Knowledge

MRT Line 2 (Dhaka Metro Rail)

Source 📝

306: 902:(DMTCL) disagreed as the PPP study by the consultancy firm recommended that Japan should take the responsibility for operation and maintenance of MRT Line 2. Based on a preliminary study prepared by Oriental Consultants Global and PwC for the fiscal year 2020-21, the project was declared ineligible for implementation in a March 2021 report. However, in 2015 the finalized Strategic Transport Plan (STP) made the project feasible. According to the study, if construction is done in PPP, the government would have to bear 85% of the budget, so the government excludes it from PPP and looks for donor agencies for construction. On the other hand, with another railway project underway on the proposed route of MRT Line 2, DMTCL planned to change the route to connect the southern city of 1617: 1609: 282: 751: 1267: 763: 1260: 1751: 1650: 1741: 1640: 305: 1784: 1877: 898:. The pre-feasibility report showed that three lakh passengers could travel through this line. 24 stations were proposed on the route and the proposed length of the line was 24 km. But the 786: 1181: 850:
prepared a strategic transport plan for Dhaka. The World Bank helped to develop this plan, which proposed the construction of five MRT lines in Dhaka. The five metro lines were
922:
in a meeting with ERD expressed interest in lending 75% of the total budget of MRT Line 2. On the same day, local government and rural development and co-operatives minister
1121: 1521: 1046: 1774: 942:, proposed to prioritize the implementation of the proposed line considering the economic importance and population density of the route and a branch line to 1718: 1440: 1336: 1101: 1066: 87: 1356: 1556: 1536: 1376: 1081: 1498: 1405: 1201: 1867: 1420: 1161: 1141: 1004: 81: 231: 1316: 878:
was formed to list its construction project in the PPP. It was planned to connect Gabtoli with Kamalapur through MRT Line 2. On 1 October 2019,
2029: 2024: 241: 1682: 793: 911: 890:, the Road Transport and Bridges minister, to connect Narayanganj with the Dhaka Metro network. As a result, in the meeting of the 17: 1839: 1983: 515: 2034: 2014: 927: 891: 722: 651: 671: 500: 413: 1816: 54: 1956: 1844: 899: 823: 727: 706: 666: 145: 959: 581: 510: 686: 1708: 2019: 1591:. This allocation is intended for the construction of the depot, depot access corridors, and construction yards. 919: 448: 935: 423: 691: 596: 586: 894:
on 24 November 2019, it was decided to revise and extend the route of MRT Line 2 to Chittagong Road area of
883: 474: 1872: 1779: 1024: 1014: 947: 779: 612: 607: 871: 428: 1306: 895: 676: 469: 408: 1386: 1296: 1286: 1276: 1231: 931: 863: 859: 855: 851: 839: 681: 357: 313: 1250: 1221: 696: 418: 226: 1672: 701: 625: 505: 1961: 1713: 560: 520: 433: 8: 867: 438: 387: 1270: 1266: 1033: 926:
