49:
166:
significant improvement in low level frequency mitigation. Local communities are forming a number of pressure groups to encourage the South Hook
Terminal, Qatargas and regulatory Authorities to carry out further assessments and enforcement. These groups claim the aim is not to try to close the terminal down, but to encourage a better integration into the community through the use of quiet ships.
150:. At construction peak, some 2,500 people were employed on site. Despite starting work some 3 months later than the nearby Dragon LNG terminal (which has two LNG tanks compared to the 5 at South Hook), South Hook was the first of the two to receive LNG and send natural gas into the national gas network.
169:
There is an ongoing controversy over the safety of the site spearheaded by the Safe Haven group. It is claimed by Safe Haven that in case of gas ignition, it could endanger twenty thousand lives and that there are concerns that sufficient risk assessments had not been carried out into the possibility
190:
In 2014, RasGas and Eon struck a deal for 2 BCM of gas to be delivered into either the IOG terminal or South Hook (likely the IOG) over a four-year period. This was the first deal to be struck by the sister company of
Qatargas for deliveries into the UK – as previously the two companies kept their
165:
Droning and vibration from the
Qatargas Q-Flex and Q-Max vessels cause nuisance to local residents, who have formed a community group to pressure the South Hook LNG Terminal and Qatargas to comment on the issue. A trial of new exhaust silencers has been implemented but they are not producing a
178:
The main source of cargoes to the terminal is from trains No. 4 and 5 of the
Qatargas 2 project in Ras Laffan, Qatar. These are jointly owned by Qatar Petrolium and ExxonMobil. The initial GSPA signed in 2005 was for 15.6 million
106:. There are five storage tanks located onsite. The large tanks are each 94 metres in diameter and 31 metres high, rising another 12 metres to the top. The volume of a large tank is roughly that of the
511:
516:
462:
18:
157:. This allowed the tanks to be located such that they cannot be seen from the Milford Haven – Dale road that runs north along the terminal.
521:
297:
506:
374:
448:
466:
400:
485:
426:
80:
126:
The terminal is owned and operated by the South Hook LNG Terminal
Company Ltd, a joint venture between
71:
nearby, it can handle up to 25% of the UK's gas requirement. The first tanker docked on 20 March 2009.
301:
111:
352:
275:
92:
48:
323:
249:
227:
8:
200:
68:
205:
60:
489:
378:
327:
253:
127:
115:
500:
184:
154:
64:
33:
20:
183:
per year, but this was reduced to 10.4 million tonnes per year in 2009 when
107:
79:
The project was announced in April 2003. The terminal is located at the
135:
131:
99:
67:
and is the largest LNG terminal in Europe. Together with the smaller
404:
96:
482:
147:
187:
acquired a 16.7-percent share in one of the
Qatargas 2 trains.
180:
103:
401:"South Hook LNG Terminal – Ship Noise Community Information"
353:"Total buys 8.35 pct stake in South Hook LNG terminal"
91:
The terminal is built to receive, store and re-gasify
298:"FACTBOX-Europe LNG import terminals to open by 2011"
393:
52:South Hook LNG terminal under construction in 2008
512:Natural gas infrastructure in the United Kingdom
498:
110:. The regasified natural gas is fed through the
403:. South Hook Noise. 10 May 2010. Archived from
367:
268:
347:
345:
170:of a collision or major incident at the port.
132:ExxonMobil Qatargas (II) Terminal Company Ltd.
290:
342:
222:
220:
449:"Total Acquires 25% Stake in Qatari Block"
300:. Reuters. 19 January 2009. Archived from
517:Buildings and structures in Milford Haven
128:Qatar Petroleum LNG Services (QG II) Ltd.
419:
316:
276:"Dragon LNG Terminal To Open In Q2 – BG"
217:
47:
463:"RasGas South Hook Sign 2 BCM LNG Deal"
146:The terminal was designed and built by
114:to the national gas network at Tirley,
499:
522:ExxonMobil buildings and structures
278:. Downstream Today. 4 February 2009
13:
121:
14:
533:
476:
228:"Port awaits liquid gas delivery"
153:The site slopes down towards the
377:. Taylor Woodrow. Archived from
507:Liquefied natural gas terminals
455:
441:
324:"Timeline: LNG plants in Wales"
250:"Timeline: LNG plants in Wales"
141:
242:
160:
86:
1:
211:
83:at South Hook, Herbrandston.
191:markets very much separate.
