A1 motorway (Romania)

Source 📝

845:
interested parties will be invited to comment on the proposed solutions and also to contribute with knowledge regarding the potential problems CNADNR might face on the selected routes. Dependent on the issues that might be identified and their environmental impact, the bid for the construction works on these two lots might be launched as early as January 2016. CNADNR has published on 7 November 2015 five alternative routes for the Pitești – Sibiu section. As previously announced all interested parties are welcome to provide their opinion by 11 December 2015 on the company's Facebook page. Following these consultations, it is expected that on 15 December 2015 the company preparing the feasibility study will hand over to CNADNR the final study for lots 1 and 5.
833:
one of the bid participants. As the Ministry of Transport has started work on the Romanian General Master Plan for Transport required to access 2014–2020 European funds, it generated further controversy by appearing to continue to try avoiding the construction of the section as a motorway, as it downgraded it to express road in an October 2014 version of the Master Plan and later considered a phased express road/motorway approach in a subsequent version of the Master Plan. This has prompted reactions from the European Union, the public society and the employees of the
209: 4006: 48: 1010:'s ones looking for the technical solutions to address the issues. As those solutions were discussed and agreed, lot 3 was closed down to traffic, initially for about one month and a half, just nine months after it was inaugurated. According to information surfacing from various sources about one kilometer from the motorway will need to be completely rebuilt from the ground while other issues that appeared will be addressed as well. During October and November 2015 the conflict between CNADNR and 3859: 3569: 3421: 2933: 2299: 1754: 36: 490: 475: 2030: 3324: 2524: 1679: 3964: 3917: 3723: 3641: 3547: 3492: 3401: 3351: 3270: 3192: 3074: 3027: 2880: 2727: 2551: 2372: 7979: 456: 430: 8553: 7924: 3806: 3470: 3448: 3134: 2799: 2456: 2391: 1887: 8504: 8158: 8144: 7482: 3984: 7952: 7790: 7717: 8582: 980:, all in June 2011. Construction works on all four segments have started in October 2011 and were planned to finish in April 2013. After several delays, lots 1, 2 and 4 were opened in December 2013, while lot 3 was eventually opened at the end of November 2014. As of November 2015 construction works were still ongoing on lot 3, as there are multiple issues on this lot generated by a combination of ignoring the 773:, the 2008 feasibility study had to be updated with several key elements required by the European Union that were previously not considered. The tender for the update was launched in April 2012 aiming to have the section finalized by 2020, as total construction costs for its 116.6 kilometers were estimated at 3.25 billion euro. Eight months later the Romanian Government reconsidered and cancelled the tender. 3847: 2836: 2236: 2187: 2019: 1875: 441: 3389: 3339: 3305: 3258: 2355: 2747: 1623: 3794: 3711: 3680: 3535: 2626: 2287: 2261: 1967: 1743: 3952: 3759: 3180: 3122: 2715: 2680: 2505: 2444: 2360: 2199: 2150: 2138: 2111: 2050: 1979: 1930: 1908: 1838: 25: 1716: 2085: 3905: 3629: 3231: 3175: 3117: 3062: 3015: 2987: 2921: 2916: 2868: 2863: 2787: 2782: 2595: 2590: 2539: 2500: 2439: 1019:. Six months after the closing, come the spring of 2016, the CNADNR decided to fix the problems itself with its own workforce and rented equipment; part of the financing of these repairs was to come from the 90 million lei guarantee posted for the project by Impregilo, which was to be blacklisted for two years in which it would not be allowed to obtain contracts from the Romanian government. 8311: 7896: 3878: 2956: 2318: 190: 150: 136: 122: 8394: 8225: 3937: 3890: 3828: 3771: 3743: 3692: 3661: 3606: 3592: 3512: 3436: 3370: 3290: 3243: 3212: 3156: 3094: 3047: 2999: 2968: 2900: 2848: 2821: 2767: 2692: 2661: 2638: 2607: 2571: 2477: 2412: 2332: 2272: 2248: 2221: 2172: 2123: 2096: 2072: 2004: 1952: 1860: 1817: 1795: 1781: 1728: 1701: 383: 368: 176: 163: 108: 8125: 900:
into two segments. The first segment (km 0-14) was awarded in May 2008 to a joint venture composed of Geiger, Max BĂśgl and Comtram. The second segment (km 14-17) was awarded in September 2009 to the Romanian company Vectra Service and included also the upgrade of 3.3 kilometers of road connecting the motorway with
899:
was initially signed during 2003 with Italian company Todini, with the actual construction work starting during 2004 and scheduled to finish during 2007. This plan suffered multiple delays and eventually in September 2006 CNADNR decided to terminate the contract. Following this, the section was split
5699: 1348:
However, the contract for the first part of the section was terminated by the Romanian government in November 2012, due to low construction progress recorded by the Romstrade company (approximately 15–20%) and potential fraud by the company owner. Also, the contract for the second part (construction
1278:
The stretch between Timișoara and Lugoj (25.6 km, referred to as the Timișoara – Lugoj lot 2) has been re-auctioned in August 2012, after appeals from participants at the previous auction. It has been awarded to the joint venture between the Italian companies Tirrena Scavi and Societa Italiana
1133:
segment (27.4 km) was awarded to a joint venture composed of Italian companies Tirrena Scavi, Societa Italiana per Condotte D'Acqua and Cossi Construzioni in May 2011, after an appeal from one of the bid participants. Construction works on lot 1 have started in October 2011 and were planned to
1049:
Bids for the construction works for this section were launched by CNADNR during 2006 and subsequently during September 2009, but they were both cancelled due to problems related to the selection criteria. The bid was launched again during March 2010 and the whole section (32.8 km) was finally
904:
that was designated DN1T. Works started on the first segment during July 2008 and on the second during February 2010 and were scheduled to be fully completed during 2011, but as a result of the authorities insisting on the bypass being finished sooner the section was opened for traffic in December
832:
has retendered in June 2014 the update of the 2008 feasibility study for the section, and has signed the contract for this activity with a joint venture composed of the Italian company Spea Ingegneria Europea and the Romanian company Tecnic Consulting Engineering in June 2015, after an appeal from
1224:
ash and clay deposit. In an interview given by the general manager of CNADNR during August 2015, it was announced that the problems on lot 4 were now cleared and Spedition UMB was praised for their approach and pace of work on the segment, the appreciation being that if the issues hadn't surfaced
844:
In an interview given by the general manager of CNADNR during August 2015 it was announced that possible routes for lots 1 and 5 were already discussed with the joint venture updating the feasibility study and based on that the company will hold public consultations during October 2015, where all
677:
and Todini, between 2002 and 2004 by the Romanian companies Albix Timișoara and Cosar București and between 2006 and 2010 by Romanian companies PA&CO Internațional and Euroconstruct Trading '98. As of August 2023 this is the only segment of the motorway where motels and restaurants operate in
1239:
On 14 August 2019, lot 4 of the motorway was opened, whereas the lot 3 was opened on 23 December, same year, with speed and tonnage restrictions. Both restrictions on the latter were lifted gradually throughout the following year. In October 2022, the remainder segments of lot 2 were signed with
415: 615:
On the Pitești – Sibiu section, two segments were tendered as well: Pitești − Curtea de Argeș (30.4 km, lot 5) and Curtea de Argeș − Tigveni (10.7 km, lot 4), with the latter one awarded for construction in April 2019, and the first segment (Pitești − Curtea de Argeș) in May 2020.
768:
has continuously delayed the start of the activity until 2012, considering several options on how the motorway construction was to be funded, while advancing several deadlines for the start/completion of works on the section. As during early 2012 the section was accepted to be funded under
4963: 400: 4658: 868:. The value of the contract is 356 million euro and it is scheduled to take 12 months for planning and 48 months for execution. The lot 4 (Curtea de Argeș – Tigveni, 9.86 km) followed on 15 November 2021; the contract for its construction was signed with the Austrian company 5133: 988:
pressuring for electoral reasons for the segment to open before a number of critical road elements were completed. Another aspect that has surfaced and is generating controversy is related to the fact that while there are multiple disputes awaiting resolution between CNADNR and
1014:
seems to have taken a turn for worse as after the promised one month and a half term passed no substantial progress has been made on fixing the identified problems, the construction works on the lot were completely stopped and CNADNR announced it made a penal complaint against
821:. During the 2013 Trans-European Transport Networks (TEN-T) reunion the European Union rejected the plan and officially criticized the attempt to switch priorities from constructing the Pitești – Sibiu motorway, determining the Romanian authorities to reconsider the change. 1214:
for protecting the large carnivore fauna in the area, which called for an additional bid to cover for the changes; on lot 4 an illegal cemetery was discovered on the path of the motorway and was relocated, the motorway route was passing by too close to a cave near
1210:, both in October 2013. Constructions works for lots 2, 3 and 4 were planned to finish in May 2016, however the lots face multiple issues: a revision of the environmental study imposed a number of changes to structures among which the requirement for a number of 5174: 6133: 997:
the works executed. Following this, during August 2015 the general manager of CNADNR has given a number of interviews during various TV shows defending the company and putting all the blame for the issues on lot 3 on the poor quality of execution of
6382: 536:
regions in the western part of the country and the rest of Europe. When completed it will be 581 kilometers long and it will span the country on the approximative south-east to north west direction. The motorway starts in the western part of
4967: 6516: 4886: 5700:"Povestea autostrazii care o ia la vale: Cum s-a ajuns ca Lotul 3 din A1 Orastie – Sibiu sa fie macinat de alunecari de teren, cat de serioase sunt riscurile pentru soferi si cum explica autoritatile problemele de la viaductul Aciliu" 1360:
The section between Nădlac and Pecica and 6.30 km of the section between Pecica and Arad ware opened ahead of schedule on December 19, 2014. The remainder of the Pecica – Arad segment (10.3 km) was opened on 11 July 2015.
5633: 1005:
Regardless of the statements from both parties, the problems on lot 3 are serious enough so that they required CNADNR to close down the traffic on the affected lanes during August 2015, while having both the company's experts and
876:-Cengiz. On 1 August 2022, the contract for the construction of the lot 3 (Cornetu–Tigveni, 37.3 km) was signed with Webuild. It is the most expensive roadbuilding contract ever signed in Romania. On 15 December 2022, lot 1 ( 1235:
By April 2019, the physical progress was at 95.8% on lot 2 (except tunnels), 94% on lot 3 and 95% on lot 4. The bid for the new planned tunnels on lot 2, claimed publicly since December 2014, was finally announced in June 2019.
7255: 4659:"Strategia de autostrazi pana in 2018: Guvernul vrea mai multe autostrazi mici, printre care si una care sa lege Bucuresti de Alexandria – fieful lui Liviu Dragnea, in loc sa finalizeze coridorul european de la Sibiu la Pitești" 7012: 5134:"HARTĂ INTERACTIVĂ Traseul modificat al autostrăzii A1 Pitești - Sibiu, așa cum va fi scos la licitație. Cum s-au schimbat secțiunile, unde vor fi tunelurile și câte noduri rutiere au mai rămas - Infrastructura - HotNews.ro" 4031: 6995: 6712: 4758: 1357:. Works should be completed until the end of 2014. A tender for the remaining works on the second segment was announced in June 2014, and the section was finally awarded to the same joint venture of Astaldi and Max Bögl. 7213: 6943: 6570: 6303: 841:, and while the Romanian Prime Minister announced during October 2014 that the section will be included as a motorway in the final version of the Master Plan the change was reflected in the document only in July 2015. 1607:
Lugoj – Deva: The remaining 13.5 km of segment 2 are currently being auctioned and likely to take a significantly longer period of time to complete, but in order to receive EU funding, needs to be started before
5147: 4608: 7122: 6281: 4526: 1349:
progress approximately 85%) was terminated in July 2013, because the Austrian company filed for bankruptcy. The first segment was re-auctioned in April 2013, and awarded in December 2013 to the joint venture of
664:
in 1987. Construction works began on 4 February 1967 and the motorway's initial carriageway was opened on 12 April 1972, before eventually entering in full service to all traffic on 11 September 1972, except for
4082: 6738: 6259: 6969: 6644: 1219:
which was supposedly housing a significant bat population protected by law and there were discussions between Spedition UMB and CNADNR regarding a potential change of the technical solution in the area of the
7227: 4580: 5018: 1173:
The bid for the design & build contracts for the remaining three segments that are part of this section was launched by CNADNR during April 2012. After more than one year after the bid was launched, the
804:
and Sibiu, via Brașov, while the section between Pitești and Sibiu was no longer an immediate priority. This was generally regarded as a strategy to avoid a competing alternative route to the section of the
611:
An additional segment, between Coșevița – Margina (13.5 km), which has several tunnels (2.1 km, in total) along its route, has been re-tendered in June 2019, because the project had been modified.
6386: 4930: 6895: 4482: 5918: 5821: 5175:
Autostrada Sibiu – Pitești: CNAIR a semnat contractul pentru primul lot de autostradă din România care intră în zona de munte / Turcii de la MAPA au termen cinci ani și jumătate pentru lotul de 31 km
6598: 5891: 5186: 1345:, while the second section, between Pecica and Arad (16.6 km), was to be constructed by the Austrian company Alpine. Works started in October 2011 and were due to be finalized in April 2013. 5266: 4786: 7241: 5937: 7191: 6869: 5561: 1054:
and the Romanian company Straco Grup in November 2010, after appeals from the competing companies. Construction works have started in April 2011 and were planned to finish in April 2013. The
8037: 7038: 5743: 4387: 584:
As of December 2022, the combined length of the opened sections totals 458.1 kilometers. Other 54.5 kilometers have been tendered. The parts of the motorway currently in service include the
5160: 8058: 8072: 7935: 5526: 7016: 4412: 1279:
Per Condotte D'Acqua in December 2013. Construction works have been completed seven months earlier than the contractual deadline and the segment became operational in December 2015.
848:
According to the approved version of the Master Plan, the section was expected to be completed until 2020 using a mix between European funds, Romanian budget and low interest loans.
