248:-based development firm Forshaw Land & Property and a revised planning application was made and approved by Manchester City Council in 2015 for 420 privately rented apartments, fewer than the 600 originally planned in the 2012 scheme. Construction of the skyscraper was expected to take approximately 18 months with the demolition of the concrete car park shell to commence in November 2015. However, by May 2017 construction had yet to begin, and the car park structure had not been demolished.
210:
31:
184:
A 125 m (410 ft) tower was originally approved in
October 2012. However, the scheme never materialised and the land was sold to new owners. A revised scheme for the site was approved in 2017 for a 32 storey, 92 m (302 ft) high-rise tower, comprising 420 apartments targeted at the
259:
A planning application was submitted in late 2017 for a tower reduced in scale and which was approved in
January 2018. The concrete frame which has been incomplete since 2005 was finally demolished in May 2018. Groundworks commenced in summer 2018 with the core beginning to rise in October 2018. In
217:
The development was located on a site on River Street, beside
Manchester city centre's southern boundary next to the Mancunian Way. At the time of the planning submission in 2012, the site was occupied by a half-built concrete frame, originally built for a medium-rise apartment block in 2004. The
233:
and will reflect light to create effect. The architect, Ian
Simpson described the building as "a simple, very elegant and slender building with a glass surface so it will pick up reflections from the light and I think it will be quite dramatic".
229:
The 2012 approved scheme included 600 serviced apartments designed for short-stay 'serviced living' as well as a café and gym. The tower would have been similar to modernist buildings like the
218:
developer went bankrupt and the concrete frame remained uncompleted for 13 years. Chelmer
Developments bought the site in April 2011 and pursued development opportunities. Liaising with
344:
237:
The planning application was submitted in July 2012 and
Manchester City Council approved the plans in October 2012. Approval was confirmed on 25 October 2012 at the monthly
226:
to devise design proposals for a skyscraper building above 100 m (330 ft) in height. The company held a four-week consultation period in spring 2012.
188:
The unfinished concrete frame was demolished in May 2018 and construction commenced on the tower in summer 2018. As of 2023, River Street Tower is the
694:
756:
741:
643:
588:
761:
625:
603:
536:
661:
454:
751:
746:
189:
251:
The scheme was effectively abandoned when new owners of the site proposed a different and smaller building in
December 2017.
702:
276:
241:
meeting. Demolition of the existing concrete structure was expected to begin in earnest, though works did not commence.
428:
398:
562:
563:"Sister skyscraper for Beetham Tower to finally be built and replace eyesore car park in city centre"
223:
141:
589:"The weird history of the derelict car park on River Street that you can see from the Mancunian Way"
406:
219:
689:
322:
484:
8:
345:"Revealed: Plans for new skyscraper in Manchester by Beetham Tower architect Ian Simpson"
644:"This half-built concrete eyesore next to the Mancunian Way is finally being demolished"
462:
238:
297:
230:
181:
on land which was formerly occupied by a concrete car park frame from 2005 to 2018.
260:
September 2020, the building was completed and began taking bookings for students.
193:
510:
369:
735:
717:
704:
178:
174:
75:
209:
65:
30:
626:"Downing moves fast with plans for 32-storey River Street tower"
604:"Downing moves fast with plans for 32-storey River Street tower"
245:
537:"REVEALED Four Major Manchester Developments Move Forward"
177:, England. The tower is situated immediately north of the
173:
after its developer) is a high-rise residential tower in
485:"Manchester's River Street tower gets planning approval"
662:"Downing Construction wins £140m brace of tower jobs"
277:"Planes approved for £95 million River Street scheme"
190:joint 22nd-tallest building in Greater Manchester
733:
601:
244:The land was subsequently sold to new owners,
399:"Report for Resolution - River Street Tower"
292:
290:
602:Middleton-Pugh, Jessica (16 January 2018).
16:Residential building in Manchester, England
338:
336:
393:
391:
287:
208:
757:Residential buildings completed in 2020
370:"Second Tallest Planned For Manchester"
333:
742:Buildings and structures in Manchester
734:
388:
342:
213:River Street Tower under construction
690:- Developer's website for the scheme
762:Residential buildings in Manchester
511:"Mancunian Way Tower Wins Approval"
13:
35:River Street Tower, September 2020
14:
773:
683:
343:Linton, Deborah (18 July 2012).
323:"Manchester, River Street Tower"
29:
695:- Planning application document
654:
636:
618:
595:
581:
555:
529:
503:
752:Apartment buildings in England
747:2020 establishments in England
477:
447:
421:
362:
315:
269:
254:
204:
185:student accommodation market.
1:
429:"Chelmer tower plans on show"
263:
199:
7:
222:, the company commissioned
10:
778:
224:SimpsonHaugh and Partners
160:
155:
147:
142:SimpsonHaugh and Partners
137:
132:
124:
119:
111:
106:
98:
90:
82:
71:
61:
53:
45:
40:
28:
23:
567:Manchester Evening News
541:Manchester Confidential
407:Manchester City Council
349:Manchester Evening News
220:Manchester City Council
133:Design and construction
115:92 m (302 ft)
718:53.470824°N 2.249284°W
214:
666:Construction Enquirer
212:
723:53.470824; -2.249284
459:Chelmer Developments
298:"River Street Tower"
83:Construction started
714: /
169:(also known as the
62:Architectural style
41:General information
650:. 28 October 2018.
632:. 28 October 2018.
