1420:
5244:
58:
1392:
1436:
1638:
2290:
5850:
5262:
1408:
1893:
6885:
6062:
5538:
5275:
743:
49:
5232:
1464:
1275:, was looking for a test site for the ICTS system and demanded that the TTC use it for one of their planned streetcar projects, selecting the Scarborough extension. The TTC initially refused to make the change, arguing it was both the wrong solution and that since the construction of the line had already commenced this would be a waste of money. However, as the Ontario government was providing 75 percent of the funding for the line, they changed their minds when the government threatened to cut the funding.
6254:
5288:
491:
1555:, with return current travelling through the running rails, a separate positive and negative power rail were provided on one side of the track. With respect to the accelerating trucks and the micro-lifting, the truck wheels had a somewhat larger flange than normal in order to keep the car inline on the track during the micro-lifting. The linear induction motors also allowed the cars to climb steeper grades than would be possible with traditional subway technology since wheel slip was not an issue.
796:
789:
1298:
2508:
Eglinton Avenue and
Lawrence Avenue), Lawrence Avenue East and Ellesmere Road. Between the proposed Ellesmere stop and Scarborough Centre station, buses would operate along Ellesmere Road and Brimley Road. Midland and McCowan stations, along with the connecting guideway, would be permanently shut down as they were deemed not usable for a busway. The busway would operate until the opening of the Line 2 Scarborough subway extension, after which its disposition was not known.
1934:
705:
659:
607:
598:
1952:
1992:
683:
7049:
2045:
1908:
1866:
1602:, with two trainsets being retained for preservation. In June 2024, the Detroit People Mover transit system announced the purchase of the Mark I train sets and equipment from Line 3. Their transportation to and integration with the Detroit People Mover was projected to take over a year and a half. The purchase would replace the system's existing train sets with upgraded features, along with providing much-needed parts needed to keep the system functional.
615:
393:
758:
2185:
2091:
2083:
2019:
1970:
462:
431:
2147:
2027:
1874:
1849:
1221:
569:
540:
2101:
2037:
1587:; the operator monitored their operations and controlled the doors. One of the features which was not implemented at the time of Scarborough line's opening was the automated audible-only next-stop announcement system, which was introduced in January 2008 and meant operators were no longer required to announce stops manually. These announcements feature the voice of Susan Bigioni, a TTC employee, who also voiced the announcements for the
676:
547:
408:
367:
1124:
2109:
1858:
804:
782:
773:
669:
651:
753:
2162:
2154:
498:
484:
400:
1229:
1941:
1927:
838:
715:
697:
690:
6771:
5238:
447:
6627:
6386:
5316:
5301:
748:
812:
723:
623:
576:
6297:
1888:
1452:
1356:
several weeks, the city accelerated work to support the replacement buses. On August 24, 2023, the TTC announced that the line would not reopen. In late
September 2023, the TTC explained that bolts that held the linear induction rail to the roadbed had come loose in the July incident, causing the magnetically attracted induction rail to rise up, strike and derail the last car of the train.
1310:
uni-directional streetcars under the earlier plan and not needed for the bi-directional ICTS trains, was causing derailments; it was replaced with a single terminal track and the station was thus quasi-Spanish solution, with one side for boarding and another side for alighting, though the boarding side is also used for alighting during off-peak hours, weekends and holidays.
1093:
resulted in the line permanently closing four months ahead of schedule. By March 2023, a plan existed to convert a portion of the existing right-of-way between
Kennedy and Ellesmere stations into a bus right-of-way, including an additional stop at Mooregate Avenue / Tara Avenue, located near a pedestrian bridge that spans over the former Line 3 and GO Transit's
1282:, there are clues revealing that it was originally built for streetcar operation; it is possible to see old low-level streetcar platforms protruding under the current high-level platforms, and the loop to turn streetcars proved too sharp for safe operation of the ICTS cars, which did not have a reason to turn around, so the loop was replaced by a single-track
1364:
and
Scarborough Centre stations. Unlike the shuttle service, route 903 did not serve the closed Lawrence East, Ellesmere, Midland and McCowan stations. On November 19, 2023, the TTC extended eight bus routes from Scarborough Centre to Kennedy station, eliminating the need to transfer to route 903 at Scarborough Centre station.
1523:. After Bombardier took over UTDC, it redesigned the technology with newer, longer cars, used to expand the SkyTrain network and also for new installations across the world. ICTS was rebranded as "Advanced Rapid Transit" (ART) and became a success for the company. Later, the technology was again rebranded, this time as
1697:, where it connects with the 322 Coxwell bus that travelled to the west, as well as Route 324 Victoria Park that runs north. From the loop, Route 302 travels east along Kingston Road to Brimley Road, then north along Brimley Road to Danforth Road, then north on McCowan Road to Steeles Avenue. With the exception of
1419:
1076:
was debating competing plans to revitalize and expand the line, to convert its right-of-way for use by modern light rail vehicles, or to close the line and extend Line 2 Bloor–Danforth farther into
Scarborough along a different route. In 2013, Toronto City Council decided on a three-station extension
2507:
In April 2022, the TTC recommended that the Line 3 right-of-way between
Kennedy and Ellesmere stations be converted into a 4-kilometre (2.5 mi) dedicated busway after the Line 3 closure. There would be stops along the right-of-way at Mooregate Avenue / Tara Avenue (approximately halfway between
2407:
In 2013, the rejected LRT proposal would have provided a 9.9-kilometre (6.2 mi) line with seven stops serving 47,000 residents within walking distance. The selected 3-stop subway extension would be 7.6 km (4.7 mi) long, serving 14,000–20,000 residents within walking distance. In 2013,
2355:
again debated having the
Scarborough line replaced with an extension of Line 2 Bloor–Danforth north to Sheppard Avenue along a different right of way. Metrolinx issued a letter to Toronto City Council indicating it would cease work on the Scarborough portion of the line, because its position strayed
1363:
was implemented initially by shuttle buses serving the closed stations along Line 3. On
September 3, 2023, the TTC replaced the shuttle bus service with route 903 Kennedy–Scarborough Centre Express, running northbound on Kennedy Road and southbound on Midland Avenue in reserved lanes between Kennedy
1355:
On July 24, 2023, the last car of a train on Line 3 Scarborough derailed south of
Ellesmere station. There were 45 people on board, with five injuries reported. The TTC closed the line while the cause of the incident was being investigated. Although the investigation and closure was expected to last
1320:
to emphasize the line's colour and displaying the number 3, a linear diagram of the
Scarborough line, and the TTC logo. The original "RT" logo was no longer featured on the trains, except when the Line 3 shrink wrap is removed but not re-applied yet. These were followed by interior upgrades, such as
2439:
billion because of "delays and redesign" since 2013, but Brad Ross, also of the TTC, warned of "caveats around numbers and assumptions" associated with that estimate. After Council's vote, Byford admitted that the cost estimates for "delays" was unnecessary, which assumed the LRT's completion would
2401:. The Murray plan would have required the relocation of Kennedy station as a new northbound curve from the existing Kennedy station would have been too tight for subway trains. It would also have required the complete shutdown of the line during construction, something that the Stintz plan avoided.
2591:
Eight TTC bus routes will be extended from Scarborough Centre to Kennedy station, saving their riders three minutes in transfer time. With the full implementation of transit priority measures, buses will run via Kennedy Road (northbound), Midland Avenue (southbound), Ellesmere, Brimley and Triton
2444:
billion, an estimate not presented to City Council when it voted. There was also the issue of whether there would be space for both expanded GO service and an LRT north of Kennedy station; however, Metrolinx subsequently denied there would be such a problem. On July 13, Toronto City Council voted
2411:
Converting Line 3 to light rail would require the complete shutdown of the line while extending Line 2 could occur without requiring a Line 3 shutdown. Circa 2013, this was promoted as a major benefit of the Line 2 extension over a conversion to light rail. At the time, the TTC estimated it could
2527:
million would be required to modify the bus platforms at Kennedy and Scarborough Centre stations. With the dedicated lanes, a trip between Kennedy and Scarborough Centre stations would take 17 to 22 minutes versus 15 minutes using the future busway. The duration of the same trip on Line 3 was 10
2488:
stated that Line 3 was likely to fail and be taken out of service before the Scarborough Subway Extension was completed, with the failure possibly happening several years before completion. At that point, the Line 3 vehicles were 35 years old, a decade past their 25-year life expectancy, and had
2531:
Work on the dedicated bus lanes was expected to be completed by November 19, 2023, when Line 3 had been scheduled to shut down. However, due to the derailment of a Line 3 train on July 24, 2023, the TTC decided to end Line 3 service three months earlier. The dedicated bus lanes began service on
1546:
metal plate that ran down the centre of the tracks. This system required very few moving parts and therefore led to lower maintenance costs. When the car motors were accelerating, they actually lifted the car off the track an extremely small distance, repelling against the aluminum plate. This
1105:
From when the line opened in 1985 until 2015, it was known as the "Scarborough RT" or "SRT". The "RT" in Scarborough RT stood for "rapid transit". The name Scarborough Line was used on the official TTC website and 2014 TTC Ride Guide. In October 2013, the TTC announced plans to give the lines
1092:
The TTC planned for Line 3 to cease operations in November 2023, with shuttle buses running in place of Line 3 train service until the Line 2 Bloor–Danforth subway extension to the existing Scarborough Centre station opens for service (estimated 2030). However, a train derailment in July 2023
2522:
By the fourth quarter of 2023, the TTC planned to set up dedicated bus lanes via Kennedy Road (northbound) and Midland Avenue (southbound) to run buses express between Kennedy and Scarborough Centre stations. Bus lanes would be painted red and transit signal priority would be implemented. An
2452:
justified the subway extension saying "Scarborough residents need the same access to a subway system that everybody else already has." Mayor Tory was concerned that switching from subway to LRT would delay transit improvements in Scarborough, and might not get support from senior levels of
1309:
The Scarborough line was formally opened (as the Scarborough RT) to invited guests on March 22, 1985, and began revenue service on March 24, 1985. Three years after it opened, the TTC renovated its southwestern terminus at Kennedy station, because the looped turnaround track, designed for
2453:
government. In September 2013, Metrolinx prepared a draft report comparing the subway and LRT options concluding that the subway option was "not a worthwhile use of money." Metrolinx had declined a TTC request to give an opinion prior to City Council's July 2016 vote.
1681:. The north–south section of the route, where it followed the Stouffville line tracks, is at ground level; the shorter east–west section (except for the ground-level yard) is elevated, as is the Kennedy terminus. The line dives briefly underground just north of
2412:
keep Line 3 operating until 2026; however, in February 2021, the TTC recommended replacing Line 3 with buses, thus eliminating that benefit. A remaining benefit of the subway option is that it would eliminate the need to change trains at Kennedy station.