8044: 8014: 7907: 6823: 6076: 8051: 5467: 5411:"CNADNR a lansat licitația pentru 'Proiectare și execuție autostrada Orăștie-Sibiu, Loturile 1, 2, 3 și 4' și 'Proiectare și execuție autostrada Timișoara-Lugoj, Loturile 1 și 2'" 4035: 6716: 4083:"Au fost semnate contractele pentru tronsonul Sibiu-Boiţa (13,7 km) al autostrăzii Sibiu-Piteşti și pentru lotul 3 al centurii de sud a Capitalei (18 km) - Esential - HotNews.ro" 6947: 4708: 8445: 4839: 6619: 4630: 6350: 4099: 5868: 5721: 4254: 6041: 4730: 4175: 7126: 6408: 4536: 7912: 6742: 6440: 6973: 6686: 6517:"A1 Lugoj – Deva (Loturile 2,3,4) – Prima autostrada cu ecoducte pentru ursi, dar care s-a poticnit intr-un cimitir ilegal, o pestera cu lilieci si o halda de steril" 7871: 5611: 851:
The works for lots 1 and 5 were tendered in July 2017 and for lot 4 in March 2019. As of April 2019, the lot 1 was awarded for construction to the Austrian company
8065: 673:
road. Various parts of the segment underwent several major rehabilitations: between 1997 and 2000 by the FAT joint venture composed of Italian companies Federici,
7276: 6899: 4279: 5796: 6767: 6224: 5435: 4759:"Șapte semne de întrebare legate de planul cincinal pentru autostrăzi al Guvernului Ponta: De la autostrada lui Dragnea, la eliminarea soluției Pitești – Sibiu" 8103: 7751: 776:
The year 2013 brought much controversy, as the Romanian Government declared that the priority motorway route for crossing the Carpathian Mountains will be the
7256:"VIDEO Autostrada Lugoj – Deva la final. Au loc ultimele retuşuri la nodul rutier de la Dobra şi la podul peste Mureş. Cum arată construcţia începută în 2014" 8024: 5046: 7108: 8535: 6669: 5960:"CNADNR lansează procedura de achiziție publică de lucrări pentru "Construcția variantei de ocolire Deva-Orăștie la standard de autostradă – relicitare"" 7060: 4558: 4305: 7510: 6472: 1113:
The bid for the design & build contract for lot 1 was launched by CNADNR during December 2010. The contract included also the first segment of the
855:, for nearly 128.7 million euro, with 12 months allowed for planning and 36 months for execution. The other two lots were still pending to be awarded. 652:
segment (95.9 km) is the first motorway class road built in Romania and remained the only one for more than 15 years, until the completion of the
5363: 8211: 7526: 6873: 4340: 8079: 7685: 5120:"Primul tronson de autostradă făcut de chinezi? CNAIR, obligată a doua oară să primească China Railway în cursa pentru lotul 5 din Sibiu – Pitești" 4609:"Cum vrea sa schimbe Sova traseul autostrazilor din Romania: "Mutam Coridorul IV pe Sibiu-Brașov. Autostrada Sibiu-Pitești o facem abia dupa 2020"" 4362: 5985:"Anunt de participare în vederea atribuirii contractului "Constructia Variantei de Ocolire Deva – Orastie la standard de autostrada – relicitare"" 5148:"Contract semnat pentru autostrada Sibiu - Pitești: 356 milioane de euro pentru 30 de kilometri de la Pitești la Curtea de Argeș - Hotnews Mobile" 4931:"Victor Ponta, in vizita la Dacia Mioveni: Am stabilit ca segmentul Pitesti-Sibiu este trecut ca autostrada in Programul Operational de Transport" 940:
The bid for the design & build contracts for all four segments that are part of this section was launched by CNADNR during December 2010. The
796:
to pass through Brașov. According to the same plans the A3 motorway was to be connected to the A1 motorway via another motorway between Sibiu and
5677: 4686: 5288: 6571:"Construcţia tunelurilor pentru urşi de pe autostrada Lugoj – Deva intră în faza de licitaţie. Vom avea două tuneluri forate de 2,13 kilometri" 6098: 4460: 4438: 1313:
The 32.25 km section of motorway between Arad and Timișoara was awarded in December 2008 to the joint venture between the Spanish company
872:. On 7 February 2022, the contract for the construction of the lot 2 (Boița – Cornetu, 31.3 km) was signed with the Turkish joint-venture 6009: 6599:"CNAIR: Pe lotul 3 al autostrăzii Lugoj-Deva vor fi menținute restricțiile de viteză. Au fost ridicate doar "temporar" restricțiile de tonaj" 5211: 864:
On 11 May 2020, the contract for the construction of the lot 5 (Pitești – Curtea de Argeș, 30.4 km) was signed with the Italian company
6921: 5533: 7242:"Autostrada Lugoj-Deva: A picat negocierea cu Salini pe tunelurile pentru urşi. Pretenţiile italienilor, considerate inacceptabile – surse" 7228:"S-au semnat contractele pentru o secţiune din autostrada Piteşti-Sibiu, centura Bucureștiului şi metroul de Drumul Taberei. Ce a spus Cuc" 4416: 4200: 1134:
finish in April 2013. After several delays, the segment was eventually opened during December 2013, but only between the junction with the
6827: 6792: 4908: 4057: 770: 5474: 4504: 972:– Cunța segment (19.7 km) was awarded to a joint venture composed of Romanian companies Straco and Studio Corona and the Săliște – 824:
After further trying unsuccessfully in December 2013 to persuade the European Union to change the route of the motorway to pass through
8118: 7323: 7091: 5892:"Directorul Companiei de Drumuri: Repararea autostrazii demolate incepe in aprilie si va fi facuta de CNADNR – Infrastructura_Articole" 5562:"CNADNR: Circulația pe AUTOSTRADA Orăștie – Sibiu se DESCHIDE de JOI, 19 decembrie. Lotul 3, finalizat doar la sfârșitul anului viitor" 4581:"CNADNR anulează pe bandă rulantă licitațiile pentru autostrăzi. După Comarnic-Brașov, a fost oprită și procedura pentru Sibiu-Pitești" 5919:"Autostrada A1 Saliste-Cunta a fost redeschisa traficului, la peste un an de cand a fost inchisa si demolata partial - Hotnews Mobile" 1271:
The Timișoara bypass (9.5 km, also referred to as the Timișoara – Lugoj lot 1) was awarded in April 2011 to the Romanian company
7286: 8377: 8362: 8352: 8347: 8332: 8327: 5410: 4787:"Cea mai importantă decizie pentru autostrada Sibiu-Pitești: Compania de Drumuri a lansat licitația pentru studiul de fezabilitate" 756:
This is the most difficult section of the whole motorway from construction works perspective, considering that it has to cross the
7214:"Autostrada de care Guvernului i-a fost rușine. Cei 22 de kilometri dintre Lugoj și Deva au fost dați în folosință fără ceremonie" 6357: 6177: 8455: 8450: 8440: 8382: 8372: 8367: 8357: 8342: 8337: 8322: 7281: 4153: 6048: 5080: 8435: 8430: 8425: 8420: 8415: 8410: 8405: 7963: 6922:"Promisiunile ministrului Șova cu privire la finalizarea lucrărilor la autostrada Arad-Nădlac nu reflectă realitatea din teren" 5822:"Premiera absoluta: Romania inchide o autostrada la 9 luni dupa inaugurare. Cum pierd autoritatile 1,2 mld. EUR pentru drumuri" 764:. The feasibility study was initially completed during late 2008 with plans to start construction works next year, however the 6415: 5385: 5187:"Primul tronson al autostrăzii A1 Sibiu - Pitești, de la Sibiu la Boița, se deschide mai devreme. Constructorul e din Austria" 5504: 1314: 1303: 1244:, the section is supposed to finish by 2026, and 11 months would be for the project phase, and 45 months for the execution. 8523: 6447: 7678: 7462: 6690: 6441:"Semnare contract "Proiectare și execu ie autostrada Lugoj – Deva, Lot 3, Sectorul Dumbrava – Ilia: Km 56+220 – Km 77+361"" 7767: 7736: 6556: 6494: 5938:"CNADNR a semnat cu Strabag un contract de 220 milioane de euro pentru constructia tronsonului de autostrada Deva-Orastie" 5119: 689:
and Italstrade. The segment was opened to traffic during November 2007, having a major role in diverting traffic from the
7272: 4814: 1078:
This section of the motorway is partially operational and partially under construction and is split into four segments:
8529: 5744:"CNADNR: italienii au lucrat foarte prost pe autostrada din Sibiu. Peste 300 de neconformități. Dar și-au primit banii" 5583: 4283: 8108: 5634:"Stadiul lucrarilor pe fiecare autostrada din Romania. Ce autostrada are sanse sa fie deschisa pana la finalul anului" 1302:
Works for the Arad bypass (12.25 km) were awarded in March 2009 to the joint venture between the Spanish company
858:
Announcements of intention for a tender were published for two of the rest of the three lots, as well, in April 2018.
577:
Rhine-Danube Corridor the construction receives 85% funding from the European Union. The road is part of the proposed
7531: 6231: 5442: 4141:
Argeş: Contractul pentru secţiunea 5 a tronsonului de autostradă Sibiu-Piteşti – semnat în prezenţa premierului Orban
574: 7927: 6645:"UMB va construi tunelurile lipsă de pe A1 Lugoj - Deva / Cursă contra-cronometru pentru a nu pierde banii din PNRR" 5843: 7884: 7431: 5335: 5310: 993:
and during the construction of the segment there were around 300 non-conformity reports issued, CNADNR has paid to
7998: 7671: 6853:"Documentația de atribuire a contractului de servicii "Supervizare autostrada Nadlac – Arad si Drum de legatura"" 6620:"Restricțiile de viteză pe lotul 3 al Autostrăzii Lugoj-Deva, ridicate de miercuri seară, după mai bine de un an" 5238:"A fost semnat contractul pentru construcția variantei de ocolire a municipiului Sibiu la standard de autostradă" 4709:"Comisia Europeană a decis să finanțeze construirea autostrăzii Sibiu–Pitești și a respins varianta Sibiu-Brașov" 4100:"Moment important pentru Autostrada Sibiu – Pitești: Se semnează contractul pentru un tronson de 30 de kilometri" 1502:
lot 3 (22.1 km) was opened on 14 November 2014, but closed down completely for repairs on 7 September 2015.
1150:
lot 2) was not opened for traffic. The idea of building a temporary exit at the western end of the segment near
8585: 8190: 7457: 7316: 7170: 6584: 5468:"Proiectarea și execuția loturilor 1, 2 și 4 ale autostrăzii Orăștie-Sibiu sunt finanțate de Uniunea Europeană" 3478: 1554:
segment 3 (22.1 km) was re-opened on 10 October 2016, after repairing works had reportedly been completed.
6383:"Loturile 2,3 și 4 ale tronsonului de autostradă Lugoj-Deva au fost atribuite ĂŽn vederea ĂŽnceperii lucrărilor" 5612:"AUTOSTRADA ORĂȘTIE-SIBIU : Din 14 noiembrie se va putea circula și pe cei 22 km dintre Cunța și Săliște" 4731:"Cum a ajuns autostrada Sibiu-Pitesti sa fie din nou o prioritate si de ce risca sa fie amanata in continuare" 8633: 7067: 6077:"CNADNR anunta deschiderea traficului pe sectiunea Simeria – Deva a tronsonului de autostrada Deva – Orastie" 4861: 4631:"Guvernul a scos autostrada Sibiu-Pitești de pe harta investițiilor ĂŽn infrastructură pe următorii cinci ani" 4312: 7955: 1142:. As of July 2015 the remaining part of lot 1 was still not usable, as the next segment containing an exit ( 8465: 6260:"Primul lot al Autostrazii Lugoj – Deva, deschis circulatiei in plina noapte, cu o intarziere de noua luni" 5722:"Rus pe autostrada Sibiu – Orăștie: Pe 15 sau 16 noiembrie deschidem lotul 3. Mergem la vot pe autostradă!" 8314: 1310:. The segment was opened in on a single carriageway December 2011, and on both carriageways in June 2012. 8128: 8124: 4887:"Master Planul de Transport – Șoseaua Sibiu-Pitești va fi construită ca o autostradă fazată până ĂŽn 2020" 685:
bypass segment (13.6 km) was awarded in April 2004 to a joint venture composed of Italian companies
8507: 7441: 6202: 8610: 5436:"Proiectarea și execuția autostrăzii Orăștie-Sibiu km 43+855 – km 65+96 finanțate de Uniunea Europeană" 4989: 4176:"Prima autostradă din România: La 4 februarie 1967 începea construcţia Autostrăzii Bucureşti – Piteşti" 8009: 6713:"Constructorii străini surclasați de "Regii Asfaltului". Umbrărescu vrea 291 mil. € pentru Lugoj-Deva" 8202: 7982: 7899: 7490: 7309: 7039:"Ministrul Dan Șova a anunțat că lucrările la autostrada Arad – Nădlac vor fi finalizate anul viitor" 6852: 4840:"CNADNR a semnat contractul pentru revizuirea studiului de fezabilitate al autostrăzii Sibiu-Pitești" 4124: 861:
As of July 2019, the lot 1 of this section (Boița – Sibiu, 13.1 km) is undergoing construction.
7013:"Astaldi a câștigat un contract de 56 de milioane de euro pentru lotul 1 din autostrada Arad-Nădlac" 6585:"Autostrada Lugoj - Deva: S-a deschis circulația pe lotul 3, cu restricții de 80 km/Oră FOTO Update" 6225:"Proiectarea și execuția autostrăzii Lugoj-Deva km 0+000 – km 27+400 finanțate de Uniunea Europeană" 6105: 5984: 7642: 7467: 6016: 1604:
Pitești – Sibiu: Segments 4 and 5 are actively being built, segments 2 and 3 are in a design phase.
793: 8228: 5267:"Consortiul Boegl–Geiger–Comtram a castigat licitatia pentru modernizarea centurii orasului Sibiu" 8293: 8004: 7857: 7846: 7835: 7824: 7813: 7802: 7411: 7355: 6409:"Semnare contract "Proiectare și execu ie autostrada Lugoj – Deva, Lot 2, Km 27+620 – Km 56+220"" 5959: 5161:
Contractul pentru lotul 4 al autostrăzii Sibiu - Pitești a fost semnat cu o întârziere de doi ani
1430:
bypass (12.25 km) was initially opened on a single carriageway and completed on 6 June 2012.
1022:
On 10 October 2016, the lot 3 was re-opened after repairing works had reportedly been completed.
7192:"Un tronson de 15 km din autostrada A1 Lugoj – Deva, deschis traficului rutier luni dupa-amiaza" 6739:"Cine a câștigat licitația pentru lotul 2 din autostrada Timișoara-Lugoj. Cât va costa lucrarea" 4207: 1404:(South) (95.9 km) was opened on 12 April 1972 partially, 11 September 1972 for all traffic. 8397: 7694: 7436: 7395: 7390: 6796: 5237: 4005: 1640: 1523: 1369: 566: 212: 193: 153: 139: 125: 6795:. Constructia autostrazii Arad – Timișoara (inclusiv varianta de ocolire Arad). Archived from 4232: 721:
This section of the motorway is partially under construction and is split into five segments:
8184: 8179: 8169: 7426: 7421: 7385: 7380: 7375: 7370: 7365: 6473:"Au fost semnate contractele pentru constructia loturilor 2 si 3 din autostrada Lugoj – Deva" 6325: 3858: 3568: 3420: 2932: 2298: 1753: 1481: 1373: 1135: 1114: 985: 829: 818: 806: 777: 765: 738: 734: 661: 386: 371: 258: 179: 166: 111: 5097: 4687:"Analiză. Autostrada Sibiu – Pitești vs Sibiu – Brașov. Care este mai importantă investiție" 3382: 8566: 7940: 7340: 5019:"Traseul autostrăzii A1 Pitești – Sibiu. Cele cinci variante luate in calcul de autorități" 3520: 1167: 757: 8299: 8276: 7591: 6896:"Autostrada Nădlac-Pecica a mai scăpat de o contestație. A început organizarea de șantier" 4531: 4527:"Studiul de fezabilitate pentru Autostrada Sibiu – Pitești va costa 61 de milioane de lei" 3618: 1480:
segment 1 (17.4 km) was opened on 23 December 2013, between the interchange with the
8: 8597: 8161: 8157: 7632: 5655: 2493: 2029: 1960: 1709: 825: 351: 6944:"Când vom circula pe AUTOSTRADĂ de la Nădlac pe Sibiu, în viziunea ministrului Dan Șova" 3963: 3916: 3722: 3640: 3546: 3491: 3400: 3350: 3269: 3191: 3073: 3026: 2879: 2726: 2550: 2371: 8488: 8483: 8478: 8473: 5869:"Un an de la deschiderea circulației pe Săliște – Cunța. Și 69 de zile de la închidere" 3323: 2523: 1678: 1512:
segment 1 and 6.30 km of segment 2 (28.5 km) were opened on 19 December 2014.
984:
identified by the feasibility study, the low quality of the construction works and the
3787: 3378: 2489: 1770: 1489: 1341:(22.2 km), was awarded in April 2011 to a consortium led by the Romanian company 1187: 1139: 1130: 1103: 1099: 730: 726: 8084: 7109:"O porĹŁiune de 28 de kilometri din autostrada Nădlac-Arad a fost deschisă traficului" 7085: 3999: 1221: 1182:
segment (22.1 km) was awarded to a joint venture composed of Romanian companies
509: 4154:"12 aprilie 1972: Ceaușescu a inaugurat primele două benzi din A1 București-Pitești" 3983: 1384:. A connecting road between the motorway (near the border crossing) and the town of 1194:
segment (28.6 km) was awarded to a joint venture composed of Italian companies
1162:
lot 2 was awarded to the same joint venture of companies was a partial opening from
8503: 8147: 7536: 7505: 7332: 6178:"Execuția și proiectarea tronsoanelor Nădlac-Arad și Lugoj-Deva va dura 30 de luni" 4791: 4635: 4559:"Un nou vis spulberat? Autostrada Sibiu-Pitești care ar trebui să fie gata în 2020" 3251: 2344: 2307: 1287:
This section of the motorway is fully operational and is composed of two segments:
1252:
This section of the motorway is fully operational and is composed of two segments:
1195: 1030:
This section of the motorway is fully operational and is composed of two segments:
895:
The contract for the whole section (17.5 km) forming a partial beltway around
834: 629:
This section of the motorway is fully operational and is composed of two segments:
343: 278: 3224: 266: 8593: 7793: 5527:"Deschiderea traficului rutier pe Autostrada Orăstie-Sibiu, Loturile I, II si IV" 3220: 1206:
segment (21.1 km) was awarded to a joint-venture led by the Spanish company
1203: 1175: 1087: 1083: 4439:"Autostrada Pitești-Sibiu: licitație la toamnă, fonduri de la Uniunea Europeană" 3996: 3805: 3469: 3447: 3133: 2798: 2455: 2390: 1886: 1154:
was discussed but never implemented. Another option discussed, considering that
797: 282: 262: 7741: 5081:"În sfârșit! România va avea o nouă autostradă. Au ĂŽnceput lucrările – Capital" 3700: 2807: 2198: 2149: 2049: 1978: 1929: 1907: 1837: 1388:(approximately 7 km southbound), designated as DN7G, has also been built. 949: 254: 5765: 4461:"Constructorul autostrăzii Comarnic-Brașov-Făgăraș va fi selectat anul viitor" 4119: 4117: 3814: 3142: 2464: 2399: 2180: 1895: 1117:(11.4 km) that is branching off from the A1 motorway near the village of 8627: 4094: 4092: 3867: 3836: 3783: 3779: 3751: 3298: 3164: 2829: 2708: 2704: 1991: 1868: 1825: 1636: 1581: 1571: 1561: 1541: 1519: 1509: 1477: 1443: 1427: 1419: 1334: 1296: 1292: 1265: 1216: 1199: 1191: 1163: 1151: 1126: 1107: 1095: 1091: 1059: 1043: 701:) was also built to resolve traffic congestion at the nearby junction of the 666: 578: 558: 550: 497: 493: 482: 324: 316: 197: 7291: 3877: 2955: 2317: 1780: 1736: 948:
segment (22.1 km), which includes the 1,100-metre (3,600 ft) long
913:
This section of the motorway is fully open and is split into four segments:
115: 8029: 7746: 5336:"Varianta de Ocolire a Municipiului Sibiu, Secțiunea 2 deschisă traficului" 5311:"Varianta de Ocolire a Municipiului Sibiu, Secțiunea 1 deschisă traficului" 4483:"Transporturile vor să construiască în trei ani autostrada Sibiu – Pitești" 4114: 3846: 3840: 3673: 3524: 3055: 2835: 2775: 2235: 2186: 2018: 1874: 1715: 1547: 1495: 1463: 1457: 1063: 1031: 957: 945: 934: 922: 918: 463: 448: 312: 270: 250: 7148: 4505:"Autostrada Pitești-Sibiu se licitează în toamnă. UE ne dă bani s-o facem" 4089: 3669: 3614: 3591: 3577: 3435: 3388: 3338: 3304: 3257: 2428: 2354: 1529: 1433: 1423: 1288: 1155: 1143: 657: 554: 478: 320: 183: 60:
Maintained by Compania Națională de Administrare a Infrastructurii Rutiere
8603: 7663: 6996:"Lotul Romstrade al autostrazii Arad – Nadlac, scos din nou la licitatie" 3793: 3710: 3679: 3534: 3168: 2949: 2746: 2625: 2286: 2260: 2131: 2104: 2012: 1966: 1774: 1742: 1179: 1079: 489: 474: 286: 274: 35: 7301: 6970:"Contractul cu Alpine pentru autostrada Nădlac-Arad, reziliat în secret" 5364:"Premierul Emil Boc a inaugurat centura ocolitoare a municipiului Sibiu" 4341:"A fost inaugurat pasajul subteran de la Bascov. Orban a taiat panglica" 3951: 3758: 3581: 3179: 3121: 2714: 2679: 2583: 2504: 2443: 2359: 2229: 2137: 2110: 1354: 1170:
interchange with DJ572 (6.02 km), but this was not pursued either.
