401: 2144: 785: 746: 731: 705: 652: 633: 622: 392:, comprising 12 residential units and 4 shops, was acquired to make way for construction of the NSC. Unit owners were initially instructed to vacate the premises temporarily for a period of two years until excavation works were completed for safety reasons, but it was found that the building's concrete strength was lower than safely required in order to withstand excavation works for the tunnel beneath the building, and thus was instead chosen to be acquired and demolished. This sparked some unhappiness with the unit owners who were looking forward to a collective sale on the open market, since the proceeds were expected to be higher than the compensation that they would have received from the land acquisition. 101: 322:(LTA), the continuous bus lanes along the NSC will be able to reduce bus travelling times from Woodlands, Sembawang, Yishun and Ang Mo Kio to the city by up to 30 minutes through morning and evening peak express bus services, and also make bus connections between residential towns along the NSC faster by allowing intra-town buses to leverage the ramps and bus lanes on the surface. A cycling path along the entire stretch of the highway will link up the Park Connector Networks and dedicated cycling path networks within 355:
November 2011, the government gave the go-ahead for the alignment of southern section consisting of the full tunnel to ECP, and the construction was further delayed, to "after the demolition of Rochor Centre" in 2017 and construction is expected to begin in 2018 for completion in 2025, then subsequently delayed to 2026 during the groundbreaking ceremony of North-South Corridor and further delayed to 2028 due to COVID-19 pandemic. Then Minister for Transport
385:, slamming the decision to reconstruct as it would be equivalent to the "falsification of historical artefacts", while also bringing the efficacy of conservation gazettes into question. The URA then came up with a revised plan in February 2018 to instead demolish and reconstruct part of the façade of only one unit, compared to the original plan of demolishing and reconstructing three full units in the building. 1865: 45: 315:, a 0.4 km (0.25 mi) at-grade section at Lentor Avenue, and a 12.3 km (7.6 mi) underground tunnel portion that runs until East Coast Parkway. Additionally, the surface streets that run along the underground tunnel of the NSC will see road lanes reprioritised for walking, cycling, public transport and community spaces. 372:
in the initial phase. Terraced houses were the easiest to move, HDB flats requires the construction of the replacement which is due to the construction delays for North-South Corridor. A total of 567 flats and 187 rental shops and eating houses were vacated by 31 December 2016. The four blocks of HDB
419:
On 1 July 2023, it was announced that the NSC will be completed in two phases instead, starting with the viaduct segment which would be completed by the previous expected completion date of 2027, followed by the underground tunnel segment which would be delayed by another two years and completed by
354:
On 19 January 2011, the government gave the go-ahead for the alignment of the northern section consisting of viaducts, surface and tunnel from Admiralty Road West to Toa Payoh Rise, which is expected to complete in 2020, construction is expected to start in 2013 with the easiest acquisition. On 15
329:
When first conceptualised in 2011, the NSE was initially targeted to be ready by 2020. In January 2016, the NSE was then reconfigured to instead be part of the NSC, with a new completion date of 2026 set for the NSC. However, due to significant delays in construction, the deadline has been pushed
451:
During the construction, noise complaints were received by the LTA that construction works did not adhere to requirements to cease after 10pm and during weekends. In response, the LTA mentioned that there may be exceptions to the stoppage requirement in the case of "safety critical works". In
412:
The first contract for the NSC was awarded in November 2017, which expected the construction for the section of the tunnel between Toa Payoh Rise and Novena Rise to commence in 2018. Several other contracts were also awarded for the construction of various sections of the underground tunnel
359:
outlined the ministry's plans to reconfigure the NSE as part of the North-South Corridor (NSC), an integrated transport corridor with one lane out of the three-lane highway to be dedicated for express bus services, as well as to have cycling and pedestrian paths that run along the NSC.
380:
which was built in 1924, was considered for partial demolition and reconstruction after the completion of the NSC, despite its previous conservation gazette in 2008 by the URA. This sparked concerns from several heritage groups in Singapore including the Singapore Heritage Society and
441:
On 30 March 2023, it was announced that a traffic junction between Marymount Road, Sin Ming Avenue and Bishan Street 22 would be converted into a signalised roundabout temporarily to speed up construction on the underground road tunnel beneath the junction from 30 April 2023 until Q2
350:
as the North-South Expressway (NSE), as part of a major review of Singapore's transport network by the Land Transport Authority (LTA). It was then expected that the NSE would be completed by 2020, and would reduce travel time to the city for residents in the north by up to 30%
435:
With the demolition of the underpasses around the Novena area, it was announced that the major traffic junction at Novena linking Newton Road, Moulmein Road and Thomson Road, will be adjusted to make way for the construction of expressway
330:
back multiple times. It is now expected for the viaduct (at the northern terminus of the expressway) to be opened in 2027, and the underground tunnels (at the southern terminus of the expressway) to be opened in 2029.
1797: 1835: 935: 851: 1571: 2578: 1762: 970: 901: 1092: 423:
On 17 September 2023, an accident occurred resulting in the death of a 41-year-old construction worker at the worksite of Cavenagh Road when a pallet of gas cylinders toppled.
460:
Based on the plans released by LTA as of the NSE alignment released on November 2011, the route that the 21.5 km (13.4 mi) NSC expressway will take is as follows:
447:
On 4 October 2023, it was announced that Marymount Flyover will be temporarily closed for construction works for the North-South Corridor starting 8 October 2023 until 2029.
