264:, 13.7 km south of Whangarei. After studying coastal and inland routes, the report proposed an inland route through hills, marshy flats and farmland with a tunnel, five rail bridges, at least two road bridges and several culverts. The route would leave Oakleigh parallel to State Highway One for 3 km, cross Mata Creek, curve under Hewlett's Ridge in a tunnel, cross the Ruakaka River about 6 km from Oakleigh, pass farmland up to One Tree Point Road and swing east to parallel McEwen Road before crossing the road to enter the terminal. The report was prepared by the Auckland firm of Kingston, Reynolds, Thom and Allardice, following recommendations of the Northland Forestry Port Study in 1979. 305:
The result of these talks was positive and in August 2007 the Council began work to purchase land for the proposed route. ONTRACK subsequently confirmed that once the land is acquired it will designate the route as a rail corridor. On 27 November 2007 ONTRACK and the Council confirmed that they were
251:
rather than oil. The railway is used elsewhere to carry high volumes of Waikato coal, and the quantity required if the conversion took place would have almost certainly required coal to be carried by rail. The proposal was abandoned. In 1979, another proposal was made to establish a deepwater port
466:
and Whangarei. The population of Ruakaka and surrounds was expected to grow by 15,000 in the ten years from 2007, although the population at the 2018 census was only 2,586. Proposals for commercial precincts, residential subdivisions, and a tertiary education centre then led to calls for a commuter
412:
The interim report of the feasibility study investigating moving the Port of Auckland to Northport was published in April 2019. The interim report noted that further investment in Northport was not feasible without investment in the construction of the Marsden Point Branch and upgrades to the North
211:
railway line (later part of the North Auckland Line) was inadequate for the purpose it served and an alternative in deeper water was necessary. This was found at Onerahi, but construction was not approved until 1899 and the branch opened on 2 October 1911. The port served coastal shipping between
289:
through a hill, but the line would remove a large number of trucks from local roads and provide a boost to local employment. The proposal was delayed in June 2006 when ONTRACK (now KiwiRail Network) declined to approve land designation for the line. ONTRACK wanted greater certainty about potential
448:
The Northland Rail rejuvenation project funding announced in January 2020 includes $ 40 million for land purchase on the Marsden Point/Northport rail route. KiwiRail has said that trains could be running to Marsden Point by 2023. In July 2020 it was announced that land purchased by the Northland
371:
NorthPort responded to these claims by stating that while the line "is not a short-term priority" for Northport, the company supported "the designation of the rail corridor" as it fits with the company's strategy of long-term growth. The company confirmed Peters had never visited the port.
189:
and building the branch at a cost of $ 200 million, the total works to cost $ 800 million. In June 2021 it was announced that the line would be built and was expected to take about 5 years. In April 2023 it was announced that KiwiRail was "progressing" the business case for the branch.
342:
In 2011, the joint venture to acquire land for the branch was formed between KiwiRail (as the successor to ONTRACK) and the Northland Regional Council, and properties along the route were acquired. In 2020, the government announced $ 40 million to purchase land along the corridor.
1258: 367:
claimed that Peters had never visited NorthPort, confused the port with the closed Port of Whangarei, and that Northport's CEO had stated that NorthPort "does not want a rail link" and that the line "does not feature in the Port's 30-year plan."
206:
that was partially built and then abandoned. The former was built for the same purpose as the Marsden Point Branch: better harbour access for Whangarei. In 1885, the government officially acknowledged that the wharf serving the Whangarei to
272:
In the early 2000s, the 1979 proposal was revived. In 2003, a feasibly study was undertaken, and it estimated that a 16 km line to Marsden Point from a junction with the North Auckland Line 25 km south of Whangarei in
1247: 461:
and were cancelled in 1976. However, Northland Regional Land Transport Committee chairman Bill Rossiter suggested in February 2006 that passenger trains could be introduced (in the long term) for commuters between
966: 392:
by 2027. Peters had vowed in July that the building of the Marsden Point Branch at a cost of up to $ 1 billion was non-negotiable in any post–election coalition between NZ First and either National or Labour.
252:
at Marsden Point to export forestry products and the plan was resurrected. The branch to the port would have been an approximately 14 km long, and was shelved due to a lack of development of the port.
671: 306:
entering into a joint venture arrangement to progress the land designation process and share the costs of land acquisition. A commitment to build the line will be made once the corridor is designated.
212:
Whangarei and Auckland, and when the North Auckland Line was completed in 1925 and provided a quicker overland route, traffic switched from ships to the railway and the wharf suffered a decline. The
219:
Although the Onerahi Branch mirrors the Marsden Point Branch in purpose, the Marsden Point proposal more closely follows the route of the proposed Waipu branch. The branch was intended to serve
1169: 698: 436:
A KiwiRail arranged geotechnical survey carried out four test drills in December 2018 and January 2019 to check the land along the route. At completion, a press conference was held by minister
641: 1143: 1000: 1225: 231:
was established. At least 25 men were at work on the line's construction in 1920. A lack of government will doomed the line, and before any track was laid it was cancelled in 1924.