47: 8113: 6351:"Semnare contract Proiectare și execuție Autostrada Lugoj – Deva Lot 4" 4413:"Anca Boagiu: Autostrada Sibiu – Pitești va fi finalizată până în 2016" 4363:"Revision/Update of the Feasibility Study for Pitești – Sibiu motorway" 4201:"Iptana, 50 de ani de proiectare pentru infrastructura transporturilor" 3456: 2980: 2941: 2084: 873: 7978: 5289:"Vectra Service SRL – PD-L a câștigat centura Sibiului. Partea a doua" 3904: 3628: 3230: 3174: 3116: 3061: 3014: 2986: 2920: 2915: 2867: 2862: 2786: 2781: 2594: 2589: 2538: 2499: 2485: 2438: 2420: 2340: 1630:
This article contains a bulleted list or table of intersections which
1587: 1544:
remainder of segment 1 (10.1 km) were opened on 23 December 2015.
1410:
bypass (South – Bascov) (13.6 km) was opened on 19 November 2007.
1407: 1401: 838: 722: 710: 698: 690: 682: 653: 649: 638: 634: 589: 542: 533: 455: 429: 422: 418: 407: 300: 129: 8552: 8019: 6282:"Drumul de legatura pentru descarcarea de pe Autostrada Lugoj – Deva" 6010:"Varianta de ocolire Deva-Orastie se finanteaza prin Fonduri ex-ISPA" 3936: 3889: 3827: 3770: 3742: 3691: 3660: 3605: 3511: 3369: 3289: 3242: 3211: 3155: 3093: 3046: 2998: 2967: 2899: 2847: 2820: 2766: 2691: 2660: 2637: 2606: 2570: 2476: 2432: 2411: 2331: 2271: 2247: 2220: 2171: 2158: 2122: 2095: 2071: 2003: 1951: 1859: 1816: 1794: 1727: 1700: 1688: 1397: 1342: 1016: 1011: 1007: 999: 994: 990: 981: 953: 801: 761: 713:
motorway end. The underpass was fully completed during October 2008.
645: 630: 585: 538: 525: 403: 296: 94: 7123:"Ungurii s-au apucat de autostrada care va lega România de Occident" 4964:"Adevarul Live – Interview with CNADNR general manager Narcis Neaga" 4585: 3992: 3945: 3528: 2673: 1515: 1505: 1485: 1385: 1330: 1118: 814: 785: 605: 570: 216: 7720: 7716: 7297:
Description & collection of news articles about the A1 motorway
6155: 3585: 1381: 1272: 1253: 1241: 1183: 810: 781: 517: 8143: 7951: 7481: 6538: 5883: 5212:"Boc: Centura ocolitoare a Sibiului va fi gata la finele lui 2010" 3110: 3106: 3007: 2976: 2908: 2856: 2532: 1803: 1225:
most probably the works would have been completed by end of 2015.
1062:
segment (15.4 km) was opened during December 2012, while the
969: 961: 941: 930: 926: 881: 746: 742: 593: 467: 459: 308: 157: 5770: 5023: 4935: 4763: 4735: 4663: 3704: 3332: 3102: 2424: 2348: 2311: 2058: 1766: 1762: 1453: 1447: 1365: 1350: 1318: 1229: 1211: 1067: 1055: 1051: 1039: 1035: 977: 965: 865: 686: 674: 601: 562: 521: 240: 220: 7789: 6687:"Primul lot din autostrada Timișoara-Lugoj, deschis circulatiei" 6557:"Pentru Autostrada Lugoj – Deva se cer tuneluri si viaducte noi" 6495:"Pentru Autostrada Lugoj – Deva se cer tuneluri si viaducte noi" 399: 8581: 4909:"Peste 10.000 de angajati de la Uzina Dacia au iesit in strada" 4415:(in Romanian). Realitatea.net. 2 September 2011. Archived from 4282:(in Romanian). Realitatea.net. 19 November 2007. Archived from 3898: 3871: 2619: 2207: 1938: 1916: 1846: 1470:
lots 1, 2 and 4 (59.9 km) were opened on 19 December 2013.
1377: 1338: 792:) and further supported the idea of modifying the route of the 694: 597: 440: 414: 6134:"Inca 18 km din autostrada Deva-Orastie, deschisi circulatiei" 7652: 7637: 6768:"Se deschide traficul rutier pe Autostrada Timișoara – Lugoj" 3622: 3429: 2945: 2700: 2669: 2646: 2615: 2579: 2280: 1591: 1577: 1567: 1557: 1551: 1537: 1533: 1499: 1473: 1467: 1437: 1413: 1337:
was split into two parts. The first part, between Nădlac and
1321:. It was opened along with the Arad bypass in December 2011. 1261: 1257: 1207: 1159: 1147: 1122: 973: 914: 896: 877: 789: 750: 546: 529: 444: 433: 304: 170: 143: 4058:"Trans-European Transport Corridors – Rhine-Danube Corridor" 2720:
opened December 2010, reconfigured in December 2013 as exit
2600:
opened December 2010, reconfigured in December 2022 as exit
800:, thus creating a nearly complete motorway corridor between 8310: 8241: 7923: 7895: 7647: 7627: 7622: 7617: 7612: 7607: 5766:"TVR2 – Interview with CNADNR general manager Narcis Neaga" 4206:(in Romanian). Iptana.ro. 10 September 2003. Archived from 4128: 1659: 1632:
should be presented in a properly formatted junction table.
1522:
remainder of lot 2 (10.3 km), junction with Hungarian
1307: 869: 852: 706: 8393: 8224: 7296: 1564:
lot 2 was partially opened (15.2 km) on 6 March 2017.
1050:
awarded to the joint venture between the Austrian company
8271: 8266: 8261: 8256: 8251: 8246: 8236: 7586: 7581: 7576: 7571: 7566: 7561: 7556: 1987: 901: 702: 670: 410:
segment – country road overpass at km 55 (westbound view)
6203:"Contract de Finanțare pentru Autostrada Lugoj Dumbrava" 6099:"Autostrada Deva – Orăstie finalizată prin fonduri ISPA" 4388:"Transporturile le propun chinezilor să facă autostradă" 4032:"Nadlac II – Csanadpalota border checkpoint inaugurated" 1526:
and border control facility were opened on 11 July 2015.
436:
bypass section – A1/DN14 node at km 246 (westbound view)
24: 6670:"Cum au fost "impartite" patru tronsoane de autostrada" 6047:(in Romanian). CNADNR. 21 December 2012. Archived from 5532:(in Romanian). CNADNR. 19 December 2013. Archived from 5386:"Contract de Finanțare pentru Autostrada Orăștie-Sibiu" 4966:(in Romanian). Adevarul. 20 August 2015. Archived from 1228:
On 6 March 2017, a part of lot 2, between Dumbrava and
964:
segment (24.1 km) was awarded to Austrian company
6446:(in Romanian). CNADNR. 31 October 2013. Archived from 6414:(in Romanian). CNADNR. 31 October 2013. Archived from 6156:"Studiu de fezabilitate final. Obiectiv: Lugoj – Deva" 6015:(in Romanian). CNADNR. 9 November 2010. Archived from 4311:(in Romanian). CNADNR. 22 October 2008. Archived from 3883:
opened 2011, reconfigured in July 2015 as interchange
1450:
segment (15.4 km) was opened on 21 December 2012.
976:
segment (16.1 km) was awarded to Italian company
7103: 7101: 6870:"Panglicile se Îndepărtează de autostrăzile În lucru" 5505:"Panglicile se Îndepărtează de autostrăzile În lucru" 4255:"Studiu de caz: Cea mai veche autostradă din România" 1329:
The construction of the 38.8 km section between
6946:(in Romanian). Capital. 29 July 2013. Archived from 6385:(in Romanian). Agerpres. 23 May 2013. Archived from 1416:
bypass (17.5 km) was opened on 1 December 2010.
6356:(in Romanian). CNADNR. 31 July 2013. Archived from 5092: 5090: 4034:. The Romania Journal. 11 July 2015. Archived from 2365:opened 1972, reconfigured in November 2007 as exit 1574:
lot 4 (22.13 km) was opened on 14 August 2019.
1070:segment (17.4 km) was opened during May 2013. 892:This section of the motorway is fully operational. 709:roads which was generating in turn problems at the 7098: 6284:(in Romanian). Opinia Timisoarei. 24 December 2013 6230:(in Romanian). CNADNR. 20 May 2011. Archived from 6104:(in Romanian). CNADNR. 30 May 2013. Archived from 5441:(in Romanian). CNADNR. 20 May 2011. Archived from 1594:lot 1 (13 km) was opened on 15 December 2022. 1584:lot 3 (21 km) was opened on 23 December 2019. 1440:lot 1 (9.5 km) was opened on 23 October 2012. 788:) instead of the A1 motorway (between Pitești and 7171:"S-au unit autostrăzile ĂŽntre România și Ungaria" 6824:"Centura Aradului, deschisă și pe al doilea sens" 6741:. Realitatea.net. 4 December 2013. Archived from 5291:(in Romanian). Turnul Sfatului. 27 September 2009 4889:(in Romanian). Ziarul Financiar. 25 November 2014 4463:(in Romanian). Buna Ziua Brasov. 17 December 2011 1460:segment (17.4 km) was opened on 30 May 2013. 451:segment – Săcel Tunnel at km 264 (westbound view) 8625: 7273:Map of the Lugoj – Deva section, lots 2, 3 and 4 5871:(in Romanian). Turnul Sfatului. 15 November 2015 5087: 4280:"S-a inaugurat centura de ocolire a Piteștiului" 4257:(in Romanian). Ziarul Financiar. 31 October 2010 6898:. Ziua de Vest. 14 January 2014. Archived from 4390:(in Romanian). Ziarul Financiar. 16 August 2011 1426:(44.5 km) was opened on 17 December 2011. 1364:At the western end, the motorway connects with 72:122.9 km (76.4 mi) under construction 6972:. România Liberă. 22 July 2013. Archived from 5678:"Sibiu-Orăștie, autostrada greșelilor ĂŽn lanț" 5170: 5168: 4561:(in Romanian). Wall-Street.ro. 11 October 2012 500:center/airport node at km 542 (westbound view) 7679: 7317: 6681: 6679: 5913: 5911: 5889: 5791: 5789: 5606: 5604: 4982: 4485:(in Romanian). Ziarul Financiar. 7 March 2012 4235:(in Romanian). Evenimentul Zilei. 9 June 2008 4178:(in Romanian). economica.net. 4 February 2022 1639:for information on how to create one. Please 6787: 6785: 6762: 6760: 6715:. Capital.ro. 24 August 2012. Archived from 6128: 6126: 6071: 6069: 5746:(in Romanian). Turnul Sfatului. 22 July 2015 5556: 5554: 5358: 5356: 4807: 4407: 4405: 4306:"Deschiderea traficului prin Pasajul Bascov" 1275:. It was opened to traffic in October 2012. 7184: 7015:. Capital. 23 December 2013. Archived from 7007: 7005: 6306:(in Romanian). Hotnews.ro. 30 December 2013 6254: 6252: 5932: 5930: 5928: 5626: 5165: 5011: 4923: 4854: 4751: 4723: 4689:(in Romanian). Ora de Sibiu. 4 October 2013 4651: 4601: 4535:(in Romanian). 1 April 2012. Archived from 4355: 4024: 3957:opened December 2014, last exit in Romania 7693: 7686: 7672: 7324: 7310: 7125:. Capital.ro. 11 July 2013. Archived from 6847: 6845: 6689:. TION.ro. 23 October 2012. Archived from 6676: 6509: 6433: 6401: 6343: 6318: 6217: 6195: 6170: 6091: 6034: 6002: 5977: 5940:(in Romanian). Hotnews.ro. 9 November 2010 5908: 5836: 5786: 5601: 5576: 5564:(in Romanian). Alba24.ro. 15 December 2013 5519: 5460: 5428: 5403: 5328: 5098:"Monitorizare: stadiul proiectelor majore" 4958: 4956: 4954: 4551: 4441:(in Romanian). Automarket. 19 January 2012 4431: 4335: 4333: 4127:(in Romanian). 11 May 2020. Archived from 4050: 884:, 13.1 km) was opened to the public 669:that were otherwise restricted to the old 40:Map of the A1 motorway, as of January 2022 7331: 7287:Motorways in Romania 2014–2020 (pdf file) 6872:. Capital.ro. 4 June 2012. Archived from 6826:. Capital.ro. 6 June 2012. Archived from 6782: 6757: 6487: 6296: 6148: 6123: 6066: 5952: 5614:(in Romanian). Alba24.ro. 5 November 2014 5551: 5499: 5497: 5495: 5378: 5353: 5303: 5230: 4832: 4519: 4497: 4402: 4298: 4274: 4272: 541:and connects the following major cities: 7292:CNADNR – Coridorul IV Nădlac – Constanța 7041:(in Romanian). Adevărul. 1 November 2013 7002: 6924:(in Romanian). Adevărul. 10 January 2014 6862: 6818: 6816: 6814: 6770:(in Romanian). Hotnews. 23 December 2015 6705: 6519:(in Romanian). Hotnews. 11 February 2015 6262:(in Romanian). Hotnews. 23 December 2013 6249: 6079:(in Romanian). Hotnews. 21 December 2012 5965:(in Romanian). CNADNR. 16 September 2009 5925: 5692: 5658:(in Romanian). Money.ro. 29 October 2014 5648: 5259: 5047:"Romanian General Transport Master Plan" 4901: 4879: 4862:"Romanian General Transport Master Plan" 4779: 4701: 4679: 4623: 4573: 4475: 4453: 4195: 4193: 3316:Margina (TM) – Nădlac (AR) (158 km) 2516:Boița (SB) – Coșevița (TM) (188 km) 1186:and Tehnostrade in July 2013, while the 488: 473: 454: 439: 428: 413: 398: 8515: 6842: 6465: 6304:"Bilantul autostrazilor la final de an" 6183:(in Romanian). CNADNR. 13 December 2010 5861: 5814: 5802:(in Romanian). CNADNR. 3 September 2015 5670: 5589:(in Romanian). CNADNR. 26 November 2014 5416:(in Romanian). CNADNR. 14 December 2010 5366:(in Romanian). Hotnews. 