was assured of financial support for the project by Hara Shohei, vice president of the
847: 382: 362: 342: 297: 1056: 939: 767: 484: 332: 246: 866:. On 15 June 2017, an agreement was signed between the government of Bangladesh and 1580: 1131: 1091: 906:
with the metro network. The proposed mass rapid transit line was budgeted at about
879: 819: 811: 755: 576: 540: 535: 530: 135: 1899: 1806: 1508: 1346: 1240: 1211: 1111: 656: 555: 550: 392: 377: 347: 1746: 1645: 1546: 1191: 1151: 923: 887: 545: 525: 367: 2008: 1811: 1171: 661: 464: 372: 327: 125: 64: 1579:
A land area totaling 65 hectares (0.65 km) has been designated between
874:(PPP) basis. On June 7 of the following year, a sub-working group headed by 281: 1677: 943: 750: 630: 352: 1904: 1588: 1450: 1395: 1366: 1326: 915: 914:(ERD) to find donors to fund MRT Line 2. ERD found World Bank, Japan and 903: 443: 322: 192: 156: 835: 732: 618: 601: 479: 337: 237: 68: 818:) is Dhaka's proposed rapid transit line. It will be the fifth of the 1932: 1566: 635: 1610:"āĻĒā§āĻ°ā§‹āĻŸāĻžāĻ‡ āĻ‰āĻĄāĻŧāĻžāĻ˛āĻĒāĻĨā§‡ āĻ¨āĻŋāĻ°ā§āĻŽāĻžāĻŖ āĻ­āĻžāĻ°āĻ¤ā§‡āĻ° 'āĻŽā§‡āĻŸā§āĻ°ā§‹ āĻŽā§āĻ¯āĻžāĻ¨' āĻļā§āĻ°ā§€āĻ§āĻ°āĻ¨ā§‡āĻ° āĻĒāĻ°āĻžāĻŽāĻ°ā§āĻļā§‡" 1430: 875: 737: 1927: 1583:
and Amulia Model Town, encompassing the Matuail and Damripara
1584: 843: 1775:"MRT-2 physical work: Funding setback may delay the start" 1259: 1984:"Six MRT lines to crisscross Bangladesh capital by 2030" 1868:"Metro Line-2, -4: Japan, S Korea, WB show interests" 1840:"Govt plans to start construction of MRT-2 and MRT-4" 1673:"āĻāĻ¯āĻŧāĻžāĻ°āĻĒā§‹āĻ°ā§āĻŸ āĻĨā§‡āĻ•ā§‡ āĻ•āĻŽāĻ˛āĻžāĻĒā§āĻ° āĻ†āĻ¨ā§āĻĄāĻžāĻ°āĻ—ā§āĻ°āĻžāĻ‰āĻ¨ā§āĻĄ āĻ˛āĻžāĻ‡āĻ¨ āĻšāĻšā§āĻ›ā§‡" 1928:"āĻŽā§‡āĻŸā§āĻ°ā§‹āĻ°ā§‡āĻ˛ā§‡āĻ° āĻĻā§āĻ‡ āĻĒā§āĻ°āĻ•āĻ˛ā§āĻĒā§‡ āĻ¸āĻšāĻžāĻ¯āĻŧāĻ¤āĻžāĻ° āĻ†āĻļā§āĻŦāĻžāĻ¸ āĻœāĻžāĻ‡āĻ•āĻžāĻ°" 910:. In 2023, the government decided to request the 2006: 838:published a study report, recommending that the 950:including only Hatirjheel–Dasherkandi section. 1957:"Now focus is on linking Old Dhaka with metro" 846:. In the same year, American consultancy firm 787: 1639:Zaman, Sheikh Shahriar (25 December 2022). 938:, under the direction of Planning Advisor 826:(DMTCL). It is scheduled to open in 2030. 794: 780: 1900:"āĻ¨āĻ¤ā§āĻ¨ āĻāĻ•āĻŸāĻŋ āĻŽā§‡āĻŸā§āĻ°ā§‹āĻ°ā§‡āĻ˛ā§‡ āĻ‹āĻŖ āĻĻāĻŋāĻ¤ā§‡ āĻ†āĻ—ā§āĻ°āĻšā§€ āĻšā§€āĻ¨" 1773:Adhikari, Tuhin Subhra (6 October 2022). 1865: 1772: 14: 2007: 1739: 1607: 928:Japan International Cooperation Agency 892:Dhaka Transport Coordination Authority 723:Dhaka Transport Coordination Authority 652:Hazrat Shahjalal International Airport 27:Mass rapid transit line of Dhaka Metro 2030:Standard gauge railways in Bangladesh 1955:Saif, Saifullah (21 September 2024). 