Knowledge

Integrated logistics support

Source 📝

764:
requirements, and pre-positioning of material and parts. It also includes preservation and packaging level requirements and storage requirements (for example, sensitive, proprietary, and controlled items). This element includes planning and programming the details associated with movement of the system in its shipping configuration to the ultimate destination via transportation modes and networks available and authorized for use. It further encompasses establishment of critical engineering design parameters and constraints (e.g., width, length, height, component and system rating, and weight) that must be considered during system development. Customs requirements, air shipping requirements, rail shipping requirements, container considerations, special movement precautions, mobility, and transportation asset impact of the shipping mode or the contract shipper must be carefully assessed. PHS&T planning must consider:
796:
available concurrently with system fielding. Planning must be comprehensive and include the need for new construction as well as modifications to existing facilities. It also includes studies to define and establish impacts on life cycle cost, funding requirements, facility locations and improvements, space requirements, environmental impacts, duration or frequency of use, safety and health standards requirements, and security restrictions. Also included are any utility requirements, for both fixed and mobile facilities, with emphasis on limiting requirements of scarce or unique resources.
168: 66: 25: 376:
executed ILS strategy will ensure that the requirements for each of the elements of ILS are properly planned, resourced, and implemented. These actions will enable the system to achieve the operational readiness levels required by the warfighter at the time of fielding and throughout the life cycle. ILS can be also used for civilian projects, as highlighted by the ASD/AIA ILS Guide.
755:(CR-IPT) that documents the approach and tracks progress via a Computer Resources Life-Cycle Management Plan (CRLCMP). Developers will need to ensure that planning actions and strategies contained in the ILSP and CRLCMP are complementary and that computer resources support for the operational software, and ATE software, support software, is available where and when needed. 659:
Technical Data and Technical Publications consists of scientific or technical information necessary to translate system requirements into discrete engineering and logistic support documentation. Technical data is used in the development of repair manuals, maintenance manuals, user manuals, and other
375:
Decisions are documented in a life cycle sustainment plan (LCSP), a Supportability Strategy, or (most commonly) an Integrated Logistics Support Plan (ILSP). ILS planning activities coincide with development of the system acquisition strategy, and the program will be tailored accordingly. A properly
650:
Embedded training devices, features, and components are designed and built into a specific system to provide training or assistance in the use of the system. (One example of this is the HELP files of many software programs.) The design, development, delivery, installation, and logistic support of
804:
Design interface is the relationship of logistics-related design parameters of the system to its projected or actual support resource requirements. These design parameters are expressed in operational terms rather than as inherent values and specifically relate to system requirements and support
597:
engineering (HFE) or behavioral research is frequently applied to ensure a good man-machine interface. Manpower requirements are predicated on accomplishing the logistics support mission in the most efficient and economical way. This element includes requirements during the planning and decision
448:
Maintenance planning begins early in the acquisition process with development of the maintenance concept. It is conducted to evolve and establish requirements and tasks to be accomplished for achieving, restoring, and maintaining the operational capability for the life of the system. Maintenance
795:
The Facilities logistics element is composed of a variety of planning activities, all of which are directed toward ensuring that all required permanent or semi-permanent operating and support facilities (for instance, training, field and depot maintenance, storage, operational, and testing) are
750:
Computer Resources Support includes the facilities, hardware, software, documentation, manpower, and personnel needed to operate and support computer systems and the software within those systems. Computer resources include both stand-alone and embedded systems. This element is usually planned,
592:
Manpower and personnel involves identification and acquisition of personnel with skills and grades required to operate and maintain a system over its lifetime. Manpower requirements are developed and personnel assignments are made to meet support demands throughout the life cycle of the system.
