76:
68:
121:
103:
52:
276:
147:
The joint design must consider the anticipated operational movement of each joint. Timing is also important, as freshly poured concrete shrinks particularly during the first few months of a new building, potentially causing joint size changes.
159:
Where vertical fire-resistance rated wall assemblies meet the underside of the floor slab above, a movement joint results, which can be subject to compression, as the freshly placed
271:
27:
elements meet without applying a static load from one element to another. When one or more of these vertical or horizontal elements that meet are required by the local
125:
141:
266:
40:
296:
242:
291:
222:
192:
87:
197:
163:
cures and shrinks all over a new building. This joint must be firestopped in a flexible manner.
212:
202:
177:
114:
32:
8:
301:
136:
must be able to demonstrate the ability to withstand operational movement prior to
75:
217:
285:
28:
207:
111:
95:
16:
Junction where building elements meet without applying loads to one another
84:
80:
71:
HOW Joint with uneven silicone caulking thickness. Status: inoperable.
137:
187:
172:
160:
133:
107:
91:
60:
56:
36:
24:
267:
UL2079 Scope: Tests for Fire
Resistance of Building Joint Systems
182:
67:
142:
UL 2079 -- Tests for Fire
Resistance of Building Joint Systems
120:
102:
51:
140:. Firestops for such building joints can be qualified to
35:, the resulting opening that makes up the joint must be
124:
HOW joint penetrated by both mechanical and electrical
106:"HOW" (Head Of Wall) Building Joint with incomplete
55:Perimeter slab edge building joint with incomplete
243:"Cement Association of Canada - Drying Shrinkage"
283:
46:
132:Such joints are often subject to movement.
119:
101:
74:
66:
50:
284:
154:
13:
63:floor and precast concrete facade.
14:
313:
260:
83:insulation in point contact with
39:in order to restore the required
277:UL HW-S-0055: A common condition
272:UL treatise on building joints
245:. Cement Association of Canada
235:
1:
228:
7:
166:
10:
318:
47:Qualification requirements
297:Passive fire protection
198:Passive fire protection
213:Packing (firestopping)
203:Active fire protection
178:Penetration (firestop)
129:
117:
99:
72:
64:
33:fire-resistance rating
123:
105:
78:
70:
54:
292:Building engineering
98:without topcaulking.
90:backban. Incomplete
41:compartmentalisation
23:is a junction where
155:Head-of-Wall (HOW)
130:
118:
100:
73:
65:
309:
254:
253:
251:
250:
239:
317:
316:
312:
311:
310:
308:
307:
306:
282:
281:
263:
258:
257:
248:
246:
241:
240:
236:
231:
169:
157:
151:
49:
17:
12:
11:
5:
315:
305:
304:
299:
294:
280:
279:
274:
269:
262:
261:External links
259:
256:
255:
233:
232:
230:
227:
226:
225:
220:
218:Fire sprinkler
215:
210:
205:
200:
195:
190:
185:
180:
175:
168:
165:
156:
153:
48:
45:
21:building joint
15:
9:
6:
4:
3:
2:
314:
303:
300:
298:
295:
293:
290:
289:
287:
278:
275:
273:
270:
268:
265:
264:
244:
238:
234:
224:
221:
219:
216:
214:
211:
209:
206:
204:
201:
199:
196:
194:
191:
189:
186:
184:
181:
179:
176:
174:
171:
170:
164:
162:
152:
149:
145:
143:
139:
135:
127:
122:
116:
113:
109:
104:
97:
93:
89:
86:
82:
77:
69:
62:
58:
53:
44:
42:
38:
34:
30:
29:building code
26:
22:
247:. Retrieved
237:
223:Articulation
208:Mineral wool
193:Curtain wall
158:
150:
146:
138:fire testing
131:
88:curtain wall
79:Combustible
20:
18:
85:sheet metal
81:Polystyrene
37:firestopped
286:Categories
249:2008-05-05
229:References
126:penetrants
59:, between
31:to have a
302:Firestops
134:Firestops
188:Firestop
173:Concrete
167:See also
161:concrete
112:rockwool
110:made of
108:firestop
96:rockwool
94:made of
92:firestop
61:concrete
57:firestop
25:building
183:Sealant
115:packing
288::
144:.
128:,
43:.
19:A
252:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.