1113: 913: 1299: 449:
Regional Council for the line had been purchased by KiwiRail, who have also engaged a real estate company, The Property Group, to purchase the remaining land for the route.
1060: 440:
plus KiwiRail chairman Greg Miller and acting Chief Executive Todd Moyle; although "the numbers still had to be crunched" before any announcement on construction was made.
1195: 970: 896: 1375: 876: 318:
for the route's rail designation, seen as an important legal step towards the eventual line. This process began in January 2009 and was completed later that year.
433:
of 1.19 (assuming NorthPort's expansion goes ahead), meaning for every $ 1.00 spent there would be a return of $ 1.19. The estimated cost of the line was $ 300m.
856: 2397: 663: 1439: 474:
at the western extremity of Auckland's commuter network was New Zealand's northernmost main-line passenger railway station until services were reduced to
1333: 599: 571: 1165: 694: 2426: 2416: 633: 1135: 992: 1217: 457:
In addition to freight traffic, there is also the possibility of passenger services. The last passenger trains to service Whangarei were
1109: 1022: 429:
and published May 2019. The business case found the total cost of the upgrade and Marsden Point line would be NZ$ 1.3 billion, with a
2213: 917: 1289: 2272: 1052: 1191: 185:
In October 2017, the new Labour–NZ First coalition government announced that it would spend $ 600 million on rehabilitating the
397: 893: 1372: 482:
in 2015 (because of low passenger traffic to Waitakere, and the expense of increasing clearance in the Waitakere tunnel for
1480: 2239: 1471: 1254: 1221: 873: 426: 1587: 381: 853: 1422: 1775: 483: 2003: 1048: 364: 1641: 216:
further ruined the port's fortunes, and with insubstantial traffic, the Onerahi Branch closed on 30 June 1933.
1444: 1337: 1086: 607: 2368: 2353: 2328: 2105: 2056: 796: 560: 2333: 2277: 1592: 1568: 1530: 2421: 2318: 2266: 2252: 1974: 1707: 471: 352: 384:. On 31 August 2017, New Zealand First party leader Winston Peters announced a policy of relocating the 182:. The proposal has existed since the 1970s and land for the rail corridor is being actively purchased. 2285: 1992: 1688: 510: 315: 299: 291: 51: 2244: 1623: 475: 2348: 286: 260:
In 1981 the NZR released a proposal for a 17 km branch line to the Marsden Port terminal from
2363: 1543: 1507: 1464: 479: 363:
argued the line should be built to carry containers from NorthPort to Auckland. In response the
2358: 1720: 801: 467:
rail service and industrial development that would require a rail-road freight transit centre.
175: 1290:"Northland rail upgrade to cost $ 1.3b, but Northport expansion needed to get value for money" 2323: 1918: 1647: 1636: 1501: 1026: 274: 261: 167: 65: 2343: 2207: 2118: 2049: 8: 1967: 1953: 1837: 1823: 1581: 496: 422: 186: 163: 2178: 2024: 1997: 1925: 1798: 1457: 430: 295: 278: 1763: 2226: 2131: 1946: 1810: 1695: 1682: 1418: 996: 755: 667: 503: 356: 327: 208: 2219: 2152: 2070: 1911: 1879: 1844: 1677: 1604: 750: 401: 385: 213: 151: 2233: 2124: 2098: 2077: 2063: 1892: 1816: 1738: 1725: 1701: 1535: 1379: 900: 880: 860: 240: 326:
Land acquisition began following the KiwiRail designation of the route in 2009.
2302: 2259: 2185: 2166: 2159: 2145: 2138: 2091: 2017: 1986: 1980: 1960: 1939: 1932: 1886: 1865: 1851: 1830: 1793: 1758: 1745: 1731: 1714: 1630: 1598: 1574: 1539: 524: 517: 360: 331: 199: 2410: 2172: 2112: 1872: 1858: 1804: 1769: 759: 389: 179: 70: 1449: 944: 2373: 2084: 2043: 2010: 281:
86.5 million. Environmental issues include the need to cross a portion of
203: 159: 695:"New Marsden Point rail link one step closer but costs still not revealed" 171: 1752: 1513: 1248:"Interim progress report on the Upper North Island Supply Chain Strategy" 1056: 637: 531: 458: 437: 224: 220: 155: 144: 114: 425:
and the Marsden Point Branch's construction was prepared by New Zealand
1373:"Planning for the Future: Marsden Point City Centre and Northgate Park" 198:
The Marsden Point proposal has been preceded by two earlier lines: the
244: 228: 1440:
Northland Regional Council's overview of the Marsden Point Rail Link
1082: 874:"Marsden Point Rail Line Designation Will Follow Land Negotiations" 634:"Rail line to Marsden Point and possible port move one step closer" 567: 45: 1294: 931: 463: 282: 248: 147: 1047: 993:"Government to buy land for rail to Northport and Marsden Point" 894:"Joint Venture to be Formed to Advance Marsden Point Rail Link" 731: 729: 967:"Rejuvenating Rail – Planning for the Marsden Point Rail Line" 290:
freight tonnages from potential users of the line such as the
1110:"Winston Peters promises shift of Auckland port to Northland" 555: 553: 334:
has proposed the construction of the line from 2015 to 2017.