1 December 2010 5075: 5073: 5071: 5039: 4951: 4611:(in Romanian). Hotnews. 8 November 2013 4507:(in Romanian). RTV.net. 19 January 2012 4380: 4330: 8626: 7149:"Constructie Autostrada Nadlac – Arad" 7090:: CS1 maint: archived copy as title ( 6375: 6274: 6205:(in Romanian). CNADNR. 2 December 2011 5849:(in Romanian). CNADNR. 9 November 2015 5824:(in Romanian). ProTV. 3 September 2015 5758: 5736: 5714: 5680:(in Romanian). Digi24.ro. 22 July 2015 5492: 5391:(in Romanian). CNADNR. 21 October 2011 5341:(in Romanian). CNADNR. 1 December 2010 5316:(in Romanian). CNADNR. 1 December 2010 5281: 4911:(in Romanian). National. 16 April 2015 4815:"Comunicat de presa CNADNR 15.06.2015" 4711:(in Romanian). Unirea. 23 October 2013 4343:(in Romanian). Pro TV. 22 October 2008 4269: 4156:(in Romanian). click.ro. 16 April 2018 4102:(in Romanian). HotNews.ro. 11 May 2020 2926:southbound only, opened December 2013 1598: 817:, which was planned to be built via a 624: 7667: 7305: 6811: 6497:(in Romanian). TION. 23 December 2014 5473:. CNADNR. 7 June 2011. Archived from 5269:(in Romanian). Hotnews. 24 April 2008 5204: 4842:(in Romanian). Mediafax. 15 June 2015 4247: 4225: 4190: 2143:northbound entrance, southbound exit 1810:northbound only, opened January 2021 573:. As the motorway is built along the 470:North node at km 309 (westbound view) 7194:(in Romanian). Hotnews. 6 March 2017 6858:. CNADNR. 23 March 2011. p. 54. 6475:(in Romanian). TION. 23 October 2013 5990:(in Romanian). CNADNR. 19 March 2010 5702:(in Romanian). Hotnews. 22 July 2015 5068: 1616: 1391: 1247: 425:East node at km 115 (westbound view) 6331:(in Romanian). CNADNR. 1 April 2012 6136:(in Romanian). Hotnews. 30 May 2013 5656:"Autostrada pe nisipuri miscatoare" 5507:(in Romanian). Capital. 4 June 2012 4990:"Variante Autostrada Sibiu-Pitești" 4820:(in Romanian). CNADNR. 15 June 2015 1282: 13: 8530:Aurel Vlaicu International Airport 8524:Henri Coandă International Airport 7282:Map of the Sibiu – Pitești section 1372:, which further connects with the 908: 716: 485:segment at km 506 (eastbound view) 68:458.1 km (284.7 mi) 14: 8645: 7266: 6158:(in Romanian). CNADNR. April 2009 1671:Bucharest – Pitești (110 km) 1376:, that runs from the border with 1025: 693:city centre. An underpass in the 575:Trans-European Transport Networks 70:581 km (361 mi) planned 8580: 8551: 8502: 8392: 8309: 8223: 8156: 8142: 8123: 7977: 7950: 7922: 7894: 7885:List of Bucharest metro stations 7788: 7715: 7480: 7248: 7234: 7220: 7206: 7163: 7141: 7115: 7053: 7031: 6988: 6962: 6936: 6914: 6888: 6731: 6662: 6637: 6612: 6591: 6577: 6563: 6549: 6531: 4004: 3982: 3962: 3950: 3935: 3915: 3903: 3888: 3876: 3857: 3845: 3826: 3804: 3792: 3769: 3757: 3741: 3721: 3709: 3690: 3678: 3659: 3639: 3627: 3604: 3590: 3567: 3545: 3533: 3510: 3490: 3468: 3446: 3434: 3419: 3399: 3387: 3368: 3349: 3337: 3322: 3303: 3288: 3268: 3256: 3241: 3229: 3210: 3190: 3178: 3173: 3154: 3132: 3120: 3115: 3092: 3072: 3060: 3045: 3025: 3013: 2997: 2985: 2966: 2954: 2931: 2919: 2914: 2898: 2878: 2866: 2861: 2846: 2834: 2819: 2797: 2785: 2780: 2765: 2745: 2725: 2713: 2690: 2678: 2659: 2636: 2624: 2605: 2593: 2588: 2569: 2549: 2537: 2522: 2503: 2498: 2475: 2454: 2442: 2437: 2410: 2389: 2370: 2358: 2353: 2330: 2316: 2297: 2285: 2270: 2259: 2246: 2234: 2219: 2197: 2185: 2170: 2148: 2136: 2121: 2109: 2094: 2083: 2070: 2048: 2028: 2017: 2002: 1977: 1965: 1950: 1928: 1906: 1885: 1873: 1858: 1836: 1815: 1793: 1779: 1752: 1741: 1726: 1714: 1699: 1677: 1664:Exits and buildings (Northbound) 1621: 1536:lot 2 (25.6 km) along with 1324: 381: 366: 207: 188: 174: 161: 148: 134: 120: 106: 46: 34: 23: 5890:Victor Cozmei (15 March 2016), 5636:(in Romanian). 11 November 2015 5179: 5154: 5140: 5126: 5112: 1073: 952:was awarded to Italian company 887: 600:section (188 km), and the 5724:. Ora de Sibiu. 9 October 2014 5100:. AsociaĹŁia Pro Infrastructura 5027:(in Romanian). 7 November 2015 4939:(in Romanian). 11 October 2014 4767:(in Romanian). 4 December 2013 4667:(in Romanian). 3 December 2013 4639:(in Romanian). 4 December 2013 4589:(in Romanian). 8 November 2012 4233:"Autostrada meșterului Manole" 4168: 4146: 4075: 771:European Union's Cohesion Fund 1: 8613:(construction halted in 1990) 5774:(in Romanian). 18 August 2015 5218:(in Romanian). 26 August 2010 4017: 2161:, Motel, Restaurant, Parking 592:section (109.5 km), the 6998:. Hotnews.ro. 10 April 2013. 6672:. Hotnews.ro. 12 April 2011. 4739:(in Romanian). 18 March 2014 1612: 7: 5056:(in Romanian). 23 July 2015 1121:and connecting the city of 733:– Văleni (lot 4), Văleni – 619: 10: 8650: 5247:(in Romanian). 16 May 2008 4795:(in Romanian). 2 June 2014 8579: 8562: 8550: 8501: 8464: 8391: 8308: 8285: 8222: 8201: 8155: 8141: 8096: 7990: 7976: 7949: 7921: 7893: 7787: 7780: 7760: 7729: 7708: 7701: 7600: 7549: 7519: 7498: 7489: 7478: 7450: 7404: 7348: 7339: 6626:(in Romanian). 2020-12-30 4997:www.cnadnr.roÂlanguage=ro 3314: 2514: 1669: 1662: 1306:and the Austrian company 925:– Cunța (lot 3), Cunța – 608:section (158.8 km). 359: 339: 334: 330: 292: 246: 236: 231: 227: 203: 100: 90: 85: 77: 64: 59: 54: 45: 33: 21: 8538:(leisure and air-school) 1317:and the Italian company 794:Pan-European Corridor IV 6649:monitorizari.hotnews.ro 1687:Iuliu Maniu Boulevard, 1380:to the capital city of 1232:was opened to traffic. 956:in May 2011, while the 516:) is a partially built 8611:Danube–Bucharest Canal 8129:Transferoviar Călători 8015:Bucharest South/Cățelu 7695:Transport in Bucharest 6793:"Progresul Lucrarilor" 1919:, Restaurant, Parking 513: 501: 486: 471: 452: 437: 426: 411: 7333:Main roads in Romania 4867:(in Romanian). AMPOST 4368:(in Romanian). CNADNR 4063:. European Commission 3910:opened December 2014 3764:opened December 2011 3685:opened December 2011 3540:opened December 2015 3505:opened December 2015 3485:opened December 2015 3463:opened December 2015 3441:opened December 2013 3394:opened December 2013 3310:opened December 2019 3283:opened December 2019 3263:opened December 2019 3127:opened December 2012 3020:opened December 2013 2992:opened December 2013 2873:opened December 2013 2841:opened November 2014 2814:opened November 2014 2792:opened December 2013 2685:opened December 2010 2654:opened December 2010 2631:opened December 2010 2564:opened December 2022 2544:opened December 2022 2510:opened November 2007 2449:opened November 2007 524:, planned to connect 492: 477: 458: 443: 432: 417: 402: 8634:Motorways in Romania 8600:(leisure boats only) 8567:Cycling in Bucharest 8104:Astra Trans Carpatic 7752:Regio Serv Transport 7601:Other national roads 6453:on 23 September 2015 6421:on 23 September 2015 6363:on 23 September 2015 6326:"Comunicat de presă" 6237:on 23 September 2015 6111:on 23 September 2015 6054:on 23 September 2015 6022:on 23 September 2015 5844:"Comunicat de presă" 5797:"Comunicat de Presă" 5584:"Comunicat de presă" 5539:on 23 September 2015 5480:on 23 September 2015 5448:on 23 September 2015 4970:on 24 September 2015 4419:on 24 September 2015 4318:on 23 September 2015 3634:opened October 2012 3457:Timiș – Bega Channel 2210:, Motel, Restaurant 1849:, Motel, Restaurant 1641:improve this article 758:Carpathian Mountains 118:(under construction) 8606:(water-sports only) 8025:Bucharest East/Obor 7761:Tram and Trolleybus 7550:Main national roads 7129:on 24 December 2013 7019:on 28 December 2013 6976:on 28 December 2013 6587:. 23 December 2019. 6389:on 13 December 2013 4038:on 24 December 2015 3236:opened August 2019 3205:opened August 2019 1710:Bucharest Ring Road 1599:Incomplete sections 1198:and Secol, and the 986:Romanian Government 982:terrain instability 830:Romanian Government 819:concession contract 766:Romanian Government 760:, partly along the 625:Bucharest – Pitești 102:Major intersections 16:Motorway in Romania 8300:National road DNCB 7520:Under construction 7405:Under construction 7244:. 10 January 2019. 6902:on 16 January 2014 6745:on 4 December 2013 3561:under construction 3344:opened March 2017 2324:under construction 1787:under construction 1488:) and the exit at 502: 487: 472: 453: 438: 427: 412: 8621: 8620: 8575: 8574: 8546: 8545: 8536:Clinceni Airfield 8497: 8496: 8137: 8136: 8038:Bucharest Carpați 7972: 7971: 7964:Trolleybus routes 7776: 7775: 7661: 7660: 7545: 7544: 7476: 7475: 6876:on 27 August 2012 6719:on 27 August 2012 4999:. 7 November 2015 4539:on 8 October 2015 4532:Jurnalul Național 4015: 4014: 4011:opened July 2015 3977:opened July 2015 3852:opened June 2012 3799:opened June 2012 3619:Timișoara Airport 2961:opened July 2021 1658: 1657: 1392:Openings timeline 1248:Lugoj – Timișoara 496:bypass segment – 421:bypass segment – 397: 396: 393: 392: 55:Route information 8641: 8584: 8560: 8559: 8555: 8513: 8512: 8506: 8396: 8313: 8227: 8160: 8153: 8152: 8146: 8127: 8088: 8073:Pantelimon South 8033: 7988: 7987: 7981: 7954: 7926: 7898: 7878: 7876: 7864: 7862: 7853: 7851: 7842: 7840: 7831: 7829: 7820: 7818: 7809: 7807: 7792: 7785: 7784: 7719: 7706: 7705: 7688: 7681: 7674: 7665: 7664: 7496: 7495: 7484: 7346: 7345: 7326: 7319: 7312: 7303: 7302: 7260: 7259: 7252: 7246: 7245: 7238: 7232: 7231: 7230:. 14 April 2019. 7224: 7218: 7217: 7210: 7204: 7203: 7201: 7199: 7188: 7182: 7181: 7179: 7178: 7167: 7161: 7160: 7158: 7156: 7145: 7139: 7138: 7136: 7134: 7119: 7113: 7112: 7105: 7096: 7095: 7089: 7081: 7079: 7078: 7072: 7066:. Archived from 7065: 7057: 7051: 7050: 7048: 7046: 7035: 7029: 7028: 7026: 7024: 7009: 7000: 6999: 6992: 6986: 6985: 6983: 6981: 6966: 6960: 6959: 6957: 6955: 6950:on 1 August 2013 6940: 6934: 6933: 6931: 6929: 6918: 6912: 6911: 6909: 6907: 6892: 6886: 6885: 6883: 6881: 6866: 6860: 6859: 6857: 6849: 6840: 6839: 6837: 6835: 6820: 6809: 6808: 6806: 6804: 6789: 6780: 6779: 6777: 6775: 6764: 6755: 6754: 6752: 6750: 6735: 6729: 6728: 6726: 6724: 6709: 6703: 6702: 6700: 6698: 6683: 6674: 6673: 6666: 6660: 6659: 6657: 6656: 6641: 6635: 6634: 6632: 6631: 6616: 6610: 6609: 6607: 6606: 6595: 6589: 6588: 6581: 6575: 6574: 6567: 6561: 6560: 6553: 6547: 6546: 6535: 6529: 6528: 6526: 6524: 6513: 6507: 6506: 6504: 6502: 6491: 6485: 6484: 6482: 6480: 6469: 6463: 6462: 6460: 6458: 6452: 6445: 6437: 6431: 6430: 6428: 6426: 6420: 6413: 6405: 6399: 6398: 6396: 6394: 6379: 6373: 6372: 6370: 6368: 6362: 6355: 6347: 6341: 6340: 6338: 6336: 6330: 6322: 6316: 6315: 6313: 6311: 6300: 6294: 6293: 6291: 6289: 6278: 6272: 6271: 6269: 6267: 6256: 6247: 6246: 6244: 6242: 6236: 6229: 6221: 6215: 6214: 6212: 6210: 6199: 6193: 6192: 6190: 6188: 6182: 6174: 6168: 6167: 6165: 6163: 6152: 6146: 6145: 6143: 6141: 6130: 6121: 6120: 6118: 6116: 6110: 6103: 6095: 6089: 6088: 6086: 6084: 6073: 6064: 6063: 6061: 6059: 6053: 6046: 6038: 6032: 6031: 6029: 6027: 6021: 6014: 6006: 6000: 5999: 5997: 5995: 5989: 5981: 5975: 5974: 5972: 5970: 5964: 5956: 5950: 5949: 5947: 5945: 5934: 5923: 5922: 5915: 5906: 5905: 5904: 5902: 5887: 5881: 5880: 5878: 5876: 5865: 5859: 5858: 5856: 5854: 5848: 5840: 5834: 5833: 5831: 5829: 5818: 5812: 5811: 5809: 5807: 5801: 5793: 5784: 5783: 5781: 5779: 5762: 5756: 5755: 5753: 5751: 5740: 5734: 5733: 5731: 5729: 5718: 5712: 5711: 5709: 5707: 5696: 5690: 5689: 5687: 5685: 5674: 5668: 5667: 5665: 5663: 5652: 5646: 5645: 5643: 5641: 5630: 5624: 5623: 5621: 5619: 5608: 5599: 5598: 5596: 5594: 5588: 5580: 5574: 5573: 5571: 5569: 5558: 5549: 5548: 5546: 5544: 