Knowledge

Suam–Endebess–Kitale–Eldoret Road

Source 📝

232:. The projected cost estimate is US$ 147.3 million, financed by loans from the African Development Bank (AfDB) and African Development Fund (AfDF) and counterpart funding by the Government of Kenya. The improvement to the 77 kilometres (48 mi) road, is expected to last 30 months. As of March 2024, construction was still ongoing. 216:
to improve the road along with the Kapchorwa–Suam Road on the Ugandan side, to grade II bituminous surface with shoulders and culverts. Some parts of this road are already tarmacked. However a new bypass around the town of Eldoret is part of the planned upgrade. The contract distance on this road is
325: 175:
The road starts at Suam, at the international border with Uganda and proceeds in a southeasterly direction, through Endebess, to end at Kitale, a total distance of about 45 kilometres (28 mi). The work includes building a bypass around the city of
432: 200:. Both people and goods move along this corridor, with Ugandans buying fuel, fertilizer, and maize seeds from Kenya and Kenyans buying bananas, sugar, electric power and rental accommodation from Uganda. 400: 559: 551: 462: 520: 267: 433:"Multinational: Uganda/Kenya: Kapchorwa–Suam–Endebess–Kitale–Eldoret Bypass Roads: Environmental and Social Impact Assessment (ESIA)" 491: 228:, the president of Uganda, officially jointly kick-started the rehabilitation and improvement of this road, and the contiguous 296: 209: 246: 608: 603: 439: 213: 374: 598: 229: 193: 241: 196:, form an important transport corridor between the two countries, sometimes referred to as the 8: 208:
The governments of Kenya and Uganda though the Kenya National Highways Authority and the
164: 148: 124: 352: 301: 525: 405: 225: 521:"Completion Of Kitale-Endebess-Suam Road To Boost Trade Between Kenya, Uganda" 592: 574: 561: 467: 348: 272: 221: 144: 60: 496: 463:"Museveni, Kenya's DP Ruto flag off Kapchorwa-Suam road project works" 552:
Uganda seeks Shs270b for Kapchorwa-Suam road to boost regional trade
192:
This road, together with the Ugandan road that connects to it, the
152: 72: 375:"Chinese firm to start work on KSh4.5 billion Kitale–Uganda road" 177: 160: 86: 401:"Kenya, Uganda seek transport corridor funds with eye on trade" 181: 156: 76: 326:"Distance between Suam Border Control Kenya and Kitale, Kenya" 140: 105: 198:
Kapchorwa–Suam–Endebess–Kitale–Eldoret Road Corridor
346: 590: 460: 268:"Kenya, Uganda in joint road tarmacking project" 492:"Museveni, Ruto Commission Kapchorwa-Suam Road" 203: 180:, and the dualing of the road section between 323: 518: 297:"Trans Nzoia to build dual carriage road" 349:"Road project to enhance regional trade" 426: 424: 398: 294: 591: 489: 394: 392: 372: 399:Murumba, Stellar (30 December 2015). 265: 224:, the deputy president of Kenya, and 430: 421: 347:Kenya News Agency (18 August 2017). 512: 461:Monitor Reporter (19 August 2018). 389: 13: 295:Wamalwa, Nicholas (19 June 2015). 14: 620: 545: 483: 454: 266:Bwayo, Philip (17 October 2014). 137:Suam–Endebess–Kitale–Eldoret Road 24:Suam–Endebess–Kitale–Eldoret Road 490:Gwambe, Tracy (19 August 2018). 373:Baraza, James (18 August 2018). 324:Globefeed.com (22 August 2018). 210:Uganda National Roads Authority 366: 340: 317: 288: 259: 1: 377:. Nairobi: Construction Kenya 252: 519:Ken Muthomi (3 March 2024). 217:76 kilometres (47 mi). 47:Completed in 2021 (Expected) 37:48 mi (77 km) 7: 235: 212:are seeking funds from the 204:Updating to bitumen surface 187: 170: 10: 625: 431:AfDB (22 December 2015). 