234: 29: 392: 364: 378: 409: 229:
of Andorra granted Forces Andorranes Societat Anonima (FASA), a Spanish and French-owned company, the ability to develop the country for hydroelectric power. In return, FASA would construct roads various highways connecting to Andorra in return for exporting the energy. Construction of the power
230:
station and Engolasters Dam began in 1930 and the power station with two 14 MW generators was commissioned in August 1934. Beginning in 2007, a third Pelton turbine-generator was added to the station. At 17 MW, it was commissioned in 2008.
66: 413: 444: 439: 305: 449: 429: 222:-generators. The difference in elevation between the lake and power station is about 490 metres (1,610 ft). 256:"Rail and Voucher Systems in Power Plants and Mines of Western Pyrenees Catalan, Andorra and Val d'Aran" 255: 226: 397: 309: 434: 8: 199: 165: 207: 203: 283: 233: 28: 369: 219: 142: 423: 152: 81: 68: 206:, located 1,616 metres (5,302 ft) above sea level in order to generate 383: 195: 183: 158: 50: 331: 391: 211: 171: 377: 191: 408: 187: 54: 218:
to the power station which contains two 14 MW and one 17 MW
214:
deliver water from the 178 m (584 ft) long
359: 421: 308:. Forces Elèctriques d'Andorra. Archived from 284:"Hydroelectric Power Plants in Europe - Other" 27: 278: 276: 232: 445:Energy infrastructure completed in 1934 440:Hydroelectric power stations in Andorra 237:Penstock extending from Engolasters Dam 422: 306:"Escaldes Hydroelectric Power Station" 210:. A 1,250 metres (4,100 ft) long 273: 414:Escaldes Hydroelectric Power Station 337:(in Spanish). Andritz. November 2007 180:Escaldes Hydroelectric Power Station 132:Forces Electriques d'Andorra (FEDA) 13: 261:(in Spanish). DocuTren. p. 15 198:, is located just to the south in 22:Escaldes Hydroelectric Power Plant 14: 461: 353: 407: 390: 376: 362: 157:2 x 14 MW, 1 x 17 MW 450:1934 establishments in Andorra 324: 298: 248: 1: 241: 7: 202:parish. It uses water from 10: 466: 16:Dam in Engolasters, Encamp 164: 151: 141: 136: 128: 113: 105: 97: 60: 46: 38: 26: 21: 82:42.5150306°N 1.5535944°E 398:Renewable energy portal 166:Installed capacity 106:Construction began 430:Dams completed in 1934 238: 33:Inside the power house 236: 87:42.5150306; 1.5535944 416:at Wikimedia Commons 78: /  239: 200:Escaldes-Engordany 412:Media related to 177: 176: 114:Opening date 457: 411: 400: 395: 394: 386: 381: 380: 372: 367: 366: 365: 347: 346: 344: 342: 336: 328: 322: 321: 319: 317: 312:on 18 April 2015 302: 296: 295: 293: 291: 280: 271: 270: 268: 266: 260: 252: 208:hydroelectricity 204:Lake Engolasters 194:. Its namesake, 124: 122: 93: 92: 90: 89: 88: 83: 79: 76: 75: 74: 71: 31: 19: 18: 465: 464: 460: 459: 458: 456: 455: 454: 420: 419: 404: 403: 396: 389: 382: 375: 368: 363: 361: 356: 351: 350: 340: 338: 334: 330: 329: 325: 315: 313: 304: 303: 299: 289: 287: 282: 281: 274: 264: 262: 258: 254: 253: 249: 244: 227:General Council 216:Engolasters Dam 120: 118: 86: 84: 80: 77: 72: 69: 67: 65: 64: 34: 17: 12: 11: 5: 463: 453: 452: 447: 442: 437: 432: 418: 417: 402: 401: 387: 373: 370:Andorra portal 358: 357: 355: 354:External links 352: 349: 348: 323: 297: 272: 246: 245: 243: 240: 220:Pelton turbine 182:is located in 175: 174: 168: 162: 161: 155: 149: 148: 145: 143:Hydraulic head 139: 138: 134: 133: 130: 126: 125: 115: 111: 110: 107: 103: 102: 99: 95: 94: 62: 58: 57: 48: 44: 43: 40: 36: 35: 32: 24: 23: 15: 9: 6: 4: 3: 2: 462: 451: 448: 446: 443: 441: 438: 436: 433: 431: 428: 427: 425: 415: 410: 406: 405: 399: 393: 388: 385: 379: 374: 371: 360: 333: 327: 311: 307: 301: 286:. IndustCards 285: 279: 277: 257: 251: 247: 235: 231: 228: 223: 221: 217: 213: 209: 205: 201: 197: 193: 189: 185: 181: 173: 169: 167: 163: 160: 156: 154: 150: 146: 144: 140: 137:Power Station 135: 131: 127: 116: 112: 108: 104: 100: 96: 91: 70:42°30′54.11″N 63: 59: 56: 52: 49: 45: 41: 37: 30: 25: 20: 435:Masonry dams 384:Water portal 339:. Retrieved 332:"Hydro News" 326: 314:. Retrieved 310:the original 300: 288:. Retrieved 263:. Retrieved 250: 225:In 1929 the 224: 215: 196:Les Escaldes 179: 178: 73:1°33′12.94″E 184:Engolasters 159:Pelton-type 129:Operator(s) 101:Operational 85: / 61:Coordinates 51:Engolasters 424:Categories 341:17 January 316:17 January 290:17 January 265:17 January 242:References 190:parish in 147:490 m 212:penstock 153:Turbines 47:Location 192:Andorra 186:of the 119: ( 42:Andorra 39:Country 188:Encamp 98:Status 55:Encamp 335:(PDF) 259:(PDF) 343:2015 318:2015 292:2015 267:2015 121:1934 117:1934 109:1930 170:45 426:: 275:^ 172:MW 53:, 345:. 320:. 294:. 269:. 123:)

Index


Engolasters
Encamp
42°30′54.11″N 1°33′12.94″E / 42.5150306°N 1.5535944°E / 42.5150306; 1.5535944
Hydraulic head
Turbines
Pelton-type
Installed capacity
MW
Engolasters
Encamp
Andorra
Les Escaldes
Escaldes-Engordany
Lake Engolasters
hydroelectricity
penstock
Pelton turbine
General Council

"Rail and Voucher Systems in Power Plants and Mines of Western Pyrenees Catalan, Andorra and Val d'Aran"


"Hydroelectric Power Plants in Europe - Other"
"Escaldes Hydroelectric Power Station"
the original
"Hydro News"
Andorra portal
icon
Water portal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.