2246:
million upgrade estimate was made.) The TTC Board approved the recommended plan for the upgrades on August 30, 2006, but later cancelled the plans. Extending Line 2 Bloor–Danforth, either along the current route or along a different alignment directly to
1779:
has committed to fully fund its $ 5.5-billion cost. In February 2021, the TTC recommended closing Line 3 permanently by 2023 and replacing it with bus service until the Line 2 extension opens. Once Line 3 is closed, portions of its right-of-way could be
1371:
submitted a report to the TTC that found that, prior to the derailment, maintenance procedures on Line 3 were weak or non-existent and that track inspection staff lacked experience to understand how various defects could create an operating risk.
2262:
northeast from Kennedy station. He felt the cost savings would be great enough to overcome difficulties such as the incompatibility of Mark II cars with the existing line geometry and the extra cost of building a fully separated right-of-way to
4905:
2396:
made an alternative proposal to extend Line 2 along the Line 3 route but have it terminate at Scarborough Town Centre. Under the Murray plan, there would be only two stations and there would be no direct connection with the then-proposed
3790:
2636:". Construction was expected to start in 2025, with the busway planned to begin operation in 2027. The busway was planned to remain in service after the Scarborough Subway Extension opened in order to provide extra rapid transit.
3335:
1618:" situated between the running rails at the same top of rail elevation. There are two side contacting power rails +300V and −300V respectively situated a distance of about 14 in. from the closest gauge line of one running rail.
4626:
1578:
were retained; the union has firmly opposed driverless trains. (Other systems took full advantage of the automated operation and Vancouver's SkyTrain has been automated since 1985 without incident.) The Line 3 trains had only
1077:
of Line 2 to replace Line 3 along a different route. In 2016, in order to free up funds for another transit project, the city reduced the extension to include only one station, which was set to be completed by 2026. In 2019,
4071:
3089:
2868:
1723:
In winter, during heavy snow or freezing rain, the TTC previously ran "storm trains" overnight on Line 3 to keep power rails clear of ice, and apply anti-freeze to the power rail once freezing rain starts. However, since
1685:
to cross under the Stouffville line tracks. After that, it is elevated towards McCowan station. Two stations, Kennedy and Scarborough Centre, have accessible elevators as those two were the busiest stations of Line 3.
4791:
4555:
1705:
pass near stations. Bus service was extended on Sundays because the rapid transit lines started at 8 a.m. (beginning January 3, 2016) instead of the usual 6 a.m. start. Service frequency was 30 minutes.
4423:
4126:
3539:
4306:
1384:
on September 23, 2023, two months after the line's closure. The event featured trains, food and drinks, a photo area, and posters depicting archival photos and trivia. The following are photos from the event:
5078:
4692:
4489:
3430:
4972:
5045:
4197:
2404:
On October 8, 2013, Toronto City Council voted 24–20 to replace the Scarborough line with a three-station extension of the Bloor–Danforth subway line. Council chose the Stintz plan for the extension.
4883:
4916:
4725:
1313:
With the line approaching the end of its useful life, the TTC reduced the frequency of service in mid-September 2012 to reduce wear and tear on both the aging rolling stock and the infrastructure.
3950:
2336:
proceeded with plans to convert the line to light rail and extend it to Sheppard Avenue with a single new intermediate station at Centennial College. The existing line would have closed after the
3499:
3479:
2991:
2492:
In February 2021, the TTC recommended shutting down Line 3 permanently in 2023 and replacing it with bus service. The TTC rejected doing a third overhaul of the line because it would cost $ 522.4
2489:
become unreliable and difficult to maintain, leading to reduced service and frequent service interruptions. The TTC was looking into an alternative solution of replacing Line 3 with bus service.
4230:
2798:
4659:
3556:
2423:
extension of Line 5 Eglinton. The eliminated intermediate stops were at Lawrence Avenue and Sheppard Avenue. Subsequently, the cost estimate for the one-stop subway extension increased to $ 3.2
1728:, the TTC decided to change its procedures for Line 3. Thus, about two hours before an expected storm, the TTC may have decided to shut down Line 3 and replace it with bus service. Just before
4593:
3779:
2632:
In May 2024, it was announced that a 4 km (2.5 mi) stretch of the former Line 3 right-of-way, between Kennedy station and the closed Ellesmere station, would be converted into the "
989:
The rolling stock of Line 3 consisted of smaller, semi-automated, medium-capacity trains, rather than the larger heavy-rail subway trains used on other lines in the system. Designated by the
2580:
Route 903 Scarborough Centre Express operates in temporarily marked reserved lanes via Kennedy Road (northbound), Midland Avenue (southbound), Progress Avenue, Brimley Road and Triton Road.
5017:
2348:
to shortlist companies to construct both this line and the Eglinton Crosstown line. The Eglinton Crosstown line was later renamed Line 5 Eglinton and officially given the colour of orange.
1507:
was cancelled after meeting widespread public opposition, and the only other transit systems to use the technology, named the Intermediate Capacity Transit System (ICTS), at the time were
7447:
3328:
2431:
reopened the subway versus LRT debate. Matlow proposed scrapping the one-stop subway extension in order to provide funding for 24 LRT stops on two LRT lines within Scarborough. TTC CEO
7457:
4758:
4616:
4522:
2440:
be in 2026, the same date as the subway option. However, according to Michael Warren, a former TTC chief general manager, the LRT could have been completed in 2020 at a cost of $ 1.8
4061:
3079:
1294:. Changes to federal railway regulations had made the new system unnecessary for GO, so the government hoped to sell it to other transit services in order to recoup its investment.
4453:
4243:
Dr. Richard Soberman, former chair of civil engineering at the University of Toronto, would simply buy new rolling stock for the SRT and rebuild a bend to accommodate new vehicles.
2858:
1720:
Line 3 trains could switch directions only at the ends of the line as there were no intermediate crossovers between the two termini. Thus, there could be no short turns on Line 3.
1629:
used on Line 2 Bloor–Danforth, as the ICTS design for the line would not allow for the interchange of rail equipment between lines 2 and 3 even if they were both the same gauge.
4997:
2238:
million of new rolling stock. Rebuilding the curve in the tunnel north of Ellesmere station would have been required to accommodate Mark II cars. (According to transit advocate
2468:
billion with an estimated completion date between 2029 and 2030. Line 2 would also receive new subway trains as part of the extension to replace the existing T1-series trains.
2464:
billion by April 2019. On April 10, 2019, Premier Doug Ford announced that the province would revert the extension back to the three-stop proposal at an estimated cost of $ 5.5
4391:
1435:
1343:
cars. If the problem were not rectified, there would be the risk of serious structural damage to the cars. That would have prevented the cars from lasting until 2026 when the
2828:
2603:
A busway will be constructed in the Line 3 right-of-way between Kennedy and Ellesmere stations. From the busway, buses will continue via Ellesmere, Brimley and Triton Roads.
2427:
billion, leaving the Crosstown East LRT unfunded. Given the rising cost for the subway extension and the loss of funding for the LRT line, a group of city councillors led by
4781:
4545:
4413:
4133:
3754:
1391:
1260:
federal government declined further funding. GO-Urban then used some of the technologies from the Transurban to develop a simpler steel-wheeled version, the ICTS system.
4296:
3528:
7427:
2617:
One of the TTC's redevelopment proposals for the Line 3 lands was to convert the corridor, including the elevated section between Midland and McCowan stations, into a
3618:
7452:
5067:
4682:
4104:
2898:
4479:
3368:
3651:
1407:
7432:
4941:
3420:
3015:
4962:
2370:
reported that Scarborough councillors had argued that providing Scarborough residents with light rail, not heavy rail, treated them as "second-class citizens".
7442:
2377:
proposed extending Line 2 Bloor–Danforth to the east before turning north, with three new stations at Lawrence Avenue and McCowan Road (primarily to serve the
3682:
3049:
2364:
billion more than converting the Scarborough line to use the same rolling stock as the Eglinton Crosstown line be so it could be a continuation of that line.
5037:
4193:
2258:
professor emeritus Richard Soberman argued that it would be vastly cheaper and faster to buy new Line 3 vehicles than to replace Line 3 with an extension of
4875:
5181:
4354:
4715:
4158:
2415:
In June 2016, city planning staff proposed the elimination of two of the three stops along the planned Scarborough Subway Extension which would have seen
4328:
3940:
1072:
The line remained mostly unchanged from its opening in 1985 and contained two of the least-used stations in the system. Beginning in the late 2000s, the
4220:
4006:
3220:
2788:
1551:
wheels from making a solid electrical contact with the track. Instead of using the conventional method, in which motive power is supplied by a single
4649:
1759:(light rail versus subway) became a subject of debate in the late 2000s. As of April 2019, there are plans to replace Line 3 with the three-stop
3194:
2928:
4852:
4583:
5811:
4263:
3906:
2653:
2408:
the LRT was estimated to cost $ 1.48 billion to build versus $ 3.56 billion for the Line 2 extension; both estimates would subsequently increase.
1425:
Photo area in Scarborough Centre Station with the background reading "Farewell Line 3" in various languages, as well as social media handles for
1248:
plan to build an intermediate capacity transit system across suburban Toronto, particularly in Scarborough and Etobicoke, using the experimental
4280:
million. ... At this point it was assumed that the larger Mark II Skytrain cars would fit through the Ellesmere tunnel, but this was optimistic.
1316:
In 2015, the TTC started work on the cars to keep them operational until the line is replaced by another mode of rail technology. This included
5506:
3453:
3972:
3727:
1739:, located east of McCowan station. Basic maintenance was performed in this yard; for more extensive work, the cars were taken to the subway's
5211:
5068:"Eglinton East Light Rail Transit – Public Consultation for the Transit and Rail – Project Assessment Process"
4748:
4512:
2758:
2633:
1492:
1002:
913:
4445:
2496:
million and might not improve its reliability. The TTC offered two bus replacement options: purchase 60 hybrid buses by 2023 for $ 374.8
7528:
7508:
7503:
2703:
1812:
5651:
5566:
5451:
4381:
1729:
1657:
The line followed a roughly upside-down L-shaped route when viewed northwards: first northward from Kennedy station, paralleling the
1078:
2500:
million or reduce the number of spares for maintenance, deferring the purchase of new buses until 2027 to 2030, at a cost of $ 357.4
7371:
6313:
5743:
5174:
5127:
2820:
3394:
2284:
1344:
7498:
2569:
The emergency Line 3 subway shuttle operated in mixed traffic via Midland Avenue, Progress Avenue, Brimley Road and Triton Road.
1673:
and Midland Avenue, 4 km (2.5 mi) to Ellesmere Road; then eastward between Ellesmere Road and Progress Avenue, through
1188:
1717:
The TTC operated five to six trains on the line with each train consisting of four cars. There are 28 cars in the Line 3 fleet.
7523:
6968:
5511:
5441:
3854:
2381:
1160:
1110:
line to open in the system. New signage was installed in March 2014. In 2015, the name was simplified to "Line 3 Scarborough."
2532:
August 26, 2023, without the bus lane work having been fully completed. Up to 70 buses per hour will use the dedicated lanes.
7493:
7488:
7152:
5599:
5431:
5198:
4033:
3824:
3291:
2226:
In 2006, a study was completed on the prospects of the Scarborough line. It recommended upgrading the line to handle larger
7259:
5804:
5758:
5459:
4821:
3602:
3576:
2341:
3132:
2950:
2685:
1167:
7264:
7161:
7119:
6050:
5167:
4096:
3884:
2890:
1141:
5789:
3360:
2543:
mllion. Planning was 60 percent complete. If approved by city council, work would start in 2025 for completion in 2027.
1689:
From 2 a.m. to 6 a.m. (to 8 a.m. on Sundays), when Line 3 was not operating, the 302 Kingston Rd-McCowan
1286:-like crossover. Ontario wanted to develop and promote its new technology, which had been designed for a proposed urban
57:
6998:
5147:
5141:
3641:
315:
6236:
5961:
5623:
5501:
3612:
1725:
1207:
6328:
1775:. With an estimated completion between 2029 and 2030, the extension would follow a different route than Line 3. The
1174:
7518:
6518:
5748:
5243:
5153:
3674:
3057:
1702:
1567:
906:
309:
5114:
2535:
By January 2024, the estimated cost of converting the Line 3 right-of-way into a bus roadway had increased by $ 12
1347:
was scheduled to replace Line 3. The repair work required service to be reduced from 6 four-car trains down to 5.
6213:
5820:
5797:
5611:
5353:
5109:
3164:
2298:
1622:
The two power rails of 300 volts positive DC and the other of 300 volts negative DC together produced 600 volts.
1106:
official numbers to help riders and visitors to navigate the system. The line is numbered 3, as it was the third
1073:
4358:
1558:
The trains are also able to be operated exclusively by computers, becoming one of the earliest installations of
7513:
6553:
5824:
5436:
4165:
1805:
1709:
The frequency for this line was 4 to 5 minutes during peak periods and 5 to 6 minutes during off-peak periods.
1240:
for the linear motor between the rails, and the two inductive communications wires on either side of the plate.
1156:
1145:
17:
4332:
6492:
6208:
4002:
3216:
2733:
6229:
3246:
2660:
1496:
7483:
7206:
5343:
1830:
1760:
1482:
1086:
348:
3190:
2920:
2345:
6193:
6118:
6078:
5853:
5849:
5268:
5261:
4844:
4194:"Minutes of the Previous Meeting – Board Meeting Minutes – Meeting No. 1873 – Wednesday, August 30, 2006"
3980:
2310:
2293:
Superimposed former Line 3 (grey) and the under-construction Line 2 Bloor–Danforth extension (dark green)
1978:
1268:
951:
899:
156:
7228:
4259:
1637:
7478:
6961:
6916:
6265:
6138:
5906:
5881:
5871:
5190:
4912:
3976:
3914:
3910:
3786:
3704:
Claridge, Thomas (April 18, 1984). "First of new transit cars arrive for $ 196 million Scarboro line".
3535:
3053:
2378:
2248:
2196:
1892:
1646:
1398:
1381:
990:
439:
91:
3284:"Frequently Asked Questions about Toronto's Subway and the Scarborough RT – Transit Toronto – Content"
2309:
from its current eastern terminus, McCowan, with potential new intermediate stations at Bellamy Road,
2234:
million (in 2006 dollars) with an eight-month service suspension for the upgrade and to purchase $ 170
7145:
6911:
6477:
6270:
6178:
6065:
6061:
5921:
5866:
5768:
5587:
5338:
5281:
5274:
3080:"Scarborough is about to lose its light rail line. The city's replacement plan has alarmed residents"
2481:
2416:
2322:
2259:
1798:
1658:
1592:
1588:
1584:
1500:
1476:
1340:
1336:
1302:
994:
975:
822:
742:
470:
194:
63:
33:
6442:
6435:
6428:
6421:
6414:
6407:
2268:
6300:
6296:
6015:
5966:
5926:
5832:
5763:
5686:
5368:
2686:"TTC, City improving Line 3 Scarborough bus shuttle routes as train service set to permanently end"
2420:
2393:
2001:
1559:
1249:
1038:
7325:
7013:
6158:
6040:
6035:
5911:
5629:
5605:
5358:
3111:
2385:
2337:
2289:
1772:
1674:
1263:
During this period, the TTC had been working on plans to extend its own network with a series of
1134:
1089:
and committed to completing it by 2030, with all construction costs to be borne by the province.
860:
446:
291:
7191:
2699:
1181:
7386:
6861:
6641:
6546:
6025:
5986:
5936:
5617:
5593:
5571:
5494:
5489:
5348:
5221:
4617:"Watchdog says city staff may have violated public service code over Scarborough subway advice"
1670:
1065:
1006:
5126:
4062:"Doug Ford vows 3-stop Scarborough subway. The timeline could leave riders on buses for years"
1570:), doing away with the need for a human operator. However, due to opposition from the transit
7406:
7401:
7269:
7243:
6954:
6901:
6817:
6784:
6483:
6020:
6005:
5991:
5676:
5474:
2255:
1776:
1468:
1329:
584:
4355:"Request for Qualifications Issued for the Eglinton Crosstown LRT and Scarborough LRT Lines"
2859:"TTC recommends seven years of shuttle buses on Scarborough RT ahead of 2030 subway opening"
1097:
between Eglinton Avenue and Lawrence Avenue. The busway is targeted for completion by 2025.
7138:
6824:
6753:
6746:
6739:
6732:
6725:
6718:
6711:
6704:
6697:
6690:
6683:
6676:
6669:
6662:
6655:
6648:
6539:
6449:
6168:
2969:
2449:
2352:
1599:
1580:
1516:
1512:
963:
7223:
3577:"Goodbye, Line 3 Scarborough RT. TTC invites public to say farewell to a Scarborough icon"
8:
7422:
7376:
7340:
7201:
7196:
7130:
7093:
6588:
6363:
6113:
6045:
5956:
5941:
5819:
5727:
5531:
5526:
2435:
said the cost of the LRT line following the Line 3 route may have risen to as high as $ 3
1955:
1598:
In December 2023, the TTC was planning to sell five trainsets to Detroit for use on the
7381:
6884:
6759:
6456:
6318:
6163:
6148:
6083:
6030:
5971:
5946:
5901:
5891:
5876:
5561:
5537:
5469:
5206:
4782:"Toronto's major transit projects–where they're at and what Doug Ford might do to them"
4687:
4418:
4386:
4225:
3529:"Derailment Incident Overview and Operational Improvements for Bus Replacement Service"
3390:
2966:"Crews were busy installing signage to help Line 3 Scarborough customers stay informed"
2366:
1690:
738:
520:
304:
7396:
4942:"Shuttering of Scarborough RT means the end of a transit system that changed the city"
3353:
704:
696:
689:
682:
675:
668:
7366:
7335:
7330:
7305:
7285:
7088:
7083:
7073:
6906:
6631:
6626:
6463:
6358:
6285:
6275:
6173:
6128:
6103:
6098:
6000:
5916:
5896:
5717:
5712:
5661:
5464:
5322:
5315:
5118:
3709:
3608:
2398:
2389:
2272:
1682:
1614:
Track is the 5 rail system on direct fixation and car is powered by an induction or "
1504:
1491:
The 7 four-car trains used exclusively on the Scarborough line were developed by the
555:
48:
6810:
5231:
3846:
2965:
986:. Until its closure in July 2023, the system had a ridership of 3,908,000 per year.
7437:
7238:
7218:
7213:
7109:
6595:
6574:
6512:
6470:
6400:
6348:
6203:
6188:
6133:
6123:
6088:
6010:
5886:
5681:
5411:
2306:
1666:
1283:
1094:
852:
757:
512:
7391:
4546:"Scarborough subway versus LRT debate to return to council amid transit confusion"
1735:
The Scarborough line's S-series ICTS trains were stored and serviced at the small
1538:
to turn the wheels, they pushed themselves along the route using alternating flat
7361:
7300:
7068:
6921:
6896:
6799:
6615:
6602:
6525:
6499:
6390:
6385:
6323:
6257:
6253:
6223:
6198:
6143:
6073:
5976:
5951:
5646:
5401:
5381:
5307:
5300:
5294:
5287:
5074:
4029:
3816:
3421:"Scarborough RT vehicles need repairs to avoid 'catastrophic' corrosion failures"
3283:
2480:
announced that Line 3 Scarborough would be replaced by a three-stop extension of
2388:
and then at Sheppard Avenue East and McCowan Road, where it would connect to the
2329:
2314:
2264:
2171:
1768:
1764:
1698:
1650:
1456:
1279:
1233:
983:
979:
747:
734:
633:
417:
120:
115:
67:
6882:
4813:
2419:
terminate at Scarborough Town Centre in order to free up funding for a proposed
2356:
from the original LRT agreement. The subway alternative would cost between $ 500
1503:. The business proposal initially bore little fruit—a proposed pilot project in
7356:
7310:
7003:
6567:
6506:
6338:
6280:
6218:
5981:
5828:
5656:
5516:
5406:
5252:
4329:"Extension of the Scarborough Rapid Transit & Kennedy Station Improvements"
3557:"'Alarming' reports raise questions about state of Scarborough RT before crash"
3500:"TTC CEO says further transit closures possible after derailment of ageing SRT"
3139:
2951:"Here is when the last Scarborough RT train will run before line is demolished"
1887:
1740:
1535:
1426:
1033:
971:
955:
283:
166:
5136:
4963:"Scarborough RT may find new life as a multimillion-dollar dedicated bus lane"
3876:
1463:
141:
7472:
7295:
7063:
6804:
6581:
6532:
6108:
5931:
5861:
5707:
5426:
5159:
3713:
2227:
1626:
1615:
1524:
1486:
1237:
1107:
998:
967:
4716:"Mayor Tory defends Scarborough subway extension despite new ridership data"
4480:"Scarborough subway debate suffers from lack of facts, community groups say"
3780:"Request for Information (RFI) For Rail Milling Services RFI No. R31CA15135"
3454:"TTC's Line 3 shut down after train derailment; multiple passengers injured"
1297:
7290:
7171:
7008:
6977:
6840:
6775:
6770:
6609:
6560:
6308:
6183:
6093:
5671:
5556:
5549:
5479:
5421:
5330:
5022:
5002:
4967:
4946:
4786:
4753:
4720:
4654:
4621:
4588:
4550:
4517:
4484:
4301:
4159:"Scarborough RT Strategic Plan – Study Report – Final Report – August 2006"
4066:
3973:"Service changes in the event of a winter storm – Streetcar"
3945:
3646:
3561:
3504:
3484:
3425:
3084:
2996:
2992:"Scarborough RT to remain closed for at least three weeks after derailment"
2863:
2793:
2374:
2332:
and create a single line called the "Eglinton–Scarborough Crosstown line",
2318:
1736:
1694:
1678:
1642:
1575:
1531:
1413:
People taking photos during the Farewell Line 3 event on September 23, 2023
1257:
1253:
376:
184:
4814:"Toronto Transit Commission - Request for Proposals For New Subway Trains"
7233:
7186:
7181:
7048:
6353:
6343:
6153:
5691:
5416:
5396:
5216:
5018:"Scarborough RT derailment raises questions about state of repair on TTC"
4255:
2618:
2512:
2432:
2428:
2239:
1743:
by truck, given the train's different track gauge and propulsion system.
1571:
1325:
255:
4414:"Scarborough subway to be built with shortened route, Ontario announces"
4297:"Skip the Scarborough subway and modernize the SRT, says transit expert"
3313:
James, Royson (March 23, 1985). "Rapid transit line hailed at opening".
1701:, it does not pass near any of the rapid transit stations, though other
1441:
Two S-series trains stationed at the platforms during the farewell event
962:, Ontario, Canada. The line ran entirely within the eastern district of
6333:
5666:
5521:
5484:
5391:
2456:
In 2017, the estimated cost of the one-stop Line 2 extension was $ 3.35
2302:
1662:
1552:
1317:
1287:
1272:
1148: in this section. Unsourced material may be challenged and removed.
752:
2546:
The TTC is implementing bus replacement service in phases as follows:
2484:
to be completed by 2030. However, on December 10, 2020, Toronto mayor
2373:
Two competing subway plans were proposed to replace Line 3. TTC chair
1220:
7034:
5753:
5376:
4876:"Scarborough RT will shut down before subway is finished, mayor says"
4683:"Toronto City Council approves planning for raft of transit projects"
2759:"Line 3 will stay closed permanently after Scarborough RT derailment"
2725:
2626:
2622:
2485:
2477:
2333:
1610:
Line 3 used 5-rail track, which a TTC document describes as follows:
1508:
1082:
32:"Scarborough line" redirects here. For the railway in Yorkshire, see
1123:
7315:
7078:
7029:
5722:
5386:
5150:
about cancelled plan for one-stop SSE, published by City of Toronto
1543:
1245:
4513:"Toronto city council sticks with subway, rejects Scarborough LRT"
3755:"New railcars are coming to the Detroit People Mover from Toronto"
3480:"TTC hunts for Scarborough solutions as RT remains out of service"
2515:
had promised to build the busway, which was estimated to cost $ 55
1228:
803:
795:
788:
781:
5237:
3242:
3168:
2973:
2519:
million. The project is estimated to take two years to complete.
1563:
1530:
One unusual feature of the ICTS cars is that they were driven by
1520:
1291:
959:
312:
101:
6946:
4221:"What has gone wrong since the 'golden age' of Toronto transit"
2328:
After initially planning to include the line with the proposed
2242:, the need to rebuild the tunnel was discovered after the $ 190
1539:
1368:
1335:
On April 18, 2017, the TTC awarded a $ 6.8-million contract to
1267:
systems using a new and greatly enlarged streetcar design, the
3941:"TTC closes Scarborough Line 3 as Toronto hit by winter storm"
1451:
4998:"Scarborough busway may not be completed until at least 2027"
4584:"How a bid to resurrect Scarborough LRT was killed: Analysis"
1548:
4650:"Was the memo that killed the LRT deliberately misleading?"
3675:"TTC Service Changes Effective November 20, 2022 (Updated)"
3217:"TTC tests new numerical signage system | CTV Toronto News"
1264:
7160:
4027:
3728:"Toronto near deal to sell Scarborough RT cars to Detroit"
2550:
Four phases of Line 3 Scarborough bus replacement service
1625:
Line 3 tracks used standard gauge rather than the broader
1583:
since inception. In practice, the Scarborough line trains
1318:
shrink-wrapping the rolling stock with a blue vinyl finish
3329:"Chief Executive Officer's Report – November 2012 Update"
2285:
Line 2 Bloor–Danforth § Scarborough Subway Extension
4906:"Chief Executive Officer's Report – October 2020 Update"
4373:
4005:. Toronto Neighbourhood Walks Project. August 1, 2011.
3847:"Frequently Asked Questions About Toronto's Streetcars"
2789:"New Scarborough transit plan 'buys peace in the land'"
1756:
5156:
about bus replacement for Line 3, published by the TTC
3523:
3521:
3519:
3517:
3515:
2445:
down Matlow's proposal by a margin of roughly 2 to 1.
1332:, making all stations along this line Presto-enabled.
4992:
4990:
4577:
4575:
4573:
4473:
4471:
4290:
4288:
4276:
At the time was written, the cost estimate was $ 360
4248:
4055:
4053:
4051:
3934:
3932:
3414:
3412:
2985:
2983:
2913:
2558:
Route between Kennedy and Scarborough Centre stations
2278:
1232:
The original tiled streetcar platform can be seen at
407:
399:
392:
5038:"TTC looking at making a park out of Scarborough RT"
3361:"This is what the TTC's revamped SRT cars look like"
2852:
2850:
2848:
2846:
2782:
2780:
2654:"Toronto Transit Commission Subway ridership – 2018"
2267:, where Line 3 could connect with either a proposed
2251:, was not considered cost-effective or justifiable.
1732:, the TTC replaced all Line 3 trains with 25 buses.
4608:
3512:
3445:
3321:
3009:
3007:
2857:Spurr, Ben; Pagliaro, Jennifer (February 4, 2021).
1339:to repair corrosion damage under the floors of the
1037:tracks, unlike the heavy-rail subway lines and the
614:
606:
27:
Defunct light rapid transit line in Toronto, Canada
5010:
4987:
4954:
4934:
4915:. October 22, 2020. pp. 10–11. Archived from
4773:
4740:
4707:
4674:
4641:
4570:
4537:
4504:
4468:
4285:
4212:
4048:
3929:
3549:
3492:
3471:
3409:
3072:
2980:
4749:"Why I support the Scarborough subway: John Tory"
4446:"Scarborough subway confirmed by Toronto council"
4188:
4186:
3334:. Toronto Transit Commission. November 21, 2012.
3191:"TTC considers numbering subway lines | CityNews"
3044:
3042:
3040:
3038:
3036:
2843:
2821:"Scarborough subway confirmed by Toronto council"
2777:
2161:
2153:
2146:
1752:
1244:In 1972, the provincial government announced the
7470:
3004:
2254:In November 2015, transportation consultant and
2119:
2055:
1791:
1693:bus served the same area. The 302 originates at
1305:train in its original (1985–2015) livery in 2006
848:
508:
343:
4714:Spurr, Ben; Pagliaro, Jennifer (June 1, 2016).
4331:. City of Toronto. May 29, 2012. Archived from
3965:
2646:
1787:
658:
650:
5189:
4898:
4183:
3907:"Service changes in the event of an ice storm"
3899:
3772:
3183:
3050:"The future of TTC's Line 3 Scarborough (SRT)"
3033:
7146:
6962:
5805:
5175:
5060:
4713:
4151:
4091:
4089:
3016:"TTC ends Scarborough RT service permanently"
2856:
2692:
2621:. This proposed park would be similar to the
2297:The TTC and the City of Toronto completed an
2026:
2018:
1951:
1865:
1857:
1806:
1271:(CLRV). The Ontario government, in charge of
907:
5154:The future of TTC's Line 3 Scarborough (SRT)
5144:about three-stop SSE, published by Metrolinx
4438:
4097:"Premier Ford Unveils Transportation Vision"
4028:Aaron Adel & James Bow (June 25, 2015).
3995:
3877:"TT Ride Along - Scarborough RT Rear Window"
2891:"Premier Ford Unveils Transportation Vision"
2659:. Toronto Transit Commission. Archived from
2090:
2082:
2044:
2036:
1493:Urban Transportation Development Corporation
1459:, which became a dead-end tail track in 1988
1360:
1224:The original Scarborough RT logo (1985–2015)
1003:Urban Transportation Development Corporation
4406:
3869:
3600:
3268:"GO-Urban's bright future fades suddenly".
2718:
2340:and be completed in 2020. In January 2013,
1429:-owned websites and the hashtag #TakeTheTTC
1256:was forced to abandon development when the
970:and 6.4 kilometres (4.0 mi) of mostly
7153:
7139:
6969:
6955:
5812:
5798:
5182:
5168:
4294:
4086:
2612:
2471:
1813:
1799:
1542:reacting with the distinctive diamagnetic
1380:A farewell event for Line 3 was hosted at
1367:On November 30, 2023, the consulting firm
914:
900:
5131:
3451:
2108:
2100:
1208:Learn how and when to remove this message
5128:Template:Attached KML/Line 3 Scarborough
4874:Pagliaro, Jennifer (December 10, 2020).
4873:
4779:
4614:
4581:
4543:
4510:
4477:
4059:
3703:
3545:from the original on September 30, 2023.
2963:
2786:
2288:
1636:
1462:
1450:
1296:
1227:
1219:
6939:indicate a future line, station or stop
4648:Warren, R. Michael (October 26, 2016).
4615:Pagliaro, Jennifer (October 25, 2016).
4582:Pagliaro, Jennifer (October 24, 2016).
4382:"Metrolinx to Toronto: Subway is yours"
4119:
4021:
3839:
3808:
2787:Pagliaro, Jennifer (January 20, 2016).
1781:
1566:IS" system (now owned and delivered by
490:
335:Line 3 Scarborough highlighted in blue
14:
7471:
7163:Rapid transit projects in the Big Move
4886:from the original on December 10, 2020
4867:
4845:"TTC Issues RFP For New Subway Trains"
4794:from the original on November 21, 2021
4647:
4492:from the original on November 21, 2015
4426:from the original on September 4, 2013
4321:
4309:from the original on November 18, 2015
4295:Kalinowski, Tess (November 15, 2015).
4074:from the original on December 21, 2019
4009:from the original on December 20, 2022
3953:from the original on December 20, 2022
3887:from the original on December 20, 2022
3685:from the original on December 14, 2022
3654:from the original on February 29, 2008
3639:
3477:
3341:from the original on February 22, 2014
2989:
2577:August 26, 2023, to November 18, 2023
2317:with a possible additional station at
1933:
1641:The train on its elevated tracks over
1359:Immediately following the derailment,
597:
7134:
6950:
5793:
5782:indicate a project under construction
5567:Toronto–York Spadina Subway Extension
5432:King Street Transit Priority Corridor
5163:
5048:from the original on January 16, 2019
4960:
4855:from the original on November 5, 2022
4842:
4824:from the original on October 23, 2022
4680:
4662:from the original on October 27, 2016
4629:from the original on October 26, 2016
4596:from the original on October 24, 2016
4478:Pagliaro, Jennifer (August 7, 2015).
4379:
4260:"Scarborough Subway Cost Rises Again"
4254:
4218:
4200:from the original on December 8, 2015
4060:Pagliaro, Jennifer (April 10, 2019).
3938:
3796:from the original on October 14, 2017
3672:
3604:Linear motion electromagnetic devices
3418:
3312:
3243:"New TTC Signage at Eglinton Station"
3223:from the original on October 10, 2014
3197:from the original on October 25, 2013
2871:from the original on February 4, 2021
2801:from the original on January 20, 2016
1991:
982:, and terminated in the northeast at
4780:Pagliaro, Jennifer (April 3, 2019).
4746:
4544:Pagliaro, Jennifer (June 28, 2016).
4511:Pagliaro, Jennifer (July 13, 2016).
4456:from the original on August 12, 2019
3817:"The Scarborough Rapid Transit Line"
2736:from the original on August 27, 2016
2230:Mark II vehicles, at a cost of $ 190
1907:
1467:S-series train heading north toward
1236:. This image also clearly shows the
1146:adding citations to reliable sources
1117:
999:Intermediate Capacity Transit System
7120:The Big Move rapid transit projects
4233:from the original on April 22, 2017
4107:from the original on April 10, 2019
3827:from the original on March 27, 2013
3814:
3640:Bruser, David (November 17, 2006).
3433:from the original on April 18, 2017
3397:from the original on March 30, 2019
3056:. September 3, 2023. Archived from
2931:from the original on August 9, 2019
2901:from the original on April 10, 2019
2831:from the original on August 3, 2017
2746:Line 3 Scarborough has six stations
2476:On April 10, 2019, Ontario premier
1005:(UTDC). The trains were powered by
24:
5142:Scarborough Subway Extension (SSE)
4975:from the original on April 8, 2022
4761:from the original on June 28, 2016
4695:from the original on April 4, 2017
4558:from the original on June 29, 2016
4525:from the original on July 13, 2016
4357:. January 22, 2013. Archived from
4266:from the original on April 6, 2017
4036:from the original on July 17, 2012
3857:from the original on July 11, 2014
3673:Murno, Steve (November 10, 2022).
3601:Boldea, Ion; Nasar, S. A. (2001).
3452:Casaletto, Lucas (July 25, 2023).
3371:from the original on March 8, 2015
3013:
2706:from the original on March 8, 2013
2566:July 24, 2023, to August 25, 2023
2279:Replacement with alternate transit
2184:
1969:
1763:of Line 2 from Kennedy station to
1757:replacement with alternate transit
1001:(ICTS) Mark I trains built by the
722:
714:
461:
430:
25:
7540:
7529:Standard gauge railways in Canada
7509:Transport in Scarborough, Ontario
7504:2023 disestablishments in Ontario
5624:Toronto Transportation Commission
5502:1995 Russell Hill subway accident
5100:
5084:from the original on May 30, 2024
4728:from the original on June 1, 2016
4394:from the original on July 7, 2013
4132:. August 30, 2006. Archived from
3939:Iqbal, Maria (February 2, 2022).
3752:
3621:from the original on June 1, 2022
3294:from the original on May 15, 2011
3249:from the original on May 14, 2014
2460:billion, which increased to $ 3.9
2325:and Scarborough Centre stations.
1873:
1848:
1375:
568:
539:
7047:
6976:
6883:
6769:
6625:
6384:
6295:
6252:
6060:
5848:
5536:
5314:
5299:
5286:
5273:
5260:
5242:
5236:
5230:
4219:Moore, Oliver (March 17, 2017).
3913:. April 16, 2018. Archived from
3092:from the original on May 2, 2023
2625:in the New York City borough of
2183:
2160:
2152:
2145:
2107:
2099:
2089:
2081:
2043:
2035:
2025:
2017:
1990:
1968:
1950:
1939:
1932:
1925:
1906:
1891:
1886:
1872:
1864:
1856:
1847:
1568:Thales Rail Signalling Solutions
1446:
1434:
1418:
1406:
1390:
1122:
836:
810:
802:
794:
787:
780:
771:
756:
751:
746:
741:
721:
713:
703:
695:
688:
681:
674:
667:
657:
649:
621:
613:
605:
596:
574:
567:
545:
538:
496:
489:
482:
460:
445:
429:
406:
398:
391:
366:
365:
66:train at the Line 3 platform of
56:
47:
5612:Toronto and York Radial Railway
5030:
4836:
4806:
4681:Moore, Oliver (July 13, 2016).
4347:
4127:"Scarborough RT Strategic Plan"
3746:
3720:
3697:
3666:
3633:
3594:
3569:
3478:Harvey, Lex (August 17, 2023).
3383:
3306:
3276:
3261:
3235:
3209:
3157:
3125:
3112:"Key Information About the TTC"
3104:
2957:
2943:
2700:"2011 TTC Operating Statistics"
2301:in 2010 to convert the line to
1321:using coloured velour seating.
1133:needs additional citations for
1074:municipal government of Toronto
772:
7499:1985 establishments in Ontario
4380:Moore, Oliver (July 2, 2013).
2883:
2813:
2751:
2732:. Toronto Transit Commission.
2702:. Toronto Transit Commission.
2678:
2588:November 19, 2023, until 2027
978:at its southwestern terminus,
546:
497:
483:
13:
1:
7524:Rapid transit lines in Canada
4164:. August 2006. Archived from
3419:Spurr, Ben (April 18, 2017).
2990:Harvey, Lex (July 27, 2023).
2639:
1940:
1926:
1767:, with intermediate stops at
1730:the storm of February 2, 2022
1712:
1593:retired H4, H5, and H6 trains
1328:fare gates were installed at
1085:reinstated the three-station
837:
7494:Railway lines closed in 2023
7489:Railway lines opened in 1985
4961:Spurr, Ben (April 7, 2022).
4747:Tory, John (June 27, 2016).
4030:"The Greenwood Subway Yards"
3642:"TTC eyes driverless subway"
2269:extension of Line 4 Sheppard
1788:Revitalization and expansion
1761:Scarborough Subway Extension
1753:revitalization and expansion
1547:micro-lifting prevented the
1483:Toronto subway rolling stock
1345:Scarborough Subway Extension
1087:Scarborough subway extension
7:
7320:
6051:Vaughan Metropolitan Centre
5600:Metropolitan Street Railway
3815:Bow, James (June 3, 2017).
2964:@TTChelps (June 22, 2023).
2330:Eglinton Crosstown LRT line
1269:Canadian Light Rail Vehicle
811:
622:
575:
10:
7545:
6554:Aga Khan Park & Museum
5191:Toronto Transit Commission
4913:Toronto Transit Commission
4843:Murno (October 20, 2022).
3977:Toronto Transit Commission
3911:Toronto Transit Commission
3787:Toronto Transit Commission
3536:Toronto Transit Commission
3054:Toronto Transit Commission
2392:. Transportation Minister
2346:request for qualifications
2282:
2249:Scarborough Centre station
1480:
1474:
1399:Scarborough Centre station
1382:Scarborough Centre station
1350:
1113:
991:Toronto Transit Commission
954:line that was part of the
297:
176:Toronto Transit Commission
92:Toronto Transit Commission
31:
7415:
7349:
7278:
7252:
7170:
7102:
7056:
7045:
7022:
6991:
6984:
6934:
6875:
6768:
6624:
6383:
6376:
6294:
6251:
6059:
5847:
5840:
5777:
5736:
5700:
5639:
5588:Williams Omnibus Bus Line
5580:
5450:
5367:
5251:
5228:
5197:
5148:Line 2 Subway Scarborough
2192:
2177:
2170:
2137:
2117:
2073:
2053:
2009:
1999:
1984:
1977:
1962:
1948:
1919:
1915:
1900:
1841:
1746:
1659:Canadian National Railway
1501:Bombardier Transportation
1477:S series (Toronto subway)
1397:Farewell Line 3 booth in
845:
830:
819:
765:
731:
641:
630:
590:
583:
561:
554:
532:
505:
476:
469:
454:
423:
416:
383:
374:
359:
321:
303:
290:
254:
250:6.4 km (4.0 mi)
246:
241:
223:
205:
200:
190:
180:
172:
162:
152:
147:
137:
129:
108:
97:
87:
79:
74:
55:
46:
41:
7448:Steeles–Taunton (Durham)
5764:Transit Enforcement Unit
5687:William McBrien Building
5132:KML is not from Wikidata
3607:. Taylor & Francis.
2299:environmental assessment
1632:
1605:
1560:Standard Elektrik Lorenz
1495:(UTDC), then an Ontario
1250:Krauss-Maffei Transurban
1079:Progressive Conservative
1039:Toronto streetcar system
7519:Linear induction motors
5630:Hydro-Electric Railways
5606:Toronto Railway Company
4003:"McCowan Carhouse Tour"
2921:"Line 2 East Extension"
2613:Reuse of infrastructure
2561:Travel time in minutes
2472:Replacement bus service
2421:Crosstown East LRT line
2386:Scarborough Town Centre
2338:2015 Pan American Games
2313:'s Progress Campus and
1782:converted into parkland
1773:Scarborough Town Centre
1755:of Line 3 in 2006, its
1726:the winter of 2018–2019
1675:Scarborough City Centre
1574:and public perception,
1532:linear induction motors
1361:replacement bus service
1100:
1041:, which use the unique
1007:linear induction motors
229:; 14 months ago
7387:Mississauga Transitway
6243:Sheppard & McCowan
6230:Lawrence & McCowan
5618:Toronto Civic Railways
5594:Toronto Street Railway
5572:Toronto-gauge railways
5495:Sunnyside Bus Terminal
5490:Toronto Coach Terminal
5222:York University Busway
4196:. September 20, 2006.
3538:. September 26, 2023.
2511:By August 2023, Mayor
2379:Scarborough Hospital's
2342:Infrastructure Ontario
2294:
1654:
1620:
1472:
1460:
1455:The abandoned loop at
1324:On December 13, 2016,
1306:
1241:
1225:
942:, originally known as
211:; 39 years ago
7514:Toronto rapid transit
7244:Union Pearson Express
7173:Regional Express Rail
6831:Riverside–Leslieville
5677:Roncesvalles Carhouse
5044:. February 21, 2015.
4422:. September 4, 2013.
3508:. September 26, 2023.
2482:Line 2 Bloor–Danforth
2417:Line 2 Bloor–Danforth
2321:between the existing
2292:
2256:University of Toronto
1640:
1612:
1469:Lawrence East station
1466:
1454:
1330:Lawrence East station
1300:
1231:
1223:
976:Line 2 Bloor–Danforth
823:Line 2 Bloor–Danforth
34:York–Scarborough line
7074:Etobicoke–Finch West
3983:on February 25, 2021
3565:. February 22, 2024.
3272:. November 14, 1974.
3060:on September 1, 2023
2730:Schedules & Maps
2450:Glenn De Baeremaeker
2353:Toronto City Council
1600:Detroit People Mover
1157:"Line 3 Scarborough"
1142:improve this article
974:. It connected with
338:Show interactive map
7484:Linear motor metros
7416:Other rapid transit
7326:Scarborough Malvern
7084:Scarborough Malvern
6364:Queens Quay station
5728:Waterfront West LRT
5532:522 Exhibition West
5527:521 Exhibition East
5137:Official route page
5006:. January 22, 2024.
4922:on October 18, 2020
4452:. October 8, 2013.
4032:. Transit Toronto.
3734:. December 20, 2023
3458:toronto.citynews.ca
3391:"Presto on the TTC"
3171:on January 31, 2015
2827:. October 8, 2013.
2551:
1777:Province of Ontario
1751:After studying the
1536:conventional motors
1534:: instead of using
966:, encompassing six
952:light rapid transit
209:March 22, 1985
157:Light rapid transit
142:Official route page
7372:Durham–Scarborough
7279:Light rail transit
7115:Line 3 Scarborough
6917:Scarborough Centre
6319:Dufferin Gate Loop
6237:Scarborough Centre
5562:St. Clair Carhouse
5470:Eglinton West line
5207:Blue Night Network
4950:. August 28, 2023.
4688:The Globe and Mail
4419:The Globe and Mail
4387:The Globe and Mail
4361:on October 5, 2013
4335:on October 6, 2012
4226:The Globe and Mail
4139:on August 26, 2014
3789:. April 28, 2015.
3706:The Globe and Mail
3145:on August 26, 2014
3133:"Subway Route Map"
2688:. August 24, 2023.
2549:
2367:The Globe and Mail
2311:Centennial College
2303:light rail transit
2295:
2197:Scarborough Centre
1979:Centennial College
1703:night bus services
1655:
1647:Scarborough Centre
1499:but later sold to
1473:
1461:
1307:
1242:
1226:
940:Line 3 Scarborough
926:Show route diagram
440:Scarborough Centre
227:July 24, 2023
42:Line 3 Scarborough
7479:ART people movers
7466:
7465:
7402:Steeles (Toronto)
7350:Bus rapid transit
7260:Spadina extension
7207:Niagara extension
7128:
7127:
7043:
7042:
6944:
6943:
6930:
6929:
6871:
6870:
6372:
6371:
6359:Neville Park Loop
5867:North York Centre
5787:
5786:
5718:Eglinton East LRT
5713:East Bayfront LRT
5662:Hillcrest Complex
5465:Queen subway line
4818:ttc.bonfirehub.ca
4258:(March 1, 2017).
3917:on April 16, 2018
3883:. July 16, 2021.
3219:. March 2, 2014.
2765:. August 24, 2023
2610:
2609:
2539:million to $ 67.9
2399:Sheppard East LRT
2390:Sheppard East LRT
2305:and extend it to
2273:Sheppard East LRT
2224:
2223:
2220:
2219:
2132:
2131:
2068:
2067:
1882:McCowan/Sheppard
1683:Ellesmere station
1653:in September 2005
1497:Crown corporation
1290:service known as
1218:
1217:
1210:
1192:
937:
936:
933:
932:
924:
923:
888:
887:
866:
865:
526:
525:
104:, Ontario, Canada
16:(Redirected from
7536:
7438:Oshawa Connector
7219:Midtown corridor
7174:
7164:
7155:
7148:
7141:
7132:
7131:
7110:MoveOntario 2020
7051:
6989:
6988:
6971:
6964:
6957:
6948:
6947:
6887:
6880:
6879:
6851:Thorncliffe Park
6773:
6726:Norfinch Oakdale
6629:
6388:
6381:
6380:
6349:Long Branch Loop
6301:Streetcar system
6299:
6256:
6064:
5854:Yonge–University
5852:
5845:
5844:
5814:
5807:
5800:
5791:
5790:
5682:Russell Carhouse
5543:
5540:
5412:509 Harbourfront
5321:
5318:
5306:
5303:
5293:
5290:
5280:
5277:
5269:Yonge–University
5267:
5264:
5246:
5240:
5234:
5184:
5177:
5170:
5161:
5160:
5122:
5094:
5093:
5091:
5089:
5083:
5072:
5064:
5058:
5057:
5055:
5053:
5034:
5028:
5027:
5026:. July 26, 2023.
5014:
5008:
5007:
4994:
4985:
4984:
4982:
4980:
4958:
4952:
4951:
4938:
4932:
4931:
4929:
4927:
4921:
4910:
4902:
4896:
4895:
4893:
4891:
4871:
4865:
4864:
4862:
4860:
4840:
4834:
4833:
4831:
4829:
4810:
4804:
4803:
4801:
4799:
4777:
4771:
4770:
4768:
4766:
4744:
4738:
4737:
4735:
4733:
4711:
4705:
4704:
4702:
4700:
4678:
4672:
4671:
4669:
4667:
4645:
4639:
4638:
4636:
4634:
4612:
4606:
4605:
4603:
4601:
4579:
4568:
4567:
4565:
4563:
4541:
4535:
4534:
4532:
4530:
4508:
4502:
4501:
4499:
4497:
4475:
4466:
4465:
4463:
4461:
4442:
4436:
4435:
4433:
4431:
4410:
4404:
4403:
4401:
4399:
4377:
4371:
4370:
4368:
4366:
4351:
4345:
4344:
4342:
4340:
4325:
4319:
4318:
4316:
4314:
4292:
4283:
4282:
4279:
4273:
4271:
4252:
4246:
4245:
4240:
4238:
4216:
4210:
4209:
4207:
4205:
4190:
4181:
4180:
4178:
4176:
4171:on June 25, 2008
4170:
4163:
4155:
4149:
4148:
4146:
4144:
4138:
4131:
4123:
4117:
4116:
4114:
4112:
4093:
4084:
4083:
4081:
4079:
4057:
4046:
4045:
4043:
4041:
4025:
4019:
4018:
4016:
4014:
3999:
3993:
3992:
3990:
3988:
3979:. Archived from
3969:
3963:
3962:
3960:
3958:
3936:
3927:
3926:
3924:
3922:
3903:
3897:
3896:
3894:
3892:
3873:
3867:
3866:
3864:
3862:
3843:
3837:
3836:
3834:
3832:
3812:
3806:
3805:
3803:
3801:
3795:
3784:
3776:
3770:
3769:
3767:
3765:
3759:The Detroit News
3750:
3744:
3743:
3741:
3739:
3724:
3718:
3717:
3708:. pp. M.3.
3701:
3695:
3694:
3692:
3690:
3670:
3664:
3663:
3661:
3659:
3637:
3631:
3630:
3628:
3626:
3598:
3592:
3591:
3589:
3587:
3573:
3567:
3566:
3553:
3547:
3546:
3544:
3533:
3525:
3510:
3509:
3496:
3490:
3489:
3475:
3469:
3468:
3466:
3464:
3449:
3443:
3442:
3440:
3438:
3416:
3407:
3406:
3404:
3402:
3387:
3381:
3380:
3378:
3376:
3357:
3351:
3350:
3348:
3346:
3340:
3333:
3325:
3319:
3318:
3310:
3304:
3303:
3301:
3299:
3280:
3274:
3273:
3265:
3259:
3258:
3256:
3254:
3239:
3233:
3232:
3230:
3228:
3213:
3207:
3206:
3204:
3202:
3187:
3181:
3180:
3178:
3176:
3167:. Archived from
3161:
3155:
3154:
3152:
3150:
3144:
3138:. Archived from
3137:
3129:
3123:
3122:
3120:
3118:
3108:
3102:
3101:
3099:
3097:
3076:
3070:
3069:
3067:
3065:
3046:
3031:
3030:
3028:
3026:
3011:
3002:
3001:
2987:
2978:
2977:
2961:
2955:
2954:
2947:
2941:
2940:
2938:
2936:
2917:
2911:
2910:
2908:
2906:
2887:
2881:
2880:
2878:
2876:
2854:
2841:
2840:
2838:
2836:
2817:
2811:
2810:
2808:
2806:
2784:
2775:
2774:
2772:
2770:
2755:
2749:
2748:
2743:
2741:
2722:
2716:
2715:
2713:
2711:
2696:
2690:
2689:
2682:
2676:
2675:
2673:
2671:
2666:on June 28, 2021
2665:
2658:
2650:
2552:
2548:
2542:
2538:
2526:
2518:
2503:
2499:
2495:
2467:
2463:
2459:
2443:
2438:
2426:
2363:
2359:
2245:
2237:
2233:
2187:
2186:
2164:
2163:
2156:
2155:
2149:
2148:
2120:
2111:
2110:
2103:
2102:
2093:
2092:
2085:
2084:
2056:
2047:
2046:
2039:
2038:
2029:
2028:
2021:
2020:
1994:
1993:
1972:
1971:
1954:
1953:
1943:
1942:
1936:
1935:
1929:
1928:
1910:
1909:
1895:
1890:
1876:
1875:
1868:
1867:
1860:
1859:
1851:
1850:
1839:
1838:
1822:Line 3 Extension
1815:
1808:
1801:
1792:
1669:tracks, between
1667:Stouffville line
1651:McCowan stations
1585:drove themselves
1438:
1422:
1410:
1394:
1284:Spanish solution
1213:
1206:
1202:
1199:
1193:
1191:
1150:
1126:
1118:
1095:Stouffville line
1068:
1062:
1060:
1059:
1055:
1052:
1044:
1036:
1030:
1028:
1027:
1023:
1020:
1012:
927:
916:
909:
902:
896:
853:Stouffville line
849:
840:
839:
814:
813:
806:
805:
798:
797:
791:
790:
784:
783:
775:
774:
760:
755:
750:
745:
725:
724:
717:
716:
707:
706:
699:
698:
692:
691:
685:
684:
678:
677:
671:
670:
661:
660:
653:
652:
625:
624:
617:
616:
609:
608:
600:
599:
578:
577:
571:
570:
549:
548:
542:
541:
513:Stouffville line
509:
500:
499:
493:
492:
486:
485:
464:
463:
449:
433:
432:
410:
409:
402:
401:
395:
394:
369:
368:
357:
356:
344:
339:
323:
322:
286:
280:
278:
277:
273:
270:
262:
237:
235:
230:
219:
217:
212:
60:
51:
39:
38:
21:
7544:
7543:
7539:
7538:
7537:
7535:
7534:
7533:
7469:
7468:
7467:
7462:
7411:
7362:427 North/South
7345:
7341:Waterfront West
7274:
7265:Yonge extension
7248:
7172:
7166:
7162:
7159:
7129:
7124:
7098:
7094:Waterfront West
7052:
7039:
7018:
6980:
6975:
6945:
6940:
6926:
6867:
6856:Flemingdon Park
6764:
6620:
6540:Sunnybrook Park
6487:(Eglinton West)
6368:
6324:Exhibition Loop
6314:Distillery Loop
6290:
6247:
6055:
6041:Pioneer Village
6036:York University
5992:Eglinton West (
5836:
5821:Stations, stops
5818:
5788:
5783:
5773:
5732:
5696:
5647:Davisville Yard
5635:
5576:
5541:
5446:
5402:507 Long Branch
5382:503 Kingston Rd
5363:
5319:
5304:
5291:
5278:
5265:
5247:
5241:
5235:
5226:
5193:
5188:
5133:
5130:
5125:
5124:
5123:
5107:
5103:
5098:
5097:
5087:
5085:
5081:
5075:City of Toronto
5070:
5066:
5065:
5061:
5051:
5049:
5036:
5035:
5031:
5016:
5015:
5011:
4996:
4995:
4988:
4978:
4976:
4959:
4955:
4940:
4939:
4935:
4925:
4923:
4919:
4908:
4904:
4903:
4899:
4889:
4887:
4872:
4868:
4858:
4856:
4841:
4837:
4827:
4825:
4812:
4811:
4807:
4797:
4795:
4778:
4774:
4764:
4762:
4745:
4741:
4731:
4729:
4712:
4708:
4698:
4696:
4679:
4675:
4665:
4663:
4646:
4642:
4632:
4630:
4613:
4609:
4599:
4597:
4580:
4571:
4561:
4559:
4542:
4538:
4528:
4526:
4509:
4505:
4495:
4493:
4476:
4469:
4459:
4457:
4444:
4443:
4439:
4429:
4427:
4412:
4411:
4407:
4397:
4395:
4378:
4374:
4364:
4362:
4353:
4352:
4348:
4338:
4336:
4327:
4326:
4322:
4312:
4310:
4293:
4286:
4277:
4269:
4267:
4253:
4249:
4236:
4234:
4217:
4213:
4203:
4201:
4192:
4191:
4184:
4174:
4172:
4168:
4161:
4157:
4156:
4152:
4142:
4140:
4136:
4129:
4125:
4124:
4120:
4110:
4108:
4101:news.ontario.ca
4095:
4094:
4087:
4077:
4075:
4058:
4049:
4039:
4037:
4026:
4022:
4012:
4010:
4001:
4000:
3996:
3986:
3984:
3971:
3970:
3966:
3956:
3954:
3937:
3930:
3920:
3918:
3905:
3904:
3900:
3890:
3888:
3881:Transit Toronto
3875:
3874:
3870:
3860:
3858:
3851:Transit Toronto
3845:
3844:
3840:
3830:
3828:
3821:Transit Toronto
3813:
3809:
3799:
3797:
3793:
3782:
3778:
3777:
3773:
3763:
3761:
3751:
3747:
3737:
3735:
3726:
3725:
3721:
3702:
3698:
3688:
3686:
3671:
3667:
3657:
3655:
3638:
3634:
3624:
3622:
3615:
3599:
3595:
3585:
3583:
3581:www.ttc.cahttps
3575:
3574:
3570:
3555:
3554:
3550:
3542:
3531:
3527:
3526:
3513:
3498:
3497:
3493:
3476:
3472:
3462:
3460:
3450:
3446:
3436:
3434:
3417:
3410:
3400:
3398:
3389:
3388:
3384:
3374:
3372:
3359:
3358:
3354:
3344:
3342:
3338:
3331:
3327:
3326:
3322:
3311:
3307:
3297:
3295:
3288:Transit Toronto
3282:
3281:
3277:
3267:
3266:
3262:
3252:
3250:
3241:
3240:
3236:
3226:
3224:
3215:
3214:
3210:
3200:
3198:
3189:
3188:
3184:
3174:
3172:
3163:
3162:
3158:
3148:
3146:
3142:
3135:
3131:
3130:
3126:
3116:
3114:
3110:
3109:
3105:
3095:
3093:
3088:. May 1, 2023.
3078:
3077:
3073:
3063:
3061:
3048:
3047:
3034:
3024:
3022:
3012:
3005:
2988:
2981:
2962:
2958:
2949:
2948:
2944:
2934:
2932:
2919:
2918:
2914:
2904:
2902:
2895:news.ontario.ca
2889:
2888:
2884:
2874:
2872:
2855:
2844:
2834:
2832:
2819:
2818:
2814:
2804:
2802:
2785:
2778:
2768:
2766:
2757:
2756:
2752:
2739:
2737:
2724:
2723:
2719:
2709:
2707:
2698:
2697:
2693:
2684:
2683:
2679:
2669:
2667:
2663:
2656:
2652:
2651:
2647:
2642:
2615:
2540:
2536:
2524:
2523:additional $ 60
2516:
2501:
2497:
2493:
2474:
2465:
2461:
2457:
2441:
2436:
2424:
2361:
2360:million and $ 1
2357:
2315:Sheppard Avenue
2287:
2281:
2265:Sheppard Avenue
2243:
2235:
2231:
2200:
2188:
2166:
2165:
2158:
2157:
2150:
2113:
2112:
2105:
2104:
2095:
2094:
2087:
2086:
2049:
2048:
2041:
2040:
2031:
2030:
2023:
2022:
2005:
1995:
1973:
1958:
1944:
1937:
1930:
1911:
1896:
1877:
1870:
1869:
1862:
1861:
1852:
1833:
1824:
1823:
1819:
1790:
1769:Lawrence Avenue
1765:Sheppard Avenue
1749:
1715:
1699:McCowan station
1635:
1608:
1489:
1479:
1457:Kennedy station
1449:
1442:
1439:
1430:
1423:
1414:
1411:
1402:
1395:
1378:
1353:
1280:Kennedy station
1234:Kennedy station
1214:
1203:
1197:
1194:
1151:
1149:
1139:
1127:
1116:
1103:
1064:
1057:
1053:
1050:
1048:
1047:4 ft
1046:
1042:
1032:
1025:
1021:
1018:
1016:
1015:4 ft
1014:
1010:
1009:and operate on
929:
928:
925:
920:
894:
868:
841:
826:
815:
808:
807:
800:
799:
792:
785:
776:
761:
727:
726:
719:
718:
709:
708:
701:
700:
693:
686:
679:
672:
663:
662:
655:
654:
637:
634:Line 5 Eglinton
626:
619:
618:
611:
610:
601:
579:
572:
550:
543:
528:
501:
494:
487:
465:
450:
434:
412:
411:
404:
403:
396:
379:
370:
351:
340:
337:
336:
328:
292:Electrification
282:
275:
271:
268:
266:
265:4 ft
264:
260:
233:
231:
228:
215:
213:
210:
125:
70:
68:Kennedy station
37:
28:
23:
22:
15:
12:
11:
5:
7542:
7532:
7531:
7526:
7521:
7516:
7511:
7506:
7501:
7496:
7491:
7486:
7481:
7464:
7463:
7461:
7460:
7458:Trafalgar–Main
7455:
7450:
7445:
7440:
7435:
7430:
7425:
7419:
7417:
7413:
7412:
7410:
7409:
7404:
7399:
7397:Steeles (Peel)
7394:
7389:
7384:
7379:
7374:
7369:
7364:
7359:
7357:407 Transitway
7353:
7351:
7347:
7346:
7344:
7343:
7338:
7333:
7328:
7323:
7318:
7313:
7308:
7303:
7298:
7293:
7288:
7282:
7280:
7276:
7275:
7273:
7272:
7267:
7262:
7256:
7254:
7250:
7249:
7247:
7246:
7241:
7236:
7231:
7226:
7221:
7216:
7211:
7210:
7209:
7202:Lakeshore West
7199:
7197:Lakeshore East
7194:
7189:
7184:
7178:
7176:
7168:
7167:
7158:
7157:
7150:
7143:
7135:
7126:
7125:
7123:
7122:
7117:
7112:
7106:
7104:
7100:
7099:
7097:
7096:
7091:
7086:
7081:
7076:
7071:
7066:
7060:
7058:
7054:
7053:
7046:
7044:
7041:
7040:
7038:
7037:
7032:
7026:
7024:
7020:
7019:
7017:
7016:
7011:
7006:
7004:Adam Giambrone
7001:
6995:
6993:
6986:
6982:
6981:
6974:
6973:
6966:
6959:
6951:
6942:
6941:
6935:
6932:
6931:
6928:
6927:
6925:
6924:
6919:
6914:
6909:
6904:
6899:
6893:
6891:
6877:
6873:
6872:
6869:
6868:
6866:
6865:
6862:Science Centre
6858:
6853:
6848:
6843:
6838:
6833:
6828:
6821:
6814:
6807:
6802:
6797:
6792:
6787:
6781:
6779:
6766:
6765:
6763:
6762:
6757:
6750:
6743:
6736:
6733:Jane and Finch
6729:
6722:
6715:
6708:
6701:
6694:
6687:
6684:Rowntree Mills
6680:
6673:
6666:
6659:
6652:
6645:
6642:Humber College
6637:
6635:
6622:
6621:
6619:
6618:
6613:
6606:
6599:
6592:
6589:Hakimi Lebovic
6585:
6578:
6571:
6564:
6557:
6550:
6547:Science Centre
6543:
6536:
6529:
6522:
6519:Mount Pleasant
6515:
6510:
6503:
6496:
6489:
6481:
6474:
6467:
6460:
6453:
6446:
6439:
6432:
6425:
6418:
6411:
6404:
6396:
6394:
6378:
6374:
6373:
6370:
6369:
6367:
6366:
6361:
6356:
6351:
6346:
6341:
6339:High Park Loop
6336:
6331:
6326:
6321:
6316:
6311:
6305:
6303:
6292:
6291:
6289:
6288:
6283:
6278:
6273:
6268:
6266:Sheppard–Yonge
6262:
6260:
6249:
6248:
6246:
6245:
6240:
6233:
6226:
6221:
6216:
6211:
6206:
6201:
6196:
6191:
6186:
6181:
6176:
6171:
6166:
6161:
6156:
6151:
6146:
6141:
6136:
6131:
6126:
6121:
6116:
6111:
6106:
6101:
6096:
6091:
6086:
6081:
6076:
6070:
6068:
6066:Bloor–Danforth
6057:
6056:
6054:
6053:
6048:
6043:
6038:
6033:
6028:
6026:Downsview Park
6023:
6018:
6013:
6008:
6003:
5998:
5989:
5987:St. Clair West
5984:
5979:
5974:
5969:
5964:
5959:
5954:
5949:
5944:
5939:
5934:
5929:
5924:
5919:
5914:
5909:
5904:
5899:
5894:
5889:
5884:
5879:
5874:
5872:Sheppard–Yonge
5869:
5864:
5858:
5856:
5842:
5838:
5837:
5829:Toronto subway
5817:
5816:
5809:
5802:
5794:
5785:
5784:
5778:
5775:
5774:
5772:
5771:
5766:
5761:
5756:
5751:
5746:
5740:
5738:
5734:
5733:
5731:
5730:
5725:
5720:
5715:
5710:
5704:
5702:
5698:
5697:
5695:
5694:
5689:
5684:
5679:
5674:
5669:
5664:
5659:
5657:Greenwood Yard
5654:
5649:
5643:
5641:
5637:
5636:
5634:
5633:
5627:
5621:
5615:
5609:
5603:
5597:
5591:
5584:
5582:
5578:
5577:
5575:
5574:
5569:
5564:
5559:
5554:
5553:
5552:
5534:
5529:
5524:
5519:
5517:502 Downtowner
5514:
5509:
5504:
5499:
5498:
5497:
5492:
5482:
5477:
5472:
5467:
5462:
5456:
5454:
5448:
5447:
5445:
5444:
5439:
5434:
5429:
5424:
5419:
5414:
5409:
5407:508 Lake Shore
5404:
5399:
5394:
5389:
5384:
5379:
5373:
5371:
5365:
5364:
5362:
5361:
5356:
5351:
5346:
5341:
5335:
5334:
5327:
5312:
5297:
5284:
5282:Bloor–Danforth
5271:
5257:
5255:
5249:
5248:
5229:
5227:
5225:
5224:
5219:
5214:
5209:
5203:
5201:
5195:
5194:
5187:
5186:
5179:
5172:
5164:
5158:
5157:
5151:
5145:
5139:
5106:
5105:
5104:
5102:
5101:External links
5099:
5096:
5095:
5077:. p. 13.
5059:
5029:
5009:
4986:
4953:
4933:
4897:
4866:
4835:
4805:
4772:
4739:
4706:
4673:
4640:
4607:
4569:
4536:
4503:
4467:
4437:
4405:
4372:
4346:
4320:
4284:
4247:
4211:
4182:
4150:
4118:
4085:
4047:
4020:
3994:
3964:
3928:
3898:
3868:
3838:
3807:
3771:
3753:Rahal, Sarah.
3745:
3719:
3696:
3665:
3632:
3613:
3593:
3568:
3548:
3511:
3491:
3470:
3444:
3408:
3382:
3352:
3320:
3305:
3275:
3260:
3234:
3208:
3182:
3156:
3124:
3103:
3071:
3032:
3003:
2979:
2972:) – via
2956:
2942:
2912:
2882:
2842:
2812:
2776:
2750:
2717:
2691:
2677:
2644:
2643:
2641:
2638:
2614:
2611:
2608:
2607:
2604:
2601:
2597:
2596:
2593:
2589:
2585:
2584:
2581:
2578:
2574:
2573:
2570:
2567:
2563:
2562:
2559:
2556:
2473:
2470:
2382:General Campus
2351:In June 2013,
2280:
2277:
2222:
2221:
2218:
2217:
2215:
2213:
2211:
2209:
2207:
2205:
2202:
2201:
2193:
2191:
2189:
2182:
2180:
2178:
2175:
2174:
2169:
2167:
2159:
2151:
2144:
2143:
2142:
2140:
2138:
2135:
2134:
2130:
2129:
2125:
2124:
2116:
2114:
2106:
2098:
2097:
2096:
2088:
2080:
2079:
2078:
2076:
2074:
2071:
2070:
2066:
2065:
2061:
2060:
2052:
2050:
2042:
2034:
2033:
2032:
2024:
2016:
2015:
2014:
2012:
2010:
2007:
2006:
2002:Highland Creek
2000:
1998:
1996:
1989:
1987:
1985:
1982:
1981:
1976:
1974:
1967:
1965:
1963:
1960:
1959:
1949:
1947:
1945:
1938:
1931:
1924:
1922:
1920:
1917:
1916:
1914:
1912:
1905:
1903:
1901:
1898:
1897:
1885:
1883:
1880:
1878:
1871:
1863:
1855:
1854:
1853:
1846:
1844:
1842:
1835:
1834:
1829:
1826:
1825:
1821:
1820:
1818:
1817:
1810:
1803:
1795:
1789:
1786:
1748:
1745:
1741:Greenwood Yard
1714:
1711:
1634:
1631:
1607:
1604:
1572:workers' union
1475:Main article:
1448:
1445:
1444:
1443:
1440:
1433:
1431:
1424:
1417:
1415:
1412:
1405:
1403:
1396:
1389:
1377:
1376:Farewell event
1374:
1352:
1349:
1216:
1215:
1130:
1128:
1121:
1115:
1112:
1102:
1099:
1034:standard gauge
972:elevated track
956:Toronto subway
944:Scarborough RT
935:
934:
931:
930:
922:
921:
919:
918:
911:
904:
895:This diagram:
893:
890:
889:
886:
885:
883:
881:
879:
877:
875:
873:
870:
869:
864:
863:
856:
855:
846:
844:
842:
835:
833:
831:
828:
827:
820:
818:
816:
809:
801:
793:
786:
779:
778:
777:
770:
768:
766:
763:
762:
733:
730:
728:
720:
712:
711:
710:
702:
694:
687:
680:
673:
666:
665:
664:
656:
648:
647:
646:
644:
642:
639:
638:
631:
629:
627:
620:
612:
604:
603:
602:
595:
593:
591:
588:
587:
582:
580:
573:
566:
564:
562:
559:
558:
553:
551:
544:
537:
535:
533:
530:
529:
524:
523:
516:
515:
506:
504:
502:
495:
488:
481:
479:
477:
474:
473:
468:
466:
459:
457:
455:
452:
451:
444:
442:
437:
435:
428:
426:
424:
421:
420:
415:
413:
405:
397:
390:
389:
388:
386:
384:
381:
380:
375:
373:
371:
364:
362:
360:
353:
352:
347:
341:
334:
333:
330:
329:
326:
319:
318:
307:
301:
300:
294:
288:
287:
284:standard gauge
258:
252:
251:
248:
244:
243:
239:
238:
225:
221:
220:
207:
203:
202:
198:
197:
192:
188:
187:
182:
178:
177:
174:
170:
169:
167:Toronto subway
164:
160:
159:
154:
150:
149:
145:
144:
139:
135:
134:
131:
127:
126:
124:
123:
118:
112:
110:
106:
105:
99:
95:
94:
89:
85:
84:
81:
77:
76:
72:
71:
61:
53:
52:
44:
43:
26:
18:Scarborough RT
9:
6:
4:
3:
2:
7541:
7530:
7527:
7525:
7522:
7520:
7517:
7515:
7512:
7510:
7507:
7505:
7502:
7500:
7497:
7495:
7492:
7490:
7487:
7485:
7482:
7480:
7477:
7476:
7474:
7459:
7456:
7454:
7451:
7449:
7446:
7444:
7441:
7439:
7436:
7434:
7431:
7429:
7426:
7424:
7421:
7420:
7418:
7414:
7408:
7405:
7403:
7400:
7398:
7395:
7393:
7390:
7388:
7385:
7383:
7380:
7378:
7375:
7373:
7370:
7368:
7365:
7363:
7360:
7358:
7355:
7354:
7352:
7348:
7342:
7339:
7337:
7334:
7332:
7331:Sheppard East
7329:
7327:
7324:
7322:
7319:
7317:
7314:
7312:
7309:
7307:
7304:
7302:
7299:
7297:
7294:
7292:
7289:
7287:
7284:
7283:
7281:
7277:
7271:
7268:
7266:
7263:
7261:
7258:
7257:
7255:
7251:
7245:
7242:
7240:
7237:
7235:
7232:
7230:
7229:Richmond Hill
7227:
7225:
7222:
7220:
7217:
7215:
7212:
7208:
7205:
7204:
7203:
7200:
7198:
7195:
7193:
7190:
7188:
7185:
7183:
7180:
7179:
7177:
7175:
7169:
7165:
7156:
7151:
7149:
7144:
7142:
7137:
7136:
7133:
7121:
7118:
7116:
7113:
7111:
7108:
7107:
7105:
7101:
7095:
7092:
7090:
7089:Sheppard East
7087:
7085:
7082:
7080:
7077:
7075:
7072:
7070:
7067:
7065:
7062:
7061:
7059:
7055:
7050:
7036:
7033:
7031:
7028:
7027:
7025:
7021:
7015:
7012:
7010:
7007:
7005:
7002:
7000:
6997:
6996:
6994:
6990:
6987:
6983:
6979:
6972:
6967:
6965:
6960:
6958:
6953:
6952:
6949:
6938:
6933:
6923:
6920:
6918:
6915:
6913:
6910:
6908:
6905:
6903:
6902:Lawrence East
6900:
6898:
6895:
6894:
6892:
6890:
6886:
6881:
6878:
6874:
6864:
6863:
6859:
6857:
6854:
6852:
6849:
6847:
6844:
6842:
6839:
6837:
6834:
6832:
6829:
6827:
6826:
6822:
6820:
6819:
6815:
6813:
6812:
6808:
6806:
6803:
6801:
6798:
6796:
6795:Queen–Spadina
6793:
6791:
6790:King–Bathurst
6788:
6786:
6783:
6782:
6780:
6778:
6777:
6772:
6767:
6761:
6758:
6756:
6755:
6751:
6749:
6748:
6744:
6742:
6741:
6737:
6735:
6734:
6730:
6728:
6727:
6723:
6721:
6720:
6716:
6714:
6713:
6709:
6707:
6706:
6705:