125: 105: 212:. Karnataka Power Corporation Limited began its journey with a humble beginning in 1970. With an installed capacity of 746 MW (1970), it has expanded its capacity to 8738.305 MW (2019). A revenue of Rs.77442 Million in 2019 as compared, to Rs.1.30 Million in 1971, speaks volumes about KPCL's progress. 229:
at Raichur And two more thermal project at Bellary of 500 MW station. The installed capacity of the thermal power station is 1720 MW (210 MW ×7units+1x250MW) at Raichur and 1700MW (2x500MW+1x700MW) at Bellary. The total gross power generation per annum is in the order of
224:
projects of Karnataka Power Corporation Limited are built mainly across rivers Kaveri (Cauvery), Sharavathi, Kali, Krishna, Tungabhadra and their tributaries. The total installed capacity of KPCL is 8846.305 MW. The corporation has its
234:
at a plant load factor (PLF) 80% and 11,589 GW·h at a plant load factor of 90%. The corporation, in order to increase generation, has planned one moreadditional units in Bellary of 1x700MW, The corporation has
1164:
1035 Nagjhari Hydel 6 150 900 Varahi River Hydel 4 115 460 Almatti Dam Hydel 5 + 1 5x55 + 1x15 290 Gerusoppa Hydel 4 60 240 Kadra Dam Hydel 3 50 150 Kodasalli Dam Hydel 3 40 120 Supa Dam Hydel 2 50 100
204:. The company was started on 20.07.1970 due to a vision of the Karnataka government for separate entities for generation and distribution of electric power. This was done, long before 220:
KPCL has 34 dams (including the main, pickup and saddle dams) and 24 power stations across the state with power production capabilities ranging from 0.35 MW to 1035 MW. The
1202: 29: 1152: 1024: 1177: 1207: 1197: 1111: 1212: 1192: 1147: 1017: 1101: 928: 1187: 1106: 1010: 965: 1126: 1116: 1065: 1121: 1080: 308: 236: 1075: 1055: 289: 270: 1182: 1142: 1060: 1037: 1002: 49: 226: 8: 1070: 492: 239:
under construction at Yermarus, Raichur of capacity, with two units of 800MW each.
189: 185: 1033: 39: 1171: 969: 437: 221: 181: 363: 201: 87:
Srikar M S, IAS, Managing Director & Narendra kumar, Technical Director
382: 193: 327: 205: 169: 117: 208:
dictated power sector reforms were initiated in early 21st century in
1041: 418: 173: 165: 71: 67: 456: 1032: 149: 994: 231: 936: 923: 918: 913: 209: 177: 75: 28: 197: 128: 108: 1153:
Indian states ranking by households having electricity
1203:
Non-renewable resource companies established in 1970
180:. The modes for generation of electric power are 1169: 851:Simsha Solar PV Plant, Shimshapur Mandya Dist 215: 168:, and is engaged in the Service of generating 1112:Chamundeshwari Electricity Supply Corporation 1018: 16:Power generation company in Karnataka, India 1148:States of India by installed power capacity 1025: 1011: 960: 958: 164:) is a company owned by the government of 27: 1102:Karnataka Power Transmission Corporation 834:Yapaldinni Solar PV