570: 556: 221:
to 30% imported coal. Sea water is proposed for cooling purpose and potable water by desalination. Krishnapatnam port (about 5 km from site) will cater to the requirement of importing heavy machinery and both domestic & imported coal of 3.5 and 1.5 million tons per annum respectively. EPC
234:
Limited during July 2008 and for BOP during February 2009. The estimated complete cost of project is about Rs 8432/- Crores. The Debt & Equity ratio is 80:20 and Project is being financed by PFC and KfW, Germany.
216:
The proposed capacity of plant is 1600 MW. The project is under construction and likely to be completed by the end of 2014. The Power station is designed for blended coal in the ratio of 70% washed domestic coal from
57: 300: 610: 514: 500: 733: 808: 583: 803: 122: 784: 818: 813: 603: 728: 687: 692: 596: 641: 532: 446: 777: 651: 656: 533:"BHEL secures Two Orders for setting up Thermal Power Projects comprising India's Highest Rating 800 MW Supercritical Sets" 823: 758: 707: 646: 472: 418: 400: 661: 770: 702: 723: 671: 302:
1600 MW Thermal Power Project proposed to be named as "Sri.Damodaram Sanjeevaiah Thermal Power Station".
588: 250: 223: 623: 536: 243:
In view of the exemplary Statesmanship and dedicated services rendered to the state by late
244: 8: 227: 165: 218: 450: 404: 44: 247:, Former Chief Minister of Andhra Pradesh, the Govt.of Andhra Pradesh ordered ∃∈ 754: 627: 619: 202: 797: 575: 231: 194: 72: 59: 697: 561: 160:
3 × 800 MW = 2400 MW Ultra mega super critical Thermal Power Station-APPDCL
24:
Sri Damodaram Sanjeevaiah ultra mega super critical Thermal Power Station
180: 618: 380:
EPC contracted to TATA, Boiler and Turbine Generator Contract to BHEL
477: 423: 320: 209:
It is the Special Purpose Vehicle (SPV), a joint venture company of
171: 569: 210: 198: 501:"800-MW unit-I of AP Genco's Krishnapatnam plant goes on stream" 205:. The power plant is one of the coal-based power plants of 137: 213:(with 50% equity) and IL AND FS (50% equity) partnership. 207:
Andhra Pradesh Power Development Company Limited (APPDCL).
114:
Andhra Pradesh Power Development Company Limited (APPDCL)
515:"BHEL commissions second 800 MW boiler at Krishnapatnam" 734:
Indian states ranking by households having electricity
253: 551: 419:"Works stalled at Damodaram Sanjeevaiah power plant" 473:"Nelatur power plant 1st unit to be ready by 2013" 294: 795: 753:This article about an Indian power station is a 222:contract for the main plant has been awarded to 667:Sri Damodaram Sanjeevaiah Thermal Power Station 584:KRISHNAPATNAM THERMAL POWER STATION PROJECT pdf 191:Sri Damodaram Sanjeevaiah Thermal Power Station 778: 604: 809:Buildings and structures in Nellore district 804:Coal-fired power stations in Andhra Pradesh 729:States of India by installed power capacity 688:Andhra Pradesh Power Generation Corporation 785: 771: 693:Transmission Corporation of Andhra Pradesh 611: 597: 521:. India. Press Trust of India. April 2015. 642:Dr. Narla Tata Rao Thermal Power Station 819:Energy infrastructure completed in 2014 796: 814:2014 establishments in Andhra Pradesh 652:Jegurupadu Combined Cycle Power Plant 592: 197:and at a distance of 23 km from 748: 657:Simhadri Super Thermal Power Station 193:is located in Nelatur Village, near 13: 708:Power System Operation Corporation 647:Gautami Combined Cycle Power Plant 14: 835: 662:Rayalaseema Thermal Power Station 547: 568: 554: 129:Thermal power station 703:Power Grid Corporation of India 525: 507: 493: 465: 439: 411: 393: 295:{\displaystyle {math|{mvar|}}} 286: 268: 1: 386: 757:. You can help Knowledge by 238: 7: 724:Electricity sector in India 672:Vizag Thermal Power Station 305: 10: 840: 824:Indian power station stubs 747: 401:"APGENCO Official Website" 245:Sri. Damodaram Sanjeevaiah 716: 680: 634: 449:. apgenco. Archived from 177: 164: 152: 148: 143: 133: 128: 118: 110: 96: 88: 51: 40: 32: 28: 23: 166:Nameplate capacity 296: 157:Units operational 106:(US$ 1.0 billion) 97:Construction cost 16:Power station in India 326:Date of Commissioning 297: 144:Power generation 539:on 17 November 2020. 447:"APGENCO and APPDCL" 319:Installed Capacity ( 251: 69: /  481:. 10 February 2012 427:. 17 December 2011 292: 92:Under Construction 766: 765: 742: 741: 519:Business Standard 384: 383: 219:Talcher Coalfield 188: 187: 134:Primary fuel 831: 787: 780: 773: 749: 613: 606: 599: 590: 589: 578: 573: 572: 564: 559: 558: 557: 541: 540: 535:. Archived from 529: 523: 522: 511: 505: 504: 497: 491: 490: 488: 486: 469: 463: 462: 460: 458: 443: 437: 436: 434: 432: 415: 409: 408: 407:on 17 July 2014. 