1389: 726: 302:
and ONTRACK had entered into talks with interested parties.
1136:"Northland rail 'going to happen', Winston Peters promises" 930:
ONTRACK serves notice for Marsden Point rail designation] (
806: 404:
to Northport, with upgrades of road and rail to Northport.
396:
As part of the Labour-NZ First coalition agreement for the
914:"ONTRACK serves notice for Marsden Point rail designation" 550: 285:, and some substantial earthworks would be required for a 314:
In late 2008, ONTRACK served a notice of requirement to
839:"NRC, Ontrack Assess Support for Potential Rail Link", 664:"Northland's rail network to get $ 800 million upgrade" 1415:
The Railways of New Zealand: A Journey through History
1283: 1281: 1279: 443: 416: 380:
The matter became an issue during campaigning for the
903:, posted 27 November 2007, accessed 28 November 2007. 1287: 1276: 1083:"Response to statement by the NZ Taxpayers' Union" 969:. Beca Infrastructure. 1 July 2010. Archived from 1334:"Northland Rail Rejuvenation (project timetable)" 1053:"Northland Port doesn't want Winston's rail link" 883:, posted 9 August 2007, accessed 29 October 2007. 863:, posted 9 August 2007, accessed 29 October 2007. 2408: 1108:Flahive, Brad; Jacobson, Adam (31 August 2017). 1107: 773:"New Branch Line contemplated near Whangarei". 627: 625: 330:candidate and leader (and former Northland MP) 2398:New Zealand railway museums and heritage lines 1412: 1395: 1240: 735: 400:, there was a feasibility study of moving the 1479: 1465: 1413:Churchman, Geoffrey B; Hurst, Tony (2001) . 631: 622: 2387:represents lines used by passenger trains, 1417:(Second ed.). Transpress New Zealand. 854:"Negotiations for Rail Link Land Under Way" 794: 223:interests and was surveyed in 1914. After 1472: 1458: 1218:"Upper North Island Supply Chain Strategy" 16:Future rail line in Northland, New Zealand 2214:Dunedin Peninsula and Ocean Beach Railway 1142:. Newshub – newshub.co.nz. 15 July 2017. 790: 788: 351:Construction of the line featured in the 934:website press release, 22 December 2008) 375: 346: 2273:Wellington and Manawatu Railway Company 1323:March 2019 No 348-page 12 (Vol 25 No 2) 421:A business case for the upgrade of the 2427:Rail transport in the Northland Region 2409: 1445:KiwiRail – Northland Rail Rejuvenation 785: 2417:Proposed railway lines in New Zealand 2391:indicates lines which are now closed. 1453: 1146:from the original on 3 September 2017 1116:from the original on 3 September 2017 723:(Auckland: H. J. Hansen, 1992), 80–3. 193: 1288:John-Michael Swannix (18 May 2019). 1194:. Stuff (Fairfax). 2 November 2017. 1172:from the original on 7 November 2017 1168:. Stuff (Fairfax). 22 October 2017. 1089:from the original on 8 December 2015 1063:from the original on 8 December 2015 1023:"NorthPort answer to port expansion" 1003:from the original on 30 January 2020 945:"Designation of rail link under way" 674:from the original on 1 December 2017 594: 592: 452: 407: 2240:New Zealand Midland Railway Company 1255:Ministry of Transport (New Zealand) 1222:Ministry of Transport (New Zealand) 1198:from the original on 5 January 2018 947:. Whangarei Leader. 13 January 2009 797:"Northland port signals big future" 444:Northland Rail rejuvenation project 417:Ministry of Transport Business Case 337: 13: 1192:"Chinese money for Northport etc?" 1166:"Government eyes port shift north" 826:"Rail Link Decision Disappoints", 701:from the original on 14 April 2023 577:from the original on 27 March 2019 321: 267: 255: 234: 14: 2438: 1433: 589: 511:Donnellys Crossing Section/Branch 1336:. KiwiRail. 