617:
Training and training devices support encompasses the processes, procedures, techniques, training devices, and equipment used to train personnel to operate and support a system. This element defines qualitative and quantitative requirements for the training of operating and support personnel
763:
This element includes resources and procedures to ensure that all equipment and support items are preserved, packaged, packed, marked, handled, transported, and stored properly for short- and long-term requirements. It includes material-handling equipment and packaging, handling and storage
414:. Integrated Logistic Support will provide important means to identify (as early as possible) reliability issues / problems and can initiate system or part design improvements based on reliability, maintainability, testability or system availability analysis 329:
may be required between elements in order to acquire a system that is: affordable (lowest life cycle cost), operable, supportable, sustainable, transportable, and environmentally sound. In some cases, a deliberate process of
579:
Special inspection equipment and depot maintenance plant equipment, which includes all equipment and tools required to assemble, disassemble, test, maintain, and support the production and/or depot repair of end items or
553:
Support and test equipment includes all equipment, mobile and fixed, that is required to perform the support functions, except that equipment which is an integral part of the system. Support equipment categories include:
480:
The maintenance concept must ensure prudent use of manpower and resources. When formulating the maintenance concept, analysis of the proposed work environment on the health and safety of maintenance personnel must be
805:
costs of the system. Programs such as "design for testability" and "design for discard" must be considered during system design. The basic requirements that need to be considered as part of design interface include:
430:, special tools, and documentation. Quantities required for a specified initial period are calculated, procured, and delivered to support delivery, installation in some of the cases, and operation of the equipment. 320:
ILS is the integrated planning and action of a number of disciplines in concert with one another to assure system availability. The planning of each element of ILS is ideally developed in coordination with the
289:. ILS therefore addresses these aspects of supportability not only during acquisition, but also throughout the operational life cycle of the system. The impact of ILS is often measured in terms of 488:
to optimize the support system, in terms of LCC, readiness objectives, design for discard, maintenance task distribution, support equipment and ATE, and manpower and personnel requirements.
387:
disciplines. ILS Sabbaticals are normally taken in developing nations - allowing the practitioner an insight into sustainment practices in an environment of limited materiel resources.
864: 713: 901:
IEEE 1332, IEEE Standard Reliability Program for the Development and Production of Electronic Systems and Equipment, Institute of Electrical and Electronics Engineers.
1075: 1058: 727: 893: 1042: 465: 1059:
MIL-HDBK-781A, Reliability Test Methods, Plans, and Environments for Engineering Development, Qualification, and Production, U.S. Department of Defense
87: 80: 379:
It is considered common practice within some industries - primarily Defence - for ILS practitioners to take a leave of absence to undertake an ILS
678: 38: 130: 1084: 285:
for military systems, with the goal of creating systems that last longer and require less support, thereby reducing costs and increasing
102: 1064: 109: 1160:(UK MoD) Through Life Support (TLS) Directorate into the following elements and promulgated in UK Defence Standard (DEFSTAN) 00-600 449:
planning also involves Level Of Repair Analysis (LORA) as a function of the system acquisition process. Maintenance planning will:
1069: 453:
Define the actions and support necessary to ensure that the system attains the specified system readiness objectives with minimum
434:
The ILS management process facilitates specification, design, development, acquisition, test, fielding, and support of systems.
310: 116: 420:. Ensuring that the Support Solution considers and integrates the elements considered by ILS. This is discussed fully below. 404: 98: 924:
MIL-STD-2173, Reliability Centered Maintenance Requirements, U.S. Department of Defense (superseded by NAVAIR 00-25-403)
1157: 1118: 768:
System constraints (such as design specifications, item configuration, and safety precautions for hazardous material)
341:
Reliability engineering, maintainability engineering and maintenance (preventive, predictive and corrective) planning
229: 211: 189: 149: 52: 44: 182: 443: 904:
MIL-STD-785, Reliability Program for Systems and Equipment Development and Production, U.S. Department of Defense.
506:
Supply support encompasses all management actions, procedures, and techniques used to determine requirements to:
1039: 1004: 991: 660:
documents that are used to operate or support the system. Technical data includes, but may not be limited to:
1195:
SX000i - International guide for the use of the S-Series of Integrated Logistics Support (ILS) specifications
1113:
Integrated Logistics Support, The Design Engineering Link by Walter Finkelstein, J.A. Richard Guertin, 1989,
732: 1217: 875:
The references below cover many relevant standards and handbooks related to Integrated logistics support.