473:
The northern terminus of the NSC commences at Admiralty Road West, and runs southwards along Woodlands Avenue 8/Gambas Avenue/Sembawang Road, before joining Lentor Avenue.
1708: 1649: 1784: 253:(CTE). The 21.5 kilometres (13.4 mi) expressway is expected to cost about S$ 7.47 billion when fully completed in 2029 as North-South Corridor and will connect the 1822: 1053: 1897: 540:
One on-ramp is planned from the PIE traveling eastwards to join NSC towards the south, as well as one off-ramp going northwards to join the PIE traveling westwards.
1532: 1452: 1018: 1227: 1281: 925: 416:
The contracts for the viaduct portion of the NSC were awarded later, with three contracts awarded in December 2019, with works expecting to begin in early 2020.
1361: 1122: 1869: 1557: 1204: 841: 1424: 514:
The underground tunnel starts at Lentor Avenue/SLE and runs southwards along Ang Mo Kio Avenue 6/Marymount Road, passing Toa Payoh Rise, before joining
2048: 1675: 993:"Joint Release by the Land Transport Authority (LTA) & NParks - Transforming North-South Corridor: Co-Creating Community Spaces for Greener Travel" 1479: 17: 1389: 2583: 1722: 992: 1890: 1623: 1174: 1506: 962: 382: 2143: 1758: 905: 496:
Three off-ramps are planned, with two off-ramps going north/south-wards along Lentor Avenue, and one off-ramp going westwards towards SLE/
431:
In order to support the construction of the North-South Corridor, several roads were temporarily rerouted or diverted during the process:
307:
integrated with a traditional expressway. The NSC Expressway (previously conceived as the NSE) consists of an 8.8 km (5.5 mi)
2002: 249:
when completed. The North South Corridor will serve increasing traffic along the north-south corridor that is currently served by the
1883: 1997: 1145: 2041: 1923: 1597: 1045: 808: 2573: 1019:"North-South Expressway to have express bus lanes, cycling route; 85% to use public transport as main travel mode by 2050s" 1957: 1175:"Government acquires 4-storey Thomson Road building to make way for North-South Corridor constructionAhmad Zhaki Abdullah" 400: 2568: 2523: 877:"SPEECH BY MR RAYMOND LIM,MINISTER FOR TRANSPORT, AT VISIT TO KALLANG-PAYA LEBAR EXPRESSWAY, 30 JANUARY 2008, 10.15 AM" 1572:"Written Reply to Parliamentary Question on Impact of Covid-19 Disruptions on Completion Date of North-South Corridor" 2518: 2495: 2101: 2034: 344: 1118: 1906: 1410:"Maximising retention of corner unit of Ellison Building affected by the construction of the North-South Corridor" 1307: 1253: 299:
The NSC will be Singapore's first expressway conceived as an "integrated transport corridor", featuring dedicated
1967: 1759:"$ 615.9 million contract awarded for North-South Corridor, Transport News & Top Stories - the Straits Times" 1200: 1992: 420:
2029 instead. Reasons cited for the delay include the COVID-19 pandemic along with challenging soil conditions.
1078: 2528: 2178: 2091: 749: 734: 323: 250: 158: 2294: 1335: 127:
Construction began in 2018, viaduct completion in 2027 (estimated), tunnel completion in 2029 (estimated)
1362:"Council of heritage practitioners slams decision to demolish and reconstruct historic Ellison Building" 2558: 2548: 2479: 2249: 2224: 260:
The NSC will have a total of 16 entrances and 17 exits to connect towns along the north-south corridor—
1733: 2111: 2017: 1972: 1409: 261: 246: 100: 876: 511:: 12.3 km (7.6 mi) running from Lentor Avenue/SLE to ECP, Republic Avenue, Nicoll Highway 2404: 2058: 1830: 1792: 477: 319: 242: 214: 31: 2474: 2459: 2269: 2067: 688: 515: 476:
The portion of the viaduct that runs along Lentor Avenue is also expected to run parallel to the
389: 2374: 2354: 2264: 2173: 2086: 1982: 1933: 640: 497: 304: 1558:"LTA Awards $ 954.1 million in Contracts for the Construction of North-South Corridor Viaduct" 1282:"Demolition of Rochor Centre to begin on June 26 in preparation for North-South Corridor: LTA" 526:, before joining ECP, Republic Avenue, and Nicoll Highway at its southern terminus of the NSC. 284:—with the city centre. The NSC will also provide links to existing expressways, including the 2319: 2209: 2163: 2123: 2081: 1987: 1533:"LTA awards six more contracts worth $ 3.14 billion for construction of North-South Corridor" 1228:"Long-time residents bid goodbye to Rochor Centre: 'Each neighbour is worth a million bucks'" 1093:"Government Gives Go-Ahead for Alignment of Northern Segment of North-South Expressway (NSE)" 708: 534: 373:
flats eventually began demolition on 26 June 2018, and was targeted to finish by April 2019.
289: 154: 1962: 2026: 1046:"LTA to Call Tenders for the North-South Corridor | Press Room | Land Transport Authority" 368:
The North-South Corridor entails the acquisition of Marymount Terrace terraced houses and
8: 2543: 2414: 2274: 2133: 1425:"A larger part of Ellison Building likely to be saved from demolition and reconstruction" 1650:"Marymount junction to be turned into roundabout to expedite North-South Corridor works" 452:
addition, more noise barriers were deployed in the Novena area following the complaint.