2019. Archived from 1302:from the original on 18 May 2019 644:from the original on 2 July 2020 561:"KiwiRail Annual Report 2011-12" 1405: 1365: 1352: 1326: 1314: 1264:from the original on 1 May 2019 1228:from the original on 4 May 2019 1210: 1184: 1158: 1128: 1101: 1075: 1041: 1025:. 23 March 2015. Archived from 1015: 985: 959: 937: 906: 886: 866: 846: 833: 820: 795:Graham, Pam (29 October 2007). 243:, a proposal was made that the 2267:Taupo Totara Timber Co Railway 1588:Palmerston North–Gisborne Line 766: 741: 713: 686: 656: 309: 150:, which is to be built in the 1: 2369:Wainuiomata railway proposals 2329:Canterbury Interior Main Line 719:H. J. Hansen and F. J. Neil, 600:"Northland rail rejuvenation" 538: 245:Marsden Point B power station 143:is a 19 km (12 mi) 1386:, accessed 28 November 2007. 1049:New Zealand Taxpayers' Union 892:Northland Regional Council, 852:Northland Regional Council, 775:New Zealand Railway Observer 632:Denise Piper (2 July 2020). 543: 365:New Zealand Taxpayers' Union 37:Proposed, subject to funding 7: 2253:Riccarton Racecourse Siding 489: 472:Helensville railway station 353:Northland by-election, 2015 202:of 1911–33, and a proposed 162:. It will diverge from the 10: 2443: 2286:Whakatane Board Mills Line 1396:Churchman & Hurst 2001 1358:"All aboard for Ruakaka", 736:Churchman & Hurst 2001 316:Whangarei District Council 300:Northland Regional Council 298:. By August 2006 both the 292:Marsden Point Oil Refinery 241:oil crisis of October 1973 52:Northland Regional Council 2382: 2311: 2295: 2199: 2034: 1901: 1784: 1668: 1661: 1615: 1561: 1554: 1542:), known together as the 1524: 1494: 1487: 1481:New Zealand railway lines 697:. Stuff (Fairfax). 2023. 476:Waitakere railway station 113: 105: 97: 92: 84: 79: 58: 41: 33: 28: 23: 2349:Nelson railway proposals 2334:Haywards–Plimmerton Line 2278:Wellington–Manawatu Line 1642:Stillwater–Ngākawau Line 1593:Stratford–Okahukura Line 1569:Marton–New Plymouth line 247:could use coal from the 120:3 ft 6 in 2364:Taupo railway proposals 2319:Avondale–Southdown Line 1776:Waiuku and Mission Bush 1544:South Island Main Trunk 1508:North Island Main Trunk 1384:Coastal Focus Northland 1378:21 October 2007 at the 1321:The New Zealand Railfan 899:1 December 2007 at the 879:25 January 2008 at the 859:5 November 2007 at the 480:Swanson railway station 398:Sixth Labour Government 802:The New Zealand Herald 2324:Auckland Airport Line 2312:Significant proposals 1648:Waimea Plains Railway 1637:Otago Central Railway 1502:East Coast Main Trunk 754:: 83. November 1984. 748:"Northland's Ports". 427:Ministry of Transport 382:2017 general election 376:2017 general election 359:candidate and leader 347:Northland by-election 2344:Martinborough Branch 2339:Marsden Point Branch 2208:Dun Mountain Railway 2106:Ngapara and Tokarahi 2057:Dunback and Makareao 141:Marsden Point Branch 50:Previously KiwiRail- 24:Marsden Point Branch 1582:North Auckland Line 1362:, 21 February 2006. 999:. 30 January 2020. 920:on 24 December 2008 721:Tracks in the North 670:. 27 October 2017. 497:North Auckland Line 423:North Auckland Line 187:North Auckland Line 164:North Auckland Line 2422:Whangarei District 2359:Paeroa–Pokeno Line 2296:Under construction 2220:Glen Massey Branch 1689:Donnellys Crossing 1371:Sandra K. Bogart, 1340:on 23 January 2020 1029:on 8 December 2015 973:on 27 January 2016 610:on 23 January 2020 431:benefit-cost ratio 296:Carter Holt Harvey 194:Early 20th century 2404: 2403: 2227:Hutt Park Railway 2195: 2194: 1912:Blackball and Roa 1657: 1656: 1550: 1549: 1051:(19 March 2015). 