Feasibility studies for the dam occurred in 1971 and in June 1977, construction on the dam began. In August 1981, the dam began to impound the reservoir and the first generator became operation in 1982, the last in 1983. The dam was inaugurated in 1983 by Brazilian president
338:
The dam is 1,507 metres (4,944 ft) long and 158 metres (518 ft) tall and withholds a reservoir with a capacity of 17.6 cubic kilometres (14,300,000 acre⋅ft) and surface area of 703 square kilometres (271 sq mi).
570: 536: 87: 611: 529: 432: 462: 492: 412: 32: 522: 596: 601: 327: 247: 606: 402: 348: 8: 575: 270: 549: 294: 174: 470: 496: 352: 263: 440: 290: 514: 590: 565: 374: 314: 310: 257: 102: 89: 388: 302: 71: 355:
for a total installed capacity of 1,192 megawatts (1,598,000 hp).
396: 347:
The dam's power plant contains four 298 megawatts (400,000 hp)
298: 67: 382: 306: 161: 75: 466: 436: 149: 545: 139: 342: 364: 588: 544: 493:"Hydroelectric Plants in Brazil - Minas Gerais" 530: 537: 523: 589: 433:"Plant Emborcação celebrates 25 years" 221:17.6 km (14,300,000 acre⋅ft) 39: 518: 343:Emborcação Hydroelectric Power Plant 47:Location of Emborcação Dam in Brazil 13: 14: 623: 275:1,192 MW (1,598,000 hp) 229:703 km (271 sq mi) 413:List of power stations in Brazil 395: 381: 367: 38: 31: 485: 455: 425: 1: 612:1983 establishments in Brazil 495:. industCards. Archived from 418: 320: 439:. 2008-03-06. Archived from 192:1,507 m (4,944 ft) 7: 358: 10: 628: 556: 309:. It was constructed for 269: 256: 246: 238: 233: 225: 217: 209: 204: 196: 188: 180: 170: 160: 155: 145: 134: 126: 118: 81: 63: 55: 26: 21: 200:Service, gate-controlled 184:158 m (518 ft) 403:Renewable energy portal 328:João Batista Figueiredo 271:Installed capacity 119:Construction began 597:Dams completed in 1983 463:"Cemig's Power Plants" 333: 135:Construction cost 313:power production and 162:Type of dam 103:18.44694°S 47.98639°W 602:Dams in Minas Gerais 239:Commission date 213:Emborcação Reservoir 108:-18.44694; -47.98639 287:Theodomiro Santiago 218:Total capacity 99: /  59:Usina de Emborcação 499:on 9 December 2012 197:Spillway type 584: 583: 571:Cachoeira Dourada 443:on 5 October 2010 279: 278: 226:Surface area 156:Dam and spillways 127:Opening date 16:Dam in MG, Brazil 619: 539: 532: 525: 516: 515: 509: 508: 506: 504: 489: 483: 482: 480: 478: 469:. Archived from 459: 453: 452: 450: 448: 429: 405: 400: 399: 391: 386: 385: 377: 372: 371: 370: 353:Francis turbines 285:, also known as 264:Francis turbines 114: 113: 111: 110: 109: 104: 100: 97: 96: 95: 92: 42: 41: 35: 19: 18: 627: 626: 622: 621: 620: 618: 617: 616: 607:Embankment dams 587: 586: 585: 580: 552: 550:Paranaíba River 543: 513: 512: 502: 500: 491: 490: 486: 476: 474: 473:on 24 July 2012 461: 460: 456: 446: 444: 431: 430: 426: 421: 409: 408: 401: 394: 387: 380: 373: 368: 366: 361: 345: 336: 323: 295:Paranaíba River 175:Paranaíba River 107: 105: 101: 98: 93: 90: 88: 86: 85: 51: 50: 49: 48: 45: 44: 43: 17: 12: 11: 5: 625: 615: 614: 609: 604: 599: 582: 581: 579: 578: 573: 568: 563: 557: 554: 553: 542: 541: 534: 527: 519: 511: 510: 484: 454: 423: 422: 420: 417: 416: 415: 407: 406: 392: 378: 363: 362: 360: 357: 344: 341: 335: 332: 322: 319: 291:embankment dam 283:Emborcação Dam 277: 276: 273: 267: 266: 260: 254: 253: 250: 244: 243: 240: 236: 235: 231: 230: 227: 223: 222: 219: 215: 214: 211: 207: 206: 202: 201: 198: 194: 193: 190: 186: 185: 182: 178: 177: 172: 168: 167: 164: 158: 157: 153: 152: 147: 143: 142: 138:$ 380 million 136: 132: 131: 128: 124: 123: 120: 116: 115: 83: 79: 78: 65: 61: 60: 57: 53: 52: 46: 37: 36: 30: 29: 28: 27: 24: 23: 22:Emborcação Dam 15: 9: 6: 4: 3: 2: 624: 613: 610: 608: 605: 603: 600: 598: 595: 594: 592: 577: 574: 572: 569: 567: 564: 562: 559: 558: 555: 551: 547: 540: 535: 533: 528: 526: 521: 520: 517: 498: 494: 488: 472: 468: 464: 458: 442: 438: 434: 428: 424: 414: 411: 410: 404: 398: 393: 390: 384: 379: 376: 375:Brazil portal 365: 356: 354: 350: 340: 331: 329: 318: 316: 315:flood control 312: 311:hydroelectric 308: 304: 300: 296: 292: 288: 284: 274: 272: 268: 265: 261: 259: 255: 251: 249: 245: 241: 237: 234:Power Station 232: 228: 224: 220: 216: 212: 208: 203: 199: 195: 191: 187: 183: 179: 176: 173: 169: 165: 163: 159: 154: 151: 148: 144: 141: 137: 133: 129: 125: 121: 117: 112: 84: 80: 77: 73: 69: 66: 62: 58: 56:Official name 54: 34: 25: 20: 560: 503:19 September 501:. Retrieved 497:the original 487: 477:19 September 475:. Retrieved 471:the original 457: 447:19 September 445:. Retrieved 441:the original 427: 389:Water portal 346: 337: 324: 303:Minas Gerais 286: 282: 280: 252:Conventional 351:powered by 106: / 82:Coordinates 591:Categories 561:Emborcação 419:References 349:generators 321:Background 166:Embankment 94:47°59′11″W 91:18°26′49″S 576:São Simão 566:Itumbiara 242:1982-1983 205:Reservoir 359:See also 299:Araguari 289:, is an 258:Turbines 171:Impounds 146:Owner(s) 68:Araguari 64:Location 548:on the 293:on the 210:Creates 307:Brazil 189:Length 181:Height 76:Brazil 467:CEMIG 437:CEMIG 297:near 150:CEMIG 546:Dams 505:2010 479:2010 449:2010 281:The 262:4 x 248:Type 130:1983 122:1977 334:Dam 301:in 140:USD 593:: 465:. 435:. 330:. 317:. 305:, 74:, 72:MG 70:, 538:e 531:t 524:v 507:. 481:. 451:.

Index

Emborcação Dam is located in Brazil
Araguari
MG
Brazil
18°26′49″S 47°59′11″W / 18.44694°S 47.98639°W / -18.44694; -47.98639
USD
CEMIG
Type of dam
Paranaíba River
Type
Turbines
Francis turbines
Installed capacity
embankment dam
Paranaíba River
Araguari
Minas Gerais
Brazil
hydroelectric
flood control
João Batista Figueiredo
generators
Francis turbines
Brazil portal
icon
Water portal
icon
Renewable energy portal
List of power stations in Brazil
"Plant Emborcação celebrates 25 years"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.