2553: 2454: 2394: 2379: 2254: 2229: 2128: 2096: 788: 655: 636: 625: 491: 468: 293: 285: 254: 172: 162: 150: 503:
One on-ramp is planned from the SLE traveling westwards to join NSC towards the north.
2434: 2399: 2369: 2329: 2106: 1683: 1457: 1429: 1394: 1366: 1312: 1258: 1023: 930: 926:"North-South integrated transport corridor expected to be completed around 2026: LTA" 846: 698: 671: 530: 485: 277: 2563: 2464: 2349: 2214: 2194: 2158: 1875: 740: 725: 519: 377: 76: 2469: 2419: 1676:"Marymount Flyover to be shut from Oct 8 for construction of North-South Corridor" 529:
On Marymount Road, the tunnel will be integrated with the MRT station box for the
2538: 2533: 2364: 2339: 2219: 2289: 2199: 2168: 773: 176: 90: 62: 467:: 8.8 km (5.5 mi) running from Admiralty Road West to Lentor Avenue/ 2512: 2439: 2234: 1687: 1453:"Thomson Road building to be demolished: Owners of residential units stunned" 758: 369: 356: 1390:"LTA and URA reviewing plans to tear down part of historic Ellison Building" 2449: 2389: 2334: 2324: 2259: 2244: 2239: 2204: 1598:"Man dies after accident at North-South Corridor worksite in Cavenagh Road" 904:(Press release). Land Transport Authority. 15 November 2011. Archived from 842:"Road tunnel portion of North-South Corridor delayed by two years to 2029" 2444: 2429: 2424: 2409: 2344: 2314: 2304: 2299: 2284: 2279: 347: 2384: 2309: 763: 615: 523: 273: 1507:"South Korean firm lands first civil contract for new expressway here" 768:
Southbound exit and northbound entrance only, latter from Rochor Road
2359: 1909: 683: 565: 281: 265: 238: 195: 1977: 300: 1119:"North-South Expressway construction will only start in 2016: Lui" 1412:(Press release). Urban Redevelopment Authority. 13 February 2018. 719: 308: 1864: 594: 405: 343:
On 30 January 2008, the expressway was first announced by then
312: 269: 237:, is an under-construction expressway that will be the 11th of 1308:"North-South Corridor tunnel works to affect Ellison Building" 1709:"More noise barriers installed following resident's feedback" 1624:"Changes to major junction in Novena due to expressway works" 522:
running parallel to the Central Expressway, continuing along
2056: 1560:(Press release). Land Transport Authority. 16 December 2019. 490:: 0.4 km (0.25 mi) intersecting at Lentor Avenue/ 54: 1146:"Start of works for North-South Corridor delayed to 2018" 44: 2579:
Buildings and structures under construction in Singapore
1081:(Press release). Ministry of Transport. 21 January 2016. 383:
International Council on Monuments and Sites (Singapore)
1711:(Press release). Land Transport Authority. 7 June 2023. 995:(Press release). Land Transport Authority. 29 July 2023 902:"Full alignment of the North-South Expressway unveiled" 105:
North–South Corridor is labelled in single violet line
1905: 1480:"LTA Awards First Contract for North-South Corridor" 363: 326:
towns along the entire corridor to the city centre.
963:"Full Alignment of North-South Expressway Unveiled" 607:Sembawang Road, Yishun Avenue 1 and Mandai Avenue 388:In April 2021, another four-storey building along 311:in the north running from Admiralty Road West to 2510: 894: 871: 869: 1622:Yong, Clement; Toh, Ting Wei (5 October 2020). 27:Future expressway and cycling path in Singapore 1198: 546: 413:throughout the whole of 2018 to January 2019. 2042: 1891: 866: 714:Northbound exit and southbound entrance only 693:Northbound exit and southbound entrance only 602:Northbound exit and southbound entrance only 589:Northbound exit and southbound entrance only 426: 68: 1252:Chia, Rachel; Teo, Dominic (31 March 2016). 1226:Chia, Rachel; Teo, Dominic (31 March 2016). 1201:"New expressway sparks big land acquisition" 404:Construction of the North-South Corridor at 257:(ECP) with the northern parts of Singapore. 