120: 115: 111: 101: 96: 92: 82: 66: 56: 51: 41: 33: 28: 23: 440:African Development Bank 247:Kakira–Kisumu Expressway 214:African Development Bank 242:List of roads in Kenya 139:, is a rural road in 575:1.07417°N 34.85639°E 571: /  230:Kapchorwa–Suam Road 194:Kapchorwa–Suam Road 125:Transport in Kenya 68:Major intersections 16:Rural road in Kenya 609:Uasin Gishu County 604:Trans-Nzoia County 165:Uasin Gishu County 151:, to the towns of 149:Trans-Nzoia County 83:Southeast end 57:Northwest end 45:Designated in 2018 580:1.07417; 34.85639 353:Kenya News Agency 143:. The road links 133: 132: 29:Route information 616: 586: 585: 583: 582: 581: 576: 572: 569: 568: 567: 564: 539: 538: 536: 534: 529:. Nairobi, Kenya 516: 510: 509: 507: 505: 487: 481: 480: 478: 476: 458: 452: 451: 449: 447: 437: 428: 419: 418: 416: 414: 396: 387: 386: 384: 382: 370: 364: 363: 361: 359: 344: 338: 337: 335: 333: 321: 315: 314: 312: 310: 302:The Star (Kenya) 292: 286: 285: 283: 281: 263: 220:In August 2018, 69: 21: 20: 624: 623: 619: 618: 617: 615: 614: 613: 589: 588: 579: 577: 573: 570: 565: 562: 560: 558: 557: 548: 543: 542: 532: 530: 526:98.4 Capital FM 517: 513: 503: 501: 488: 484: 474: 472: 459: 455: 445: 443: 435: 429: 422: 412: 410: 406:The EastAfrican 397: 390: 380: 378: 371: 367: 357: 355: 345: 341: 331: 329: 328:. Globefeed.com 322: 318: 308: 306: 293: 289: 279: 277: 264: 260: 255: 238: 226:Yoweri Museveni 206: 190: 173: 75: 67: 52:Major junctions 46: 17: 12: 11: 5: 622: 612: 611: 606: 601: 599:Roads in Kenya 555: 554: 547: 546:External links 544: 541: 540: 511: 482: 453: 420: 388: 365: 339: 316: 287: 257: 256: 254: 251: 250: 249: 244: 237: 234: 205: 202: 189: 186: 172: 169: 131: 130: 129: 128: 118: 117: 116:Highway system 113: 112: 109: 108: 103: 99: 98: 94: 93: 90: 89: 84: 80: 79: 70: 64: 63: 58: 54: 53: 49: 48: 43: 39: 38: 35: 31: 30: 26: 25: 15: 9: 6: 4: 3: 2: 621: 610: 607: 605: 602: 600: 597: 596: 594: 587: 584: 553: 550: 549: 528: 527: 522: 515: 499: 498: 493: 486: 470: 469: 468:Daily Monitor 464: 457: 441: 434: 427: 425: 408: 407: 402: 395: 393: 376: 369: 354: 350: 343: 327: 320: 304: 303: 298: 291: 275: 274: 269: 262: 258: 248: 245: 243: 240: 239: 233: 231: 227: 223: 218: 215: 211: 201: 199: 195: 185: 183: 179: 168: 166: 162: 158: 154: 150: 146: 142: 138: 127: 126: 122: 121: 119: 114: 110: 107: 104: 100: 95: 91: 88: 85: 81: 78: 74: 71: 65: 62: 59: 55: 50: 44: 40: 36: 32: 27: 22: 19: 556: 531:. Retrieved 524: 514: 502:. Retrieved 495: 485: 473:. Retrieved 466: 456: 444:. Retrieved 411:. Retrieved 404: 379:. Retrieved 368: 356:. Retrieved 342: 330:. Retrieved 319: 307:. Retrieved 300: 290: 278:. Retrieved 273:Daily Nation 271: 261: 222:William Ruto 219: 207: 197: 191: 184:and Matisi. 174: 136: 134: 123: 18: 578: / 438:. Abidjan: 351:. Nairobi: 593:Categories 566:34°51′23″E 563:01°04′27″N 497:New Vision 253:References 504:22 August 500:. Kampala 475:22 August 471:. Kampala 409:. Kampala 381:22 August 358:22 August 332:22 August 305:. Nairobi 276:. Nairobi 533:10 March 446:27 March 413:27 March 309:27 March 280:27 March 236:See also 188:Overview 171:Location 153:Endebess 97:Location 73:Endebess 178:Eldoret 161:Eldoret 102:Country 87:Eldoret 42:History 442:(AfDB) 182:Kitale 159:, and 157:Kitale 77:Kitale 34:Length 436:(PDF) 147:, in 141:Kenya 106:Kenya 535:2024 506:2018 477:2018 448:2016 415:2016 383:2018 360:2018 334:2018 311:2016 282:2016 145:Suam 135:The 61:Suam 163:in 595:: 523:. 494:. 465:. 423:^ 403:. 391:^ 299:. 270:. 167:. 155:, 537:. 508:. 479:. 450:. 417:. 385:. 362:. 336:. 313:. 284:.

Index

Suam
Endebess
Kitale
Eldoret
Kenya
Transport in Kenya
Kenya
Suam
Trans-Nzoia County
Endebess
Kitale
Eldoret
Uasin Gishu County
Eldoret
Kitale
Kapchorwa–Suam Road
Uganda National Roads Authority
African Development Bank
William Ruto
Yoweri Museveni
Kapchorwa–Suam Road
List of roads in Kenya
Kakira–Kisumu Expressway
"Kenya, Uganda in joint road tarmacking project"
Daily Nation
"Trans Nzoia to build dual carriage road"
The Star (Kenya)
"Distance between Suam Border Control Kenya and Kitale, Kenya"
"Road project to enhance regional trade"
Kenya News Agency

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.