36:
183:
278:
The concrete arch dam is about 100 feet (30 m) high and 480 feet (150 m) long at the dam's crest. Approximately 14,000 cubic yards (11,000 m) of concrete were used to construct the dam. During construction, scaffolding collapsed resulting in seven men sustaining injuries, with two men
210:
only, and is not generally recommended. The high parts of the road are closed from early June to late
September each year, and Poolburn Reservoir thus cannot be accessed by road during winter. The road from Paerau to the Ida Valley via Poolburn Reservoir is part of the
275:, reported in August 1930 that the excavation for the concrete arch dam had been filled to approximately ground level. Poolburn Reservoir was completed by late 1931. The reservoir is located on the Old Dunstan Road and the flooded area had five hotels.
231:. With no major settlements along its way, much of the Old Dunstan Road was never fully formed, resulting in only seasonal access to Poolburn Reservoir. Since 2004, council staff fly in by helicopter to lock the mountainous roads each winter.
282:
Today, the dam is administered by the Ida Valley
Irrigation Company. When full, the reservoir covers over 300 hectares (3.0 km). Poolburn Reservoir and Poolburn Dam are alternative names for the same body of water.
227:
was longer by 50 kilometres (31 mi) but much easier to travel on, as it did cross any mountainous ranges or major rivers. This became the major wagon route and is today
322:
around the reservoir. An application to subdivide a 902 hectares (2,230 acres) land holding for housing was withdrawn just prior to the hearing, as the commissioner for the
158:
The reservoir is located west of the Rough Ridge Range. Long Valley Creek feeds the reservoir, and the reservoir itself feeds the Pool Burn. The Pool Burn flows into the
298:
were introduced into the reservoir, but only brown trout remain. The other aquatic species that can be caught is the New
Zealand freshwater crayfish
163:
267:
71,823 into the 1930 budget. Preliminary work, including the construction of the access road from the Ida Valley, started in late 1929. The
64:
768:
272:
623:
567:
679:
651:
595:
511:
268:
480:
453:
713:
311:
244:
403:
773:
736:
539:
252:
240:
485:
323:
260:
251:, in March 1929 with regards to a proposal for an irrigation dam for the benefit of Ida Valley farmers. The
228:
430:
342:
373:
778:
224:
255:
approved the scheme by
September of that year, partially as an employment initiative during the
684:
656:
203:
96:
306:
206:(24 kilometres or 15 miles), but this is a dry-weather road only that can be negotiated by
8:
369:
146:
for irrigation but also as an employment initiative, the water is used by farmers in the
279:
initially in critical condition. In June 1931, one worker died from a fall at the site.
319:
223:
to the gold fields took five days. An alternative route to the gold fields starting in
741:
458:
264:
171:
256:
212:
207:
143:
707:
216:
167:
215:
that gave gold diggers access to the gold fields during the early days of the
762:
407:
295:
135:
79:
66:
49:
299:
291:
248:
198:
in the Ida Valley (43 kilometres or 27 miles). There is also access from
139:
35:
159:
147:
628:
600:
572:
544:
516:
195:
182:
220:
660:. Vol. LXVII, no. 20725. 19 November 1930. p. 10
398:
396:
394:
392:
390:
199:
191:
632:. Vol. LXVII, no. 20384. 3 November 1931. p. 16
194:
in the
Manuherikia Valley (30 kilometres or 19 miles) or from
688:. Vol. LXVIII, no. 20897. 12 June 1931. p. 10
604:. Vol. LXVI, no. 20018. 28 August 1930. p. 10
576:. Vol. LXV, no. 19760. 26 October 1929. p. 18
520:. Vol. LXV, no. 19716. 5 September 1929. p. 8
387:
548:. Vol. LXVI, no. 19989. 25 July 1930. p. 13
489:. Vol. CVII, no. 68. 23 March 1929. p. 10
162:, combines with the Ida Burn, and breaks through the
190:There is access to Poolburn Reservoir from either
760:
506:
504:
57:
501:
454:"Central Otago Helicopters a waste: farmers"
712:(Sign on access road). Poolburn Reservoir:
422:
326:had recommended for consent to be refused.