1254:"Counting down to the end of Rochor Centre" 1079:"MOT's Addendum to the President's Address" 82: 2049: 2035: 1898: 1884: 1336:"Tunnel works to affect heritage building" 957: 955: 953: 1998:Thomson–East Coast Line airport extension 1422: 1387: 1359: 1333: 1305: 1172: 399: 1621: 1595: 1251: 1225: 1173:Abdullah, Ahmad Zhaki (16 April 2021). 950: 14: 2584:Transport in Central Region, Singapore 2511: 792:Republic Avenue and Republic Boulevard 586:Gambas Avenue and Woodlands Avenue 12 2030: 1879: 1765:from the original on 30 December 2019 1596:Devaraj, Samuel (17 September 2023). 1505:Tan, Christopher (24 November 2017). 1423:Zaccheus, Melody (13 February 2018). 1360:Zaccheus, Melody (2 September 2016). 1207:from the original on 16 November 2011 1168: 1166: 1121:. Channel NewsAsia. 21 January 2015. 376:In August 2016, several units in the 84:வடக்கு-தெற்கு போக்குவரத்து நெடும்பாதை 1388:Zaccheus, Melody (19 October 2016). 1073: 1071: 1012: 1010: 919: 917: 915: 836: 834: 832: 830: 233:), originally conceptualised as the 1950: 1924:Singapore Changi Airport Terminal 5 1673: 1647: 1530: 1504: 1450: 1334:Zaccheus, Melody (18 August 2016). 1306:Zaccheus, Melody (18 August 2016). 1199:Hetty Musfirah (15 November 2011). 1143: 1016: 923: 24: 1279: 1192: 1163: 1056:from the original on 21 March 2017 25: 2595: 2496:Singapore Underground Road System 1857: 1841:from the original on 20 July 2024 1803:from the original on 20 July 2024 1785:"Annex A - NSC Viaduct Ramps.pdf" 1125:from the original on 2 April 2015 1068: 1007: 973:from the original on 5 March 2016 938:from the original on 23 June 2017 912: 854:from the original on 29 July 2023 827: 364:Land acquisitions and demolitions 18:North-South Expressway, Singapore 2142: 1993:North–South Line infill stations 1870:North–South Corridor (Singapore) 1863: 1823:"Annex B - NSC Tunnel Ramps.pdf" 1531:Lim, Adrian (21 December 2018). 783: 744: 729: 703: 650: 631: 620: 119:21.5 km (13.4 mi) 99: 43: 1968:Thomson–East Coast Line Stage 5 1815: 1777: 1751: 1715: 1701: 1667: 1641: 1615: 1589: 1564: 1550: 1524: 1498: 1472: 1444: 1416: 1402: 1381: 1353: 1327: 1299: 1273: 1245: 1219: 1137: 1111: 1085: 1017:Lim, Adrian (21 January 2016). 647:Southbound and northbound exits 395: 1674:Loi, Esther (4 October 2023). 1280:Ng, Charmaine (20 June 2018). 1038: 985: 13: 1: 1648:Kok, Yufeng (17 April 2023). 1451:Kok, Yufeng (17 April 2021). 1144:Lim, Adrian (12 April 2017). 924:Lim, Adrian (28 April 2016). 820: 235:North-South Expressway (NSE) 7: 2574:Proposed roads in Singapore 644:Lentor Avenue (northbound) 547:Planned entrances and exits 10: 2600: 2003:Kuala Lumpur–Singapore HSR 629:Lentor Avenue (southbound) 427:Impact during construction 333: 29: 2569:Downtown Core (Singapore) 2524:Road tunnels in Singapore 2488: 2187: 2151: 2140: 2074: 2065: 2018:Architecture of Singapore 2015: 1958:North East Line extension 1932: 1916: 799: 778:Northbound entrance only 757: 666:Northbound entrance only 649:Northbound entrance from 614: 610:Southbound entrance only 593: 564: 210: 205: 201: 191: 186: 182: 168: 144: 136: 131: 123: 115: 110: 98: 83: 69: 53: 41: 2519:Expressways in Singapore 2059:expressways of Singapore 1963:Downtown Line extenstion 1831:Land Transport Authority 1793:Land Transport Authority 1730:Land Transport Authority 1484:Land Transport Authority 1097:Singapore Land Authority 967:Land Transport Authority 804:     455: 338: 320:Land Transport Authority 215:Expressways of Singapore 30:Not to be confused with 2068:Road names in Singapore 2174:Outer Ring Road System 1907:Future developments in 409: 345:Minister for Transport 175:, Republic Avenue and 55: 2164:Jurong Island Highway 1576:Ministry of Transport 581:Northbound exit only 535:Cross Island MRT line 403: 290:Pan-Island Expressway 56:Koridor Utara-Selatan 2529:Woodlands, Singapore 2118:North–South Corridor 1942:North–South Corridor 1872:at Wikimedia Commons 1723:"NSErampsrev2-1.ppt" 1203:. Channel NewsAsia. 