358:
35:
575:
136:
739:
241:
415:
The adjacent Boden Lane bridge was closed on
October 31, 2019, after it was damaged by brush-clearing equipment. On November 5, MassDOT announced that the bridge would be permanently closed and replaced. The bridge was removed in December 2019; a temporary pedestrian span opened on January 27, 2020.
419:
In June 2021, the MBTA issued a $ 28 million design contract for a project to add a third track from Weston to
Framingham, including reconstruction of the three Wellesley stations and West Natick station. The project was expected to cost around $ 400 million, of which rebuilding West Natick station
411:
in 2015. The MBTA earmarked $ 4 million to replace them and brought a portable lift to the station to maintain accessibility. The mini-high platforms were demolished in March 2017; new composite platforms opened that
November.
765:
770:
70:
718:
607:
633:
244:
240:
259:
719:"MBTA Contract No. C72PS01: Worcester Line Track and Stations Accessibility Improvements (P0261) Design and Engineering Services"
651:
592:
743:
357:
139:
666:
407:
were closed because the folding platform edges were deteriorated, risking a dangerous collapse like one that happened at
489:
448:
397:
408:
374:
541:
400:), but it was not due to a budget shortfall. Accessible mini-high sections were installed around 1993.
366:
34:
703:
388:
station to ease demand at Natick and
Framingham stations. The $ 500,000 station included a 200-space
334:
267:
685:
574:
404:
338:
54:
568:
558:
342:
274:
58:
546:. Massachusetts Bay Transportation Authority. 1965. p. 68 – via Internet Archive.
8:
441:
463:
331:
254:
485:
505:
523:
105:
654:(Press release). Massachusetts Department of Transportation. November 5, 2019.
759:
389:
346:
327:
279:
116:
85:
72:
750:
608:"FOX25 Investigates wheelchair ramps boarded at Commuter Rail stations"
393:
461:
396:(state accessibility laws date from the 1970s, long before the 1990
738:
766:
MBTA Commuter Rail stations in
Middlesex County, Massachusetts
634:"No time frame for reopening of Boden Lane Bridge in Natick"
369:
opened through Natick in
September 1834. In the late 1800s,
381:
373:
station was briefly open at Speen Street, midway between
593:"Composites enable handicap-accessible train platforms"
512:. George H. Walker & Co. 1875 – via WardMaps.
416:
Solar panels over the parking lots were added in 2021.
484:. Boston Street Railway Association. pp. 21, 28.
361:
The demolished inbound mini-high platform in May 2017
39:
An outbound train leaving West Natick station in 2017
667:"New Boden Lane Pedestrian Bridge Arrives In Natick"
771:Buildings and structures in Natick, Massachusetts
442:"Changes to Transit Service in the MBTA district"
757:
706:. Town of Natick. April 29, 2021. pp. 4, 5.
420:would be $ 37 million, with completion in 2030.
480:Humphrey, Thomas J.; Clark, Norton D. (1985).
462:Central Transportation Planning Staff (2019).
724:. Massachusetts Bay Transportation Authority.
479:
466:. Massachusetts Bay Transportation Authority.
16:Railroad station in Natick, Massachusetts, US
652:"Natick: Boden Lane Bridge to Remain Closed"
586:
584:
482:Boston's Commuter Rail: The First 150 Years
435:
433:
704:"2021 Annual Town Meeting: Fourth Session"
605:
475:
473:
33:
392:lot. The station should have been built
664:
606:Coueignoux, Stephanie (March 21, 2016).
581:
530:. F.W. Beers. 1875 – via WardMaps.
510:Atlas of Middlesex County, Massachusetts
430:
356:
528:County Atlas of Middlesex Massachusetts
470:
455:
758:
683:
631:
556:
716:
590:
238:
135:
557:Iudica, Doreen E. (August 2, 1992).
439:
337:, located off West Central Street (
13:
684:Linsky, David (January 27, 2020).
665:McNamara, Neal (January 8, 2020).
632:Schwan, Henry (November 1, 2019).
14:
782:
732:
591:Black, Sara (December 11, 2017).
559:"Advocates push for train access"
449:Boston Street Railway Association
737:
717:Kelly, Maribel (June 21, 2021).
573:
239:
134:
710:
696:
677:
658:
644:
625:
398:Americans with Disabilities Act
214:944 (weekday average boardings)
599:
550:
534:
516:
498:
405:mini-high accessible platforms
1:
423:
377:and the modern station site.
345:. It was opened in 1982 as a
7:
565:– via Newspapers.com.
464:"2018 Commuter Rail Counts"
10:
787:
686:"Boden Lane Bridge Update"
367:Boston and Albany Railroad
352:
268:Framingham/Worcester Line
335:Framingham/Worcester Line
313:
306:
302:
298:
294:
290:
248:
235:
231:
226:
222:
218:
210:
206:
201:
193:
188:
180:
175:
167:
159:
151:
146:
130:
122:
111:
101:
64:
49:
44:
32:
21:
380:On August 23, 1982, the
409:North Billerica station
155:178 spaces ($ 4.00 fee)
362:
746:at Wikimedia Commons
360:
343:Natick, Massachusetts
59:Natick, Massachusetts
638:Metrowest Daily News
744:West Natick station
595:. Composites World.
