374:, was completed in October 1998 at the cost of $ 40 million (excluding land acquisition). The second segment, a 7.2-mile (11.6 km) extension from IL 143 to Fosterburg Road was constructed for $ 78.1 million and opened on October 20, 2006, approximately one year behind schedule, owing to the 2005 collapse of the Wisconsin-based construction company that held the contracts for that portion of the roadway. The $ 25.1 million third segment opened on August 22, 2008 and extended the road from Fosterburg Road to Seminary Road. The fourth and final segment opened on November 23, 2012 and extended the road 4.3 miles (6.9 km) from Seminary Road to US 67 in Godfrey, just north of the intersection of US 67 and Montclaire Avenue ( 367:) that roughly parallel the IL 255 corridor. Although it was part of the much larger Corridor 413 plan, the local politicians focused mostly on the segment from I-270 to what was then IL 267 north of the Godfrey "Y" intersection. At that time, the Berm Highway, the Beltline extension, and the Madison Avenue connector were not built and both IL 3 and IL 111 were over capacity between Alton and I-270. In 1975, a six-month detour related with the closing of the Old Clark Bridge exposed the need for the Alton Bypass along with the other three routes. However, until 1985, the Alton Bypass was a low priority, as other local road projects in the area were considered more important. 845: 821: 864: 833: 28: 460: 876: 735: 730: 637: 632: 596: 560: 244: 766: 1173: 772: 466: 441: 229: 119: 96: 91: 1108: 350:
Described as "the Road to Prosperity" by business leaders and government officials who initially proposed it in the late 1970s, IL 255 was part of a region-wide effort to create a high-speed alternative to
1116: 1082: 370:
The roadway was constructed in four segments opening from 1998 to 2012 at a total cost of $ 165.2 million. The first 6.5-mile (10.5 km) segment, from I-270 to
299:, at a total length of approximately 23.3 miles (37.5 km). It was constructed in four segments opening from 1998 to 2012 at a total cost of $ 165.2 million. 1213: 315:. The final segment—4.3 miles (6.9 km) from Seminary Road to US 67 in Godfrey, just north of the intersection of US 67 and Montclaire Avenue ( 1049: 1023: 844: 518: 328: 1162: 192: 1208: 444: 103: 908: 339: 58: 800: 785:
Northern terminus; northbound exit and southbound entrance; no access to southbound US 67 or from northbound US 67
1193: 1177: 284: 197: 202: 1149: 479:
Southern terminus; exit number based on I-255 mileage; I-270 west exit 7B, east exit 7; roadway continues as I-255
1144: 657: 832: 184: 311:
for its entire length. It serves as an important circumferential artery for the northeastern portion of the
335: 212: 324: 820: 1056: 776: 352: 292: 122: 391: 165: 424: 288: 107: 1198: 780: 567: 540: 484: 1161: 448: 956: 603: 580: 571: 8: 1203: 1055:(Press release). Illinois Department of Transportation. August 22, 2008. Archived from 742: 738: 652: 644: 640: 616: 607: 599: 563: 474: 379: 375: 371: 364: 320: 316: 247: 1153: 880: 746: 702: 312: 296: 280: 126: 997: 525: 360: 207: 868: 648: 904: 470: 272: 232: 99: 323:)—was opened on November 23, 2012. The highway passes just to the west of the 1187: 145: 452: 356: 1109:"Remaining sections of Illinois 255 freeway expected to open in October" 276: 962:. Letter to District engineers. Illinois Department of Transportation 359:
through the city-center of Alton, and to two congested local routes (
930: 902: 155: 308: 1172: 762: 27: 790:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
850:
Damaged signs off exit 2, which has since been removed
957:"Federal-Aid Freeway System: Supplemental Freeways" 784: 760: 1185: 334:Although IL 255 was designed to federal 16:State highway in Madison County, Illinois, US 903:Illinois Technology Transfer Center (2006). 307:IL 255 is a four-lane, limited-access 1214:Transportation in Madison County, Illinois 1166: 519:Southern Illinois University Edwardsville 329:Southern Illinois University Edwardsville 1163:Template:Attached KML/Illinois Route 255 1022:Schmidt, Sanford J. (October 21, 2006). 1015: 1083:"Final Stretch of Highway 255 Now Open" 1074: 1021: 838:Northbound at IL 111 (exit 8) 1186: 1106: 1080: 995: 909:Illinois Department of Transportation 754: 727: 720: 713: 706: 694: 685: 675: 666: 629: 620: 593: 584: 557: 548: 538: 529: 513: 504: 497: 488: 437: 428: 340:Illinois Department of Transportation 954: 922: 898: 896: 302: 1042: 1024:"New Stretch of Illinois 255 Opens" 981:"Alton Interstate Tie-In Revived". 928: 342:(IDOT) using state-provided funds. 13: 408: 271:, is a northwesterly extension of 14: 1225: 1135: 1081:Leiser, Ken (November 23, 2012). 955:Dees, Dan C. (November 1, 1974). 893: 1171: 998:"Illinois 255: The Alton Bypass" 996:Harvey, Kim (October 14, 1998). 874: 862: 843: 831: 819: 770: 764: 733: 728: 635: 630: 594: 558: 464: 458: 439: 242: 227: 117: 94: 89: 68:23.3 mi (37.5 km) 26: 1107:Hillig, Terry (July 11, 2012). 985:. February 7, 1985. p. A1. 1100: 989: 974: 948: 46:IL 255 highlighted in red 1: 1209:Freeways in the United States 970:– via MidwestRoads.com. 886: 826:Control city from IL 111 498:Gateway Commerce Center Drive 403: 382:) at a cost of $ 22 million. 185:Illinois State Highway System 385: 336:Interstate Highway standards 7: 855: 812: 313:St. Louis metropolitan area 281:St. Louis metropolitan area 267:), also referred to as the 10: 1230: 1194:State highways in Illinois 345: 325:St. Louis Regional Airport 789: 757: 750: 724: 722: 716: 710: 708: 701: 697: 691: 688: 682: 678: 672: 669: 663: 656: 626: 623: 615: 611: 590: 587: 579: 575: 554: 551: 544: 535: 532: 524: 516: 510: 507: 500: 494: 491: 483: 478: 434: 431: 423: 418: 415: 412: 407: 402: 399: 220: 180: 175: 171: 161: 151: 141: 136: 132: 113: 85: 80: 72: 64: 56: 51: 44: 39: 23: 1167:KML is not from Wikidata 796:     283:. IL 255 starts at 1087:St. Louis Post-Dispatch 390:The entire route is in 261:Illinois Route 255 1113:St. Louis Post Dipatch 1002:St. Louis Highway Page 935:Illinois Highways Page 539:Madison Avenue – 338:, it was built by the 881:U.S. Roads portal 277:southwestern Illinois 1180:at Wikimedia Commons 76:October 1998–present 931:"Routes 203 and up" 869:Illinois portal 1178:Illinois Route 255 1119:on August 23, 2018 293:U.S. Route 67 33:Illinois Route 255 1176:Media related