795:
777:
767:
757:
747:
805:
815:
221:
The track was part of the erstwhile
Scindia-Neemuch railway, a branch line from Indore to Ujjain was made operational in the period 1879-1880 during the British Rule.
395:
369:
314:
760:
591:
849:
438:
859:
770:
649:
798:
624:
780:
818:
202:
on Dewas-Maksi section. It is currently operational as a single-track electrified railway line, and is undergoing doubling.
750:
689:
724:
719:
669:
664:
639:
629:
844:
729:
694:
531:
644:
340:
269:
259:
230:
191:
187:
73:
68:
679:
609:
599:
264:
238:
199:
709:
431:
864:
839:
619:
572:
480:
854:
634:
551:
288:
604:
577:
506:
501:
496:
463:
205:
The tentative time of completion of the project is slated to be March 2023. The work is being done by
659:
521:
808:
704:
424:
684:
674:
556:
516:
511:
234:
206:
151:
134:
101:
714:
699:
546:
242:
654:
614:
195:
179:
447:
254:
210:
175:
91:
8:
45:
370:"Indore: 120 kmph; Commissioner Railway Safety begins 2-day track strength test"
293:
Ministry of
Statistics and Programme Implementation (MOS&PI), Govt. of India
183:
55:
833:
144:
129:
315:"Indore: Railways has fixed time limit for completion of projects: DRM"
416:
245:
has been completed and is in operation since Late
February 2023.
295:. Online Computerised Monitoring System (OCMS). 11 July 2022
396:"Double line work completed, 26 trains get back on track"
229:The doubling work in the stretch of railways from
831:
289:"Project Summary: INDORE-DEWAS-UJJAIN (80 KMS)"
432:
439:
425:
650:Fatehabad Chandrawatiganj-Ujjain section
832:
420:
348:Ministry of Railways, Govt. of India
814:
625:Dharangadhra–Surendra Nagar section
446:
13:
14:
876:
730:Western railway elevated corridor
224:
850:Rail transport in Madhya Pradesh
813:
804:
803:
794:
793:
776:
775:
766:
765:
756:
755:
746:
745:
690:Samakhiali–Maliya Miyana section
860:Proposed railway lines in India
725:Wankaner–Surendra Nagar section
720:Viramgam–Surendra Nagar section
270:Ujjain Junction railway station
260:Indore Junction railway station
670:Maliya Miyana–Wankaner section
665:Maliya Miyana–Wankaner section
640:Gandhidham–Kandla Port section
630:Gandhidham–Ahmedabad main line
388:
376:. Indore, MP. 23 February 2023
362:
333:
307:
281:
265:Dewas Junction railway station
1:
275:
695:Surendranagar–Bhavnagar line
341:"History of Ratlam Division"
7:
645:Gandhidham–Palanpur section
248:
178:is a partially operational
172:Indore-Dewas-Ujjain section
164:100 km/h (62 mph)
24:Indore-Dewas-Ujjain section
10:
881:
680:Porbandar–Jetalsar section
610:Ahmedabad–Viramgam section
600:Ahmedabad–Mumbai main line
321:. Indore, MP. 6 April 2022
216:
789:
738:
710:Viramgam–Mahesana section
590:
565:
539:
530:
489:
473:
454:
160:
150:
128:
120:
112:
107:
97:
87:
82:
61:
51:
41:
33:
28:
23:
845:Railway lines in Gujarat
620:Chhota Udaipur–Dhar line
136:5 ft 6 in
675:Mumbai Suburban Railway
635:Gandhidham–Bhuj section
207:Ratlam railway division
116:79 km (49 mi)
102:Ratlam railway division
605:Ahmedabad–Udaipur line
374:The Free Press Journal
319:The Free Press Journal
660:Jaipur–Ahmedabad line
196:Ujjain-Bhopal section
180:public transit system
37:Partially Operational
16:Railway line in India
705:Vasai Road–Roha line
481:Ministry of Railways
176:Western Railway Zone
865:Transport in Ujjain
840:Transport in Indore
685:Rajkot–Somnath line
855:Transport in Dahod
715:Viramgam–Okha line
700:Udhna–Jalgaon line
400:The Times of India
350:. Western Railways
827:
826:
655:Indore–Dahod line
615:Akola–Ratlam line
586:
585:
402:. Indore, MP. TNN
168:
167:
872:
817:
816:
807:
806:
797:
796:
779:
778:
769:
768:
759:
758:
749:
748:
739:Railway stations
537:
536:
441:
434:
427:
418:
417:
412:
411:
409:
407:
392:
386:
385:
383:
381:
366:
360:
359:
357:
355:
345:
337:
331:
330:
328:
326:
311:
305:
304:
302:
300:
285:
211:Western Railways
182:in the state of
142:
137:
121:Number of tracks
21:
20:
880:
879:
875:
874:
873:
871:
870:
869:
830:
829:
828:
823:
785:
734:
582:
561:
526:
485:
469:
450:
448:Western Railway
445:
415:
405:
403:
394:
393:
389:
379:
377:
368:
367:
363:
353:
351:
343:
339:
338:
334:
324:
322:
313:
312:
308:
298:
296:
287:
286:
282:
278:
255:Western Railway
251:
227:
219:
161:Operating speed
152:Electrification
140:
135:
92:Western Railway
78:
74:Ujjain Junction
69:Indore Junction
17:
12:
11:
5:
878:
868:
867:
862:
857:
852:
847:
842:
825:
824:
822:
821:
811:
801:
790:
787:
786:
784:
783:
773:
763:
761:Madhya Pradesh
753:
742:
740:
736:
735:
733:
732:
727:
722:
717:
712:
707:
702:
697:
692:
687:
682:
677:
672:
667:
662:
657:
652:
647:
642:
637:
632:
627:
622:
617:
612:
607:
602:
596:
594:
588:
587:
584:
583:
581:
580:
575:
569:
567:
563:
562:
560:
559:
554:
549:
543:
541:
534:
528:
527:
525:
524:
519:
514:
509:
504:
499:
493:
491:
487:
486:
484:
483:
477:
475:
471:
470:
468:
467:
455:
452:
451:
444:
443:
436:
429:
421:
414:
413:
387:
361:
332:
306:
279:
277:
274:
273:
272:
267:
262:
257:
250:
247:
226:
225:Current status
223:
218:
215:
186:. It connects
184:Madhya Pradesh
166:
165:
162:
158:
157:
154:
148:
147:
132:
126:
125:
122:
118:
117:
114:
110:
109:
105:
104:
99:
95:
94:
89:
85:
84:
80:
79:
77:
76:
71:
65:
63:
59:
58:
56:Madhya Pradesh
53:
49:
48:
46:Indian Railway
43:
39:
38:
35:
31:
30:
26:
25:
15:
9:
6:
4:
3:
2:
877:
866:
863:
861:
858:
856:
853:
851:
848:
846:
843:
841:
838:
837:
835:
820:
812:
810:
802:
800:
792:
791:
788:
782:
774:
772:
764:
762:
754:
752:
744:
743:
741:
737:
731:
728:
726:
723:
721:
718:
716:
713:
711:
708:
706:
703:
701:
698:
696:
693:
691:
688:
686:
683:
681:
678:
676:
673:
671:
668:
666:
663:
661:
658:
656:
653:
651:
648:
646:
643:
641:
638:
636:
633:
631:
628:
626:
623:
621:
618:
616:
613:
611:
608:
606:
603:
601:
598:
597:
595:
593:
589:
579:
576:
574:
571:
570:
568:
564:
558:
555:
553:
550:
548:
545:
544:
542:
538:
535:
533:
529:
523:
520:
518:
515:
513:
510:
508:
505:
503:
500:
498:
495:
494:
492:
488:
482:
479:
478:
476:
472:
466:
465:
460:
457:
456:
453:
449:
442:
437:
435:
430:
428:
423:
422:
419:
401:
397:
391:
375:
371:
365:
349:
342:
336:
320:
316:
310:
294:
290:
284:
280:
271:
268:
266:
263:
261:
258:
256:
253:
252:
246:
244:
240:
236:
232:
222:
214:
212:
208:
203:
201:
197:
193:
189:
185:
181:
177:
173:
163:
159:
155:
153:
149:
146:
141:1,676 mm
138:
133:
131:
127:
123:
119:
115:
111:
106:
103:
100:
96:
93:
90:
86:
81:
75:
72:
70:
67:
66:
64:
60:
57:
54:
50:
47:
44:
40:
36:
32:
27:
22:
19:
532:Engine sheds
462:
459:Headquarters
458:
404:. Retrieved
399:
390:
378:. Retrieved
373:
364:
354:16 September
352:. Retrieved
347:
335:
325:16 September
323:. Retrieved
318:
309:
299:16 September
297:. Retrieved
292:
283:
228:
220:
204:
171:
169:
113:Track length
18:
819:WikiProject
771:Maharashtra
145:broad gauge
130:Track gauge
98:Operator(s)
834:Categories
464:Churchgate
276:References
799:Templates
781:Rajasthan
552:Sabarmati
507:Mumbai WR
502:Bhavnagar
497:Ahmedabad
490:Divisions
474:Authority
231:Ujjain Jn
192:Ujjain Jn
188:Indore Jn
108:Technical
809:Category
573:Vadodara
566:Electric
522:Vadodara
249:See also
239:Dewas Jn
200:Dewas Jn
29:Overview
751:Gujarat
592:Network
406:3 March
380:3 March
235:Karchha
217:History
174:of the
83:Service
62:Termini
578:Valsad
540:Diesel
517:Ratlam
512:Rajkot
243:Barlai
88:System
52:Locale
34:Status
557:Vatva
344:(PDF)
198:and
190:with
42:Owner
547:Mhow
408:2023
382:2023
356:2022
327:2022
301:2022
233:via
170:The
209:of
194:on
156:Yes
836::
461:-
398:.
372:.
346:.
317:.
291:.
241:,
237:,
213:.
143:)
440:e
433:t
426:v
410:.
384:.
358:.
329:.
303:.
139:(
124:2
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.