Ancillary services (electric power)

Source đź“ť

485:(V2G). Plug-in electric vehicles have the ability to supply power at a fast rate which enables them to be used like spinning reserves and provide grid stability with the increased use of intermittent generation such as wind and solar. According to the study cited in the reference, which compared the profitability of offering operating reserve ancillary service with the sales of V2G energy from a fleet of vehicles, providing operating reserve regulation service is more profitable than selling V2G energy alone. However, the technologies to utilize electric vehicles to provide ancillary services are not yet widely implemented, but there is much anticipation of their potential. 449:
ancillary services that are traditionally provided by spinning generators and voltage regulators. These services include reactive power compensation, voltage regulation, flicker control, active power filtering and harmonic cancellation. Wind turbines with variable-speed generators have the potential to add
448:
The grid integration of renewable generation simultaneously requires additional ancillary services and has the potential to provide ancillary services to the grid. The inverters that are installed with distributed generation systems and roof top solar systems have the potential to provide many of the
439:
are generators that are already online and can rapidly increase their power output to meet fast changes in demand. Spinning reserves are required because demand can vary on short timescales and rapid response is needed. Other operating reserves are generators that can be dispatched by the operator to
480:
have the potential to be utilized to provide ancillary services to the grid, specifically load regulation and spinning reserves. Plug-in electric vehicles can behave like distributed energy storage and have the potential to discharge power back to the grid through bidirectional flow, referred to as
130:
Frequency control refers to the need to ensure that the grid frequency stays within a specific range of the nominal frequency. Mismatch between electricity generation and demand causes variations in frequency, so control services are required to bring the frequency back to its nominal value and
401:
Scheduling and dispatch are necessary because in most electrical systems energy storage is nearly zero, so at any instant, the power into the system (produced by a generator) must equal the power out of the system (demand from consumers). Since production must so closely match demand, careful
60:
that are required to maintain grid stability and security. These services generally include active power control or frequency control and reactive power control or voltage control, on various timescales. Traditionally, ancillary services have been provided by large production units such as
384:
can be used to compensate the voltage drops, but must be provided closer to the loads than real power needs (this is because reactive power tend to travel badly through the grid). Notice that voltage can be controlled also using
44:"Ancillary services are all services required by the transmission or distribution system operator to enable them to maintain the integrity and stability of the transmission or distribution system as well as the power quality". 305: 51:
that facilitate and support the continuous flow of electricity, so that the demand for electrical energy is met in real time. The term ancillary services is used to refer to a variety of operations beyond
823:
U.S. Federal Energy Regulatory Commission 1995, Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities, Docket RM95-8-000, Washington, DC, March
412:
Scheduling refers to before-the-fact actions (like scheduling a generator to produce a certain amount of power the next week), while dispatch refers to the real-time control of the available resources.
205: 357: 409:
or transmission system operator, both are services dedicated to the commitment and coordination of the generation and transmission units in order to maintain the reliability of the power grid.
689: 666: 440:
meet demand, but that cannot respond as quickly as spinning reserves, and grid battery storage that can respond within tens of milliseconds, generally faster than even spinning reserve.
600:
Ahmadimanesh, A., and M. Kalantar. "A novel cost reducing reactive power market structure for modifying mandatory generation regions of producers." Energy Policy 108 (2017): 702-711.
461:
began requiring synthetic inertia in 2005 as the first grid operator, demanding a temporary 6% power boost when countering frequency drop by combining the power electronics with the
582:
Rebours, Yann G., et al. "A survey of frequency and voltage control ancillary services—Part I: Technical features." Power Systems, IEEE Transactions on 22.1 (2007): 350-357.
378:
Consumer loads expect voltage within a certain range, and the regulators require it be within a certain percent of the nominal voltage (for example, in the US it is ±5%).
609:
Sortomme, Eric, and Mohamed A. El-Sharkawi. "Optimal scheduling of vehicle-to-grid energy and ancillary services." Smart Grid, IEEE Transactions on 3.1 (2012): 351-359.