1866:Adhikary, Tuhin Subhra (1 May 2023). 1837: 1742:"āĻŽā§‡āĻŸā§āĻ°ā§‹āĻ°ā§‡āĻ˛ā§‡āĻ° āĻ†āĻ“āĻ¤āĻžāĻ¯āĻŧ āĻ†āĻ¸āĻ›ā§‡ āĻ¨āĻžāĻ°āĻžāĻ¯āĻŧāĻŖāĻ—āĻžā§āĻœ" 1706: 1702: 1700: 1653:from the original on 25 December 2022 1638: 1620:from the original on 26 December 2022 918:as potential donors. On 3 July 2024, 672:Mohakhali Inter District Bus Terminal 2025:Proposed railway lines in Bangladesh 1954: 1685:from the original on 9 December 2019 55:Road Transport and Highways Division 1880:from the original on 18 August 2023 1838:Kabir, FHM Humayan (1 April 2023). 1819:from the original on 30 August 2023 1787:from the original on 30 August 2023 1754:from the original on 30 August 2023 1721:from the original on 30 August 2023 1707:Islam, Jahidul (17 December 2020). 1608:Rahman, Shamim (23 December 2022). 516:Dhaka–Chittagong high-speed railway 24: 1697: 1641:"āĻŽā§‡āĻŸā§āĻ°ā§‹āĻ°ā§‡āĻ˛ āĻ›āĻŋāĻ˛ āĻŦāĻŋāĻ°āĻžāĻŸ āĻāĻ• āĻšā§āĻ¯āĻžāĻ˛ā§‡āĻžā§āĻœ" 900:Dhaka Mass Transit Company Limited 824:Dhaka Mass Transit Company Limited 728:Dhaka Mass Transit Company Limited 707:Shyampur Baraitala railway station 667:Kamalapur Multimodal Transport Hub 146:Dhaka Mass Transit Company Limited 25: 2046: 1740:Sharif, Sahed (3 December 2019). 1632: 1601: 960:List of Dhaka Metro Rail stations 886:, submitted a written request to 501:Narayanganj–Bahadurabad Ghat line 414:Dhaka–Ashulia Elevated Expressway 1265: 1258: 912:Department of Economic Relations 761: 749: 687:Dhaka Cantonment railway station 304: 280: 1976: 1948: 1920: 1892: 1815:(in Bengali). 19 October 2022. 1681:(in Bengali). 14 October 2019. 934:was formed in August 2024, the 842:build a mass transit system in 822:system and will be operated by 1859: 1831: 1799: 1766: 1733: 1665: 1458: 936:Bangladesh Planning Commission 13: 1: 2035:MRT Line 2 (Dhaka Metro Rail) 2015:Rail transport in Narayanganj 1594: 692:Dhaka Airport railway station 511:Narayanganj–Laksam chord line 964: 884:Narayanganj City Corporation 475:Mayor Mohammed Hanif Flyover 7: 953: 920:Export–Import Bank of China 449:Hatirjheel–Demra Expressway 256:100 km/h (62 mph) 10: 2051: 1037: 957: 872:Public Private Partnership 829: 424:Dhaka–Narayanganj old road 171:35 kilometres (22 mi) 1936:(in Bengali). 3 July 2024 1908:(in Bengali). 