5538: 5531: 5523: 5517: 5516: 5514: 5512: 5501: 5490: 5489: 5487: 5485: 5479: 5472: 5464: 5458: 5457: 5455: 5453: 5447: 5440: 5432: 5426: 5425: 5423: 5421: 5415: 5407: 5401: 5400: 5398: 5396: 5390: 5382: 5376: 5375: 5373: 5371: 5360: 5351: 5350: 5348: 5346: 5340: 5332: 5326: 5325: 5323: 5321: 5315: 5307: 5301: 5300: 5298: 5296: 5285: 5279: 5278: 5276: 5274: 5263: 5257: 5256: 5254: 5252: 5242: 5234: 5228: 5227: 5225: 5223: 5208: 5202: 5201: 5199: 5198: 5183: 5177: 5172: 5163: 5158: 5152: 5151: 5144: 5138: 5137: 5130: 5124: 5123: 5116: 5110: 5109: 5107: 5105: 5094: 5085: 5084: 5077: 5066: 5065: 5063: 5061: 5051: 5043: 5037: 5036: 5034: 5032: 5015: 5009: 5008: 5006: 5004: 4994: 4986: 4980: 4979: 4977: 4975: 4960: 4949: 4948: 4946: 4944: 4927: 4921: 4920: 4918: 4916: 4905: 4899: 4898: 4896: 4894: 4883: 4877: 4876: 4874: 4872: 4866: 4858: 4852: 4851: 4849: 4847: 4836: 4830: 4829: 4827: 4825: 4819: 4811: 4805: 4804: 4802: 4800: 4792:Ziarul Financiar 4783: 4777: 4776: 4774: 4772: 4755: 4749: 4748: 4746: 4744: 4727: 4721: 4720: 4718: 4716: 4705: 4699: 4698: 4696: 4694: 4683: 4677: 4676: 4674: 4672: 4655: 4649: 4648: 4646: 4644: 4636:Ziarul Financiar 4627: 4621: 4620: 4618: 4616: 4605: 4599: 4598: 4596: 4594: 4577: 4571: 4570: 4568: 4566: 4555: 4549: 4548: 4546: 4544: 4523: 4517: 4516: 4514: 4512: 4501: 4495: 4494: 4492: 4490: 4479: 4473: 4472: 4470: 4468: 4457: 4451: 4450: 4448: 4446: 4435: 4429: 4428: 4426: 4424: 4409: 4400: 4399: 4397: 4395: 4384: 4378: 4377: 4375: 4373: 4367: 4359: 4353: 4352: 4350: 4348: 4337: 4328: 4327: 4325: 4323: 4317: 4310: 4302: 4296: 4295: 4293: 4291: 4276: 4267: 4266: 4264: 4262: 4251: 4245: 4244: 4242: 4240: 4229: 4223: 4222: 4220: 4218: 4212: 4205: 4197: 4188: 4187: 4185: 4183: 4172: 4166: 4165: 4163: 4161: 4150: 4144: 4143: 4138: 4136: 4121: 4112: 4111: 4109: 4107: 4096: 4087: 4086: 4085:. 14 April 2019. 4079: 4073: 4072: 4070: 4068: 4062: 4054: 4048: 4047: 4045: 4043: 4028: 4008: 3986: 3966: 3954: 3939: 3919: 3907: 3892: 3880: 3861: 3849: 3830: 3808: 3796: 3773: 3761: 3745: 3725: 3713: 3694: 3682: 3663: 3643: 3631: 3608: 3594: 3571: 3549: 3537: 3514: 3494: 3472: 3450: 3438: 3423: 3403: 3391: 3372: 3353: 3341: 3326: 3307: 3292: 3272: 3260: 3245: 3233: 3214: 3194: 3182: 3177: 3158: 3136: 3124: 3119: 3096: 3076: 3064: 3049: 3029: 3017: 3001: 2989: 2970: 2958: 2935: 2923: 2918: 2902: 2882: 2870: 2865: 2850: 2838: 2823: 2801: 2789: 2784: 2769: 2749: 2729: 2717: 2694: 2682: 2663: 2640: 2628: 2609: 2597: 2592: 2573: 2553: 2541: 2526: 2507: 2502: 2479: 2458: 2446: 2441: 2414: 2393: 2374: 2362: 2357: 2334: 2320: 2301: 2289: 2274: 2263: 2250: 2238: 2223: 2201: 2189: 2174: 2152: 2140: 2125: 2113: 2098: 2087: 2074: 2052: 2043:northbound only 2032: 2021: 2006: 1981: 1969: 1954: 1945:northbound only 1932: 1910: 1889: 1877: 1862: 1840: 1819: 1797: 1783: 1756: 1745: 1730: 1718: 1703: 1681: 1660: 1653: 1650: 1644: 1625: 1624: 1617: 1315:FCC Construccion 1304:FCC Construccion 1283:Timișoara – Arad 1196:Salini Impregilo 762:Olt River Valley 389: 385: 384: 374: 370: 369: 361: 360: 344:Roads in Romania 211: 210: 192: 191: 178: 177: 165: 164: 152: 151: 138: 137: 124: 123: 110: 109: 103: 50: 38: 27: 19: 18: 8649: 8648: 8644: 8643: 8642: 8640: 8639: 8638: 8624: 8623: 8622: 8617: 8594:Colentina River 8571: 8542: 8493: 8466:European routes 8460: 8387: 8304: 8281: 8218: 8197: 8133: 8092: 8082: 8045:Bucharest Triaj 8027: 7999:Bucharest North 7968: 7945: 7917: 7889: 7872: 7870: 7858: 7856: 7847: 7845: 7836: 7834: 7825: 7823: 7814: 7812: 7803: 7801: 7772: 7756: 7725: 7697: 7692: 7662: 7657: 7596: 7541: 7515: 7485: 7472: 7446: 7400: 7335: 7330: 7269: 7264: 7263: 7254: 7253: 7249: 7240: 7239: 7235: 7226: 7225: 7221: 7212: 7211: 7207: 7197: 7195: 7190: 7189: 7185: 7176: 7174: 7169: 7168: 7164: 7154: 7152: 7147: 7146: 7142: 7132: 7130: 7121: 7120: 7116: 7107: 7106: 7099: 7083: 7082: 7076: 7074: 7070: 7063: 7061:"Archived copy" 7059: 7058: 7054: 7044: 7042: 7037: 7036: 7032: 7022: 7020: 7011: 7010: 7003: 6994: 6993: 6989: 6979: 6977: 6968: 6967: 6963: 6953: 6951: 6942: 6941: 6937: 6927: 6925: 6920: 6919: 6915: 6905: 6903: 6894: 6893: 6889: 6879: 6877: 6868: 6867: 6863: 6855: 6851: 6850: 6843: 6833: 6831: 6822: 6821: 6812: 6802: 6800: 6799:on 7 March 2021 6791: 6790: 6783: 6773: 6771: 6766: 6765: 6758: 6748: 6746: 6737: 6736: 6732: 6722: 6720: 6711: 6710: 6706: 6696: 6694: 6693:on 4 March 2016 6685: 6684: 6677: 6668: 6667: 6663: 6654: 6652: 6643: 6642: 6638: 6629: 6627: 6618: 6617: 6613: 6604: 6602: 6597: 6596: 6592: 6583: 6582: 6578: 6569: 6568: 6564: 6555: 6554: 6550: 6537: 6536: 6532: 6522: 6520: 6515: 6514: 6510: 6500: 6498: 6493: 6492: 6488: 6478: 6476: 6471: 6470: 6466: 6456: 6454: 6450: 6443: 6439: 6438: 6434: 6424: 6422: 6418: 6411: 6407: 6406: 6402: 6392: 6390: 6381: 6380: 6376: 6366: 6364: 6360: 6353: 6349: 6348: 6344: 6334: 6332: 6328: 6324: 6323: 6319: 6309: 6307: 6302: 6301: 6297: 6287: 6285: 6280: 6279: 6275: 6265: 6263: 6258: 6257: 6250: 6240: 6238: 6234: 6227: 6223: 6222: 6218: 6208: 6206: 6201: 6200: 6196: 6186: 6184: 6180: 6176: 6175: 6171: 6161: 6159: 6154: 6153: 6149: 6139: 6137: 6132: 6131: 6124: 6114: 6112: 6108: 6101: 6097: 6096: 6092: 6082: 6080: 6075: 6074: 6067: 6057: 6055: 6051: 6044: 6040: 6039: 6035: 6025: 6023: 6019: 6012: 6008: 6007: 6003: 5993: 5991: 5987: 5983: 5982: 5978: 5968: 5966: 5962: 5958: 5957: 5953: 5943: 5941: 5936: 5935: 5926: 5917: 5916: 5909: 5900: 5898: 5888: 5884: 5874: 5872: 5867: 5866: 5862: 5852: 5850: 5846: 5842: 5841: 5837: 5827: 5825: 5820: 5819: 5815: 5805: 5803: 5799: 5795: 5794: 5787: 5777: 5775: 5764: 5763: 5759: 5749: 5747: 5742: 5741: 5737: 5727: 5725: 5720: 5719: 5715: 5705: 5703: 5698: 5697: 5693: 5683: 5681: 5676: 5675: 5671: 5661: 5659: 5654: 5653: 5649: 5639: 5637: 5632: 5631: 5627: 5617: 5615: 5610: 5609: 5602: 5592: 5590: 5586: 5582: 5581: 5577: 5567: 5565: 5560: 5559: 5552: 5542: 5540: 5536: 5529: 5525: 5524: 5520: 5510: 5508: 5503: 5502: 5493: 5483: 5481: 5477: 5470: 5466: 5465: 5461: 5451: 5449: 5445: 5438: 5434: 5433: 5429: 5419: 5417: 5413: 5409: 5408: 5404: 5394: 5392: 5388: 5384: 5383: 5379: 5369: 5367: 5362: 5361: 5354: 5344: 5342: 5338: 5334: 5333: 5329: 5319: 5317: 5313: 5309: 5308: 5304: 5294: 5292: 5287: 5286: 5282: 5272: 5270: 5265: 5264: 5260: 5250: 5248: 5240: 5236: 5235: 5231: 5221: 5219: 5210: 5209: 5205: 5196: 5194: 5191:Stirileprotv.ro 5185: 5184: 5180: 5173: 5166: 5159: 5155: 5146: 5145: 5141: 5132: 5131: 5127: 5118: 5117: 5113: 5103: 5101: 5096: 5095: 5088: 5079: 5078: 5069: 5059: 5057: 5049: 5045: 5044: 5040: 5030: 5028: 5017: 5016: 5012: 5002: 5000: 4992: 4988: 4987: 4983: 4973: 4971: 4962: 4961: 4952: 4942: 4940: 4929: 4928: 4924: 4914: 4912: 4907: 4906: 4902: 4892: 4890: 4885: 4884: 4880: 4870: 4868: 4864: 4860: 4859: 4855: 4845: 4843: 4838: 4837: 4833: 4823: 4821: 4817: 4813: 4812: 4808: 4798: 4796: 4785: 4784: 4780: 4770: 4768: 4757: 4756: 4752: 4742: 4740: 4729: 4728: 4724: 4714: 4712: 4707: 4706: 4702: 4692: 4690: 4685: 4684: 4680: 4670: 4668: 4657: 4656: 4652: 4642: 4640: 4629: 4628: 4624: 4614: 4612: 4607: 4606: 4602: 4592: 4590: 4579: 4578: 4574: 4564: 4562: 4557: 4556: 4552: 4542: 4540: 4525: 4524: 4520: 4510: 4508: 4503: 4502: 4498: 4488: 4486: 4481: 4480: 4476: 4466: 4464: 4459: 4458: 4454: 4444: 4442: 4437: 4436: 4432: 4422: 4420: 4411: 4410: 4403: 4393: 4391: 4386: 4385: 4381: 4371: 4369: 4365: 4361: 4360: 4356: 4346: 4344: 4339: 4338: 4331: 4321: 4319: 4315: 4308: 4304: 4303: 4299: 4289: 4287: 4286:on 13 July 2015 4278: 4277: 4270: 4260: 4258: 4253: 4252: 4248: 4238: 4236: 4231: 4230: 4226: 4216: 4214: 4213:on 31 July 2020 4210: 4203: 4199: 4198: 4191: 4181: 4179: 4174: 4173: 4169: 4159: 4157: 4152: 4151: 4147: 4134: 4132: 4123: 4122: 4115: 4105: 4103: 4098: 4097: 4090: 4081: 4080: 4076: 4066: 4064: 4060: 4056: 4055: 4051: 4041: 4039: 4030: 4029: 4025: 4020: 4000:border crossing 3788:Sânnicolau Mare 3521:Topolovățu Mare 2490:Curtea de Argeș 1654: 1648: 1645: 1635:Please consult 1634: 1626: 1622: 1615: 1601: 1394: 1327: 1285: 1250: 1168:Topolovățu Mare 1076: 1028: 911: 909:Sibiu – Orăștie 890: 731:Curtea de Argeș 727:Curtea de Argeș 719: 717:Pitești – Sibiu 697:area (north of 660:segment on the 627: 622: 382: 380: 367: 365: 208: 189: 187: 175: 173: 162: 160: 149: 147: 135: 133: 121: 119: 107: 101: 86:Major junctions 73: 71: 41: 29:A1 motorway 28: 17: 12: 11: 5: 8647: 8637: 8636: 8619: 8618: 8616: 8615: 8607: 8601: 8598:Lake Herăstrău 8590: 8588: 8577: 8576: 8573: 8572: 8570: 8569: 8563: 8557: 8548: 8547: 8544: 8543: 8541: 8540: 8532: 8527: 8519: 8517: 8510: 8499: 8498: 8495: 8494: 8492: 8491: 8486: 8481: 8476: 8470: 8468: 8462: 8461: 8459: 8458: 8453: 8448: 8443: 8438: 8433: 8428: 8423: 8418: 8413: 8408: 8402: 8400: 8389: 8388: 8386: 8385: 8380: 8375: 8370: 8365: 8360: 8355: 8350: 8345: 8340: 8335: 8330: 8325: 8319: 8317: 8306: 8305: 8303: 8302: 8297: 8289: 8287: 8283: 8282: 8280: 8279: 8274: 8269: 8264: 8259: 8254: 8249: 8244: 8239: 8233: 8231: 8229:National roads 8220: 8219: 8217: 8216: 8207: 8205: 8199: 8198: 8196: 8195: 8187: 8182: 8177: 8172: 8166: 8164: 8150: 8139: 8138: 8135: 8134: 8132: 8131: 8121: 8116: 8114:Regio Călători 8111: 8106: 8100: 8098: 8094: 8093: 8091: 8090: 8080:Gara Progresul 8076: 8069: 8062: 8059:Bucureștii Noi 8055: 8052:Bucharest West 8048: 8041: 8034: 8022: 8017: 8012: 8007: 8002: 7994: 7992: 7985: 7974: 7973: 7970: 7969: 7967: 7966: 7960: 7958: 7947: 7946: 7944: 7943: 7938: 7932: 7930: 7919: 7918: 7916: 7915: 7910: 7904: 7902: 7891: 7890: 7888: 7887: 7882: 7874: M7  7868: 7860: M6  7854: 7849: M5  7843: 7838: M4  7832: 7827: M3  7821: 7816: M2  7810: 7805: M1  7798: 7796: 7782: 7778: 7777: 7774: 7773: 7771: 7770: 7764: 7762: 7758: 7757: 7755: 7754: 7749: 7744: 7739: 7733: 7731: 7727: 7726: 7724: 7723: 7712: 7710: 7703: 7699: 7698: 7691: 7690: 7683: 7676: 7668: 7659: 7658: 7656: 7655: 7650: 7645: 7640: 7635: 7630: 7625: 7620: 7615: 7610: 7604: 7602: 7598: 7597: 7595: 7594: 7589: 7584: 7579: 7574: 7569: 7564: 7559: 7553: 7551: 7547: 7546: 7543: 7542: 7540: 7539: 7534: 7529: 7523: 7521: 7517: 7516: 7514: 7513: 7508: 7502: 7500: 7493: 7487: 7486: 7479: 7477: 7474: 7473: 7471: 7470: 7465: 7460: 7454: 7452: 7448: 7447: 7445: 7444: 7439: 7434: 7429: 7424: 7419: 7414: 7408: 7406: 7402: 7401: 7399: 7398: 7393: 7388: 7383: 7378: 7373: 7368: 7363: 7358: 7352: 7350: 7343: 7337: 7336: 7329: 7328: 7321: 7314: 7306: 7300: 7299: 7294: 7289: 7284: 7279: 7268: 7267:External links 7265: 7262: 7261: 7247: 7233: 7219: 7205: 7183: 7162: 7140: 7114: 7097: 7052: 7030: 7001: 6987: 6961: 6935: 6913: 6887: 6861: 6841: 6830:on 9 June 2012 6810: 6781: 6756: 6730: 6704: 6675: 6661: 6636: 6624:www.hotnews.ro 6611: 6590: 6576: 6562: 6548: 6530: 6508: 6486: 6464: 6432: 6400: 6374: 6342: 6317: 6295: 6273: 6248: 6216: 6194: 6169: 6147: 6122: 6090: 6065: 6033: 6001: 5976: 5951: 5924: 5907: 5882: 5860: 5835: 5813: 5785: 5757: 5735: 5713: 5691: 5669: 5647: 5625: 5600: 5575: 5550: 5518: 5491: 5459: 5427: 5402: 5377: 5352: 5327: 5302: 5280: 5258: 5229: 5203: 5178: 5164: 5153: 5139: 5125: 5122:. 7 July 2019. 