181:
737:"Applicant withdraws on eve of hearing"
16:Reservoir in Central Otago, New Zealand
761:
364:
362:
360:
305:Poolburn Reservoir was used to depict
734:
451:
428:
357:
13:
431:"The Mountain Road / Dunstan Road"
14:
790:
769:Buildings and structures in Otago
735:Brown, Diane (15 November 2008).
40:Poolburn Reservoir in April 2015
34:
728:
700:
672:
644:
616:
588:
406:. Central Otago. Archived from
560:
532:
473:
445:
335:
324:Central Otago District Council
263:with its construction and put
1:
329:
239:A deputation went to see the
452:Brown, Diane (6 June 2008).
153:
7:
343:"Poolburn Reservoir, Otago"
10:
795:
512:"Central Otago Irrigation"
261:Department of Public Works
234:
121:300 hectares (3.0 km)
774:Reservoirs in New Zealand
177:
117:
113:
105:
95:
56:
45:
33:
28:
23:
624:"Public Works Statement"
374:Otago Central Rail Trail
286:
269:Minister of Public Works
170:before flowing into the
680:"Fall from Rope Ladder"
652:"Scaffolding Collapses"
685:The New Zealand Herald
657:The New Zealand Herald
187:
186:Poolburn Reservoir dam
714:Ministry of Fisheries
312:The Lord of the Rings
204:Rock and Pillar Range
185:
134:, is a reservoir in
481:"Irrigation Scheme"
433:. New Zealand South
219:. The journey from
142:. Built during the
76: /
259:, and charged the
241:Minister of Labour
188:
128:Poolburn Reservoir
80:45.317°S 169.750°E
24:Poolburn Reservoir
742:Otago Daily Times
596:"Political Notes"
459:Otago Daily Times
253:United Government
172:Manuherikia River
125:
124:
786:
754:
753:
751:
749:
732:
726:
725:
723:
721:
704:
698:
697:
695:
693:
676:
670:
669:
667:
665:
648:
642:
641:
639:
637:
620:
614:
613:
611:
609:
592:
586:
585:
583:
581:
564:
558:
557:
555:
553:
536:
530:
529:
527:
525:
508:
499:
498:
496:
494:
486:The Evening Post
477:
471:
470:
468:
466:
449:
443:
442:
440:
438:
426:
420:
419:
417:
415:
410:on 23 April 2015
400:
385:
384:
382:
380:
366:
355:
354:
352:
350:
339:
273:William Taverner
257:Great Depression
229:State Highway 85
213:Old Dunstan Road
208:four-wheel drive
144:Great Depression
130:, also known as
91:
90:
88:
87:
86:
85:-45.317; 169.750
81:
77:
74:
73:
72:
69:
59:
38:
21:
20:
794:
793:
789:
788:
787:
785:
784:
783:
759:
758:
757:
747:
745:
733:
729:
719:
717:
706:
705:
701:
691:
689:
678:
677:
673:
663:
661:
650:
649:
645:
635:
633:
622:
621:
617:
607:
605:
594:
593:
589:
579:
577:
566:
565:
561:
551:
549:
538:
537:
533:
523:
521:
510:
509:
502:
492:
490:
479:
478:
474:
464:
462:
450:
446:
436:
434:
429:Douglas, John.
427:
423:
413:
411:
402:
401:
388:
378:
376:
368:
367:
358:
348:
346:
341:
340:
336:
332:
318:There are many
289:
237:
217:Otago gold rush
180:
156:
84:
82:
78:
75:
70:
67:
65:
63:
62:
41:
17:
12:
11:
5:
792:
782:
781:
779:Lakes of Otago
776:
771:
756:
755:
727:
699:
671:
643:
615:
587:
568:"Public Works"
559:
531:
500:
472:
444:
421:
404:"Poolburn Dam"
386:
356:
333:
331:
328:
315:film trilogy.