440:Belcher, Jonathan.
403:In early 2016, the
324:West Natick station
86:42.2831°N 71.3918°W
82: /
55:West Central Street
45:General information
751:MBTA - West Natick
543:1982 Annual Report
506:"Natick, Sherborn"
363:
332:MBTA Commuter Rail
249:Following station
236:Preceding station
160:Bicycle facilities
742:Media related to
321:
320:
317:
316:
286:
285:
176:Other information
91:42.2831; -71.3918
778:
741:
726:
725:
723:
714:
708:
707:
700:
694:
693:
681:
675:
674:
662:
656:
655:
648:
642:
641:
629:
623:
622:
620:
618:
603:
597:
596:
588:
579:
578:
577:
566:
554:
548:
547:
538:
532:
531:
520:
514:
513:
502:
496:
495:
477:
468:
467:
459:
453:
452:
446:
437:
304:
303:
243:
233:
232:
138:
137:
97:
96:
94:
93:
92:
87:
83:
80:
79:
78:
75:
37:
19:
18:
786:
785:
781:
780:
779:
777:
776:
775:
756:
755:
735:
730:
729:
721:
715:
711:
702:
701:
697:
682:
678:
663:
659:
650:
649:
645:
630:
626:
616:
614:
604:
600:
589:
582:
572:
555:
551:
540:
539:
535:
522:
521:
517:
504:
503:
499:
492:
478:
471:
460:
456:
444:
438:
431:
426:
355:
330:station on the
309:
282:
262:
197:August 23, 1982
90:
88:
84:
81:
76:
73:
71:
69:
68:
57:
40:
28:
27:
26:
17:
12:
11:
5:
784:
774:
773:
768:
754:
753:
734:
733:External links
731:
728:
727:
709:
695:
676:
657:
643:
624:
598:
580:
549:
533:
515:
497:
490:
469:
454:
428:
427:
425:
422:
354:
351:
319:
318:
315:
314:
311:
310:
307:
300:
299:
296:
295:
292:
291:
288:
287:
284:
283:
277:
272:
270:
265:
263:
257:
251:
250:
247:
237:
229:
228:
224:
223:
220:
219:
216:
215:
212:
208:
207:
204:
203:
199:
198:
195:
191:
190:
186:
185:
182:
178:
177:
173:
172:
169:
165:
164:
161:
157:
156:
153:
149:
148:
144:
143:
132:
128:
127:
124:
120:
119:
117:side platforms
113:
109:
108:
106:Worcester Line
103:
99:
98:
66:
62:
61:
51:
47:
46:
42:
41:
38:
30:
29:
24:
23:
22:
15:
9:
6:
4:
3:
2:
783:
772:
769:
767:
764:
763:
761:
752:
749:
748:
747:
745:
740:
720:
713:
705:
699:
691:
687:
680:
672:
668:
661:
653:
647:
639:
635:
628:
613:
609:
602:
594:
587:
585:
576:
570:
564:
560:
553:
545:
544:
537:
529:
525:
519:
511:
507:
501:
493:
491:9780685412947
487:
483:
476:
474:
465:
458:
450:
443:
436:
434:
429:
421:
417:
413:
410:
406:
401:
399:
395:
391:
390:park and ride
387:
383:
378:
376:
375:Natick Center
372:
368:
359:
350:
348:
347:park and ride
344:
340:
336:
333:
329:
328:commuter rail
325:
312:
305:
301:
297:
293:
289:
281:
280:South Station
276:
275:Natick Center
273:
271:
269:
266:
264:
261:
256:
253:
252:
246:
242:
234:
230:
225:
221:
217:
213:
209:
205:
200:
196:
192:
187:
183:
179:
174:
170:
166:
162:
158:
154:
150:
145:
141:
133:
129:
125:
121:
118:
114:
110:
107:
104:
100:
95:
67:
63:
60:
56:
52:
48:
43:
36:
31:
20:
736:
712:
698:
690:Natick Patch
689:
679:
671:Natick Patch
670:
660:
646:
637:
627:
615:. Retrieved
611:
601:
563:Boston Globe
562:
552:
542:
536:
527:
518:
509:
500:
481:
457:
418:
414:
402:
385:
379:
370:
364:
323:
322:
147:Construction
569:second page
386:West Natick
371:Walkerville
131:Connections
89: /
65:Coordinates
25:West Natick
760:Categories
424:References
394:accessible
255:Framingham
202:Passengers
168:Accessible
77:71°23′30″W
74:42°16′59″N
349:station.
260:Worcester
181:Fare zone
112:Platforms
617:April 1,
524:"Natick"
308:Location
227:Services
163:5 spaces
142:: 10, 11
50:Location
384:opened
353:History
278:toward
258:toward
189:History
152:Parking
102:Line(s)
488:
339:MA-135
194:Opened
123:Tracks
722:(PDF)
612:FOX25
445:(PDF)
341:) in
326:is a
140:MWRTA
619:2017
486:ISBN
382:MBTA
365:The
245:MBTA
211:2018
53:249
171:Yes
762::
688:.
669:.
636:.
610:.
583:^
571:)
561:.
526:.
508:.
472:^
447:.
432:^
115:2
692:.
673:.
640:.
621:.
567:(
494:.
451:.
184:4
126:2
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.