969:. 15 November 2011. 908:on 30 December 2013. 663:Ang Mo Kio Avenue 6 478:North–South MRT line 305:cycling trunk routes 227:North–South Corridor 49:North–South Corridor 32:North–South MRT line 2275:Jalan Ahmad Ibrahim 1973:Circle Line Stage 6 1761:. 30 January 2019. 1739:on 16 February 2018 724:Kampong Java Road, 570:Admiralty Road West 146:Major intersections 140:Admiralty Road West 2255:Eu Tong Sen Street 2179:West Coast Highway 2102:Kallang-Paya Lebar 2097:East Coast Parkway 1983:Jurong Region Line 1486:. 24 November 2017 795:Southern terminus 578:Woodlands Avenue 8 573:Northern terminus 410: 294:East Coast Parkway 286:Seletar Expressway 255:East Coast Parkway 251:Central Expressway 2559:Novena, Singapore 2549:Bishan, Singapore 2504: 2503: 2465:Upper Bukit Timah 2380:Old Choa Chu Kang 2375:North Buona Vista 2295:Jalan Bukit Merah 2024: 2023: 2011: 2010: 1988:Cross Island Line 1868:Media related to 1680:The Straits Times 1654:The Straits Times 1628:The Straits Times 1602:The Straits Times 1537:The Straits Times 1511:The Straits Times 1458:The Straits Times 1430:The Straits Times 1395:The Straits Times 1367:The Straits Times 1313:The Straits Times 1286:The Straits Times 1259:The Straits Times 1232:The Straits Times 1150:The Straits Times 1099:. 19 January 2011 1024:The Straits Times 931:The Straits Times 847:The Straits Times 818: 817: 809:Incomplete access 752:(northbound) || 531:Teck Ghee station 318:According to the 223: 222: 111:Route information 16:(Redirected from 2591: 2350:Marina Boulevard 2320:Jurong Town Hall 2215:Bencoolen Street 2159:Bukit Timah Road 2152:Semi-expressways 2146: 2057:Major roads and 2051: 2044: 2037: 2028: 2027: 1948: 1947: 1900: 1893: 1886: 1877: 1876: 1867: 1851: 1850: 1848: 1846: 1840: 1827: 1819: 1813: 1812: 1810: 1808: 1802: 1789: 1781: 1775: 1774: 1772: 1770: 1755: 1749: 1748: 1746: 1744: 1738: 1732:. Archived from 1727: 1719: 1713: 1712: 1705: 1699: 1698: 1696: 1694: 1671: 1665: 1664: 1662: 1660: 1645: 1639: 1638: 1636: 1634: 1619: 1613: 1612: 1610: 1608: 1593: 1587: 1586: 1584: 1582: 1568: 1562: 1561: 1554: 1548: 1547: 1545: 1543: 1528: 1522: 1521: 1519: 1517: 1502: 1496: 1495: 1493: 1491: 1476: 1470: 1469: 1467: 1465: 1448: 1442: 1441: 1439: 1437: 1420: 1414: 1413: 1406: 1400: 1399: 1385: 1379: 1378: 1376: 1374: 1357: 1351: 1350: 1348: 1346: 1331: 1325: 1324: 1322: 1320: 1303: 1297: 1296: 1294: 1292: 1277: 1271: 1270: 1268: 1266: 1249: 1243: 1242: 1240: 1238: 1223: 1217: 1216: 1214: 1212: 1196: 1190: 1189: 1187: 1185: 1170: 1161: 1160: 1158: 1156: 1141: 1135: 1134: 1132: 1130: 1115: 1109: 1108: 1106: 1104: 1089: 1083: 1082: 1075: 1066: 1065: 1063: 1061: 1042: 1036: 1035: 1033: 1031: 1014: 1005: 1004: 1002: 1000: 989: 983: 982: 980: 978: 959: 948: 947: 945: 943: 921: 910: 909: 898: 892: 891: 889: 887: 873: 864: 863: 861: 859: 838: 811: 805: 787: 786: 748: 747: 741:Bukit Timah Road 733: 732: 726:Bukit Timah Road 707: 706: 654: 653: 635: 634: 624: 623: 551: 550: 533:on the upcoming 520:Bukit Timah Road 378:Ellison Building 147: 103: 94: 86: 85: 80: 72: 71: 66: 58: 47: 39: 38: 21: 2599: 2598: 2594: 2593: 2592: 2590: 2589: 2588: 2509: 2508: 2505: 2500: 2484: 2480:Victoria Street 2470:Upper Serangoon 2183: 2147: 2138: 2070: 2061: 2055: 2025: 2020: 2007: 1946: 1928: 1912: 1904: 1860: 1855: 1854: 1844: 1842: 1838: 1825: 1821: 1820: 1816: 1806: 1804: 1800: 1787: 1783: 1782: 1778: 1768: 1766: 1757: 1756: 1752: 1742: 1740: 1736: 1725: 1721: 1720: 1716: 1707: 1706: 1702: 1692: 1690: 1672: 1668: 1658: 1656: 1646: 1642: 1632: 1630: 1620: 1616: 1606: 1604: 1594: 1590: 1580: 1578: 1570: 1569: 1565: 1556: 1555: 1551: 1541: 1539: 1529: 1525: 1515: 1513: 1503: 1499: 1489: 1487: 1478: 1477: 1473: 1463: 1461: 1449: 1445: 1435: 1433: 1421: 1417: 1408: 1407: 1403: 1386: 1382: 1372: 1370: 1358: 1354: 1344: 1342: 1332: 1328: 1318: 1316: 1304: 1300: 1290: 1288: 1278: 1274: 1264: 1262: 1250: 1246: 1236: 1234: 1224: 1220: 1210: 1208: 1197: 1193: 1183: 1181: 1171: 1164: 1154: 1152: 1142: 1138: 1128: 1126: 1117: 1116: 1112: 1102: 1100: 1091: 1090: 1086: 1077: 1076: 1069: 1059: 1057: 1044: 1043: 1039: 1029: 1027: 1015: 1008: 998: 996: 991: 990: 986: 976: 974: 961: 960: 951: 941: 939: 922: 913: 900: 899: 895: 885: 883: 875: 874: 867: 857: 855: 850:. 