997:Radio New Zealand 843:, 29 August 2006. 668:Radio New Zealand 504:Dargaville Branch 453:Passenger traffic 408:Feasibility study 357:New Zealand First 328:New Zealand First 227:, work began and 130: 129: 2434: 2354:North Shore Line 1666: 1665: 1605:Hutt Valley Line 1559: 1558: 1492: 1491: 1474: 1467: 1460: 1451: 1450: 1428: 1399: 1393: 1387: 1369: 1363: 1360:Whangarei Leader 1356: 1350: 1349: 1347: 1345: 1330: 1324: 1318: 1312: 1311: 1309: 1307: 1285: 1274: 1273: 1271: 1269: 1263: 1252: 1244: 1238: 1237: 1235: 1233: 1214: 1208: 1207: 1205: 1203: 1188: 1182: 1181: 1179: 1177: 1162: 1156: 1155: 1153: 1151: 1132: 1126: 1125: 1123: 1121: 1105: 1099: 1098: 1096: 1094: 1079: 1073: 1072: 1070: 1068: 1045: 1039: 1038: 1036: 1034: 1019: 1013: 1012: 1010: 1008: 989: 983: 982: 980: 978: 963: 957: 956: 954: 952: 941: 935: 929: 927: 925: 916:. Archived from 910: 904: 890: 884: 870: 864: 850: 844: 841:Whangarei Leader 837: 831: 828:Whangarei Leader 824: 818: 817: 815: 813: 792: 783: 782: 770: 764: 763: 745: 739: 733: 724: 717: 711: 710: 708: 706: 690: 684: 683: 681: 679: 660: 654: 653: 651: 649: 629: 620: 619: 617: 615: 606:. Archived from 596: 587: 586: 584: 582: 576: 565: 557: 478:in 2010; and to 402:Port of Auckland 386:Port of Auckland 338:Land acquisition 214:Great Depression 152:Northland Region 125: 121: 21: 20: 2442: 2441: 2437: 2436: 2435: 2433: 2432: 2431: 2407: 2406: 2405: 2400: 2392: 2378: 2307: 2291: 2234:Kaitangata Line 2191: 2036: 2030: 1903: 1897: 1786: 1780: 1721:Mount Maunganui 1708:Kumeu–Riverhead 1670: 1653: 1611: 1555:Secondary lines 1546: 1536:Main South Line 1531:Main North Line 1520: 1483: 1478: 1436: 1431: 1425: 1408: 1403: 1402: 1394: 1390: 1380:Wayback Machine 1370: 1366: 1357: 1353: 1343: 1341: 1332: 1331: 1327: 1319: 1315: 1305: 1303: 1286: 1277: 1267: 1265: 1261: 1250: 1246: 1245: 1241: 1231: 1229: 1216: 1215: 1211: 1201: 1199: 1190: 1189: 1185: 1175: 1173: 1164: 1163: 1159: 1149: 1147: 1134: 1133: 1129: 1119: 1117: 1112:. Stuff.co.nz. 1106: 1102: 1092: 1090: 1081: 1080: 1076: 1066: 1064: 1046: 1042: 1032: 1030: 1021: 1020: 1016: 1006: 1004: 991: 990: 986: 976: 974: 965: 964: 960: 950: 948: 943: 942: 938: 923: 921: 912: 911: 907: 901:Wayback Machine 891: 887: 881:Wayback Machine 871: 867: 861:Wayback Machine 851: 847: 838: 834: 830:, 27 June 2006. 825: 821: 811: 809: 793: 786: 772: 771: 767: 747: 746: 742: 734: 727: 718: 714: 704: 702: 693: 691: 687: 677: 675: 662: 661: 657: 647: 645: 630: 623: 613: 611: 598: 597: 590: 580: 578: 574: 563: 559: 558: 551: 546: 541: 492: 484:electrification 455: 446: 419: 413:Auckland Line. 410: 378: 349: 340: 324: 322:2010s proposals 312: 270: 268:2000s proposals 258: 256:1980s proposals 237: 235:1970s proposals 196: 137: 136: 135: 123: 119: 75: 49: 17: 12: 11: 5: 2440: 2430: 2429: 2424: 2419: 2402: 2401: 2383: 2380: 2379: 2377: 2376: 2371: 2366: 2361: 2356: 2351: 2346: 2341: 2336: 2331: 2326: 2321: 2315: 2313: 2309: 2308: 2306: 2305: 2303:City Rail Link 2299: 2297: 2293: 2292: 2290: 2289: 2282: 2270: 2263: 2260:Sanson Tramway 2256: 2249: 2237: 2230: 2223: 2216: 2211: 2203: 2201: 2197: 2196: 2193: 2192: 2190: 2189: 2182: 2175: 2170: 2163: 2156: 2149: 2142: 2135: 2128: 2121: 2116: 2109: 2102: 2095: 2088: 2081: 