3 July 2024 1512: 1507: 1490: 1477: 1474: 1471: 1468: 1465: 1394: 1055: 996: 983: 980: 977: 974: 971: 896:Narayanganj Sadar Upazila 870:to build MRT Line 2 on a 815: 677:Kamalapur railway station 470:Moghbazar-Mouchak Flyover 409:Dhaka Elevated Expressway 268: 260: 252: 225: 191: 183: 175: 167: 162: 151: 141: 131: 121: 116: 105: 97: 74: 60: 50: 42: 37: 33:Mass Rapid Transit Line 2 32: 1807:"āĻŽā§‡āĻŸā§āĻ°ā§‹āĻ°ā§‡āĻ˛-ā§¨ āĻāĻ° āĻ°ā§āĻŸ āĻŦāĻĻāĻ˛" 1709:"Metro Rail-2 under PPP" 1574: 932:Yunus interim government 840:government of Bangladesh 682:Gandaria railway station 358:Kazi Nazrul Islam Avenue 187:Elevated and underground 110:     18:MRT Line 2 (Dhaka Metro) 1451:Narayanganj Model Thana 697:Tejgaon railway station 419:Dhaka Bypass Expressway 2020:Dhaka Metro Rail lines 946:with revised route of 702:Banani railway station 626:Dhaka Circular Railway 429:Narayanganj–Demra road 264:13 metres (43 ft) 1962:The Business Standard 1845:The Financial Express 1714:The Business Standard 1182:Dhaka Medical College 958:Further information: 561:Sonar Bangla Express 521:Narayanganj Commuter 434:Purbachal Expressway 243:1,500 V DC 388:Hrishikesh Das Road 1990:. 28 December 2022 1271:Bangladesh Railway 1186:āĻĸāĻžāĻ•āĻž āĻŽā§‡āĻĄāĻŋāĻ•ā§‡āĻ˛ āĻ•āĻ˛ā§‡āĻœ 1034:Mirpur Model Thana 848:Louis Berger Group 506:Dhaka–Jessore line 383:Sonargaon Janapath 343:Bangabandhu Avenue 298:Transport in Dhaka 233:750 V DC 1572: 1571: 1456: 1455: 1396:Siddhirganj Thana 1057:Mohammadpur Thana 940:Wahiduddin Mahmud 804: 803: 485:Mohakhali Flyover 333:New Elephant road 292: 291: 288: 287: 261:Highest elevation 247:overhead catenary 16:(Redirected from 2042: 1999: 1998: 1996: 1995: 1980: 1974: 1973: 1971: 1969: 1952: 1946: 1945: 1943: 1941: 1924: 1918: 1917: 1915: 1913: 1896: 1890: 1889: 1887: 1885: 1863: 1857: 1856: 1854: 1852: 1835: 1829: 1828: 1826: 1824: 1803: 1797: 1796: 1794: 1792: 1770: 1764: 1763: 1761: 1759: 1737: 1731: 1730: 1728: 1726: 1704: 1695: 1694: 1692: 1690: 1669: 1663: 1662: 1660: 1658: 1636: 1630: 1629: 1627: 1625: 1605: 1581:Green Model Town 1526:āĻ—ā§‹āĻ˛āĻžāĻĒ āĻļāĻžāĻš āĻŽāĻžāĻœāĻžāĻ° 1522:Golap Shah Mazar 1463: 1462: 1392: 1389: 1302: 1299: 1292: 1289: 1282: 1279: 1269: 1262: 1237: 1234: 1132:New Market Thana 1092:Hazaribagh Thana 1030: 1027: 1020: 1017: 969: 968: 909: 880:Selina Hayat Ivy 820:Dhaka Metro Rail 817: 796: 789: 782: 766: 765: 764: 754: 753: 577:Dhaka Metro Rail 541:Barendra Express 536:Banalata Express 531:Drutajan Express 308: 294: 293: 284: 270: 269: 244: 234: 221: 217: 215: 214: 210: 207: 199: 176:Number of tracks 136:Dhaka Metro Rail 112:Violet (#8031A7) 111: 30: 29: 21: 2050: 2049: 2045: 2044: 2043: 2041: 2040: 2039: 2005: 2004: 2003: 2002: 1993: 1991: 1982: 1981: 1977: 1967: 1965: 1953: 1949: 1939: 1937: 1926: 1925: 1921: 1911: 1909: 1898: 1897: 1893: 1883: 1881: 1864: 1860: 1850: 1848: 1836: 1832: 1822: 1820: 1805: 1804: 1800: 1790: 1788: 1771: 1767: 1757: 1755: 1738: 1734: 1724: 1722: 1705: 1698: 1688: 1686: 1671: 1670: 1666: 1656: 1654: 1637: 1633: 1623: 