3 July 2023. 840: 839: 828: 823: 814: 807: 803: 791: 784: 745: 738: 730: 704: 651: 648: 643: 632: 630: 628: 621: 599:Sembawang Road 549: 458: 429: 398: 366: 341: 336: 145: 132:Major junctions 106: 88: 81: 74: 67: 60: 48: 35: 28: 23: 22: 15: 12: 11: 5: 2597: 2587: 2586: 2581: 2576: 2571: 2566: 2561: 2556: 2551: 2546: 2541: 2536: 2531: 2526: 2521: 2502: 2501: 2499: 2498: 2492: 2490: 2486: 2485: 2483: 2482: 2477: 2472: 2467: 2462: 2457: 2452: 2447: 2442: 2437: 2432: 2427: 2422: 2417: 2412: 2407: 2402: 2397: 2392: 2387: 2382: 2377: 2372: 2367: 2362: 2357: 2352: 2347: 2342: 2337: 2332: 2327: 2322: 2317: 2312: 2307: 2302: 2297: 2292: 2290:Jalan Boon Lay 2287: 2282: 2277: 2272: 2267: 2262: 2257: 2252: 2247: 2242: 2237: 2232: 2227: 2222: 2217: 2212: 2207: 2202: 2197: 2191: 2189: 2185: 2184: 2182: 2181: 2176: 2171: 2169:Nicoll Highway 2166: 2161: 2155: 2153: 2149: 2148: 2141: 2139: 2137: 2136: 2131: 2126: 2121: 2114: 2112:Marina Coastal 2109: 2104: 2099: 2094: 2089: 2084: 2078: 2076: 2072: 2071: 2066: 2063: 2062: 2054: 2053: 2046: 2039: 2031: 2022: 2021: 2016: 2013: 2012: 2009: 2008: 2006: 2005: 2000: 1995: 1990: 1985: 1980: 1975: 1970: 1965: 1960: 1954: 1952: 1945: 1944: 1938: 1936: 1930: 1929: 1927: 1926: 1920: 1918: 1914: 1913: 1903: 1902: 1895: 1888: 1880: 1874: 1873: 1859: 1858:External links 1856: 1853: 1852: 1814: 1776: 1750: 1714: 1700: 1666: 1640: 1614: 1588: 1563: 1549: 1523: 1497: 1471: 1443: 1415: 1401: 1380: 1352: 1326: 1298: 1272: 1244: 1218: 1191: 1162: 1136: 1110: 1084: 1067: 1050:www.lta.gov.sg 1037: 1006: 984: 949: 911: 893: 881:www.nas.gov.sg 865: 825: 824: 822: 819: 816: 815: 813: 812: 800: 797: 796: 793: 780: 779: 776: 774:Nicoll Highway 770: 769: 766: 761: 755: 754: 722: 716: 715: 712: 701: 695: 694: 691: 686: 680: 679: 677: 676:Marymount Road 674: 668: 667: 664: 660: 659: 645: 618: 612: 611: 608: 604: 603: 600: 597: 591: 590: 587: 583: 582: 579: 575: 574: 571: 568: 562: 561: 558: 555: 548: 545: 544: 543: 542: 541: 538: 527: 506: 505: 504: 501: 483: 482: 481: 474: 457: 454: 449: 448: 444: 443: 438: 437: 428: 425: 397: 394: 365: 362: 340: 337: 335: 332: 221: 220: 219: 218: 208: 207: 206:Highway system 203: 202: 199: 198: 193: 189: 188: 184: 183: 180: 179: 177:Nicoll Highway 170: 169:South end 166: 165: 148: 142: 141: 138: 137:North end 134: 133: 129: 128: 125: 121: 120: 117: 113: 112: 108: 107: 104: 96: 95: 51: 50: 42: 26: 9: 6: 4: 3: 2: 2596: 2585: 2582: 2580: 2577: 2575: 2572: 2570: 2567: 2565: 2562: 2560: 2557: 2555: 2552: 2550: 2547: 2545: 2542: 2540: 2537: 2535: 2532: 2530: 2527: 2525: 2522: 2520: 2517: 2516: 2514: 2507: 2497: 2494: 2493: 2491: 2487: 2481: 2478: 2476: 2475:Upper Thomson 2473: 2471: 2468: 2466: 2463: 2461: 2458: 2456: 2455:Telok Blangah 2453: 2451: 2448: 2446: 2443: 2441: 2440:Stamford Road 2438: 2436: 2433: 2431: 2428: 2426: 2423: 2421: 2418: 2416: 2413: 2411: 2408: 2406: 2403: 2401: 2398: 2396: 2395:Pasir Panjang 2393: 2391: 2388: 2386: 2383: 2381: 2378: 2376: 2373: 2371: 2368: 2366: 2363: 2361: 2358: 2356: 2353: 2351: 2348: 2346: 2343: 2341: 2338: 2336: 2333: 2331: 2328: 2326: 2323: 2321: 2318: 2316: 2313: 2311: 2308: 2306: 2303: 2301: 2298: 2296: 2293: 2291: 2288: 2286: 2283: 2281: 2278: 2276: 2273: 2271: 2268: 2266: 2263: 2261: 2258: 2256: 2253: 2251: 2248: 2246: 2243: 2241: 2238: 2236: 2233: 2231: 2230:Choa Chu