123: 1212: 751:
developed, implemented, and monitored by a Computer Resources Working Group (CRWG) or Computer Resources
1023: 908: 403:
of an equipment item is considered during its design and development. The technique was adopted by the
331: 933:
DEF(AUST)5692 Logistic Support Analysis Record Requirements for the Australian Defence Organisation
1146: 783:
Emerging PHS&T technologies, methods, or procedures and resource-intensive PHS&T procedures
548: 485: 176: 1170: 809: 752: 461: 294: 258: 76: 1081: 1052: 979:- International specification for operational and maintenance data feedback (under development) 701: 697: 691: 651:
required embedded training features, mockups, simulators, and training aids are also included.
193: 973:- International specification for developing and continuously improving preventive maintenance 384: 265:. Although originally developed for military purposes, it is also widely used in commercial 917:
MIL-STD-1629A, Procedures for Performing a Failure Mode, Effects and Criticality Analysis (
286: 8: 1040:
MIL-HDBK-217F, Reliability Prediction of Electronic Equipment, U.S. Department of Defense
400: 955:- International specification for technical publications using a common source database 843: 584:
This also encompasses planning and acquisition of logistic support for this equipment.
322: 290: 250: 468:
requirements; automatic test equipment; and manpower skills and facility requirements.
1114: 1012: 985:- International specification for training needs analysis - TNA (definition on-going) 664: 884: 824: 266: 961:- International specification for materiel management - Integrated data processing 593:
Manpower requirements are based on related ILS elements and other considerations.
407:
in 1993 and made compulsory for the procurement of the majority of MOD equipment.
1088: 1053:
MIL-HDBK-338B, Electronic Reliability Design Handbook, U.S. Department of Defense
1046: 1008: 995: 819: 814: 454: 302: 262: 1147:
US Defense Acquisition University on Integrated Logistics Support (ILS) Elements
1026:, Data Item Description: Integrated Logistics Support Plan (ILSP) (17 Dec 1985) 758: 1206: 894:
British Defence Standard 00-600 Integrated Logistics Support for MOD Projects
594: 314: 298: 282: 474:
Define actions and support required for fielding and marketing the system.
949:- International guide for integrated logistic support (under development) 598:
process to optimize numbers, skills, and positions. This area considers:
306: 277:
In general, ILS plans and directs the identification and development of
618:
throughout the life cycle of the system. It includes requirements for:
511: 501: 427: 380: 334:
will be used to identify tasks within each logistics support element.
1036:
Integrated Logistics Support Handbook, third edition - James V. Jones
837: 608:
Human factors considerations during the planning and decision process
326: 278: 254: 491:
Minimize the use of hazardous materials and the generation of waste.
464:(BITE) requirements, testability, reliability, and maintainability; 65: 1102:
Systems Assessments, Integrated Logistics and COOP Support Services
1082:
MIL-HDBK-502A, Product Support Analysis, U.S. Department of Defense
1001: 988: 914:
MIL-STD 1388-2B Requirements for a Logistic Support Analysis Record
353: 967:- International specification for Logistics Support Analysis - LSA 848: 396: 865:
Reliability, availability and serviceability (computer hardware)
471:
State specific maintenance tasks, to be performed on the system.
946: 829: 643: 1108: 918: 682: 1109:
AeroSpace and Defence (ASD) Industries Association of Europe
1017:
AECMA 1000D (Technical Publications) - Refer to S1000D above
759:
Packaging, handling, storage, and transportation (PHS&T)
1100: 253:
to lower a product life cycle cost and decrease demand for
1020:
AECMA 2000M (initial provisioning) - Refer to S2000M above
675:
Maintenance expenditure limits and calibration procedures
337:
The most widely accepted list of ILS activities include:
1194: 982: 976: 970: 964: 958: 952: 576:
Support equipment for on- and off-equipment maintenance.