Plant, Raichur Dist 955: 1178:Electric-generation companies of India 1170: 817:Yalesandra Solar PV Plant, Kolar Dist 1006: 247:The power stations of Karnataka are: 242: 1208:Indian companies established in 1970 1198:Energy companies established in 1970 1107:Mangalore Electricity Supply Company 1213:1970 establishments in Mysore State 1193:State electricity agencies of India 868:Itnal Solar PV Plant, Belgaum Dist 158:Karnataka Power Corporation Limited 22:Karnataka Power Corporation Limited 13: 1127:Power System Operation Corporation 1117:Nuclear Power Corporation of India 14: 1224: 1066:Kudgi Super Thermal Power Station 988: 124: 123: 104: 103: 1122:PowerGrid Corporation of India 1081:Yermarus Thermal Power Station 309:Yermarus Thermal Power Station 237:Yermarus Thermal Power Station 150:http://www.karnatakapower.com/ 1: 1076:Raichur Thermal Power Station 1056:Bellary Thermal Power station 948: 290:Bellary Thermal Power station 271:Raichur Thermal Power station 7: 1188:State agencies of Karnataka 1143:Electricity sector in India 1097:Karnataka Power Corporation 907: 216:Power projects in Karnataka 10: 1229: 1061:Kaiga Atomic Power Station 1135: 1089: 1048: 145: 135: 115: 99: 91: 81: 63: 55: 45: 35: 26: 172:power in the state of 50:Electricity generation 227:thermal power station 545:Bhadra right bank-2 528:Bhadra right bank-1 131:254.35 crores (2019) 111:7744.20 crores(2019) 1183:Energy in Karnataka 579:Bhadra left bank-2 562:Bhadra left bank-1 137:Number of employees 23: 966:"Projects of KPCL" 243:Installed capacity 21: 1161: 1160: 1071:Udupi Power Plant 905: 904: 647:Shivanasamudra-2 630:Shivanasamudra-1 155: 154: 1220: 1027: 1020: 1013: 1004: 1003: 982: 981: 979: 977: 968:. Archived from 962: 493:Linganamakki Dam 259:Number of Units 250: 249: 127: 126: 107: 106: 31: 24: 20: 1228: 1227: 1223: 1222: 1221: 1219: 1218: 1217: 1168: 1167: 1162: 1157: 1131: 1085: 1044: 1031: 1000: 991: 986: 985: 975: 973: 972:on 12 July 2011 964: 963: 956: 951: 910: 800:Kappatagudda-2 783:Kappatagudda-1 245: 218: 138: 120: 84: 17: 12: 11: 5: 1226: 1216: 1215: 1210: 1205: 1200: 1195: 1190: 1185: 1180: 1159: 1158: 1156: 1155: 1150: 1145: 1139: 1137: 1136:Related topics 1133: 1132: 1130: 1129: 1124: 1119: 1114: 1109: 1104: 1099: 1093: 1091: 1087: 1086: 1084: 1083: 1078: 1073: 1068: 1063: 1058: 1052: 1050: 1049:Power stations 1046: 1045: 1034:Power stations 1030: 1029: 1022: 1015: 1007: 998: 997: 990: 989:External links 987: 984: 983: 953: 952: 950: 947: 946: 945: 942: 939: 934: 931: 926: 921: 916: 909: 906: 903: 902: 897: 894: 891: 888: 882: 881: 878: 875: 872: 871:Solar Project 869: 865: 864: 861: 858: 855: 854:Solar Project 852: 848: 847: 844: 841: 838: 837:Solar Project 835: 831: 830: 827: 824: 821: 820:Solar Project 818: 814: 813: 810: 807: 804: 801: 797: 796: 793: 790: 787: 784: 780: 779: 776: 773: 770: 767: 763: 762: 759: 756: 753: 