288:
285:
236:
233:
179:
176:
168:Poolburn Gorge
155:
152:
123:
122:
119:
115:
114:
111:
110:
107:
103:
102:
99:
93:
92:
60:
54:
53:
47:
43:
42:
39:
31:
30:
26:
25:
15:
9:
6:
4:
3:
2:
791:
780:
777:
775:
772:
770:
767:
766:
764:
744:
743:
738:
731:
715:
711:
710:
703:
687:
686:
681:
675:
659:
658:
653:
647:
631:
630:
625:
619:
603:
602:
597:
591:
575:
574:
569:
563:
547:
546:
541:
535:
519:
518:
513:
507:
505:
488:
487:
482:
476:
461:
460:
455:
448:
432:
425:
409:
405:
399:
397:
395:
393:
391:
375:
371:
365:
363:
361:
345:. NZ Topo Map
344:
338:
334:
327:
325:
321:
316:
314:
313:
308:
303:
301:
297:
296:rainbow trout
293:
284:
280:
276:
274:
270:
266:
262:
258:
254:
250:
246:
242:
232:
230:
226:
222:
218:
214:
209:
205:
201:
197:
193:
184:
175:
173:
169:
165:
164:Raggedy Range
161:
151:
149:
145:
141:
137:
136:Central Otago
133:
129:
120:
116:
112:
108:
104:
100:
98:
94:
89:
61:
55:
51:
50:Central Otago
48:
44:
37:
32:
27:
22:
19:
746:. Retrieved
740:
730:
718:. Retrieved
708:
702:
690:. Retrieved
683:
674:
662:. Retrieved
655:
646:
634:. Retrieved
627:
618:
606:. Retrieved
599:
590:
578:. Retrieved
571:
562:
550:. Retrieved
543:
540:"The Budget"
534:
522:. Retrieved
515:
491:. Retrieved
484:
475:
463:. Retrieved
457:
447:
435:. Retrieved
424:
412:. Retrieved
408:the original
377:. Retrieved
347:. Retrieved
337:
317:
310:
304:
290:
281:
277:
238:
189:
157:
132:Poolburn Dam
131:
127:
126:
118:Surface area
29:Poolburn Dam
18:
292:Brown trout
249:Bill Veitch
140:New Zealand
83: /
58:Coordinates
763:Categories
370:"Poolburn"
330:References
225:Palmerston
160:Ida Valley
148:Ida Valley
629:The Press
601:The Press
573:The Press
545:The Press
517:The Press
245:Transport
202:over the
154:Geography
109:1930–1931
101:Reservoir
196:Oturehua
71:169°45′E
46:Location
748:7 April
720:7 April
692:7 April
664:7 April
636:7 April
608:7 April
580:7 April
552:7 April
524:7 April
493:7 April
465:7 April
437:7 April
414:7 April
379:7 April
349:7 April
235:History
221:Dunedin
166:as the
68:45°19′S
716:. 2015
320:baches
200:Paerau
192:Omakau
178:Access
709:Koura
307:Rohan
300:koura
287:Usage
106:Built
750:2015
722:2015
694:2015
666:2015
638:2015
610:2015
582:2015
554:2015
526:2015
495:2015
467:2015
439:2015
416:2015
381:2015
351:2015
294:and
243:and
97:Type
52:, NZ
309:in
765::
739:.
682:.
654:.
626:.
598:.
570:.
542:.
514:.
503:^
483:.
456:.
389:^
372:.
359:^
302:.
271:,
247:,
174:.
150:.
138:,
752:.
724:.
696:.
668:.
640:.
612:.
584:.
556:.
528:.
497:.
469:.
441:.
418:.
383:.
353:.
265:£
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.