1076:
Failure Reporting, Analysis and Corrective Action Taken
426:. These tasks include calculation of requirements for 1174: 780:
Impact on spare or repair parts storage requirements
942:The ASD/AIA Suite of S-Series ILS specifications 937: 1204: 898:Federal Standard 1037C in support of MIL-STD-188 612: 707:Drawings/specifications/technical data packages 460:Set up specific criteria for repair, including 418:Design of the Support Solution for minimum cost 368:Packaging, handling, storage and transportation 745: 542: 344:Supply (spare part) support acquire resources 998:- Glossary for the Suite of S-specifications 538:Acquire, distribute, and replenish inventory 526:Transfer the items to where they are needed. 347:Support and test equipment/equipment support 1065:NASA Probabilistic Risk Assessment Handbook 672:Transportability guidance technical manuals 53:Learn how and when to remove these messages 561:Tools (hand tools as well as power tools). 535:Provide for initial support of the system. 16:Technology relating to maintenance systems 777:Special handling equipment and procedures 774:Geographic and environmental restrictions 587: 230:Learn how and when to remove this message 212:Learn how and when to remove this message 150:Learn how and when to remove this message 738:Lifting and tie down pamphlet/references 175:This article includes a list of general 930:DEF(AUST)5691 Logistic Support Analysis 602:Man-machine and environmental interface 437: 1205: 86:Please improve this article by adding 1124: 786:Environmental impacts and constraints 646:disposal and safe procedures training 628:Instructor and key personnel training 395:ILS is a technique introduced by the 383:; furthering their knowledge of the 161: 59: 18: 1070:NASA Fault Tree Assessment handbook 851:, particularly for computer systems 799: 718:Depot maintenance work requirements 558:Handling and Maintenance Equipment. 13: 1158:United Kingdom Ministry of Defence 564:Metrology and measurement devices. 181:it lacks sufficient corresponding 14: 1229: 733:Flight safety critical parts list 654: 495: 34:This article has multiple issues. 1171:"Defense Acquisition University" 741:Hazardous Material documentation 477:Address warranty considerations. 444:Reliability-centered maintenance 166: 64: 23: 42:or discuss these issues on the 1188: 1163: 1151: 1140: 1131: 938:Specifications - not standards 669:Technical and supply bulletins 523:Store and warehouse the items. 272: 99:"Integrated logistics support" 1: 870: 790: 771:Special security requirements 688:Maintenance allocation charts 613:Training and training devices 88:secondary or tertiary sources 1094: 1078:, U.S. Department of Defense 1030: 887:Integrated Logistics Support 878: 325:effort and with each other. 243:Integrated logistics support 7: 858: 631:New equipment training team 532:Dispose of secondary items. 390: 359:Technical data/publications 10: 1234: 1137:The header in this article 746:Computer resources support 714:Provisioning documentation 546: 543:Support and test equipment 510:Acquire support items and 499: 441: 362:Computer resources support 332:Logistics Support Analysis 909:Logistic Support Analysis 573:Automatic test equipment. 261:optimization to ease the 249:) is a technology in the 885:Army Regulation 700-127 549:ground support equipment 753:Integrated Product Team 622:Competencies management 462:Built-In Test Equipment 424:Initial Support Package 196:more precise citations. 