606:. North West Place
515:skyscrapernews.com
465:on 28 October 2012
374:skyscrapernews.com
239:planning committee
215:
167:River Street Tower
24:River Street Tower
569:. 27 October 2015
543:. 28 October 2015
517:. 25 October 2012
491:. 25 October 2012
231:New Century House
164:
163:
120:Technical details
769:
729:
728:
726:
725:
724:
719:
715:
712:
711:
710:
707:
678:
677:
675:
673:
668:. 28 August 2018
658:
652:
651:
640:
634:
633:
630:Place North West
622:
616:
615:
613:
611:
599:
593:
592:
585:
579:
578:
576:
574:
559:
553:
552:
550:
548:
533:
527:
526:
524:
522:
507:
501:
500:
498:
496:
481:
475:
474:
472:
470:
461:. Archived from
451:
445:
444:
442:
440:
433:Place North West
425:
419:
418:
416:
414:
403:
395:
386:
385:
383:
381:
366:
360:
359:
357:
355:
340:
331:
330:
319:
313:
312:
310:
308:
294:
285:
284:
273:
194:1 Spinningfields
33:
21:
20:
777:
776:
772:
771:
770:
768:
767:
766:
732:
731:
722:
720:
716:
713:
708:
705:
703:
701:
700:
686:
681:
671:
669:
660:
659:
655:
642:
641:
637:
624:
623:
619:
609:
607:
600:
596:
587:
586:
582:
572:
570:
561:
560:
556:
546:
544:
535:
534:
530:
520:
518:
509:
508:
504:
494:
492:
483:
482:
478:
468:
466:
455:"Our Proposals"
453:
452:
448:
438:
436:
427:
426:
422:
412:
410:
401:
397:
396:
389:
379:
377:
368:
367:
363:
353:
351:
341:
334:
321:
320:
316:
306:
304:
296:
295:
288:
283:. 9 March 2018.
275:
274:
270:
266:
257:
207:
202:
36:
17:
12:
11:
5:
775:
765:
764:
759:
754:
749:
744:
698:
697:
692:
685:
684:External links
682:
680:
679:
653:
635:
617:
594:
591:. 13 May 2017.
580:
554:
528:
502:
476:
446:
420:
387:
376:. 20 July 2012
361:
332:
314:
302:skyscrapernews
286:
267:
265:
262:
256:
253:
206:
203:
201:
198:
162:
161:
158:
157:
153:
152:
149:
145:
144:
139:
135:
134:
130:
129:
126:
122:
121:
117:
116:
113:
109:
108:
104:
103:
100:
96:
95:
92:
88:
87:
84:
80:
79:
73:
69:
68:
63:
59:
58:
55:
51:
50:
47:
43:
42:
38:
37:
34:
26:
25:
15:
9:
6:
4:
3:
2:
774:
763:
760:
758:
755:
753:
750:
748:
745:
743:
740:
739:
737:
730:
727:
696:
693:
691:
688:
687:
667:
663:
657:
649:
645:
639:
631:
627:
621:
605:
598:
590:
584:
568:
564:
558:
542:
538:
532:
516:
512:
506:
490:
486:
480:
464:
460:
456:
450:
435:. 7 June 2012
434:
430:
424:
409:
408:
400:
394:
392:
375:
371:
365:
350:
346:
339:
337:
328:
324:
318:
303:
299:
293:
291:
282:
281:Insider Media
278:
272:
268:
261:
252:
249:
247:
242:
240:
235:
232:
227:
225:
221:
211:
197:
195:
191:
186:
182:
180:
179:Mancunian Way
176:
172:
171:Downing Tower
168:
159:
154:
150:
146:
143:
140:
136:
131:
127:
123:
118:
114:
110:
105:
101:
97:
93:
89:
85:
81:
77:
74:
70:
67:
64:
60:
56:
52:
48:
44:
39:
32:
27:
22:
19:
699:
670:. Retrieved
665:
656:
647:
638:
629:
620:
608:. Retrieved
597:
583:
571:. Retrieved
566:
557:
545:. Retrieved
540:
531:
519:. Retrieved
514:
505:
493:. Retrieved
488:
479:
467:. Retrieved
463:the original
458:
449:
437:. Retrieved
432:
423:
411:. Retrieved
405:
378:. Retrieved
373:
364:
352:. Retrieved
348:
326:
317:
305:. Retrieved
301:
280:
271:
258:
250:
243:
236:
228:
216:
187:
183:
170:
166:
165:
138:Architect(s)
18:
721: /
648:14 May 2018
255:2017 scheme
205:2012 scheme
125:Floor count
102:£95 million
57:Residential
736:Categories
706:53°28′15″N
672:28 October
573:30 October
547:30 October
521:25 October
495:25 October
469:18 October
439:18 October
413:18 October
380:18 October
354:18 October
307:18 October
264:References
200:Background
175:Manchester
156:References
76:Manchester
709:2°14′57″W
148:Developer
91:Completed
78:, England
66:Neomodern
49:Completed
489:BBC News
72:Location
610:2 March
327:Downing
151:Downing
246:Bolton
107:Height
46:Status
402:(PDF)
192:with
674:2018
612:2018
575:2015
549:2015
523:2012
497:2012
471:2012
441:2012
415:2012
382:2012
356:2012
309:2012
112:Roof
99:Cost
94:2020
86:2018
54:Type
738::
664:.
646:.
628:.
565:.
539:.
513:.
487:.
457:.
431:.
404:.
390:^
372:.
347:.
335:^
325:.
300:.
289:^
279:.
196:.
128:32
676:.
614:.
577:.
551:.
525:.
499:.
473:.
443:.
417:.
384:.
358:.
329:.
311:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.