1621: 1606: 1602: 1597: 1577: 1461: 1387: 1384: 1347:Sabujbagh Thana 1297: 1294: 1293: 1287: 1284: 1283: 1277: 1274: 1264: 1232: 1229: 1112:Dhanmondi Thana 1106:āĻ¸āĻžāĻ¯āĻŧā§‡āĻ¨ā§āĻ¸ āĻ˛ā§āĻ¯āĻžāĻŦ 1025: 1022: 1021: 1015: 1012: 967: 962: 956: 907: 882:, the mayor of 832: 800: 762: 760: 748: 657:Tejgaon Airport 556:Suborno Express 551:Maitree Express 378:Sat Masjid Road 348:B. K. Dash Road 275: 253:Operating speed 242: 232: 227:Electrification 219: 212: 208: 205: 203: 202:4 ft  201: 197: 109: 93: 28: 23: 22: 15: 12: 11: 5: 2048: 2038: 2037: 2032: 2027: 2022: 2017: 2001: 2000: 1975: 1947: 1919: 1891: 1873:The Daily Star 1858: 1830: 1798: 1780:The Daily Star 1765: 1750:(in Bengali). 1747:Bangla Tribune 1732: 1696: 1664: 1649:(in Bengali). 1646:Bangla Tribune 1631: 1616:(in Bengali). 1614:Bonikbarta.net 1599: 1598: 1596: 1593: 1576: 1573: 1570: 1569: 1564: 1562: 1559: 1554: 1550: 1549: 1547:Bangshal Thana 1544: 1542: 1539: 1534: 1530: 1529: 1527: 1524: 1519: 1515: 1514: 1511: 1506: 1504: 1501: 1496: 1492: 1491: 1488: 1487: 1484: 1480: 1479: 1476: 1473: 1470: 1467: 1460: 1457: 1454: 1453: 1448: 1446: 1443: 1438: 1434: 1433: 1431:Fatullah Thana 1428: 1426: 1423: 1418: 1414: 1413: 1411: 1408: 1403: 1399: 1398: 1393: 1382: 1379: 1374: 1370: 1369: 1364: 1362: 1359: 1354: 1350: 1349: 1344: 1342: 1339: 1334: 1330: 1329: 1324: 1322: 1319: 1314: 1310: 1309: 1304: 1256: 1253: 1248: 1244: 1243: 1238: 1227: 1224: 1219: 1215: 1214: 1209: 1207: 1204: 1199: 1195: 1194: 1192:Shahbagh Thana 1189: 1187: 1184: 1179: 1175: 1174: 1169: 1167: 1164: 1159: 1155: 1154: 1149: 1147: 1144: 1139: 1135: 1134: 1129: 1127: 1124: 1119: 1115: 1114: 1109: 1107: 1104: 1099: 1095: 1094: 1089: 1087: 1084: 1079: 1075: 1074: 1072: 1069: 1064: 1060: 1059: 1054: 1052: 1049: 1044: 1040: 1039: 1036: 1031: 1010: 1007: 1002: 998: 997: 994: 993: 990: 986: 985: 982: 979: 976: 973: 966: 963: 955: 952: 948:Southern Route 924:Md Tazul Islam 888:Obaidul Quader 854:, MRT Line 2, 831: 828: 802: 801: 799: 798: 791: 784: 776: 773: 772: 771: 770: 758: 743: 742: 741: 740: 735: 730: 725: 717: 716: 712: 711: 710: 709: 704: 699: 694: 689: 684: 679: 674: 669: 664: 659: 654: 646: 645: 641: 640: 639: 638: 633: 628: 623: 622: 621: 616: 610: 604: 599: 594: 589: 584: 571: 570: 566: 565: 564: 563: 558: 553: 548: 546:Mitali Express 543: 538: 533: 528: 526:Turag Commuter 523: 518: 513: 508: 503: 495: 494: 493:Rail transport 490: 489: 488: 487: 482: 477: 472: 467: 459: 458: 454: 453: 452: 451: 446: 441: 436: 431: 426: 421: 416: 411: 403: 402: 398: 397: 396: 395: 390: 385: 380: 375: 370: 368:Pragati Sarani 365: 360: 355: 350: 345: 340: 335: 330: 325: 317: 316: 310: 309: 301: 300: 290: 289: 286: 285: 277: 276: 273: 266: 265: 262: 