Kang 2228: 2226: 2223: 2221: 2218: 2216: 2213: 2211: 2208: 2206: 2203: 2201: 2198: 2196: 2193: 2192: 2190: 2186: 2180: 2177: 2175: 2172: 2170: 2167: 2165: 2162: 2160: 2157: 2156: 2154: 2150: 2145: 2135: 2132: 2130: 2127: 2125: 2122: 2120: 2119: 2115: 2113: 2110: 2108: 2105: 2103: 2100: 2098: 2095: 2093: 2090: 2088: 2085: 2083: 2080: 2079: 2077: 2073: 2069: 2064: 2060: 2052: 2047: 2045: 2040: 2038: 2033: 2032: 2029: 2019: 2014: 2004: 2001: 1999: 1996: 1994: 1991: 1989: 1986: 1984: 1981: 1979: 1976: 1974: 1971: 1969: 1966: 1964: 1961: 1959: 1956: 1955: 1953: 1949: 1943: 1940: 1939: 1937: 1935: 1931: 1925: 1922: 1921: 1919: 1915: 1911: 1908: 1901: 1896: 1894: 1889: 1887: 1882: 1881: 1878: 1871: 1866: 1862: 1861: 1837: 1833: 1832: 1824: 1818: 1799: 1795: 1794: 1786: 1780: 1764: 1760: 1754: 1735: 1731: 1724: 1718: 1710: 1704: 1689: 1685: 1681: 1677: 1670: 1655: 1651: 1644: 1629: 1625: 1618: 1603: 1599: 1592: 1577: 1573: 1567: 1559: 1553: 1538: 1534: 1527: 1512: 1508: 1501: 1485: 1481: 1475: 1460: 1459: 1454: 1447: 1432: 1431: 1426: 1419: 1411: 1405: 1397: 1396: 1391: 1384: 1369: 1368: 1363: 1356: 1341: 1337: 1330: 1315: 1314: 1309: 1302: 1287: 1283: 1276: 1261: 1260: 1255: 1248: 1233: 1229: 1222: 1206: 1202: 1195: 1180: 1176: 1169: 1167: 1151: 1147: 1140: 1124: 1120: 1114: 1098: 1094: 1088: 1080: 1074: 1072: 1055: 1051: 1047: 1041: 1026: 1025: 1020: 1013: 1011: 994: 988: 972: 968: 964: 958: 956: 954: 937: 933: 932: 927: 920: 918: 916: 907: 903: 897: 882: 878: 872: 870: 853: 849: 848: 843: 837: 835: 833: 831: 826: 810: 802: 801: 798: 794: 790: 782: 781: 777: 775: 772: 771: 767: 765: 762: 760: 759:Downtown Core 756: 753: 751: 742: 736: 727: 723: 721: 718: 717: 713: 710: 702: 700: 697: 696: 692: 690: 687: 685: 682: 681: 678: 675: 673: 670: 669: 665: 662: 661: 657: 646: 642: 638: 627: 619: 617: 613: 609: 606: 605: 601: 598: 596: 592: 588: 585: 584: 580: 577: 576: 572: 569: 567: 563: 559: 556: 553: 552: 539: 536: 532: 528: 525: 521: 517: 513: 512: 510: 507: 502: 499: 495: 494: 493: 489: 488: 484: 479: 475: 472: 471: 470: 466: 463: 462: 461: 453: 446: 445: 440: 439: 434: 433: 432: 424: 421: 417: 414: 408:in April 2024 407: 402: 393: 391: 386: 384: 379: 374: 371: 370:Rochor Centre 361: 358: 357:Khaw Boon Wan 352: 349: 346: 331: 327: 325: 321: 316: 314: 313:Lentor Avenue 310: 306: 302: 297: 295: 291: 287: 283: 279: 275: 271: 267: 263: 258: 256: 252: 248: 244: 240: 236: 232: 228: 217: 216: 212: 211: 209: 204: 200: 197: 194: 190: 185: 181: 178: 174: 171: 167: 164: 160: 156: 152: 149: 143: 139: 135: 130: 126: 122: 118: 114: 109: 102: 97: 92: 78: 64: 57: 52: 46: 40: 37: 33: 19: 2506: 2435:South Bridge 2400:River Valley 2370:North Bridge 2335:Lorong Chuan 2330:Lim Chu Kang 2270:Holland Road 2240:Collyer Quay 2117: 2116: 1941: 1843:. Retrieved 1829: 1817: 1805:. Retrieved 1791: 1779: 1767:. Retrieved 1753: 1741:. Retrieved 1734:the original 1729: 1717: 1703: 1691:. Retrieved 1679: 1669: 1657:. Retrieved 1653: 1643: 1631:. Retrieved 1627: 1617: 1605:. Retrieved 1601: 1591: 1579:. Retrieved 1575: 1566: 1552: 1540:. Retrieved 1536: 1526: 1514:. Retrieved 1510: 1500: 1488:. Retrieved 1483: 1474: 1462:. Retrieved 1456: 1446: 1434:. Retrieved 1428: 1418: 1404: 1393: 1383: 1371:. Retrieved 1365: 1355: 1343:. Retrieved 1339: 1329: 1317:. Retrieved 1311: 1301: 1289:. Retrieved 1285: 1275: 1263:. Retrieved 1257: 1247: 1235:. Retrieved 1231: 1221: 1209:. Retrieved 1194: 1182:. Retrieved 1178: 1153:. Retrieved 1149: 1139: 1127:. Retrieved 1113: 1101:. Retrieved 1096: 1087: 1058:. Retrieved 1049: 1040: 1028:. Retrieved 1022: 997:. Retrieved 987: 975:. Retrieved 966: 940:. Retrieved 929: 906:the original 896: 884:. Retrieved 880: 858:11 September 856:. Retrieved 845: 806:   739: 737:(southbound) 689:Thomson Road 557:Destinations 516:Thomson Road 508: 486: 464: 459: 450: 430: 422: 418: 