403:. Archived from 397: 360:16 December 2014 310: 309: 301: 299: 298: 293: 291: 290: 289: 271: 181:edit on Wikidata 105: 104:84,322.0 million 103: 84: 83: 81: 80: 79: 74: 70: 67: 66: 65: 62: 47:, Andhra Pradesh 21: 20: 839: 838: 834: 833: 832: 830: 829: 828: 794: 793: 792: 791: 745: 743: 738: 712: 676: 630: 617: 574: 567: 560: 555: 553: 550: 545: 544: 531: 530: 526: 513: 512: 508: 499: 498: 494: 484: 482: 471: 470: 466: 456: 454: 453:on 12 June 2014 445: 444: 440: 430: 428: 417: 416: 412: 399: 398: 394: 389: 308: 285: 272: 267: 254: 252: 249: 248: 241: 184: 101: 100: 77: 75: 73:14.31°N 80.10°E 71: 68: 63: 60: 58: 56: 55: 17: 12: 11: 5: 837: 827: 826: 821: 816: 811: 806: 790: 789: 782: 775: 767: 764: 763: 740: 739: 737: 736: 731: 726: 720: 718: 717:Related topics 714: 713: 711: 710: 705: 700: 695: 690: 684: 682: 678: 677: 675: 674: 669: 664: 659: 654: 649: 644: 638: 636: 635:Power stations 632: 631: 628:Andhra Pradesh 620:Power stations 616: 615: 608: 601: 593: 587: 586: 580: 579: 565: 549: 548:External links 546: 543: 542: 524: 506: 492: 464: 438: 410: 391: 390: 388: 385: 382: 381: 378: 375: 372: 369: 365: 364: 361: 358: 355: 352: 348: 347: 344: 341: 338: 335: 331: 330: 327: 324: 317: 314: 307: 304: 288: 284: 281: 278: 275: 270: 266: 263: 260: 257: 240: 237: 203:Andhra Pradesh 186: 185: 178: 175: 174: 168: 162: 161: 158: 154: 153: 150: 149: 146: 145: 141: 140: 135: 131: 130: 126: 125: 120: 116: 115: 112: 108: 107: 98: 94: 93: 90: 86: 85: 53: 49: 48: 42: 38: 37: 34: 30: 29: 26: 25: 15: 9: 6: 4: 3: 2: 836: 825: 822: 820: 817: 815: 812: 810: 807: 805: 802: 801: 799: 788: 783: 781: 776: 774: 769: 768: 762: 760: 756: 751: 750: 746: 735: 732: 730: 727: 725: 722: 721: 719: 715: 709: 706: 704: 701: 699: 696: 694: 691: 689: 686: 685: 683: 681:Organisations 679: 673: 670: 668: 665: 663: 660: 658: 655: 653: 650: 648: 645: 643: 640: 639: 637: 633: 629: 625: 624:organisations 621: 614: 609: 607: 602: 600: 595: 594: 591: 585: 582: 581: 577: 576:Energy portal 571: 566: 563: 552: 538: 534: 528: 520: 516: 510: 502: 496: 480: 479: 474: 468: 452: 448: 442: 426: 425: 420: 414: 406: 402: 396: 392: 379: 376: 373: 370: 367: 366: 362: 359: 356: 353: 350: 349: 345: 343:31 March 2014 342: 339: 336: 333: 332: 328: 325: 322: 318: 315: 312: 311: 303: 282: 279: 276: 273: 264: 261: 258: 255: 246: 236: 233: 232:Tata Projects 229: 225: 220: 214: 212: 208: 204: 200: 196: 195:Krishnapatnam 192: 182: 176: 173: 169: 167: 163: 159: 156: 155: 151: 147: 142: 139: 136: 132: 127: 124: 121: 117: 113: 109: 99: 95: 91: 87: 82: 54: 50: 46: 43: 39: 35: 31: 27: 22: 19: 759:expanding it 752: 744: 698:NTPC Limited 666: 562:India portal 537:the original 527: 518: 509: 495: 483:. Retrieved 476: 467: 455:. Retrieved 451:the original 441: 429:. Retrieved 422: 413: 405:the original 395: 377:Work Started 363:Operational 346:Operational 242: 215: 206: 190: 189: 78:14.31; 80.10 18: 485:4 September 431:4 September 316:Unit Number 119:Operator(s) 76: / 52:Coordinates 798:Categories 387:References 478:The Hindu 424:The Hindu 239:Etymology 306:Capacity 201:city of 111:Owner(s) 41:Location 329:Status 228:L&T 211:APGENCO 199:Nellore 123:APGENCO 64:80°06′E 61:14°19′N 45:Nellore 33:Country 457:4 July 89:Status 313:Stage 179:[ 170:2400 36:India 755:stub 622:and 487:2012 459:2014 433:2012 230:and 224:BHEL 138:Coal 626:of 374:800 357:800 340:800 800:: 517:. 475:. 421:. 368:II 321:MW 226:, 172:MW 786:e 779:t 772:v 761:. 612:e 605:t 598:v 503:. 489:. 461:. 435:. 371:1 354:2 351:I 337:1 334:I 323:) 287:| 283:r 280:a 277:v 274:m 269:| 265:h 262:t 259:a 256:m 183:] 102:₹

Index

Nellore
14°19′N 80°06′E / 14.31°N 80.10°E / 14.31; 80.10
APGENCO
Coal
Nameplate capacity
MW
edit on Wikidata
Krishnapatnam
Nellore
Andhra Pradesh
APGENCO
Talcher Coalfield
BHEL
L&T
Tata Projects
Sri. Damodaram Sanjeevaiah
MW
"APGENCO Official Website"
the original
"Works stalled at Damodaram Sanjeevaiah power plant"
The Hindu
"APGENCO and APPDCL"
the original
"Nelatur power plant 1st unit to be ready by 2013"
The Hindu
"800-MW unit-I of AP Genco's Krishnapatnam plant goes on stream"
"BHEL commissions second 800 MW boiler at Krishnapatnam"
"BHEL secures Two Orders for setting up Thermal Power Projects comprising India's Highest Rating 800 MW Supercritical Sets"
the original
India portal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.