710:Software documentation 702:Predictive maintenance 698:Preventive maintenance 692:Corrective maintenance 588:Manpower and personnel 567:Calibration equipment. 350:Manpower and personnel 75:relies excessively on 385:logistics engineering 287:return on investments 728:Product support data 721:Identification lists 637:Sustainment training 438:Maintenance planning 356:and training support 1218:Systems engineering 889:, 27 September 2007 412:Influence on Design 399:to ensure that the 281:support and system 1213:Military logistics 1125:Article References 1087:2013-12-24 at the 1045:2015-07-03 at the 1007:2015-09-24 at the 994:2015-09-24 at the 842:Environmental and 520:Receive the items. 517:Catalog the items. 323:system engineering 259:maintenance system 251:system engineering 1013:Common Data Model 927:OPNAVINST 4130.2A 665:Technical manuals 634:Resident training 466:support equipment 313:), and sometimes 240: 239: 232: 222: 221: 214: 160: 159: 152: 134: 57: 1225: 1197: 1192: 1186: 1185: 1183: 1182: 1173:. Archived from 1167: 1161: 1155: 1149: 1144: 1138: 1135: 1104:, 26 August 2008 907:MIL-STD 1388-1A 825:Interoperability 800:Design interface 625:Factory training 529:Issue the items. 371:Design interface 267:customer service 235: 228: 217: 210: 206: 203: 197: 192:this article by 183:inline citations 170: 169: 162: 155: 148: 144: 141: 135: 133: 92: 68: 60: 49: 27: 26: 19: 1233: 1232: 1228: 1227: 1226: 1224: 1223: 1222: 1203: 1202: 1201: 1200: 1193: 1189: 1180: 1178: 1169: 1168: 1164: 1156: 1152: 1145: 1141: 1136: 1132: 1127: 1097: 1089:Wayback Machine 1074:MIL-HDBK-2155, 1047:Wayback Machine 1033: 1009:Wayback Machine 996:Wayback Machine 940: 881: 873: 861: 820:Standardization 815:Maintainability 802: 793: 761: 748: 724:Component lists 657: 615: 590: 570:Test equipment. 551: 545: 504: 498: 455:Life Cycle Cost 446: 440: 393: 303:maintainability 275: 269:organisations. 263:product support 236: 225: 224: 223: 218: 207: 201: 198: 188:Please help to 187: 171: 167: 156: 145: 139: 136: 93: 91: 85: 81:primary sources 69: 28: 24: 17: 12: 11: 5: 1231: 1221: 1220: 1215: 1199: 1198: 1187: 1162: 1150: 1139: 1129: 1128: 1126: 1123: 1122: 1121: 1119:978-1854230119 1111: 1106: 1096: 1093: 1092: 1091: 1079: 1072: 1067: 1062: 1056: 1050: 1037: 1032: 1029: 1028: 1027: 1021: 1018: 1015: 999: 986: 980: 974: 968: 962: 956: 950: 939: 936: 935: 934: 931: 928: 925: 922: 915: 912: 905: 902: 899: 896: 891: 880: 877: 872: 869: 868: 867: 860: 857: 856: 855: 852: 846: 840: 835: 832: 827: 822: 817: 812: 801: 798: 792: 789: 788: 787: 784: 781: 778: 775: 772: 769: 760: 757: 747: 744: 743: 742: 739: 736: 730: 725: 722: 719: 716: 711: 708: 705: 695: 689: 686: 676: 673: 670: 667: 656: 655:Technical data 653: 648: 647: 641: 638: 635: 632: 629: 626: 623: 614: 611: 610: 609: 606: 605:Special skills 603: 589: 586: 582: 581: 577: 574: 571: 568: 565: 562: 559: 547:Main article: 544: 541: 540: 539: 536: 533: 530: 527: 524: 521: 518: 515: 500:Main article: 497: 496:Supply support 494: 493: 492: 489: 482: 478: 475: 472: 469: 458: 442:Main article: 439: 436: 432: 431: 421: 415: 401:supportability 392: 389: 373: 372: 369: 366: 363: 360: 357: 351: 348: 345: 342: 274: 271: 238: 237: 220: 219: 174: 172: 165: 158: 157: 72: 70: 63: 58: 32: 31: 29: 22: 15: 9: 6: 4: 3: 2: 1230: 1219: 1216: 1214: 1211: 1210: 1208: 1196: 1191: 1177:on 2009-04-23 1176: 1172: 1166: 1159: 1154: 1148: 1143: 1134: 1130: 1120: 1116: 1112: 1110: 1107: 1105: 1103: 1099: 1098: 1090: 1086: 1083: 1080: 1077: 1073: 1071: 1068: 1066: 1063: 1060: 1057: 1054: 1051: 1048: 1044: 1041: 1038: 1035: 1034: 1025: 1024:DI-ILSS-80095 