815:
Joos, G., et al. "The potential of distributed generation to provide ancillary services." Power Engineering Society Summer Meeting, 2000. IEEE. Vol. 3. IEEE, 2000.
618:
Lalor, Gillian, Alan Mullane, and Mark O'Malley. "Frequency control and wind turbine technologies." Power Systems, IEEE Transactions on 20.4 (2005): p. 1905-1913.
37:
to consumers given the obligations of control areas and transmission utilities within those control areas to maintain reliable operations of the interconnected
457:
tested the 131 MW Tule wind farm's synchronverter in 2018, and found it could perform some of the grid services similar or better than traditional generators.
218: 681: 658: 743: 373: 93: 542:"A Critical Review of Demand Response Products as Resource for Ancillary Services: International Experience and Policy Recommendations" 139: 828: 314: 852: 827:
E. Hirst and B. Kirby, “Ancillary Services,” Oak Ridge National Laboratory, Technical Report ORNL/CON 310, February 1996.
628: 629:"The utilization of synthetic inertia from wind farms and its impact on existing speed governors and system performance" 528:
Thermal Working Group .(2004). Ancillary Services Unbundling Electricity Products – an Emerging Market. retrieved form
213:
is the change in power of the system. If we have multiple generators, each might have its own R. Beta can be found by:
17: 361:
This simple equation can be rearranged to find the change in power that corresponds to a given change in frequency.
529: 435:
is a generator that can quickly be dispatched to ensure that there is sufficient energy generation to meet load.
134:
If we have a graph for a generator where frequency is on the vertical axis and power is on the horizontal axis:
494: 837: 406: 57: 38: 721: 381: 540:
Ribó-Pérez, David; Larrosa-López, Luis; Pecondón-Tricas, David; Alcázar-Ortega, Manuel (January 2021).
504: 833:
Operations, Power Exchange. "Guide to Ancillary Services in the National Electricity Market." (2010).
499: 53: 682:"Wind plants can provide grid services similar to gas, hydro, easing renewables integration: CAISO" 477: 466: 702: 70: 591:
Glover, J. Duncan, et al. Power System Analysis & Design. 6th ed., Cengage Learning, 2017.
62: 769:
Chandra Mouli, Gautham Ram; Kefayati, Mahdi; Baldick, Ross; Bauer, Pavol (16 October 2017).
829:
https://web.archive.org/web/20150225160053/http://web.ornl.gov/~webworks/cpr/rpt/84170.pdf
645:
Installing wind turbines with synthetic inertia is a way of preventing this deterioration.
8: 509: 89:, Frequency Containment Reserve (FCR), and Automatic Frequency Restoration Reserve (aFRR) 798: 771:"Integrated PV Charging of EV Fleet Based on Energy Prices, V2G, and Offer of Reserves" 47:
Ancillary services are specialty services and functions provided by actors within the
790: 744:"Network Code on Requirements for Grid Connection Applicable to all Generators (RfG)" 462: 450: 432: 390: 386: 86: 539: 802: 782: 563: 553: 436: 300:{\displaystyle \beta ={\frac {1}{R_{1}}}+{\frac {1}{R_{2}}}+...+{\frac {1}{R_{n}}}} 482: 458: 770: 428:), operating reserves help make up the difference when production is too low. 65:. With the integration of more intermittent generation and the development of 33:
are the services necessary to support the transmission of electric power from
846: 794: 786: 48: 836:
ARENAWIRE, “What is Frequency Control Ancillary Services?” February 1996.