750: 746: 745: 742: 739: 736: 733: 729: 728: 725: 722: 719: 716: 712: 711: 708: 705: 702: 699: 695: 694: 691: 688: 685: 682: 678: 677: 674: 671: 668: 665: 661: 660: 657: 654: 651: 648: 644: 643: 640: 637: 634: 631: 627: 626: 623: 620: 617: 614: 610: 609: 606: 603: 600: 597: 593: 592: 589: 586: 583: 580: 576: 575: 572: 569: 566: 563: 559: 558: 555: 552: 549: 546: 542: 541: 538: 535: 532: 529: 525: 524: 521: 518: 515: 512: 508: 507: 504: 501: 498: 495: 489: 488: 485: 482: 479: 476: 472: 471: 468: 465: 462: 459: 453: 452: 449: 446: 443: 440: 434: 433: 430: 427: 424: 421: 415: 414: 411: 408: 405: 402: 398: 397: 394: 391: 388: 385: 379: 378: 375: 372: 369: 366: 360: 359: 356: 353: 350: 347: 343: 342: 339: 336: 333: 330: 324: 323: 320: 317: 314: 311: 305: 304: 301: 300:2x500 + 1x700 298: 295: 292: 286: 285: 282: 281:7x210 + 1x250 279: 276: 273: 267: 266: 263: 262:Capacity (MW) 260: 257: 254: 253:Power Station 244: 241: 217: 214: 153: 152: 147: 143: 142: 139: 136: 133: 132: 121: 116: 113: 112: 101: 97: 96: 93: 89: 88: 85: 82: 79: 78: 65: 61: 60: 57: 53: 52: 47: 43: 42: 37: 33: 32: 15: 9: 6: 4: 3: 2: 1225: 1214: 1211: 1209: 1206: 1204: 1201: 1199: 1196: 1194: 1191: 1189: 1186: 1184: 1181: 1179: 1176: 1175: 1173: 1166: 1154: 1151: 1149: 1146: 1144: 1141: 1140: 1138: 1134: 1128: 1125: 1123: 1120: 1118: 1115: 1113: 1110: 1108: 1105: 1103: 1100: 1098: 1095: 1094: 1092: 1090:Organizations 1088: 1082: 1079: 1077: 1074: 1072: 1069: 1067: 1064: 1062: 1059: 1057: 1054: 1053: 1051: 1047: 1043: 1039: 1038:organizations 1035: 1028: 1023: 1021: 1016: 1014: 1009: 1008: 1005: 1001: 996: 995:Official site 993: 992: 971: 967: 961: 959: 954: 943: 940: 938: 935: 932: 930: 927: 925: 922: 920: 917: 915: 912: 911: 901: 898: 895: 892: 889: 887: 884: 883: 879: 876: 873: 870: 867: 866: 862: 859: 856: 853: 850: 849: 845: 842: 839: 836: 833: 832: 828: 825: 822: 819: 816: 815: 811: 808: 805: 802: 799: 798: 794: 791: 788: 785: 782: 781: 777: 774: 771: 768: 765: 764: 760: 757: 754: 751: 748: 747: 743: 740: 737: 734: 731: 730: 726: 723: 720: 717: 714: 713: 709: 706: 703: 700: 697: 696: 692: 689: 686: 683: 680: 679: 675: 672: 669: 666: 663: 662: 658: 655: 652: 649: 646: 645: 641: 638: 635: 632: 629: 628: 624: 621: 618: 615: 612: 611: 607: 604: 601: 598: 595: 594: 590: 587: 584: 581: 578: 577: 573: 570: 567: 564: 561: 560: 556: 553: 550: 547: 544: 543: 539: 536: 533: 530: 527: 526: 522: 519: 516: 513: 510: 509: 505: 502: 499: 496: 494: 491: 490: 486: 483: 480: 477: 474: 473: 469: 466: 463: 460: 458: 455: 454: 450: 447: 444: 441: 439: 438:Kodasalli Dam 436: 435: 431: 428: 425: 422: 420: 417: 416: 412: 409: 406: 403: 400: 399: 395: 392: 389: 386: 384: 381: 380: 376: 373: 370: 367: 365: 362: 361: 357: 354: 351: 348: 345: 344: 340: 337: 334: 331: 329: 326: 325: 321: 318: 315: 312: 310: 307: 306: 302: 299: 296: 293: 291: 288: 287: 283: 280: 277: 274: 272: 269: 