2074: 2067: 2060: 2053: 2046: 2040: 2038: 2032: 2031: 2029: 2028: 2021: 2014: 2007: 2000: 1995: 1990: 1983: 1978: 1971: 1964: 1957: 1950: 1943: 1936: 1929: 1922: 1915: 1907: 1905: 1899: 1898: 1896: 1895: 1890: 1883: 1876: 1869: 1862: 1855: 1848: 1841: 1834: 1827: 1820: 1813: 1808: 1801: 1796: 1790: 1788: 1782: 1781: 1779: 1778: 1773: 1766: 1761: 1756: 1749: 1742: 1735: 1728: 1723: 1718: 1711: 1704: 1699: 1692: 1685: 1680: 1674: 1672: 1663: 1659: 1658: 1655: 1654: 1652: 1651: 1644: 1639: 1634: 1631:Nelson Section 1627: 1619: 1617: 1613: 1612: 1610: 1609: 1599:Wairarapa Line 1595: 1590: 1585: 1578: 1575:Newmarket Line 1571: 1565: 1563: 1556: 1552: 1551: 1548: 1547: 1540:Lyttelton Line 1528: 1526: 1522: 1521: 1519: 1518: 1504: 1498: 1496: 1489: 1485: 1484: 1477: 1476: 1469: 1462: 1454: 1448: 1447: 1442: 1435: 1434:External links 1432: 1430: 1429: 1423: 1409: 1407: 1404: 1401: 1400: 1388: 1364: 1351: 1325: 1313: 1275: 1257:. April 2019. 1239: 1224:. April 2019. 1209: 1183: 1157: 1127: 1100: 1074: 1040: 1014: 984: 958: 936: 905: 885: 865: 845: 832: 819: 784: 781:(2): 82. 1981. 765: 740: 738:, p. 100. 725: 712: 685: 655: 621: 588: 548: 547: 545: 542: 540: 537: 536: 535: 528: 525:Onerahi Branch 521: 518:Ōkaihau Branch 514: 507: 500: 491: 488: 454: 451: 445: 442: 418: 415: 409: 406: 377: 374: 361:Winston Peters 348: 345: 339: 336: 332:Winston Peters 323: 320: 311: 308: 269: 266: 257: 254: 236: 233: 200:Onerahi Branch 195: 192: 133: 132: 131: 128: 127: 117: 111: 110: 107: 103: 102: 99: 95: 94: 90: 89: 86: 82: 81: 77: 76: 74: 73: 68: 62: 60: 56: 55: 43: 39: 38: 35: 31: 30: 26: 25: 15: 9: 6: 4: 3: 2: 2439: 2428: 2425: 2423: 2420: 2418: 2415: 2414: 2412: 2399: 2395: 2390: 2386: 2381: 2375: 2372: 2370: 2367: 2365: 2362: 2360: 2357: 2355: 2352: 2350: 2347: 2345: 2342: 2340: 2337: 2335: 2332: 2330: 2327: 2325: 2322: 2320: 2317: 2316: 2314: 2310: 2304: 2301: 2300: 2298: 2294: 2288: 2287: 2283: 2280: 2279: 2274: 2271: 2269: 2268: 2264: 2262: 2261: 2257: 2255: 2254: 2250: 2247: 2246: 2241: 2238: 2236: 2235: 2231: 2229: 2228: 2224: 2222: 2221: 2217: 2215: 2212: 2210: 2209: 2205: 2204: 2202: 2200:Private lines 2198: 2188: 2187: 2183: 2181: 2180: 2176: 2174: 2171: 2169: 2168: 2164: 2162: 2161: 2157: 2155: 2154: 2150: 2148: 2147: 2143: 2141: 2140: 2136: 2134: 2133: 2129: 2127: 2126: 2122: 2120: 2119:Port Chalmers 2117: 2115: 2114: 2110: 2108: 2107: 2103: 2101: 2100: 2096: 2094: 2093: 2089: 2087: 2086: 2082: 2080: 2079: 2075: 2073: 2072: 2068: 2066: 2065: 2061: 2059: 2058: 2054: 2052: 2051: 2050:Catlins River 2047: 2045: 2042: 2041: 2039: 2033: 2027: 2026: 2022: 2020: 2019: 2015: 2013: 2012: 2008: 2006: 2005: 2001: 1999: 1996: 1994: 1993:Hokitika/Ross 1991: 1989: 1988: 1984: 1982: 1979: 1977: 1976: 1972: 1970: 1969: 1965: 1963: 1962: 1958: 1956: 1955: 1951: 1949: 1948: 1944: 1942: 1941: 1937: 1935: 1934: 1930: 1928: 1927: 1923: 1921: 1920: 1919:Cape Foulwind 1916: 1914: 1913: 1909: 1908: 1906: 1900: 1894: 1891: 1889: 1888: 1884: 1882: 1881: 1877: 1875: 1874: 1870: 1868: 1867: 1863: 1861: 1860: 1856: 1854: 1853: 1849: 1847: 1846: 1842: 1840: 1839: 1835: 1833: 1832: 1828: 1826: 1825: 1821: 1819: 1818: 1814: 1812: 1809: 1807: 1806: 1802: 1800: 1797: 1795: 1792: 1791: 1789: 1783: 1777: 1774: 1772: 1771: 1767: 1765: 1762: 1760: 1757: 1755: 1754: 1750: 1748: 1747: 1743: 1741: 1740: 1736: 1734: 1733: 1729: 1727: 1724: 1722: 1719: 1717: 1716: 1712: 1710: 1709: 1705: 1703: 1700: 1698: 1697: 1693: 1691: 1690: 1686: 1684: 1681: 