1022: 1019: 1016: 1014: 1010: 1006: 1003: 1000: 997: 993: 990: 987: 984: 981: 978: 975: 972: 969: 966: 963: 960: 957: 954: 951: 948: 945: 944: 943: 932: 929: 926: 923: 920: 916: 913: 910: 906: 903: 900: 897: 895: 892: 890: 888: 883: 882: 876: 866: 863: 862: 853: 850: 847: 845: 841: 839: 836: 833: 831: 828: 826: 823: 821: 818: 816: 813: 811: 808: 807: 806: 797: 785: 782: 779: 776: 773: 770: 767: 766: 765: 756: 754: 740: 737: 734: 731: 729: 726: 723: 720: 717: 715: 712: 709: 706: 703: 699: 696: 693: 690: 687: 684: 680: 677: 674: 671: 668: 666: 663: 662: 661: 652: 645: 642: 640:User training 639: 636: 633: 630: 627: 624: 621: 620: 619: 607: 604: 601: 600: 599: 596: 595:Human factors 585: 578: 575: 572: 569: 566: 563: 560: 557: 556: 555: 550: 537: 534: 531: 528: 525: 522: 519: 516: 513: 509: 508: 507: 503: 490: 487: 483: 479: 476: 473: 470: 467: 463: 459: 456: 452: 451: 450: 445: 435: 429: 425: 422: 419: 416: 413: 410: 409: 408: 406: 402: 398: 388: 386: 382: 377: 370: 367: 364: 361: 358: 355: 352: 349: 346: 343: 340: 339: 338: 335: 333: 328: 324: 318: 316: 315:System Safety 312: 308: 304: 300: 296: 292: 288: 284: 280: 270: 268: 264: 260: 256: 252: 248: 244: 234: 231: 216: 213: 205: 195: 191: 185: 184: 178: 173: 164: 163: 154: 151: 143: 132: 129: 125: 122: 118: 115: 111: 108: 104: 101: –  100: 96: 95:Find sources: 89: 83: 82: 78: 73:This article 71: 67: 62: 61: 56: 54: 47: 46: 41: 40: 35: 30: 21: 20: 1190: 1179:. Retrieved 1175:the original 1165: 1153: 1142: 1133: 1101: 941: 886: 874: 803: 794: 762: 749: 735:for aircraft 704:instructions 694:instructions 679:Repair parts 658: 649: 616: 591: 583: 552: 505: 447: 433: 423: 417: 411: 394: 378: 374: 336: 319: 299:availability 283:requirements 276: 246: 242: 241: 226: 208: 199: 180: 146: 137: 127: 120: 113: 106: 94: 74: 50: 43: 37: 36:Please help 33: 810:Reliability 580:components. 512:spare parts 481:considered. 428:spare parts 307:testability 295:reliability 273:ILS defined 194:introducing 1207:Categories 1181:2016-07-06 871:References 791:Facilities 502:Spare part 484:Conduct a 381:Sabbatical 365:Facilities 177:references 110:newspapers 77:references 39:improve it 1095:Resources 1031:Handbooks 879:Standards 838:Usability 327:Tradeoffs 279:logistics 255:logistics 202:June 2011 140:June 2011 45:talk page 1085:Archived 1043:Archived 1005:Archived 992:Archived 859:See also 834:Security 391:Adoption 354:Training 317:(RAMS). 293:such as 849:Privacy 397:US Army 291:metrics 257:by the 190:improve 124:scholar 1117:  1002:SX002D 989:SX001G 983:S6000T 977:S5000F 971:S4000P 965:S3000L 959:S2000M 953:S1000D 947:SX000i 844:HAZMAT 830:Safety 644:HAZMAT 457:(LCC). 405:UK MoD 179:, but 126:  119:  112:  105:  97:  919:FMECA 911:(LSA) 854:Legal 685:lists 683:tools 131:JSTOR 117:books 1115:ISBN 700:and 681:and 486:LORA 311:RAMT 305:and 103:news 247:ILS 79:to 1209:: 1011:- 301:, 297:, 90:. 48:. 1184:. 1061:. 1055:. 1049:. 921:) 514:. 309:( 245:( 233:) 227:( 215:) 209:( 204:) 200:( 186:. 153:) 147:( 142:) 138:( 128:· 121:· 114:· 107:· 84:. 55:) 51:(

Index

improve it
talk page
Learn how and when to remove these messages

references
primary sources
secondary or tertiary sources
"Integrated logistics support"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message
references
inline citations
improve
introducing
Learn how and when to remove this message
Learn how and when to remove this message
system engineering
logistics
maintenance system
product support
customer service
logistics
requirements
return on investments
metrics
reliability