258: 257: 254: 250: 249: 229: 223: 222: 220:standard gauge 195: 189: 188: 185: 181: 180: 177: 173: 172: 169: 165: 164: 160: 159: 153: 149: 148: 143: 139: 138: 133: 129: 128: 123: 119: 118: 114: 113: 107: 103: 102: 99: 95: 94: 92: 91: 85: 78: 76: 72: 71: 62: 58: 57: 52: 48: 47: 44: 40: 39: 35: 34: 26: 9: 6: 4: 3: 2: 2047: 2036: 2033: 2031: 2028: 2026: 2023: 2021: 2018: 2016: 2013: 2012: 2010: 1989: 1985: 1979: 1964: 1963: 1958: 1951: 1935: 1934: 1929: 1923: 1907: 1906: 1901: 1895: 1879: 1875: 1874: 1869: 1862: 1847: 1846: 1841: 1834: 1818: 1814: 1813: 1812:Amader Shomoy 1808: 1802: 1786: 1782: 1781: 1776: 1769: 1753: 1749: 1748: 1743: 1736: 1720: 1716: 1715: 1710: 1703: 1701: 1684: 1680: 1679: 1674: 1668: 1652: 1648: 1647: 1642: 1635: 1619: 1615: 1611: 1604: 1600: 1592: 1590: 1586: 1582: 1568: 1565: 1563: 1560: 1558: 1555: 1552: 1551: 1548: 1545: 1543: 1540: 1538: 1535: 1532: 1531: 1528: 1525: 1523: 1520: 1517: 1516: 1510: 1505: 1502: 1500: 1497: 1494: 1493: 1489: 1485: 1482: 1481: 1464: 1452: 1449: 1447: 1444: 1442: 1439: 1436: 1435: 1432: 1429: 1427: 1424: 1422: 1419: 1416: 1415: 1412: 1409: 1407: 1404: 1401: 1400: 1397: 1390: 1383: 1380: 1378: 1375: 1372: 1371: 1368: 1365: 1363: 1360: 1358: 1355: 1352: 1351: 1348: 1345: 1343: 1340: 1338: 1335: 1332: 1331: 1328: 1325: 1323: 1320: 1318: 1315: 1312: 1311: 1308: 1305: 1303: 1300: 1290: 1280: 1272: 1268: 1261: 1257: 1254: 1252: 1249: 1246: 1245: 1242: 1239: 1235: 1228: 1225: 1223: 1220: 1217: 1216: 1213: 1210: 1208: 1205: 1203: 1200: 1197: 1196: 1193: 1190: 1188: 1185: 1183: 1180: 1177: 1176: 1173: 1170: 1168: 1165: 1163: 1160: 1157: 1156: 1153: 1150: 1148: 1145: 1143: 1140: 1137: 1136: 1133: 1130: 1128: 1125: 1123: 1120: 1117: 1116: 1113: 1110: 1108: 1105: 1103: 1100: 1097: 1096: 1093: 1090: 1088: 1085: 1083: 1080: 1077: 1076: 1073: 1070: 1068: 1065: 1062: 1061: 1058: 1053: 1050: 1048: 1045: 1042: 1041: 1035: 1032: 1028: 1018: 1011: 1008: 1006: 1003: 1000: 999: 995: 991: 988: 987: 970: 961: 951: 949: 945: 941: 937: 933: 929: 925: 921: 917: 913: 908:ā§ŗ60,000 crore 905: 901: 897: 893: 889: 885: 881: 877: 873: 869: 865: 861: 857: 853: 849: 845: 841: 837: 834:In 2005, the 827: 825: 821: 816:āĻāĻŽāĻ†āĻ°āĻŸāĻŋ āĻ˛āĻžāĻ‡āĻ¨ ā§¨ 813: 809: 797: 792: 790: 785: 783: 778: 777: 775: 774: 769: 759: 757: 752: 747: 746: 745: 744: 739: 736: 734: 731: 729: 726: 724: 721: 720: 719: 718: 714: 713: 708: 705: 703: 700: 698: 695: 693: 690: 688: 685: 683: 680: 678: 675: 673: 670: 668: 665: 663: 662:Port of Dhaka 660: 658: 655: 653: 650: 649: 648: 647: 643: 642: 637: 634: 632: 629: 627: 624: 620: 617: 614: 611: 609: 605: 603: 600: 598: 595: 593: 590: 588: 585: 583: 580: 579: 578: 575: 574: 573: 572: 568: 567: 562: 559: 557: 554: 552: 