632: 104: 69:
technologies, the provision of ancillary services is extended to smaller
34: 568: 838:
https://arena.gov.au/blog/what-is-frequency-control-ancillary-services/
558: 541: 66: 309:
The change in frequency due to a change in power can be found with:
659:"How a Single UK Turbine Could Prove a New Use Case for Wind Power" 768: 747: 706: 454: 469:. Similar requirements came into effect in Europe in 2016. 424:
Since production and demand must match so perfectly (see
200:{\displaystyle slope=-R={\frac {\Delta f}{\Delta P_{m}}}} 722:"Can Synthetic Inertia from Wind Power Stabilize Grids?" 352:{\displaystyle \Delta f={\frac {\Delta P_{m}}{\beta }}} 81:
There are two broad categories of ancillary services:
27:
Services to support the transmission of electric power
367: 317: 221: 142: 100:
Other types of ancillary services provision include:
631:. ELFORSK. 2013. p. 6 (Summary). Archived from 351: 299: 199: 844: 76: 453:to the grid and assist in frequency control. 374:Voltage control and reactive power management 425: 396: 679: 567: 557: 719: 713: 443: 402:scheduling and dispatch are necessary. 14: 845: 657:Early, Catherine (30 September 2020). 131:ensure it does not vary out of range. 656: 419: 669:from the original on 3 October 2020. 472: 125: 24: 720:Fairley, Peter (7 November 2016). 703:Tuel Wind Power Plant Test Results 680:Balaraman, Kavya (13 March 2020). 368:Reactive power and voltage control 330: 318: 181: 173: 94:reactive power and voltage control 25: 864: 692:from the original on 2020-03-16. 809: 775:IEEE Transactions on Smart Grid 762: 736: 696: 673: 650: 621: 612: 603: 594: 585: 576: 533: 522: 13: 1: 515: 495:National Grid Reserve Service 7: 853:Electric power transmission 488: 407:independent system operator 77:Types of ancillary services 10: 869: 505:Load following power plant 371: 500:Availability-based tariff 478:Plug-in electric vehicles 405:Usually performed by the 96:and congestion management 787:10.1109/TSG.2017.2763683 426:Scheduling and dispatch 397:Scheduling and dispatch 109:scheduling and dispatch 92:Non-frequency related: 73:and consumption units. 663:www.greentechmedia.com 353: 301: 201: 71:distributed generation 63:synchronous generators 354: 302: 202: 444:Renewable generation 315: 219: 140: 510:Virtual power plant 85:Frequency related: 39:transmission system 559:10.3390/en14040846 467:wind turbine rotor 463:rotational inertia 420:Operating reserves 391:voltage regulators 349: 297: 197: 31:Ancillary services 473:Electric vehicles 451:synthetic inertia 437:Spinning reserves 433:operating reserve 347: 295: 263: 243: 212: 195: 126:Frequency control 118:system protection 112:loss compensation 18:Ancillary service 16:(Redirected from 860: 816: 813: 807: 806: 781:(2): 1313–1325. 766: 760: 759: 757: 755: 740: 734: 733: 731: 729: 717: 711: 700: 694: 693: 677: 671: 670: 654: 648: 647: 642: 640: 635:on 21 April 2017 625: 619: 616: 610: 607: 601: 598: 592: 589: 583: 580: 574: 573: 571: 561: 537: 531: 526: 387:transformer taps 358: 356: 355: 350: 348: 343: 342: 341: 328: 306: 304: 303: 298: 296: 294: 293: 281: 264: 262: 261: 249: 244: 242: 241: 229: 210: 206: 204: 203: 198: 196: 194: 193: 192: 179: 171: 121:energy imbalance 21: 868: 867: 863: 862: 861: 859: 858: 857: 843: 842: 820: 819: 814: 810: 767: 763: 753: 751: 742: 741: 737: 727: 725: 718: 714: 701: 697: 678: 674: 655: 651: 638: 636: 627: 626: 622: 617: 613: 608: 604: 599: 595: 590: 586: 581: 577: 538: 534: 527: 523: 518: 