415: 411: 396:Construction 390:Thomson Road 387: 375: 367: 353: 342: 328: 317: 298: 259: 234: 230: 226: 224: 213: 36: 2430:Sims Avenue 2425:Shenton Way 2305:Jalan Eunos 2300:Jalan Buroh 2285:Jalan Besar 2280:Jalan Bahar 2265:Hill Street 2188:Major roads 2087:Bukit Timah 2075:Expressways 1769:30 December 1743:12 December 1659:11 December 1607:11 December 1581:11 December 1542:11 December 1464:12 December 1436:11 December 1373:12 December 1345:12 December 1319:12 December 1291:11 December 1237:11 December 1211:16 November 1184:11 December 1155:11 December 1103:12 December 1030:11 December 999:12 December 348:Raymond Lim 247:expressways 2544:Ang Mo Kio 2513:Categories 2365:New Bridge 2340:MacPherson 2310:Jalan Kayu 2250:East Coast 2225:Cantonment 2220:Bras Basah 2210:Beach Road 2124:Pan-Island 2082:Ayer Rajah 886:6 December 821:References 764:Ophir Road 616:Ang Mo Kio 524:Ophir Road 292:(PIE) and 274:Ang Mo Kio 2554:Toa Payoh 2489:Cancelled 2420:Serangoon 2415:Sembawang 2200:Balestier 1934:Transport 1917:Buildings 1910:Singapore 1693:5 October 1688:0585-3923 1633:5 October 977:11 August 684:Toa Payoh 566:Sembawang 301:bus lanes 282:Toa Payoh 266:Sembawang 262:Woodlands 239:Singapore 196:Singapore 2405:Robinson 2235:Clementi 2134:Tampines 1978:RTS Link 1836:Archived 1798:Archived 1763:Archived 1205:Archived 1123:Archived 1054:Archived 971:Archived 936:Archived 852:Archived 554:Location 487:At-grade 436:tunnels. 187:Location 2564:Kallang 2460:Thomson 2450:Tanglin 2390:Orchard 2325:Kallang 2260:Geylang 2245:Dunearn 2205:Bartley 2129:Seletar 2092:Central 1845:20 July 1807:20 July 1516:14 July 1490:14 July 1340:AsiaOne 1265:1 April 1129:7 March 720:Kallang 711:(Tuas) 465:Viaduct 334:History 309:viaduct 296:(ECP). 288:(SLE), 243:network 192:Country 124:History 77:Chinese 2539:Mandai 2534:Yishun 2445:Sungei 2410:Scotts 2355:Napier 2345:Mandai 2315:Jurong 2107:Kranji 1686:  1060:9 June 942:9 June 699:Novena 672:Bishan 595:Yishun 560:Notes 509:Tunnel 406:Rochor 278:Bishan 270:Yishun 116:Length 87:  73:  70:南北交通廊道 59:  2385:Ophir 2195:Anson 1839:(PDF) 1826:(PDF) 1801:(PDF) 1788:(PDF) 1737:(PDF) 1726:(PDF) 658:only 456:Route 442:2024. 339:Plans 91:Tamil 63:Malay 2360:Neil 1951:Rail 1847:2024 1809:2024 1771:2019 1745:2023 1695:2023 1684:ISSN 1661:2023 1635:2020 1609:2023 1583:2023 1544:2023 1518:2021 1492:2021 1466:2023 1438:2023 1375:2023 1347:2023 1321:2023 1293:2023 1267:2016 1239:2023 1213:2011 1186:2023 1157:2023 1131:2015 1105:2023 1062:2017 1032:2023 1001:2023 979:2019 944:2017 888:2022 860:2023 743:and 728:and 639:and 518:and 303:and 280:and 225:The 1179:CNA 789:ECP 750:CTE 735:CTE 709:PIE 656:SLE 641:BKE 637:SLE 626:SLE 498:BKE 492:SLE 469:SLE 324:HDB 245:of 241:'s 231:NSC 173:ECP 163:ECP 159:CTE 155:PIE 151:SLE 2515:: 1834:. 1828:. 1796:. 1790:. 1728:. 1682:. 1678:. 1652:. 1626:. 1600:. 1574:. 1535:. 1509:. 1482:. 1455:. 1427:. 1392:. 1364:. 1338:. 1310:. 1284:. 1256:. 1230:. 1177:. 1165:^ 1148:. 1095:. 1070:^ 1052:. 1048:. 1021:. 1009:^ 965:. 952:^ 934:. 928:. 914:^ 879:. 868:^ 844:. 829:^ 276:, 272:, 268:, 264:, 161:, 157:, 153:, 2050:e 2043:t 2036:v 1899:e 1892:t 1885:v 1849:. 1811:. 1773:. 1747:. 1697:. 1663:. 1637:. 1611:. 1585:. 1546:. 1520:. 1494:. 1468:. 1440:. 1398:. 1377:. 1349:. 1323:. 1295:. 1269:. 1241:. 1215:. 1188:. 1159:. 1133:. 1107:. 1064:. 1034:. 1003:. 981:. 946:. 890:. 862:. 537:. 500:. 480:. 229:( 93:) 89:( 79:) 75:( 65:) 61:( 34:. 20:)

Index

North-South Expressway, Singapore
North–South MRT line

Malay
Chinese
Tamil

SLE
PIE
CTE
ECP
ECP
Nicoll Highway
Singapore
Expressways of Singapore
Singapore
network
expressways
Central Expressway
East Coast Parkway
Woodlands
Sembawang
Yishun
Ang Mo Kio
Bishan
Toa Payoh
Seletar Expressway
Pan-Island Expressway
East Coast Parkway
bus lanes

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.