549: 547: 544: 542: 539: 537: 534: 532: 529: 527: 524: 522: 519: 517: 514: 512: 509: 507: 504: 502: 499: 498: 497: 496: 492: 491: 486: 483: 481: 478: 476: 473: 471: 468: 466: 465:Kuril Flyover 463: 462: 461: 460: 456: 455: 450: 447: 445: 442: 440: 437: 435: 432: 430: 427: 425: 422: 420: 417: 415: 412: 410: 407: 406: 405: 404: 400: 399: 394: 391: 389: 386: 384: 381: 379: 376: 374: 373:Madani Avenue 371: 369: 366: 364: 361: 359: 356: 354: 351: 349: 346: 344: 341: 339: 336: 334: 331: 329: 328:Nawabpur Road 326: 324: 321: 320: 319: 318: 315: 312: 311: 307: 303: 302: 299: 296: 295: 283: 279: 278: 272: 271: 267: 263: 259: 255: 251: 248: 245: 239: 235: 230: 228: 224: 198:1,435 mm 196: 194: 190: 186: 182: 178: 174: 170: 166: 161: 158: 154: 150: 147: 144: 140: 137: 134: 130: 127: 126:Rapid transit 124: 120: 115: 108: 106:Colour on map 104: 100: 96: 89: 86: 83: 80: 79: 77: 73: 70: 66: 65:Greater Dhaka 63: 59: 56: 53: 49: 45: 41: 36: 31: 19: 1992:. Retrieved 1987: 1978: 1968:21 September 1966:. Retrieved 1960: 1950: 1938:. Retrieved 1931: 1922: 1910:. Retrieved 1903: 1894: 1882:. Retrieved 1871: 1861: 1849:. Retrieved 1843: 1833: 1821:. Retrieved 1810: 1801: 1789:. Retrieved 1778: 1768: 1756:. Retrieved 1745: 1735: 1723:. Retrieved 1712: 1687:. Retrieved 1678:Kaler Kantho 1676: 1667: 1655:. Retrieved 1644: 1634: 1622:. Retrieved 1613: 1603: 1578: 1472:Connections 1445:āĻ¨āĻžāĻ°āĻžāĻ¯āĻŧāĻŖāĻ—āĻžā§āĻœ 1361:āĻ§āĻžāĻŽāĻĄāĻŧāĻŋāĻĒāĻžāĻĄāĻŧāĻž 1273: 1126:āĻ¨āĻŋāĻ‰ āĻŽāĻžāĻ°ā§āĻ•ā§‡āĻŸ 1071:āĻŽā§‹āĻšāĻžāĻŽā§āĻŽāĻĻāĻĒā§āĻ° 1051:āĻĸāĻžāĻ•āĻž āĻ‰āĻĻā§āĻ¯āĻžāĻ¨ 1047:Dhaka Uddyan 978:Connections 944:Bijoy Sarani 930:. After the 833: 807: 805: 631:Dhaka Subway 591: 569:Mass transit 439:Airport Road 353:Bijoy Sarani 1905:Prothom Alo 1657:26 December 1624:26 December 1459:Branch line 1441:Narayanganj 1367:Demra Thana 1341:āĻĻāĻ•ā§āĻˇāĻŋāĻŖāĻ—āĻžāĻāĻ“ 1337:Dakshingaon 1327:Mugda Thana 1263:Bus station 1102:Science Lab 1067:Mohammadpur 1026:MRT Line 5S 1016:MRT Line 5N 916:South Korea 904:Narayanganj 444:Mirpur Road 363:Bailey Road 323:Indira Road 193:Track gauge 168:Line length 157:Demra Thana 142:Operator(s) 88:Narayanganj 2009:Categories 1994:2024-03-07 1595:References 1541:āĻ¨āĻ¯āĻŧāĻžāĻŦāĻžāĻœāĻžāĻ° 1503:āĻ—ā§āĻ˛āĻŋāĻ¸ā§āĻ¤āĻžāĻ¨ 1388:MRT Line 4 1381:āĻ¸āĻžāĻ‡āĻ¨āĻŦā§‹āĻ°ā§āĻĄ 1357:Dhamripara 1298:MRT Line 6 1288:MRT Line 4 1278:MRT Line 1 1233:MRT Line 6 1206:āĻ—ā§āĻ˛āĻŋāĻ¸ā§āĻ¤āĻžāĻ¨ 1122:New Market 864:MRT Line 6 860:MRT Line 5 856:MRT Line 4 852:MRT Line 1 836:World Bank 808:MRT Line 2 768:Bangladesh 733:Rapid Pass 644:Structures 480:Hatirjheel 338:Panthapath 238:third rail 69:Bangladesh 1933:Jamuna TV 1884:18 August 1851:14 August 1823:14 August 1791:14 August 1758:18 August 