5111: 5086: 5067: 5038: 5010: 4981: 4950: 4922: 4900: 4878: 4853: 4831: 4806: 4778: 4750: 4722: 4700: 4678: 4650: 4622: 4600: 4572: 4550: 4518: 4496: 4474: 4452: 4430: 4401: 4379: 4354: 4329: 4297: 4268: 4246: 4224: 4189: 4167: 4145: 4131:on 14 May 2022 4113: 4088: 4074: 4049: 4022: 4021: 4019: 4016: 4013: 4012: 4009: 4002: 3990: 3987: 3979: 3978: 3975: 3973: 3970: 3967: 3959: 3958: 3955: 3948: 3943: 3940: 3932: 3931: 3928: 3926: 3923: 3920: 3912: 3911: 3908: 3901: 3896: 3893: 3885: 3884: 3881: 3874: 3865: 3862: 3854: 3853: 3850: 3843: 3834: 3831: 3823: 3822: 3819: 3817: 3812: 3809: 3801: 3800: 3797: 3790: 3777: 3774: 3766: 3765: 3762: 3755: 3749: 3746: 3738: 3737: 3734: 3732: 3729: 3726: 3718: 3717: 3714: 3707: 3698: 3695: 3687: 3686: 3683: 3676: 3667: 3664: 3656: 3655: 3652: 3650: 3647: 3644: 3636: 3635: 3632: 3625: 3612: 3609: 3601: 3600: 3595: 3588: 3575: 3572: 3564: 3563: 3558: 3556: 3553: 3550: 3542: 3541: 3538: 3531: 3518: 3515: 3507: 3506: 3503: 3501: 3498: 3495: 3487: 3486: 3483: 3481: 3476: 3473: 3465: 3464: 3461: 3459: 3454: 3451: 3443: 3442: 3439: 3432: 3427: 3424: 3416: 3415: 3412: 3410: 3407: 3404: 3396: 3395: 3392: 3385: 3376: 3373: 3365: 3364: 3362: 3360: 3357: 3354: 3346: 3345: 3342: 3335: 3330: 3327: 3319: 3318: 3312: 3311: 3308: 3301: 3296: 3293: 3285: 3284: 3281: 3279: 3276: 3273: 3265: 3264: 3261: 3254: 3249: 3246: 3238: 3237: 3234: 3227: 3218: 3215: 3207: 3206: 3203: 3201: 3198: 3195: 3187: 3186: 3183: 3171: 3162: 3159: 3151: 3150: 3147: 3145: 3140: 3137: 3129: 3128: 3125: 3113: 3100: 3097: 3089: 3088: 3085: 3083: 3080: 3077: 3069: 3068: 3065: 3058: 3053: 3050: 3042: 3041: 3038: 3036: 3033: 3030: 3022: 3021: 3018: 3011: 3005: 3002: 2994: 2993: 2990: 2983: 2974: 2971: 2963: 2962: 2959: 2952: 2939: 2936: 2928: 2927: 2924: 2912: 2906: 2903: 2895: 2894: 2891: 2889: 2886: 2883: 2875: 2874: 2871: 2859: 2854: 2851: 2843: 2842: 2839: 2832: 2827: 2824: 2816: 2815: 2812: 2810: 2808:Aciliu Viaduct 2805: 2802: 2794: 2793: 2790: 2778: 2773: 2770: 2762: 2761: 2758: 2756: 2753: 2750: 2742: 2741: 2738: 2736: 2733: 2730: 2722: 2721: 2718: 2711: 2698: 2695: 2687: 2686: 2683: 2676: 2667: 2664: 2656: 2655: 2652: 2650: 2644: 2641: 2633: 2632: 2629: 2622: 2613: 2610: 2602: 2601: 2598: 2586: 2577: 2574: 2566: 2565: 2562: 2560: 2557: 2554: 2546: 2545: 2542: 2535: 2530: 2527: 2519: 2518: 2512: 2511: 2508: 2496: 2494:Râmnicu Vâlcea 2483: 2480: 2472: 2471: 2469: 2467: 2462: 2459: 2451: 2450: 2447: 2435: 2418: 2415: 2407: 2406: 2404: 2402: 2397: 2394: 2386: 2385: 2383: 2381: 2378: 2375: 2367: 2366: 2363: 2351: 2338: 2335: 2327: 2326: 2321: 2314: 2305: 2302: 2294: 2293: 2290: 2283: 2278: 2275: 2267: 2266: 2264: 2257: 2254: 2251: 2243: 2242: 2239: 2232: 2227: 2224: 2216: 2215: 2213: 2211: 2205: 2202: 2194: 2193: 2190: 2183: 2178: 2175: 2167: 2166: 2164: 2162: 2156: 2153: 2145: 2144: 2141: 2134: 2129: 2126: 2118: 2117: 2114: 2107: 2102: 2099: 2091: 2090: 2088: 2081: 2078: 2075: 2067: 2066: 2063: 2061: 2056: 2053: 2045: 2044: 2041: 2039: 2036: 2033: 2025: 2024: 2022: 2015: 2010: 2007: 1999: 1998: 1996: 1994: 1985: 1982: 1974: 1973: 1970: 1963: 1961:Vânătorii Mici 1958: 1955: 1947: 1946: 1943: 1941: 1936: 1933: 1925: 1924: 1922: 1920: 1914: 1911: 1903: 1902: 1900: 1898: 1893: 1890: 1882: 1881: 1878: 1871: 1866: 1863: 1855: 1854: 1852: 1850: 1844: 1841: 1833: 1832: 1830: 1828: 1823: 1820: 1812: 1811: 1808: 1806: 1801: 1798: 1790: 1789: 1784: 1777: 1760: 1757: 1749: 1748: 1746: 1739: 1734: 1731: 1723: 1722: 1719: 1712: 1707: 1704: 1696: 1695: 1693: 1691: 1685: 1682: 1674: 1673: 1667: 1666: 1656: 1655: 1637:this guideline 1629: 1627: 1620: 1614: 1611: 1610: 1609: 1605: 1600: 1597: 1596: 1595: 1585: 1575: 1565: 1555: 1545: 1527: 1513: 1503: 1493: 1471: 1461: 1451: 1441: 1431: 1417: 1411: 1405: 1393: 1390: 1326: 1323: 1284: 1281: 1249: 1246: 1075: 1072: 1027: 1026:Orăștie – Deva 1024: 950:Aciliu viaduct 910: 907: 889: 886: 826:Râmnicu Vâlcea 718: 715: 667:oversize loads 626: 623: 621: 618: 395: 394: 391: 390: 377: 375: 357: 356: 355: 354: 348: 347: 337: 336: 335:Highway system 332: 331: 328: 327: 294: 290: 289: 248: 244: 243: 238: 234: 233: 229: 228: 225: 224: 205: 201: 200: 104: 98: 97: 92: 88: 87: 83: 82: 79: 75: 74: 69: 66: 62: 61: 57: 56: 52: 51: 43: 42: 39: 31: 30: 22: 15: 9: 6: 4: 3: 2: 8646: 8635: 8632: 8631: 8629: 8614: 8612: 8608: 8605: 8602: 8599: 8595: 8592: 8591: 8589: 8587: 8583: 8578: 8568: 8565: 8564: 8561: 8558: 8554: 8549: 8539: 8537: 8533: 8531: 8528: 8526: 8525: 8521: 8520: 8518: 8514: 8511: 8509: 8505: 8500: 8490: 8487: 8485: 8482: 8480: 8477: 8475: 8472: 8471: 8469: 8467: 8463: 8457: 8454: 8452: 8449: 8447: 8444: 8442: 8439: 8437: 8434: 8432: 8429: 8427: 8424: 8422: 8419: 8417: 8414: 8412: 8409: 8407: 8404: 8403: 8401: 8399: 8395: 8390: 8384: 8381: 8379: 8376: 8374: 8371: 8369: 8366: 8364: 8361: 8359: 8356: 8354: 8351: 8349: 8346: 8344: 8341: 8339: 8336: 8334: 8331: 8329: 8326: 8324: 8321: 8320: 8318: 8316: 8312: 8307: 8301: 8298: 8296: 8295: 8291: 8290: 8288: 8284: 8278: 8275: 8273: 8270: 8268: 8265: 8263: 8260: 8258: 8255: 8253: 8250: 8248: 8245: 8243: 8240: 8238: 8235: 8234: 8232: 8230: 8226: 8221: 8215: 8213: 8209: 8208: 8206: 8204: 8200: 8194: 8192: 8188: 8186: 8183: 8181: 8178: 8176: 8173: 8171: 8168: 8167: 8165: 8163: 8159: 8154: 8151: 8149: 8145: 8140: 8130: 8126: 8122: 8120: 8117: 8115: 8112: 8110: 8107: 8105: 8102: 8101: 8099: 8095: 8089: 8086: 8081: 8077: 8075: 8074: 8070: 8068: 8067: 8063: 8061: 8060: 8056: 8054: 8053: 8049: 8047: 8046: 8042: 8040: 8039: 8035: 8031: 8026: 8023: 8021: 8018: 8016: 8013: 8011: 8008: 8006: 8003: 8001: 8000: 7996: 7995: 7993: 7989: 7986: 7984: 7980: 7975: 7965: 7962: 7961: 7959: 7957: 7953: 7948: 7942: 7939: 7937: 7934: 7933: 7931: 7929: 7925: 7920: 7914: 7911: 7909: 7906: 7905: 7903: 7901: 7897: 7892: 7886: 7883: 7881: 7877: 7875: 7869: 7867: 7863: 7861: 7855: 7852: 7850: 7844: 7841: 7839: 7833: 7830: 7828: 7822: 7819: 7817: 7811: 7808: 7806: 7800: 7799: 7797: 7795: 7791: 7786: 7783: 7779: 7769: 7766: 7765: 7763: 7759: 7753: 7750: 7748: 7747:Ecotrans STCM 7745: 7743: 7740: 7738: 7735: 7734: 7732: 7728: 7722: 7718: 7714: 7713: 7711: 7707: 7704: 7700: 7696: 7689: 7684: 7682: 7677: 7675: 7670: 7669: 7666: 7654: 7651: 7649: 7646: 7644: 7641: 7639: 7636: 7634: 7631: 7629: 7626: 7624: 7621: 7619: 7616: 7614: 7611: 7609: 7606: 7605: 7603: 7599: 7593: 7590: 7588: 7585: 7583: 7580: 7578: 7575: 7573: 7570: 7568: 7565: 7563: 7560: 7558: 7555: 7554: 7552: 7548: 7538: 7535: 7533: 7530: 7528: 7525: 7524: 7522: 7518: 7512: 7509: 7507: 7504: 7503: 7501: 7497: 7494: 7492: 7488: 7483: 7469: 7466: 7464: 7461: 7459: 7456: 7455: 7453: 7449: 7443: 7440: 7438: 7435: 7433: 7430: 7428: 7425: 7423: 7420: 7418: 7415: 7413: 7410: 7409: 7407: 7403: 7397: 7394: 7392: 7389: 7387: 7384: 7382: 7379: 7377: 7374: 7372: 7369: 7367: 7364: 7362: 7359: 7357: 7354: 7353: 7351: 7347: 7344: 7342: 7338: 7334: 7327: 7322: 7320: 7315: 7313: 7308: 7307: 7304: 7298: 7295: 7293: 7290: 7288: 7285: 7283: 7280: 7278: 7274: 7271: 7270: 7257: 7251: 7243: 7237: 7229: 7223: 7215: 7209: 7193: 7187: 7172: 7166: 7150: 7144: 7128: 7124: 7118: 7110: 7104: 7102: 7093: 7087: 7073:on 2014-07-27 7069: 7062: 7056: 7040: 7034: 7018: 7014: 7008: 7006: 6997: 6991: 6975: 6971: 6965: 6949: 6945: 6939: 6923: 6917: 6901: 6897: 6891: 6875: 6871: 6865: 6854: 6848: 6846: 6829: 6825: 6819: 6817: 6815: 6798: 6794: 6788: 6786: 6769: 6763: 6761: 6744: 6740: 6734: 6718: 6714: 6708: 6692: 6688: 6682: 6680: 6671: 6665: 6651:(in Romanian) 6650: 6646: 6640: 6625: 6621: 6615: 6600: 6594: 6586: 6580: 6572: 6566: 6558: 6552: 6544: 6540: 6534: 6518: 6512: 6496: 6490: 6474: 6468: 6449: 6442: 6436: 6417: 6410: 6404: 6388: 6384: 6378: 6359: 6352: 6346: 6327: 6321: 6305: 6299: 6283: 6277: 6261: 6255: 6253: 6233: 6226: 6220: 6204: 6198: 6179: 6173: 6157: 6151: 6135: 6129: 6127: 6107: 6100: 6094: 6078: 6072: 6070: 6050: 6043: 6037: 6018: 6011: 6005: 5986: 5980: 5961: 5955: 5939: 5933: 5931: 5929: 5920: 5914: 5912: 5897: 5893: 5886: 5870: 5864: 5845: 5839: 5823: 5817: 5798: 5792: 5790: 5773: 5772: 5767: 5761: 5745: 5739: 5723: 5717: 5701: 5695: 5679: 5673: 5657: 5651: 5635: 5629: 5613: 5607: 5605: 5585: 5579: 5563: 5557: 5555: 5535: 5528: 5522: 5506: 5500: 5498: 5496: 5476: 5469: 5463: 5444: 5437: 5431: 5412: 5406: 5387: 5381: 5365: 5359: 5357: 5337: 5331: 5312: 5306: 5290: 5284: 5268: 5262: 5246: 5245:www.cnadnr.ro 5239: 5233: 5217: 5216:www.ziare.com 5213: 5207: 5193:(in Romanian) 5192: 5188: 5182: 5176: 5171: 5169: 5162: 5157: 5149: 5143: 5135: 5129: 5121: 5115: 5099: 5093: 5091: 5082: 5076: 5074: 5072: 5055: 5048: 5042: 5026: 5025: 5020: 5014: 4998: 4991: 4985: 4969: 4965: 4959: 4957: 4955: 4938: 4937: 4932: 4926: 4910: 4904: 4888: 4882: 4863: 4857: 4841: 4835: 4816: 4810: 4794: 4793: 4788: 4782: 4766: 4765: 4760: 4754: 4738: 4737: 4732: 4726: 4710: 4704: 4688: 4682: 4666: 4665: 4660: 4654: 4638: 4637: 4632: 4626: 4610: 4604: 4588: 4587: 4582: 4576: 4560: 4554: 4538: 4534: 4533: 4528: 4522: 4506: 4500: 4484: 4478: 4462: 4456: 4440: 4434: 4418: 4414: 4408: 4406: 4389: 4383: 4364: 4358: 4342: 4336: 4334: 4314: 4307: 4301: 4285: 4281: 4275: 4273: 4256: 4250: 4234: 4228: 4209: 4202: 4196: 4194: 4177: 4171: 4155: 4149: 4142: 4130: 4126: 4120: 4118: 4101: 4095: 4093: 4084: 4078: 4059: 4053: 4037: 4033: 4027: 4023: 4010: 4007: 4003: 4001: 3998: 3994: 3991: 3988: 3985: 3981: 3980: 3976: 3974: 3971: 3968: 3965: 3961: 3960: 3956: 3953: 3949: 3947: 3944: 3941: 3938: 3934: 3933: 3929: 3927: 3924: 3921: 3918: 3914: 3913: 3909: 3906: 3902: 3900: 3897: 3894: 3891: 3887: 3886: 3882: 3879: 3875: 3873: 3869: 3866: 3863: 3860: 3856: 3855: 3851: 3848: 3844: 3842: 3839:City Centre, 3838: 3835: 3832: 3829: 3825: 3824: 3820: 3818: 3816: 3813: 3810: 3807: 3803: 3802: 3798: 3795: 3791: 3789: 3785: 3781: 3778: 3775: 3772: 3768: 3767: 3763: 3760: 3756: 3753: 3750: 3747: 3744: 3740: 3739: 3735: 3733: 3730: 3727: 3724: 3720: 3719: 3715: 3712: 3708: 3706: 3702: 3699: 3696: 3693: 3689: 3688: 3684: 3681: 3677: 3675: 3671: 3668: 3665: 3662: 3658: 3657: 3653: 3651: 3648: 3645: 3642: 3638: 3637: 3633: 3630: 3626: 3624: 3620: 3616: 3613: 3610: 3607: 3603: 3602: 3599: 3596: 3593: 3589: 3587: 3583: 3579: 3576: 3573: 3570: 3566: 3565: 3562: 3559: 3557: 3554: 3551: 3548: 3544: 3543: 3539: 3536: 3532: 3530: 3526: 3522: 3519: 3516: 3513: 3509: 3508: 3504: 3502: 3499: 3496: 3493: 3489: 3488: 3484: 3482: 3480: 3477: 3474: 3471: 3467: 3466: 3462: 3460: 3458: 3455: 3452: 3449: 3445: 3444: 3440: 3437: 3433: 3431: 3428: 3425: 3422: 3418: 3417: 3413: 3411: 3408: 3405: 3402: 3398: 3397: 3393: 3390: 3386: 3384: 3380: 3377: 3374: 3371: 3367: 3366: 3363: 3361: 3358: 3355: 3352: 3348: 3347: 3343: 3340: 3336: 3334: 3331: 3328: 3325: 3321: 3320: 3317: 3313: 3309: 3306: 3302: 3300: 3297: 3294: 3291: 3287: 3286: 3282: 3280: 3277: 3274: 3271: 3267: 3266: 3262: 3259: 3255: 3253: 3250: 3247: 3244: 3240: 3239: 3235: 3232: 3228: 3226: 3222: 3219: 3216: 3213: 3209: 3208: 3204: 3202: 3199: 3196: 3193: 3189: 3188: 3184: 3181: 3176: 3172: 3170: 3166: 3163: 3160: 3157: 3153: 3152: 3148: 3146: 3144: 3141: 3138: 3135: 3131: 3130: 3126: 3123: 3118: 3114: 3112: 3108: 3104: 3101: 3098: 3095: 3091: 3090: 3086: 3084: 3081: 3078: 3075: 3071: 3070: 3066: 3063: 3059: 3057: 3054: 3051: 3048: 3044: 3043: 3039: 3037: 3034: 3031: 3028: 3024: 3023: 3019: 3016: 3012: 3009: 3006: 3003: 3000: 2996: 2995: 2991: 2988: 2984: 2982: 2978: 2975: 2972: 2969: 2965: 2964: 2960: 2957: 2953: 2951: 2947: 2943: 2940: 2937: 2934: 2930: 2929: 2925: 2922: 2917: 2913: 2910: 2907: 2904: 2901: 2897: 2896: 2892: 2890: 2887: 2884: 2881: 2877: 2876: 