1679: 1676: 1675: 1673: 1667: 1664: 1660: 1650: 1649: 1645: 1643: 1640: 1638: 1635: 1633: 1632: 1628: 1626: 1625: 1621: 1620: 1618: 1614: 1607: 1606: 1601: 1600: 1596: 1594: 1591: 1589: 1586: 1584: 1583: 1579: 1577: 1576: 1572: 1570: 1567: 1566: 1564: 1560: 1557: 1553: 1545: 1541: 1537: 1533: 1532: 1527: 1523: 1516: 1515: 1510: 1509: 1505: 1503: 1500: 1499: 1497: 1493: 1490: 1486: 1482: 1475: 1470: 1468: 1463: 1461: 1456: 1455: 1452: 1446: 1443: 1441: 1438: 1437: 1426: 1424:0-908876-20-3 1420: 1416: 1411: 1410: 1398:, p. 97. 1397: 1392: 1385: 1381: 1377: 1374: 1368: 1361: 1355: 1339: 1335: 1329: 1322: 1317: 1301: 1297: 1296: 1291: 1284: 1282: 1280: 1260: 1256: 1249: 1243: 1227: 1223: 1219: 1213: 1197: 1193: 1187: 1171: 1167: 1161: 1145: 1141: 1137: 1131: 1115: 1111: 1104: 1088: 1085:. NorthPort. 1084: 1078: 1062: 1058: 1054: 1050: 1044: 1028: 1024: 1018: 1002: 998: 994: 988: 972: 968: 962: 946: 940: 933: 919: 915: 909: 902: 898: 895: 889: 882: 878: 875: 869: 862: 858: 855: 849: 842: 836: 829: 823: 808: 804: 803: 798: 791: 789: 780: 776: 769: 761: 757: 753: 752: 744: 737: 732: 730: 722: 716: 700: 696: 689: 673: 669: 665: 659: 643: 639: 635: 628: 626: 609: 605: 601: 595: 593: 573: 569: 562: 556: 554: 549: 534: 533: 529: 527: 526: 522: 520: 519: 515: 513: 512: 508: 506: 505: 501: 499: 498: 494: 493: 487: 485: 481: 477: 473: 468: 465: 460: 450: 441: 439: 434: 432: 428: 424: 414: 405: 403: 399: 394: 391: 390:Marsden Point 387: 383: 373: 369: 366: 362: 358: 354: 344: 335: 333: 329: 319: 317: 307: 303: 301: 297: 293: 288: 284: 280: 276: 265: 263: 253: 250: 246: 242: 232: 230: 226: 222: 217: 215: 210: 205: 201: 191: 188: 183: 181: 180:Marsden Point 177: 173: 169: 165: 161: 157: 153: 149: 146: 142: 124:1,067 mm 118: 116: 112: 108: 104: 100: 96: 91: 87: 85:Rolling stock 83: 78: 72: 71:Marsden Point 69: 67: 64: 63: 61: 57: 54:joint venture 53: 47: 44: 40: 36: 32: 27: 22: 19: 2393: 2388: 2384: 2374:Waipu Branch 2338: 2284: 2276: 2265: 2258: 2251: 2245:Midland Line 2243: 2232: 2225: 2218: 2206: 2184: 2177: 2165: 2158: 2151: 2144: 2137: 2130: 2123: 2111: 2104: 2097: 2090: 2083: 2076: 2069: 2062: 2055: 2048: 2037:South Island 2023: 2016: 2009: 2002: 1985: 1973: 1968:Mount Somers 1966: 1959: 1954:Little River 1952: 1945: 1938: 1931: 1924: 1917: 1910: 1904:South Island 1885: 1878: 1871: 1864: 1857: 1850: 1843: 1838:Mount Egmont 1836: 1829: 1824:Johnsonville 1822: 1815: 1803: 1787:North Island 1768: 1751: 1744: 1737: 1730: 1713: 1706: 1694: 1687: 1671:North Island 1662:Branch lines 1646: 1629: 1624:Midland Line 1622: 1616:South Island 1603: 1597: 1580: 1573: 1562:North Island 1529: 1525:South Island 1512: 1506: 1495:North Island 1414: 1406:Bibliography 1391: 1383: 1367: 1359: 1354: 1342:. Retrieved 1338:the original 1328: 1320: 1316: 1304:. Retrieved 1293: 1266:. Retrieved 1242: 1230:. Retrieved 1212: 1200:. Retrieved 1186: 1174:. Retrieved 1160: 1148:. Retrieved 1139: 1130: 1118:. Retrieved 1103: 1091:. Retrieved 1077: 1065:. Retrieved 1043: 1031:. Retrieved 1027:the original 1017: 1005:. Retrieved 987: 975:. Retrieved 971:the original 961: 949:. Retrieved 939: 922:. Retrieved 918:the original 908: 888: 868: 848: 840: 835: 827: 822: 810:. Retrieved 800: 778: 774: 768: 749: 743: 720: 715: 703:. Retrieved 688: 676:. Retrieved 658: 646:. Retrieved 612:. Retrieved 608:the original 603: 579:. Retrieved 530: 523: 516: 509: 502: 495: 469: 459:mixed trains 456: 447: 435: 420: 411: 395: 379: 370: 350: 341: 325: 313: 304: 