1725:14 August 1567:Sadarghat 1557:Sadarghat 1537:Nayabazar 1475:Location 1425:āĻœāĻžāĻ˛āĻ•ā§āĻĄāĻŧāĻŋ 1377:Signboard 1307:Kamalapur 1251:Kamalapur 1241:Motijheel 1222:Motijheel 1082:Jhigatola 981:Location 965:Main line 756:Transport 636:Dhaka BRT 274:Route map 184:Character 163:Technical 155:Matuail, 1878:Archived 1817:Archived 1785:Archived 1752:Archived 1719:Archived 1689:10 March 1683:Archived 1651:Archived 1618:Archived 1513:Planned 1509:Gulistan 1499:Gulistan 1486:Bengali 1483:English 1406:Bhuighar 1255:āĻ•āĻŽāĻ˛āĻžāĻĒā§āĻ° 1212:Gulistan 1202:Gulistan 1146:āĻ†āĻœāĻŋāĻŽāĻĒā§āĻ° 1086:āĻāĻŋāĻ—āĻžāĻ¤āĻ˛āĻž 1038:Planned 992:Bengali 989:English 954:Stations 876:Marubeni 738:MRT Pass 582:Stations 393:Gulistan 216: in 152:Depot(s) 98:Stations 46:Proposed 38:Overview 1988:New Age 1561:āĻ¸āĻĻāĻ°āĻ˜āĻžāĻŸ 1478:Opened 1421:Jalkury 1321:āĻŽāĻžāĻ¨ā§āĻĄāĻž 1226:āĻŽāĻ¤āĻŋāĻāĻŋāĻ˛ 1172:Lalbagh 1162:Palashi 1152:Azimpur 1142:Azimpur 1009:āĻ—āĻžāĻŦāĻ¤āĻ˛ā§€ 1005:Gabtoli 984:Opened 830:History 812:Bengali 613:Line 5S 608:Line 5N 457:Bridges 314:Streets 211:⁄ 117:Service 90:(South) 82:Gabtoli 75:Termini 1940:5 July 1912:5 July 1585:mouzas 1410:āĻ­ā§āĻ‡āĻ˜āĻ° 1391:  1385:  1301:  1295:  1291:  1285:  1281:  1275:  1236:  1230:  1166:āĻĒāĻ˛āĻžāĻļā§€ 1029:  1023:  1019:  1013:  715:Others 619:Line 6 602:Line 5 597:Line 4 592:Line 2 587:Line 1 236:  132:System 84:(West) 61:Locale 43:Status 1589:Demra 1575:Depot 1469:Name 1466:Code 1317:Manda 975:Name 972:Code 868:Japan 844:Dhaka 401:Roads 51:Owner 1970:2024 1942:2024 1914:2024 1886:2023 1853:2023 1825:2023 1793:2023 1760:2023 1727:2023 1691:2023 1659:2022 1626:2022 862:and 806:The 240:and 122:Type 1587:in 1437:19 1417:18 1402:17 1373:16 1353:15 1333:14 1313:13 1247:12 1218:11 1198:10 2011:: 1986:. 1959:. 1930:. 1902:. 1876:. 1870:. 1842:. 1809:. 1783:. 1777:. 1744:. 1717:. 1711:. 1699:^ 1675:. 1643:. 1612:. 1553:4 1533:3 1518:2 1495:1 1178:9 1158:8 1138:7 1118:6 1098:5 1078:4 1063:3 1043:2 1001:1 858:, 814:: 218:) 101:22 67:, 1997:. 1972:. 1944:. 1916:. 1888:. 1855:. 1827:. 1795:. 1762:. 1729:. 1693:. 1661:. 1628:. 810:( 795:e 788:t 781:v 615:) 606:( 213:2 209:1 206:+ 204:8 200:( 179:2 20:)

Index

MRT Line 2 (Dhaka Metro)
Road Transport and Highways Division
Greater Dhaka
Bangladesh
Gabtoli
Narayanganj
Rapid transit
Dhaka Metro Rail
Dhaka Mass Transit Company Limited
Demra Thana
Track gauge
Electrification
750 V DC
third rail
1,500 V DC
overhead catenary

Transport in Dhaka
Kamalapur railway station at night
Streets
Indira Road
Nawabpur Road
New Elephant road
Panthapath
Bangabandhu Avenue
B. K. Dash Road
Bijoy Sarani
Kazi Nazrul Islam Avenue
Bailey Road
Pragati Sarani

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