to 810: 809: 801:Incomplete access 303:Route description 258: 257: 254: 253: 52:Route information 1221: 1175: 1157: 1129: 1128: 1126: 1124: 1115:. Archived from 1104: 1098: 1097: 1095: 1093: 1078: 1072: 1071: 1069: 1067: 1061: 1054: 1046: 1040: 1039: 1037: 1035: 1019: 1013: 1012: 1010: 1008: 993: 987: 986: 978: 972: 971: 969: 967: 961: 952: 946: 945: 943: 941: 926: 920: 919: 917: 915: 900: 879: 878: 877: 867: 866: 865: 847: 835: 823: 803: 797: 775: 774: 773: 768: 767: 737: 736: 732: 731: 658:SPUI interchange 639: 638: 634: 633: 598: 597: 562: 561: 469: 468: 467: 462: 461: 455: 443: 442: 410: 405: 397: 396: 295:(US 67) in 250: 246: 245: 235: 231: 230: 222: 221: 121: 120: 98: 97: 93: 92: 30: 21: 20: 1229: 1228: 1224: 1223: 1222: 1220: 1219: 1218: 1184: 1183: 1168: 1165: 1160: 1159: 1158: 1142: 1138: 1133: 1132: 1122: 1120: 1105: 1101: 1091: 1089: 1079: 1075: 1065: 1063: 1062:on May 29, 2010 1059: 1052: 1048: 1047: 1043: 1033: 1031: 1020: 1016: 1006: 1004: 994: 990: 983:Alton Telegraph 980: 979: 975: 965: 963: 959: 953: 949: 939: 937: 929:Carlson, Rich. 927: 923: 913: 911: 901: 894: 889: 875: 873: 863: 861: 858: 851: 848: 839: 836: 827: 824: 815: 806: 799: 795: 791: 771: 769: 765: 763: 734: 729: 676:Fosterburg Road 636: 631: 595: 559: 465: 463: 459: 457: 456: 440: 438: 388: 348: 305: 243: 241: 228: 226: 118: 95: 90: 81:Major junctions 47: 35: 34: 31: 17: 12: 11: 5: 1227: 1217: 1216: 1211: 1206: 1201: 1196: 1182: 1181: 1141: 1140: 1139: 1137: 1136:External links 1134: 1131: 1130: 1099: 1073: 1050:"Alton Bypass" 1041: 1014: 988: 973: 947: 921: 891: 890: 888: 885: 884: 883: 871: 857: 854: 853: 852: 849: 842: 840: 837: 830: 828: 825: 818: 814: 811: 808: 807: 805: 804: 792: 787: 786: 783: 761: 759: 756: 752: 751: 749: 726: 723: 721: 718: 717: 715: 712: 709: 707: 705: 699: 698: 696: 693: 690: 687: 684: 680: 679: 677: 674: 671: 668: 665: 661: 660: 655: 628: 625: 622: 619: 613: 612: 610: 592: 589: 586: 583: 577: 576: 574: 556: 553: 550: 546: 545: 543: 537: 534: 531: 528: 522: 521: 515: 512: 509: 506: 502: 501: 499: 496: 493: 490: 487: 481: 480: 477: 436: 433: 430: 427: 421: 420: 417: 414: 411: 406: 401: 392:Madison County 387: 384: 347: 344: 304: 301: 273:Interstate 255 256: 255: 252: 251: 238: 236: 218: 217: 216: 215: 210: 205: 200: 195: 189: 188: 178: 177: 176:Highway system 173: 172: 169: 168: 163: 159: 158: 153: 149: 148: 143: 139: 138: 134: 133: 130: 129: 115: 114:North end 111: 110: 87: 86:South end 83: 82: 78: 77: 74: 70: 69: 66: 62: 61: 57:Maintained by 54: 53: 49: 48: 45: 42: 41: 37: 36: 32: 25: 24: 15: 9: 6: 4: 3: 2: 1226: 1215: 1212: 1210: 1207: 1205: 1202: 1200: 1199:Interstate 55 1197: 1195: 1192: 1191: 1189: 1179: 1174: 1170: 1169: 1164: 1155: 1151: 1147: 1146: 1118: 1114: 1110: 1103: 1088: 1084: 1077: 1058: 1051: 1045: 1029: 1028:The Telegraph 1025: 1018: 1003: 999: 992: 984: 977: 958: 951: 936: 932: 925: 910: 906: 905:"T2 GIS Data" 899: 897: 892: 882: 872: 870: 860: 859: 846: 841: 834: 829: 822: 817: 816: 802: 794: 793: 788: 782: 779:north – 778: 753: 748: 744: 740: 719: 704: 700: 695:Seminary Road 681: 662: 659: 654: 650: 646: 642: 618: 614: 609: 605: 601: 582: 578: 573: 569: 565: 547: 542: 527: 523: 