271: 259: 238: 221:agricultural 218: 204:Waipu Branch 197: 184: 174:, and serve 160:North Island 140: 138: 18: 2179:Walton Park 2025:Whitecliffs 2004:Southbridge 1998:Seddonville 1926:Conns Creek 1799:Castlecliff 1514:Kapiti Line 1344:1 September 1150:3 September 1120:3 September 1057:scoop.co.nz 678:22 November 638:Stuff.co.nz 532:Opua Branch 438:Shane Jones 310:Designation 277:would cost 225:World War I 170:, south of 156:New Zealand 145:branch line 115:Track gauge 98:Line length 2411:Categories 2132:Shag Point 1811:Gracefield 1696:Glen Afton 1683:Dargaville 1488:Main lines 1202:21 January 1176:21 January 1093:6 December 1067:6 December 1033:6 December 1007:31 January 977:6 December 924:20 January 812:20 October 539:References 239:After the 101:16 km 2153:Tuatapere 2071:Hedgehope 1947:Ferrymead 1845:Moutohora 1678:Cambridge 872:ONTRACK, 760:0110-6155 544:Citations 229:formation 176:Northport 172:Whangārei 106:Character 93:Technical 2394:See also 2125:Roxburgh 2099:Mossburn 2078:Kingston 2064:Fernhill 1893:Wanganui 1817:Greytown 1764:Tāneatua 1739:Onehunga 1726:Murupara 1702:Kinleith 1376:Archived 1300:Archived 1268:30 April 1259:Archived 1232:30 April 1226:Archived 1196:Archived 1170:Archived 1144:Archived 1114:Archived 1087:Archived 1061:Archived 1001:Archived 897:Archived 877:Archived 857:Archived 705:14 April 699:Archived 672:Archived 642:Archived 604:KiwiRail 581:30 April 572:Archived 570:. 2012. 568:KiwiRail 490:See also 275:Oakleigh 262:Oakleigh 168:Oakleigh 66:Oakleigh 46:KiwiRail 29:Overview 2389:Italics 2186:Wyndham 2167:Waikaka 2160:Waikaia 2146:Tokanui 2139:Tapanui 2092:Moeraki 2018:Waimate 1987:Rewanui 1981:Rapahoe 1961:Methven 1940:Fairlie 1933:Eyreton 1887:Waitara 1866:Raetihi 1859:Opunake 1852:Ngatapa 1831:Melling 1794:Ahuriri 1759:Rotorua 1746:Onerahi 1732:Okaihau 1715:Manukau 1295:Newshub 1140:Newshub 951:2 March 932:ONTRACK 464:Ruakaka 287:cutting 283:wetland 249:Waikato 148:railway 80:Service 59:Termini 2173:Wairio 2113:Outram 1975:Oxford 1880:Te Aro 1873:Taonui 1805:Foxton 1770:Thames 1602:(inc. 1538:(inc. 1511:(inc. 1421:  1306:18 May 758:  648:2 July 614:7 June 48:(land) 34:Status 2085:Kurow 2044:Bluff 2035:Lower 2011:Waiau 1902:Upper 1785:Lower 1669:Upper 1262:(PDF) 1251:(PDF) 751:Rails 575:(PDF) 564:(PDF) 109:Rural 42:Owner 2385:Bold 1753:Opua 1534:and 1419:ISBN 1346:2019 1308:2019 1270:2019 1234:2019 1204:2018 1178:2018 1152:2017 1122:2017 1095:2015 1069:2015 1035:2015 1009:2020 979:2015 953:2009 926:2009 814:2011 807:NZPA 756:ISSN 707:2023 680:2017 650:2020 616:2021 583:2019 470:The 294:and 279:NZ$ 209:Kamo 139:The 88:None 486:). 388:to 178:at 166:at 158:'s 154:of 134:Map 2413:: 2396:: 1382:, 1298:. 1292:. 1278:^ 1253:. 1220:. 1138:. 1059:. 1055:. 995:. 805:. 799:. 787:^ 779:38 777:. 728:^ 666:. 640:. 636:. 624:^ 602:. 591:^ 566:. 552:^ 355:. 2281:) 2275:( 2248:) 2242:( 1608:) 1517:) 1473:e 1466:t 1459:v 1427:. 1348:. 1310:. 1272:. 1236:. 1206:. 1180:. 1154:. 1124:. 1097:. 1071:. 1037:. 1011:. 981:. 955:. 928:. 816:. 762:. 709:. 692:* 682:. 652:. 618:. 585:. 126:) 122:(

Index

KiwiRail
Northland Regional Council
Oakleigh
Marsden Point
Track gauge
branch line
railway
Northland Region
New Zealand
North Island
North Auckland Line
Oakleigh
Whangārei
Northport
Marsden Point
North Auckland Line
Onerahi Branch
Waipu Branch
Kamo
Great Depression
agricultural
World War I
formation
oil crisis of October 1973
Marsden Point B power station
Waikato
Oakleigh
Oakleigh
NZ$
wetland