953: 947: 944: 942: 939: 937: 934: 932: 929: 928: 926: 920: 914: 911: 909: 906: 904: 901: 899: 896: 894: 891: 890: 888: 886: 882: 876: 873: 872: 870: 866: 860: 857: 855: 852: 850: 847: 845: 844:Agua Caliente 842: 841: 839: 835: 829: 826: 825: 823: 821: 817: 811: 808: 806: 803: 801: 798: 797: 795: 793: 789: 783: 780: 778: 775: 773: 770: 768: 765: 763: 760: 758: 755: 753: 750: 748: 745: 743: 740: 738: 737:Childs-Irving 735: 734: 732: 728: 722: 719: 717: 714: 712: 709: 707: 704: 702: 699: 697: 694: 692: 689: 687: 684: 682: 679: 677: 674: 672: 669: 667: 664: 662: 659: 657: 654: 652: 649: 648: 646: 640: 634: 631: 629: 626: 624: 621: 619: 616: 614: 611: 609: 606: 605: 603: 597: 593: 589: 582: 577: 575: 570: 568: 563: 562: 559: 552: 548: 545: 543: 540: 539: 519:. The Tribune 518: 511: 496: 489: 483: 468: 464: 457: 442: 438: 431: 416: 412: 405: 389: 385: 381: 374: 370: 357: 354: 351: 348: 347: 343: 340: 337: 334: 333: 329: 326: 323: 320: 319: 315: 312: 309: 306: 305: 301: 298: 295: 291: 288: 287: 284: 276: 274: 270: 266: 262: 258: 257:McKinley Mine 248: 246: 242: 238: 234: 230: 226: 215: 209: 206: 203: 199: 194: 191: 187: 185: 181: 176: 172: 168: 165: 164:Steam turbine 162: 158: 155: 152: 148: 143: 140: 135: 131: 127: 121: 117: 107: 105: 101: 97: 93: 88: 60: 56: 53: 50: 46: 43:United States 42: 38: 34: 30: 25: 20: 1041:Cooperatives 805:Perrin Ranch 716:West Phoenix 661:Desert Basin 617: 521:. Retrieved 510: 499:. Retrieved 482: 470:. Retrieved 466: 456: 444:. Retrieved 440: 430: 418:. Retrieved 414: 404: 392:. Retrieved 388:the original 384:Navajo Times 383: 373: 282: 254: 224: 222: 124:Unit 4: 2020 122:Unit 2: 2016 114:Unit 4: 1981 112:Unit 3: 1980 110:Unit 2: 1978 108:Unit 1: 1962 1053:Dixie Power 859:Red Horse 2 849:Avra Valley 810:Red Horse 2 767:Mormon Flat 752:Glen Canyon 523:14 February 132:Units 1–3: 98:Operational 82: / 70:110°18′01″W 58:Coordinates 1124:PacifiCorp 1088:Categories 875:Palo Verde 792:Wind farms 762:Horse Mesa 676:Harquahala 671:Gila River 599:Coal-fired 501:2008-07-14 472:January 9, 365:References 265:New Mexico 245:PacifiCorp 243:(APS) and 139:PacifiCorp 67:34°56′25″N 651:Agua Fria 642:Gas-fired 549:from the 854:Mesquite 800:Dry Lake 742:Coolidge 711:Sundance 691:Ocotillo 686:Mesquite 623:Coronado 446:April 3, 420:April 3, 394:April 3, 137:Unit 4: 129:Owner(s) 48:Location 701:Saguaro 696:Redhawk 666:Douglas 592:Arizona 491:(Excel) 251:History 201:Commons 40:Country 1012:Navajo 828:Solana 772:Parker 757:Hoover 706:Santan 681:Kyrene 633:Navajo 618:Cholla 613:Apache 338:312.3 324:288.9 310:113.6 302:Notes 188:1,021 95:Status 747:Davis 721:Yucca 355:1981 341:1980 327:1978 313:1962 289:Unit 279:Units 235:near 212:[ 541:APS 525:2023 474:2020 448:2019 422:2019 396:2019 352:414 223:The 590:in 294:MWe 263:in 231:), 1090:: 493:. 465:. 439:. 413:. 382:. 349:4 335:3 321:2 307:1 296:) 229:MW 190:MW 580:e 573:t 566:v 527:. 504:. 476:. 450:. 424:. 398:. 216:]

Index


Joseph City, Arizona
34°56′25″N 110°18′01″W / 34.94028°N 110.30028°W / 34.94028; -110.30028
Commission date
Arizona Public Service
PacifiCorp
Subbituminous coal
Steam turbine
Nameplate capacity
MW
Related media on Commons
edit on Wikidata
MW
coal power plant
Joseph City, Arizona
Arizona Public Service
PacifiCorp
McKinley Mine
Window Rock, Arizona
New Mexico
Environmental Protection Agency
Arizona Corporation Commission
MWe
"McKinley Mine to cease operations in December"
the original
"Plan emerges for fourth unit at Cholla Power Plant"
"APS will try to switch coal power plant to burn wood from forest thinning, possibly cutting wildfire risk"
"Arizona coal generator to close in 2020, while another given lifeline as decline of plants across West continues"