2872: 2869: 2864: 2860: 2858: 2855: 2852: 2849: 2845: 2844: 2840: 2837: 2833: 2831: 2830:Apoldu de Jos 2828: 2825: 2822: 2818: 2817: 2813: 2811: 2809: 2806: 2803: 2800: 2796: 2795: 2791: 2788: 2783: 2779: 2777: 2774: 2771: 2768: 2764: 2763: 2759: 2757: 2755:Săcel Tunnel 2754: 2751: 2748: 2744: 2743: 2739: 2737: 2734: 2731: 2728: 2724: 2723: 2719: 2716: 2712: 2710: 2709:Ocna Sibiului 2706: 2705:Sibiu Airport 2702: 2699: 2696: 2693: 2689: 2688: 2684: 2681: 2677: 2675: 2671: 2668: 2665: 2662: 2658: 2657: 2653: 2651: 2648: 2645: 2642: 2639: 2635: 2634: 2630: 2627: 2623: 2621: 2617: 2614: 2611: 2608: 2604: 2603: 2599: 2596: 2591: 2587: 2585: 2581: 2578: 2575: 2572: 2568: 2567: 2563: 2561: 2558: 2555: 2552: 2548: 2547: 2543: 2540: 2536: 2534: 2531: 2528: 2525: 2521: 2520: 2517: 2513: 2509: 2506: 2501: 2497: 2495: 2491: 2487: 2484: 2481: 2478: 2474: 2473: 2470: 2468: 2466: 2463: 2460: 2457: 2453: 2452: 2448: 2445: 2440: 2436: 2434: 2430: 2426: 2422: 2419: 2416: 2413: 2409: 2408: 2405: 2403: 2401: 2398: 2395: 2392: 2388: 2387: 2384: 2382: 2379: 2376: 2373: 2369: 2368: 2364: 2361: 2356: 2352: 2350: 2346: 2342: 2339: 2336: 2333: 2329: 2328: 2325: 2322: 2319: 2315: 2313: 2309: 2306: 2303: 2300: 2296: 2295: 2291: 2288: 2284: 2282: 2279: 2276: 2273: 2269: 2268: 2265: 2262: 2258: 2255: 2252: 2249: 2245: 2244: 2240: 2237: 2233: 2231: 2228: 2225: 2222: 2218: 2217: 2214: 2212: 2209: 2206: 2203: 2200: 2196: 2195: 2191: 2188: 2184: 2182: 2179: 2176: 2173: 2169: 2168: 2165: 2163: 2160: 2157: 2154: 2151: 2147: 2146: 2142: 2139: 2135: 2133: 2130: 2127: 2124: 2120: 2119: 2115: 2112: 2108: 2106: 2103: 2100: 2097: 2093: 2092: 2089: 2086: 2082: 2079: 2076: 2073: 2069: 2068: 2064: 2062: 2060: 2057: 2054: 2051: 2047: 2046: 2042: 2040: 2037: 2034: 2031: 2027: 2026: 2023: 2020: 2016: 2014: 2011: 2008: 2005: 2001: 2000: 1997: 1995: 1993: 1989: 1986: 1983: 1980: 1976: 1975: 1971: 1968: 1964: 1962: 1959: 1956: 1953: 1949: 1948: 1944: 1942: 1940: 1937: 1934: 1931: 1927: 1926: 1923: 1921: 1918: 1915: 1912: 1909: 1905: 1904: 1901: 1899: 1897: 1894: 1891: 1888: 1884: 1883: 1879: 1876: 1872: 1870: 1869:Bolintin Vale 1867: 1864: 1861: 1857: 1856: 1853: 1851: 1848: 1845: 1842: 1839: 1835: 1834: 1831: 1829: 1827: 1826:Bolintin Deal 1824: 1821: 1818: 1814: 1813: 1809: 1807: 1805: 1802: 1799: 1796: 1792: 1791: 1788: 1785: 1782: 1778: 1776: 1772: 1768: 1764: 1761: 1758: 1755: 1751: 1750: 1747: 1744: 1740: 1738: 1735: 1732: 1729: 1725: 1724: 1720: 1717: 1713: 1711: 1708: 1705: 1702: 1698: 1697: 1694: 1692: 1690: 1686: 1683: 1680: 1676: 1675: 1672: 1668: 1665: 1661: 1652: 1649:November 2021 1642: 1638: 1633: 1628: 1619: 1618: 1606: 1603: 1602: 1593: 1589: 1586: 1583: 1579: 1576: 1573: 1569: 1566: 1563: 1559: 1556: 1553: 1549: 1546: 1543: 1539: 1535: 1531: 1528: 1525: 1521: 1517: 1514: 1511: 1507: 1504: 1501: 1497: 1494: 1491: 1487: 1483: 1479: 1475: 1472: 1469: 1465: 1462: 1459: 1455: 1452: 1449: 1445: 1442: 1439: 1435: 1432: 1429: 1425: 1421: 1418: 1415: 1412: 1409: 1406: 1403: 1399: 1396: 1395: 1389: 1387: 1383: 1379: 1375: 1371: 1367: 1362: 1358: 1356: 1352: 1346: 1344: 1340: 1336: 1332: 1325:Arad – Nădlac 1322: 1320: 1316: 1311: 1309: 1305: 1300: 1298: 1294: 1290: 1280: 1276: 1274: 1273:Spedition UMB 1269: 1267: 1263: 1259: 1255: 1245: 1243: 1242:Spedition UMB 1237: 1233: 1231: 1226: 1223: 1218: 1213: 1209: 1205: 1201: 1197: 1193: 1189: 1185: 1184:Spedition UMB 1181: 1177: 1171: 1169: 1165: 1161: 1157: 1153: 1149: 1145: 1141: 1137: 1132: 1128: 1124: 1120: 1116: 1111: 1109: 1105: 1101: 1097: 1093: 1089: 1085: 1081: 1071: 1069: 1065: 1061: 1057: 1053: 1047: 1045: 1041: 1037: 1033: 1023: 1020: 1018: 1013: 1009: 1003: 1001: 996: 992: 987: 983: 979: 975: 971: 967: 963: 959: 955: 951: 947: 943: 938: 936: 932: 928: 924: 920: 916: 906: 903: 898: 893: 885: 883: 879: 875: 871: 867: 862: 859: 856: 854: 849: 846: 842: 840: 836: 831: 827: 822: 820: 816: 812: 808: 803: 799: 795: 791: 787: 783: 779: 774: 772: 767: 763: 759: 754: 752: 748: 744: 740: 736: 732: 728: 724: 714: 712: 708: 704: 700: 696: 692: 688: 684: 679: 676: 672: 668: 663: 659: 655: 651: 647: 642: 640: 636: 632: 617: 613: 609: 607: 603: 599: 595: 591: 587: 582: 580: 576: 572: 568: 564: 560: 556: 552: 548: 544: 540: 535: 531: 527: 523: 519: 515: 514:Autostrada A1 511: 507: 499: 495: 491: 484: 480: 476: 469: 465: 461: 457: 450: 446: 442: 435: 431: 424: 420: 416: 409: 405: 401: 388: 378: 376: 373: 363: 362: 358: 353: 350: 349: 346: 345: 341: 340: 338: 333: 329: 326: 322: 318: 314: 310: 306: 302: 298: 295: 291: 288: 284: 280: 276: 272: 268: 264: 260: 256: 252: 249: 245: 242: 239: 235: 230: 226: 222: 219:(border with 218: 214: 206: 204:West end 202: 199: 195: 185: 181: 172: 168: 159: 155: 145: 141: 131: 127: 117: 113: 105: 99: 96: 93: 91:East end 89: 84: 80: 76: 67: 63: 58: 53: 49: 44: 37: 32: 26: 20: 8609: 8534: 8522: 8315:County roads 8292: 8210: 8189: 8174: 8109:CFR Călători 8078: 8071: 8064: 8057: 8050: 8043: 8036: 7997: 7879: 7873: 7865: 7859: 7848: 7837: 7826: 7815: 7804: 7781:Mass transit 7416: 7360: 7250: 7236: 7222: 7208: 7196:. Retrieved 7186: 7175:. Retrieved 7165: 7153:. Retrieved 7143: 7131:. Retrieved 7127:the original 7117: 7075:. Retrieved 7068:the original 7055: 7043:. Retrieved 7033: 7021:. Retrieved 7017:the original 6990: 6978:. Retrieved 6974:the original 6964: 6952:. Retrieved 6948:the original 6938: 6926:. Retrieved 6916: 6904:. Retrieved 6900:the original 6890: 6878:. Retrieved 6874:the original 6864: 6832:. Retrieved 6828:the original 6801:. Retrieved 6797:the original 6772:. Retrieved 6747:. Retrieved 6743:the original 6733: 6721:. Retrieved 6717:the original 6707: 6695:. Retrieved 6691:the original 6664: 6653:. Retrieved 6648: 6639: 6628:. Retrieved 6623: 6614: 6603:. Retrieved 6601:. 2020-05-27 6593: 6579: 6565: 6551: 6542: 6533: 6521:. Retrieved 6511: 6499:. Retrieved 6489: 6477:. Retrieved 6467: 6455:. Retrieved 6448:the original 6435: 6423:. Retrieved 6416:the original 6403: 6391:. Retrieved 6387:the original 6377: 6365:. Retrieved 6358:the original 6345: 6333:. Retrieved 6320: 6308:. Retrieved 6298: 6286:. Retrieved 6276: 6264:. Retrieved 6239:. Retrieved 6232:the original 6219: 6207:. Retrieved 6197: 6185:. Retrieved 6172: 6160:. Retrieved 6150: 6138:. Retrieved 6113:. Retrieved 6106:the original 6093: 6081:. Retrieved 6056:. Retrieved 6049:the original 6036: 6024:. Retrieved 6017:the original 6004: 5992:. Retrieved 5979: 5967:. Retrieved 5954: 5942:. Retrieved 5899:, retrieved 5895: 5885: 5873:. Retrieved 5863: 5851:. Retrieved 5838: 5826:. Retrieved 5816: 5804:. Retrieved 5776:. Retrieved 5769: 5760: 5748:. Retrieved 5738: 5726:. Retrieved 5716: 5704:. Retrieved 5694: 5682:. Retrieved 5672: 5660:. Retrieved 5650: 5638:. Retrieved 5628: 5616:. Retrieved 5591:. Retrieved 5578: 5566:. Retrieved 5541:. Retrieved 5534:the original 5521: 5509:. Retrieved 5482:. Retrieved 5475:the original 5462: 5450:. Retrieved 5443:the original 5430: 5418:. Retrieved 5405: 5393:. Retrieved 5380: 5368:. Retrieved 5343:. Retrieved 5330: 5318:. Retrieved 5305: 5293:. Retrieved 5283: 5271:. Retrieved 5261: 5249:. Retrieved 5244: 5232: 5220:. Retrieved 5215: 5206: 5195:. Retrieved 5190: 5181: 5156: 5142: 5128: 5114: 5102:. Retrieved 5058:. Retrieved 5053: 5041: 5029:. Retrieved 5022: 5013: 5001:. Retrieved 4996: 4984: 4972:. Retrieved 4968:the original 4941:. Retrieved 4934: 4925: 4913:. Retrieved 4903: 4891:. Retrieved 4881: 4869:. Retrieved 4856: 4844:. Retrieved 4834: 4822:. Retrieved 4809: 4797:. Retrieved 4790: 4781: 4769:. Retrieved 4762: 4753: 4741:. Retrieved 4734: 4725: 4713:. Retrieved 4703: 4691:. Retrieved 4681: 4669:. Retrieved 4662: 4653: 4641:. Retrieved 4634: 4625: 4613:. Retrieved 4603: 4591:. Retrieved 4584: 4575: 4563:. Retrieved 4553: 4541:. Retrieved 4537:the original 4530: 4521: 4509:. Retrieved 4499: 4487:. Retrieved 4477: 4465:. Retrieved 4455: 4443:. Retrieved 4433: 4421:. Retrieved 4417:the original 4392:. Retrieved 4382: 4370:. Retrieved 4357: 4345:. Retrieved 4320:. Retrieved 4313:the original 4300: 4288:. Retrieved 4284:the original 4259:. Retrieved 4249: 4237:. Retrieved 4227: 4215:. Retrieved 4208:the original 4180:. Retrieved 4170: 4158:. Retrieved 4148: 4140: 4133:. Retrieved 4129:the original 4104:. Retrieved 4077: 4065:. Retrieved 4052: 4040:. Retrieved 4036:the original 4026: 3997:CsanĂĄdpalota 3930:opened 2015 3841:Arad Airport 3821:opened 2011 3736:opened 2014 3716:opened 2013 3654:opened 2012 3597: 3560: 3414:opened 2014 3315: 3185:opened 2012 3149:opened 2012 3087:opened 2013 3067:opened 2013 3040:opened 2014 2893:opened 2014 2760:opened 2013 2740:opened 2014 2649:City Centre 2515: 2323: 2292:opened 1972 2241:opened 1972 2192:opened 1972 2116:opened 1972 2065:opened 2013 1972:opened 1972 1880:opened 1972 1786: 1721:opened 1972 1670: 1663: 1646: 1631: 1524:M43 motorway 1370:M43 motorway 1363: 1359: 1347: 1328: 1312: 1301: 1286: 1277: 1270: 1260:(lot 1) and 1251: 1238: 1234: 1227: 1172: 1112: 1102:(lot 2) and 1077: 1074:Deva – Lugoj 1048: 1029: 1021: 1004: 939: 929:(lot 2) and 912: 894: 891: 888:Sibiu bypass 863: 860: 857: 850: 847: 843: 823: 775: 755: 720: 680: 678:rest areas. 643: 628: 614: 610: 583: 579:Via Carpatia 567:M43 motorway 505: 503: 342: 293:Major cities 81:1972–present 8604:Lacul Morii 8398:Local roads 8294:Motorway A0 8203:Expressways 8083: [ 8028: [ 7936:Tram routes 7913:Night Buses 7491:Expressways 7155:21 December 7133:21 December 7023:27 December 6980:19 November 6774:25 December 6042:"COMUNICAT" 5875:21 November 5828:6 September 5806:6 September 5778:6 September 5640:21 November 4974:6 September 4182:23 February 4160:23 February 3815:Mureș River 3383:Traian Vuia 3143:Mureș River 2950:Cluj-Napoca 2465:Argeș River 2400:Argeș River 2038:Restaurant 2013:Corbii Mari 1896:Argeș River 1775:1 Decembrie 1643:if you can. 1482:A6 motorway 1374:M5 motorway 1136:A6 motorway 1115:A6 motorway 837:plant near 807:A3 motorway 778:A3 motorway 662:A2 motorway 561:, reaching 506:A1 motorway 8286:Ring roads 7956:Trolleybus 7941:Light rail 7908:Bus routes 7499:In service 7349:In service 7177:2015-06-12 7077:2014-07-16 7045:11 January 6954:14 January 6928:11 January 6906:14 January 6749:4 December 6697:23 October 6655:2022-12-30 6630:2022-02-17 6605:2022-02-17 5896:HotNews.ro 5853:1 December 5197:2022-12-15 5031:8 November 5003:8 November 4125:"Agrepres" 4018:References 3479:Bega River 2981:Alba Iulia 2942:Alba Iulia 1737:Ciorogârla 466:segment – 116:Ciorogârla 8214:(planned) 8193:(planned) 8162:Motorways 8097:Operators 8020:Titan Sud 7880:(planned) 7866:(planned) 7702:Operators 7341:Motorways 7277:and lot 1 6880:24 August 6723:24 August 6543:imgur.con 5054:www.mt.ro 3701:Orțișoara 3670:Timișoara 3615:Timișoara 3578:Timișoara 2433:Bucharest 2429:Câmpulung 1689:Bucharest 1613:Exit list 1530:Timișoara 1434:Timișoara 1424:Timișoara 1398:Bucharest 1343:Romstrade 1289:Timișoara 1268:(lot 2). 1156:Timișoara 1144:Timișoara 1110:(lot 1). 1094:(lot 3), 1086:(lot 4), 1017:Impregilo 1012:Impregilo 1008:Impregilo 1000:Impregilo 995:Impregilo 991:Impregilo 954:Impregilo 937:(lot 1). 921:(lot 4), 802:Bucharest 780:(between 753:(lot 1). 