520: 514:New Poag Road 503: 486: 482: 476: 473:south – 472: 454: 450: 446: 426: 425:Pontoon Beach 422: 398: 395: 393: 383: 381: 377: 373: 368: 366: 362: 358: 354: 343: 341: 337: 332: 330: 326: 322: 318: 314: 310: 300: 298: 294: 290: 289:Pontoon Beach 286: 282: 278: 274: 270: 266: 262: 249: 239: 237: 234: 224: 223: 219: 214: 211: 209: 206: 204: 201: 199: 196: 194: 191: 190: 187: 186: 182: 181: 179: 174: 170: 167: 164: 160: 157: 154: 150: 147: 146:United States 144: 140: 135: 131: 128: 124: 116: 112: 109: 108:Pontoon Beach 105: 101: 88: 84: 79: 75: 71: 67: 63: 60: 55: 50: 43: 38: 29: 22: 19: 1143: 1123:November 26, 1121:. Retrieved 1117:the original 1112: 1102: 1092:November 24, 1090:. Retrieved 1086: 1076: 1064:. Retrieved 1057:the original 1044: 1032:. Retrieved 1027: 1017: 1005:. Retrieved 1001: 991: 982: 976: 966:February 16, 964:. Retrieved 950: 938:. Retrieved 934: 924: 912:. Retrieved 798:   781:Jacksonville 714:Humbert Road 568:Edwardsville 541:South Roxana 485:Edwardsville 453:Indianapolis 416:Destinations 389: 369: 357:Clark Bridge 349: 333: 306: 291:and ends at 269:Alton Bypass 268: 264: 260: 259: 183: 40:Alton Bypass 18: 1066:October 25, 1034:October 25, 1030:. Alton, IL 940:October 26, 914:November 8, 743:IL 267 739:IL 111 645:IL 140 641:IL 111 600:IL 111 564:IL 143 449:Kansas City 380:IL 111 376:IL 267 372:IL 143 365:IL 111 321:IL 111 317:IL 267 275:(I-255) in 265:IL 255 248:IL 267 1204:Metro East 1188:Categories 887:References 777:US 67 604:Wood River 581:Wood River 572:Wood River 353:US 67 193:Interstate 123:US 67 386:Exit list 361:IL 3 355:over the 1145:KML file 856:See also 813:Pictures 745: – 741: / 653:Bethalto 647: – 643: / 617:Bethalto 608:Bethalto 602: – 566: – 447: – 400:Location 208:Tollways 162:Counties 156:Illinois 137:Location 102: / 1007:June 2, 747:Godfrey 703:Godfrey 683:​ 664:​ 517:Serves 475:Memphis 346:History 309:freeway 297:Godfrey 279:in the 166:Madison 142:Country 127:Godfrey 73:Existed 526:Roxana 213:Scenic 65:Length 1060:(PDF) 1053:(PDF) 960:(PDF) 689:26.41 686:16.41 670:21.71 667:13.49 649:Alton 624:16.59 621:10.31 588:12.94 552:10.46 471:I-255 445:I-270 419:Notes 285:I-270 233:I-255 203:State 152:State 104:I-270 100:I-255 1154:help 1150:edit 1125:2018 1094:2012 1068:2008 1036:2008 1009:2006 968:2015 942:2008 916:2007 758:37.5 755:23.3 585:8.04 549:6.50 533:8.42 530:5.23 508:4.80 505:2.98 492:1.77 489:1.10 432:0.00 429:0.00 413:Exit 363:and 327:and 59:IDOT 287:in 125:in 106:in 1190:: 1152:• 1111:. 1085:. 1026:. 1000:. 933:. 907:. 895:^ 725:20 711:19 692:16 673:13 651:, 627:10 606:, 570:, 451:, 435:30 409:km 404:mi 394:. 331:. 240:→ 225:← 198:US 1156:) 1148:( 1127:. 1096:. 1070:. 1038:. 1011:. 944:. 918:. 591:8 555:6 536:5 511:3 495:2 378:/ 319:/ 263:(

Index

Illinois Route 255 marker
IDOT
I-255
I-270
Pontoon Beach
US 67
Godfrey
United States
Illinois
Madison
Illinois State Highway System
Interstate
US
State
Tollways
Scenic
I-255
IL 267
Interstate 255
southwestern Illinois
St. Louis metropolitan area
I-270
Pontoon Beach
U.S. Route 67
Godfrey
freeway
St. Louis metropolitan area
IL 267
IL 111
St. Louis Regional Airport

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.