491: 483:vehicle-to-grid 475: 446: 422: 416: 399: 376: 370: 364: 337: 333: 329: 327: 316: 313: 312: 289: 285: 280: 257: 253: 248: 237: 233: 228: 220: 217: 216: 188: 184: 180: 172: 170: 141: 138: 137: 128: 79: 28: 23: 22: 15: 12: 11: 5: 866: 856: 855: 841: 840: 834: 831: 825: 818: 817: 808: 761: 735: 712: 695: 672: 649: 620: 611: 602: 593: 584: 575: 532: 520: 519: 517: 514: 513: 512: 507: 502: 497: 490: 487: 474: 471: 445: 442: 421: 418: 398: 395: 382:Reactive power 372:Main article: 369: 366: 346: 340: 336: 332: 326: 323: 320: 292: 288: 284: 279: 276: 273: 270: 267: 260: 256: 252: 247: 240: 236: 232: 227: 224: 191: 187: 183: 178: 175: 169: 166: 163: 160: 157: 154: 151: 148: 145: 127: 124: 123: 122: 119: 116: 115:load following 113: 110: 107: 105:system restart 98: 97: 90: 78: 75: 26: 9: 6: 4: 3: 2: 865: 854: 851: 850: 848: 839: 835: 832: 830: 826: 822: 821: 812: 804: 800: 796: 792: 788: 784: 780: 776: 772: 765: 749: 745: 739: 723: 716: 709: 708: 704: 699: 691: 687: 683: 676: 668: 664: 660: 653: 646: 634: 630: 624: 615: 606: 597: 588: 579: 570: 565: 560: 555: 551: 547: 543: 536: 530: 525: 521: 511: 508: 506: 503: 501: 498: 496: 493: 492: 486: 484: 479: 470: 468: 464: 460: 456: 452: 441: 438: 434: 429: 427: 417: 414: 410: 408: 403: 394: 392: 388: 383: 379: 375: 365: 362: 359: 344: 338: 334: 324: 321: 310: 307: 290: 286: 282: 277: 274: 271: 268: 265: 258: 254: 250: 245: 238: 234: 230: 225: 222: 214: 207: 189: 185: 176: 167: 164: 161: 158: 155: 152: 149: 146: 143: 135: 132: 120: 117: 114: 111: 108: 106: 103: 102: 101: 95: 91: 88: 84: 83: 82: 74: 72: 68: 64: 59: 55: 50: 49:electric grid 45: 42: 40: 36: 32: 19: 811: 778: 774: 764: 752:. Retrieved 750:. April 2016 738: 726:. Retrieved 715: 705: 698: 686:Utility Dive 685: 675: 662: 652: 644: 637:. Retrieved 633:the original 623: 614: 605: 596: 587: 578: 569:10251/176164 549: 545: 535: 524: 476: 459:Hydro-QuĂ©bec 447: 430: 423: 415: 411: 404: 400: 380: 377: 363: 360: 311: 308: 215: 208: 136: 133: 129: 99: 80: 58:transmission 46: 43: 30: 29: 552:(4): 846. 516:References 67:smart grid 54:generation 35:generators 795:1949-3061 345:β 331:Δ 319:Δ 223:β 182:Δ 174:Δ 162:− 847:Category 754:29 March 728:29 March 690:Archived 667:Archived 639:18 April 546:Energies 489:See also 803:3503020 748:ENTSO-E 209:where P 87:Inertia 801:  793:  724:. IEEE 710:, 2019 799:S2CID 707:CAISO 465:of a 455:CAISO 791:ISSN 756:2017 730:2017 641:2017 389:and 56:and 824:29. 783:doi 564:hdl 554:doi 431:An 849:: 797:. 789:. 779:10 777:. 773:. 746:. 688:. 684:. 665:. 661:. 643:. 562:. 550:14 548:. 544:. 393:. 41:. 805:. 785:: 758:. 732:. 572:. 566:: 556:: 339:m 335:P 325:= 322:f 291:n 287:R 283:1 278:+ 275:. 272:. 269:. 266:+ 259:2 255:R 251:1 246:+ 239:1 235:R 231:1 226:= 211:m 190:m 186:P 177:f 168:= 165:R 159:= 156:e 153:p 150:o 147:l 144:s 20:)

Index

Ancillary service
generators
transmission system
electric grid
generation
transmission
synchronous generators
smart grid
distributed generation
Inertia
reactive power and voltage control
system restart
Voltage control and reactive power management
Reactive power
transformer taps
voltage regulators
independent system operator
Scheduling and dispatch
operating reserve
Spinning reserves
synthetic inertia
CAISO
Hydro-Québec
rotational inertia
wind turbine rotor
Plug-in electric vehicles
vehicle-to-grid
National Grid Reserve Service
Availability-based tariff
Load following power plant

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