173:
7:
194:
10:
538:
74:
355:. Reuters. 12 August 2006
136:ELF Petroleum UK Limited
112:South Wales Gas Pipeline
57:South Hook LNG terminal
375:"South Hook LNG tanks"
53:
93:liquefied natural gas
51:
427:"The LNG Experience"
230:. BBC. 20 March 2009
81:former Esso refinery
488:5 July 2008 at the
429:. BBC. 3 March 2006
201:Dragon LNG terminal
69:Dragon LNG terminal
30: /
330:. 16 February 2009
304:on 1 February 2013
206:Grain LNG terminal
61:LNG regasification
54:
381:on 5 January 2009
95:shipped from the
529:
471:
470:
465:. Archived from
459:
453:
452:
445:
439:
438:
436:
434:
423:
417:
416:
414:
412:
397:
391:
390:
388:
386:
371:
365:
364:
362:
360:
349:
340:
339:
337:
335:
320:
314:
313:
311:
309:
294:
288:
287:
285:
283:
272:
266:
265:
263:
261:
246:
240:
239:
237:
235:
224:
45:
44:
42:
41:
40:
35:
34:51.720°N 5.079°W
31:
28:
27:
26:
23:
537:
536:
532:
531:
530:
528:
527:
526:
497:
496:
490:Wayback Machine
479:
474:
469:on 29 May 2014.
461:
460:
456:
447:
446:
442:
432:
430:
425:
424:
420:
410:
408:
407:on 6 March 2012
399:
398:
394:
384:
382:
373:
372:
368:
358:
356:
351:
350:
343:
333:
331:
328:BBC News Online
322:
321:
317:
307:
305:
296:
295:
291:
281:
279:
274:
273:
269:
259:
257:
256:. 19 March 2010
254:BBC News Online
248:
247:
243:
233:
231:
226:
225:
218:
214:
197:
176:
163:
144:
124:
122:Project company
116:Gloucestershire
89:
77:
38:
36:
32:
29:
24:
21:
19:
17:
16:
12:
11:
5:
535:
525:
524:
519:
514:
509:
493:
492:
483:South hook LNG
478:
477:External links
475:
473:
472:
454:
440:
418:
392:
366:
341:
315:
289:
267:
241:
215:
213:
210:
209:
208:
203:
196:
193:
175:
172:
162:
159:
143:
140:
123:
120:
88:
85:
76:
73:
63:terminal near
39:51.720; -5.079
9:
6:
4:
3:
2:
534:
523:
520:
518:
515:
513:
510:
508:
505:
504:
502:
495:
491:
487:
484:
481:
480:
468:
464:
458:
450:
444:
428:
422:
406:
402:
396:
380:
376:
370:
354:
348:
346:
329:
325:
319:
303:
299:
293:
277:
271:
255:
251:
245:
229:
223:
221:
216:
207:
204:
202:
199:
198:
192:
188:
186:
185:TotalEnergies
182:
171:
167:
158:
156:
155:River Cleddau
151:
149:
139:
137:
134:(24.15%) and
133:
129:
119:
117:
113:
109:
105:
101:
98:
94:
84:
82:
72:
70:
66:
65:Milford Haven
62:
58:
50:
46:
43:
494:
467:the original
457:
443:
431:. Retrieved
421:
409:. Retrieved
405:the original
395:
383:. Retrieved
379:the original
369:
357:. Retrieved
332:. Retrieved
318:
306:. Retrieved
302:the original
292:
280:. Retrieved
270:
258:. Retrieved
244:
232:. Retrieved
189:
177:
168:
164:
152:
145:
142:Construction
125:
90:
78:
56:
55:
15:
433:17 February
359:17 February
334:17 February
308:17 February
282:17 February
161:Controversy
108:Albert Hall
87:Description
37: /
501:Categories
212:References
97:Qatargas 2
22:51°43′12″N
174:Contracts
138:(8.35%).
130:(67.5%),
100:LNG plant
25:5°04′44″W
486:Archived
385:20 March
234:20 March
195:See also
148:CB&I
260:1 March
75:History
411:10 May
181:tonnes
59:is an
104:Qatar
435:2009
413:2010
387:2009
361:2009
336:2009
310:2009
284:2009
262:2010
236:2009
102:in
503::
344:^
326:.
252:.
219:^
118:.
451:.
437:.
415:.
389:.
363:.
338:.
312:.
286:.
264:.
238:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.