268: 264: 261: 258: 255: 252: 251: 248: 240: 238: 233: 228: 223: 222:hydroelectric 213: 211: 207: 203: 199: 195: 191: 187: 183: 182:hydroelectric 179: 175: 171: 167: 163: 159: 151: 148: 144: 140: 134: 130: 122: 119: 114: 110: 102: 98: 94: 90: 86: 80: 77: 73: 69: 66: 62: 58: 54: 51: 48: 44: 41: 38: 34: 30: 25: 19: 1163: 1096: 999: 974:. Retrieved 970:the original 899: 885: 698:Munirabad-2 681:Munirabad-1 664:Shimshapura 613:Ghataprabha 393:5x55 + 1x15 364:Varahi River 246: 230:10,362  219: 161: 157: 156: 64:Headquarters 36:Company type 18: 383:Almatti Dam 95:Electricity 1172:Categories 949:References 715:Mallapura 401:Gerusoppa 328:Sharavathi 206:world bank 170:electrical 118:Net income 83:Key people 1042:Karnataka 419:Kadra Dam 346:Nagjhari 174:Karnataka 166:Karnataka 72:Karnataka 68:Bengaluru 908:See also 900:8846.305 766:Ganekal 749:Kalmala 457:Supa Dam 313:Thermal 294:Thermal 275:Thermal 92:Products 46:Industry 976:9 April 732:Sirwar 511:MGHE-1 475:MGHE-2 186:thermal 146:Website 100:Revenue 56:Founded 937:CESCOM 933:HESCOM 929:GESCOM 924:BESCOM 919:MESCOM 809:0.230 795:2.025 792:0.225 701:Hydel 684:Hydel 667:Hydel 650:Hydel 633:Hydel 616:Hydel 599:Hydel 582:Hydel 565:Hydel 548:Hydel 531:Hydel 514:Hydel 497:Hydel 478:Hydel 461:Hydel 442:Hydel 423:Hydel 404:Hydel 390:5 + 1 387:Hydel 368:Hydel 349:Hydel 338:103.5 332:Hydel 319:2x800 297:2 + 1 278:7 + 1 265:Total 190:diesel 40:Public 914:KPTCL 886:Total 812:2.53 803:Wind 786:Wind 778:0.35 775:0.35 769:Mini 752:Mini 735:Mini 718:Mini 676:17.2 596:Mani 523:52.8 520:13.2 503:27.5 487:86.4 484:21.6 341:1035 322:1600 303:1700 284:1720 256:Type 210:India 202:solar 178:India 76:India 1036:and 978:2011 944:KERC 941:PCKL 761:0.4 758:0.4 724:4.5 673:8.6 605:4.5 540:7.2 537:7.2 470:100 451:120 432:150 413:240 396:290 377:460 374:115 358:900 355:150 232:GW·h 200:and 198:wind 162:KPCL 160:(or 141:4429 59:1970 1040:of 896:-- 893:-- 890:-- 806:11 710:10 707:10 693:18 659:18 642:24 625:32 622:16 574:24 571:12 506:55 467:50 448:40 429:50 410:60 335:10 194:gas 176:in 129:INR 109:INR 1174:: 957:^ 880:3 877:3 874:1 863:5 860:5 857:1 846:3 843:3 840:1 829:3 826:3 823:1 789:9 772:1 755:1 744:1 741:1 738:1 727:9 721:2 704:1 690:9 687:2 670:2 656:3 653:6 639:6 636:4 619:2 608:9 602:2 591:2 588:2 585:1 568:2 557:6 554:6 551:1 534:1 517:4 500:2 481:4 464:2 445:3 426:3 407:4 371:4 352:6 316:2 196:, 192:, 188:, 184:, 74:, 70:, 1026:e 1019:t 1012:v 980:.

Index


Public
Electricity generation
Bengaluru
Karnataka
India
INR
Net income
INR
http://www.karnatakapower.com/
Karnataka
electrical
Karnataka
India
hydroelectric
thermal
diesel
gas
wind
solar
world bank
India
hydroelectric
thermal power station
GW·h
Yermarus Thermal Power Station
Raichur Thermal Power station
Bellary Thermal Power station
Yermarus Thermal Power Station
Sharavathi

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.