745:(lot 2), 737:(lot 3), 729:(lot 5), 658:Cernavodă 646:Bucharest 631:Bucharest 586:Bucharest 555:Timișoara 539:Bucharest 528:with the 526:Bucharest 479:Timișoara 404:Bucharest 321:Timișoara 297:Bucharest 279:Hunedoara 259:Dâmbovița 186:(planned) 184:Timișoara 146:(planned) 132:(planned) 95:Bucharest 8628:Category 8516:Airports 8119:Softrans 7991:Stations 7721:Metrorex 7173:. ARADON 7151:. CNADNR 7086:cite web 6523:9 August 6501:9 August 6479:9 August 6457:9 August 6425:9 August 6393:9 August 6367:9 August 6335:9 August 6310:9 August 6288:9 August 6266:9 August 6241:9 August 6209:9 August 6187:9 August 6162:9 August 6140:9 August 6115:9 August 6083:9 August 6058:9 August 6026:9 August 5994:9 August 5969:9 August 5944:9 August 5901:31 March 5750:8 August 5728:8 August 5706:8 August 5684:8 August 5662:8 August 5618:8 August 5593:9 August 5568:8 August 5543:9 August 5511:9 August 5484:8 August 5452:8 August 5420:9 August 5395:8 August 5370:1 August 5345:9 August 5320:9 August 5295:1 August 5273:1 August 5251:8 August 5222:1 August 4846:9 August 4322:8 August 3972:Parking 3925:Parking 3784:Zădăreni 3731:Parking 3672:North / 3649:Parking 3586:Belgrade 3582:Moravița 3580:South / 3555:Parking 3500:Parking 3409:Parking 3379:Dumbrava 3359:Parking 3299:Coșevița 3278:Parking 3225:Săvârșin 3200:Parking 3082:Parking 3035:Parking 2979:North / 2888:Parking 2735:Parking 2672:North / 2584:Tălmaciu 2582:South / 2559:Parking 2488:North / 2380:Parking 2343:South / 2230:Căteasca 1771:Domnești 1490:Dumbrava 1382:Budapest 1355:Max BĂśgl 1299:bypass. 1266:Șanovița 1254:Giarmata 1217:Brănișca 1212:ecoducts 1200:Coșevița 1192:Coșevița 1188:Dumbrava 1164:Șanovița 1152:Șanovița 1140:Dumbrava 1131:Dumbrava 1127:Șanovița 1108:Șanovița 1104:Dumbrava 1100:Dumbrava 1096:Coșevița 1092:Coșevița 811:Comarnic 809:between 782:Comarnic 739:Racovița 735:Racovița 641:bypass. 620:Sections 518:motorway 510:Romanian 352:Highways 247:Counties 232:Location 8556:Cycling 8010:Băneasa 8005:Basarab 7451:Planned 7198:7 March 6834:12 June 6803:17 June 6539:"Image" 5771:YouTube 5060:26 July 5024:HotNews 4943:26 July 4936:HotNews 4915:26 July 4893:26 July 4871:26 July 4824:26 July 4799:26 July 4771:26 July 4764:HotNews 4743:26 July 4736:HotNews 4715:26 July 4693:26 July 4671:26 July 4664:HotNews 4643:26 July 4615:26 July 4593:26 July 4565:26 July 4543:26 July 4511:26 July 4489:26 July 4467:26 July 4445:26 July 4423:26 July 4394:26 July 4372:26 July 4347:26 July 4290:26 July 4261:26 July 4239:26 July 4217:26 July 4067:26 July 4042:26 July 3989:km 584 3969:km 584 3942:km 582 3922:km 559 3895:km 556 3870:North, 3864:km 545 3833:km 542 3811:km 540 3776:km 538 3748:km 536 3728:km 530 3705:Seceani 3697:km 516 3666:km 503 3646:km 500 3611:km 494 3598:planned 3574:km 493 3552:km 481 3517:km 474 3497:km 471 3475:km 467 3453:km 465 3426:km 458 3406:km 447 3375:km 441 3356:km 428 3333:Margina 3329:km 425 3295:km 411 3275:km 409 3248:km 402 3217:km 391 3197:km 389 3161:km 368 3139:km 355 3103:Simeria 3099:km 353 3079:km 340 3056:Orăștie 3052:km 335 3032:km 316 3004:km 312 2973:km 309 2938:km 308 2905:km 304 2885:km 296 2853:km 293 2826:km 281 2804:km 271 2776:Săliște 2772:km 269 2752:km 264 2732:km 260 2697:km 254 2666:km 247 2643:km 244 2618:East / 2612:km 243 2576:km 238 2556:km 229 2529:km 225 2486:Pitești 2482:km 120 2461:km 118 2425:Mioveni 2423:East / 2421:Pitești 2417:km 115 2396:km 110 2377:km 109 2349:Craiova 2345:Slatina 2341:Pitești 2337:km 106 2312:Craiova 2308:Slatina 2304:km 104 2277:km 102 2256:Cireșu 2080:Olteni 2059:Gazprom 1767:Otopeni 1763:Chitila 1588:Pitești 1548:Orăștie 1496:Orăștie 1464:Orăștie 1458:Orăștie 1454:Simeria 1448:Simeria 1408:Pitești 1402:Pitești 1366:Hungary 1351:Astaldi 1319:Astaldi 1230:Margina 1068:Simeria 1064:Orăștie 1056:Simeria 1052:Strabag 1040:Simeria 1036:Simeria 1032:Orăștie 978:Astaldi 966:Strabag 958:Orăștie 946:Săliște 935:Orăștie 923:Săliște 919:Săliște 866:Astaldi 839:Pitești 798:Făgăraș 723:Pitești 711:Pitești 699:Pitești 691:Pitești 687:Astaldi 683:Pitești 675:Astaldi 654:Fetești 650:Pitești 639:Pitești 635:Pitești 602:Margina 590:Pitești 581:route. 563:Hungary 543:Pitești 534:Crișana 522:Romania 464:Orăștie 449:Săliște 423:Pitești 419:Pitești 408:Pitești 313:Orăștie 301:Pitești 255:Giurgiu 241:Romania 237:Country 221:Hungary 130:Pitești 78:Existed 8378:DJ601A 8363:DJ401D 8353:DJ301B 8348:DJ301A 8333:DJ200B 8328:DJ200A 8066:Pajura 4586:Gândul 4135:11 May 4106:11 May 3993:Nădlac 3946:Nădlac 3899:Pecica 3872:Oradea 3754:South 3674:Lipova 3617:East, 3529:Buziaș 3525:Lipova 3169:Șoimuș 2703:West, 2674:Mediaș 2620:Agnita 2253:km 97 2226:km 94 2208:Petrom 2204:km 94 2177:km 86 2155:km 80 2132:Găești 2128:km 73 2105:Găești 2101:km 70 2077:km 63 2055:km 59 2035:km 56 2009:km 49 1984:km 49 1957:km 44 1939:Lukoil 1935:km 42 1917:Petrom 1913:km 36 1892:km 35 1865:km 30 1847:Lukoil 1843:km 30 1822:km 22 1800:km 18 1759:km 18 1733:km 13 1706:km 11 1684:km 10 1516:Nădlac 1506:Nădlac 1486:Balinț 1484:(near 1386:Nădlac 1378:Serbia 1339:Pecica 1331:Nădlac 1222:Mintia 1180:Șoimuș 1125:. The 1119:Balinț 1080:Șoimuș 968:, the 905:2010. 828:, the 815:Brașov 786:Brașov 695:Bascov 606:Nădlac 598:Holdea 571:Nădlac 267:Vâlcea 217:Nădlac 65:Length 8586:Water 8456:DC122 8451:DC121 8446:DC101 8441:DC77A 8383:DJ602 8373:DJ601 8368:DJ503 8358:DJ401 8343:DJ301 8338:DJ300 8323:DJ200 8148:Roads 8087:] 8032:] 7794:Metro 7709:Metro 7653:DN73A 7638:DN68A 7633:DN67C 7537:DEx12 7511:DEx16 7506:DEx12 7071:(PDF) 7064:(PDF) 6856:(PDF) 6451:(PDF) 6444:(PDF) 6419:(PDF) 6412:(PDF) 6361:(PDF) 6354:(PDF) 6329:(PDF) 6235:(PDF) 6228:(PDF) 6181:(PDF) 6109:(PDF) 6102:(PDF) 6052:(PDF) 6045:(PDF) 6020:(PDF) 6013:(PDF) 5988:(PDF) 5963:(PDF) 5847:(PDF) 5800:(PDF) 5587:(PDF) 5537:(PDF) 5530:(PDF) 5478:(PDF) 5471:(PDF) 5446:(PDF) 5439:(PDF) 5414:(PDF) 5389:(PDF) 5339:(PDF) 5314:(PDF) 5241:(PDF) 5104:3 May 5050:(PDF) 4993:(PDF) 4865:(PDF) 4818:(PDF) 4366:(PDF) 4316:(PDF) 4309:(PDF) 4211:(PDF) 4204:(PDF) 4061:(PDF) 3623:Lugoj 3430:Lugoj 3252:Dobra 3111:Hațeg 3107:Călan 3010:West 3008:Sebeș 2977:Sebeș 2946:Turda 2911:East 2909:Sebeș 2857:Cunța 2701:Sibiu 2670:Sibiu 2647:Sibiu 2616:Sibiu 2580:Sibiu 2533:Boița 2281:Oarja 1608:2022. 1592:Sibiu 1578:Lugoj 1568:Lugoj 1558:Lugoj 1552:Sibiu 1538:Lugoj 1534:Lugoj 1500:Sibiu 1474:Lugoj 1468:Sibiu 1438:Lugoj 1414:Sibiu 1262:Izvin 1258:Izvin 1208:Comsa 1160:Lugoj 1148:Lugoj 1123:Lugoj 974:Sibiu 970:Sebeș 962:Sebeș 942:Cunța 931:Sebeș 927:Sebeș 915:Sibiu 897:Sibiu 882:Boița 878:Sibiu 835:Dacia 790:Sibiu 751:Sibiu 747:Boița 743:Boița 594:Boița 569:near 547:Sibiu 530:Banat 468:Sebeș 460:Sebeș 445:Sibiu 434:Sibiu 309:Sebeș 305:Sibiu 283:Timiș 271:Sibiu 263:Argeș 251:Ilfov 182:near 171:Lugoj 169:near 158:Sebeș 144:Sibiu 142:near 128:near 114:near 8436:DC55 8431:DC27 8426:DC24 8421:DC22 8416:DC21 8411:DC18 8406:DC13 8277:DNCB 8242:DN1A 8212:DEx2 7983:Rail 7928:Tram 7648:DN73 7643:DN7C 7628:DN28 7623:DN21 7618:DN10 7613:DN1B 7608:DN1A 7592:DNCB 7532:DEx6 7527:DEx4 7200:2017 7157:2013 7135:2013 7092:link 7047:2014 7025:2013 6982:2013 6956:2014 6930:2014 6908:2014 6882:2012 6836:2012 6805:2013 6776:2015 6751:2013 6725:2012 6699:2012 6525:2015 6503:2015 6481:2015 6459:2015 6427:2015 6395:2015 6369:2015 6337:2015 6312:2015 6290:2015 6268:2015 6243:2015 6211:2015 6189:2015 6164:2015 6142:2015 6117:2015 6085:2015 6060:2015 6028:2015 5996:2015 5971:2015 5946:2015 5903:2016 5877:2015 5855:2015 5830:2015 5808:2015 5780:2015 5752:2015 5730:2015 5708:2015 5686:2015 5664:2015 5642:2015 5620:2015 5595:2015 5570:2015 5545:2015 5513:2015 5486:2015 5454:2015 5422:2015 5397:2015 5372:2015 5347:2015 5322:2015 5297:2015 5275:2015 5253:2015 5224:2015 5106:2019 5062:2015 5033:2015 5005:2015 4976:2015 4945:2015 4917:2015 4895:2015 4873:2015 4848:2015 4826:2015 4801:2015 4773:2015 4745:2015 4717:2015 4695:2015 4673:2015 4645:2015 4617:2015 4595:2015 4567:2015 4545:2015 4513:2015 4491:2015 4469:2015 4447:2015 4425:2015 4396:2015 4374:2015 4349:2015 4324:2015 4292:2015 4263:2015 4241:2015 4219:2015 4184:2023 4162:2023 4137:2020 4108:2020 4069:2015 4044:2015 3868:Arad 3837:Arad 3780:Arad 3752:Arad 3221:Ilia 3165:Deva 2181:Teiu 1804:Bâcu 1582:Deva 1572:Deva 1562:Deva 1542:Deva 1520:Arad 1510:Arad 1478:Deva 1444:Deva 1428:Arad 1420:Arad 1353:and 1335:Arad 1333:and 1308:Porr 1297:Arad 1295:and 1293:Arad 1204:Ilia 1176:Ilia 1138:and 1088:Ilia 1084:Ilia 1060:Deva 1044:Deva 1038:and 874:Mapa 870:Porr 853:Porr 813:and 784:and 707:DN7C 705:and 681:The 644:The 637:and 559:Arad 551:Deva 532:and 504:The 498:Arad 494:Arad 483:Arad 325:Arad 317:Deva 287:Arad 275:Alba 198:Arad 194:A 11 154:A 10 140:A 13 126:A 12 8508:Air 8489:E85 8484:E81 8479:E70 8474:E60 8272:DN7 8267:DN6 8262:DN5 8257:DN4 8252:DN3 8247:DN2 8237:DN1 7900:Bus 7768:STB 7742:STV 7737:STB 7730:Bus 7587:DN7 7582:DN6 7577:DN5 7572:DN4 7567:DN3 7562:DN2 7557:DN1 7468:A14 7442:A13 7437:A11 7396:A11 7391:A10 2159:MOL 1992:MOL 1988:OMV 1368:'s 1166:to 902:DN1 703:DN7 671:DN7 565:'s 520:in 387:A 2 372:A 0 215:at 213:M43 196:at 180:A 9 167:A 6 156:at 112:A 0 8630:: 8596:: 8191:A5 8185:A3 8180:A2 8175:A1 8170:A0 8085:ro 8030:ro 7463:A9 7458:A5 7432:A8 7427:A7 7422:A3 7417:A1 7412:A0 7386:A7 7381:A6 7376:A4 7371:A3 7366:A2 7361:A1 7356:A0 7275:, 7100:^ 7088:}} 7084:{{ 7004:^ 6844:^ 6813:^ 6784:^ 6759:^ 6678:^ 6647:. 6622:. 6541:. 6251:^ 6125:^ 6068:^ 5927:^ 5910:^ 5894:, 5788:^ 5768:. 5603:^ 5553:^ 5494:^ 5355:^ 5243:. 5214:. 5189:. 5167:^ 5089:^ 5070:^ 5052:. 5021:. 4995:. 4953:^ 4933:. 4789:. 4761:. 4733:. 4661:. 4633:. 4583:. 4529:. 4404:^ 4332:^ 4271:^ 4192:^ 4139:. 4116:^ 4091:^ 3995:– 3786:, 3782:/ 3703:/ 3621:/ 3584:, 3527:, 3523:/ 3381:/ 3223:, 3167:/ 3109:/ 3105:, 2948:, 2944:, 2707:, 2492:, 2431:, 2427:, 2347:, 2310:, 1990:/ 1773:, 1769:/ 1765:, 1590:– 1580:– 1570:– 1560:– 1550:– 1540:– 1532:– 1518:– 1508:– 1498:– 1476:– 1466:– 1456:– 1446:– 1436:– 1422:– 1400:– 1291:– 1264:– 1256:– 1202:– 1190:– 1178:– 1158:– 1146:– 1129:– 1106:– 1098:– 1090:– 1082:– 1066:– 1058:– 1046:. 1042:– 1034:– 1002:. 960:– 944:– 933:– 917:– 880:- 749:– 741:– 725:– 656:– 648:– 633:– 604:– 596:– 588:– 557:, 553:, 549:, 545:, 512:: 481:– 462:– 447:– 406:– 379:→ 364:← 323:, 319:, 315:, 311:, 307:, 303:, 299:, 285:, 281:, 277:, 273:, 269:, 265:, 261:, 257:, 253:, 7687:e 7680:t 7673:v 7325:e 7318:t 7311:v 7258:. 7216:. 7202:. 7180:. 7159:. 7137:. 7111:. 7094:) 7080:. 7049:. 7027:. 6984:. 6958:. 6932:. 6910:. 6884:. 6838:. 6807:. 6778:. 6753:. 6727:. 6701:. 6658:. 6633:. 6608:. 6573:. 6559:. 6545:. 6527:. 6505:. 6483:. 6461:. 6429:. 6397:. 6371:. 6339:. 6314:. 6292:. 6270:. 6245:. 6213:. 6191:. 6166:. 6144:. 6119:. 6087:. 6062:. 6030:. 5998:. 5973:. 5948:. 5921:. 5879:. 5857:. 5832:. 5810:. 5782:. 5754:. 5732:. 5710:. 5688:. 5666:. 5644:. 5622:. 5597:. 5572:. 5547:. 5515:. 5488:. 5456:. 5424:. 5399:. 5374:. 5349:. 5324:. 5299:. 5277:. 5255:. 5226:. 5200:. 5150:. 5136:. 5108:. 5083:. 5064:. 5035:. 5007:. 4978:. 4947:. 4919:. 4897:. 4875:. 4850:. 4828:. 4803:. 4775:. 4747:. 4719:. 4697:. 4675:. 4647:. 4619:. 4597:. 4569:. 4547:. 4515:. 4493:. 4471:. 4449:. 4427:. 4398:. 4376:. 4351:. 4326:. 4294:. 4265:. 4243:. 4221:. 4186:. 4164:. 4110:. 4071:. 4046:. 1651:) 1647:( 1492:. 508:( 223:)

Index

A1 motorway shield}}

A1 (Rumänien) 03.JPG
Bucharest
A 0
Ciorogârla
A 12
Pitești
A 13
Sibiu
A 10
Sebeș
A 6
Lugoj
A 9
Timișoara
A 11
Arad
M43
Nădlac
Hungary
Romania
Ilfov
Giurgiu
Dâmbovița
Argeș
Vâlcea
Sibiu
Alba
Hunedoara

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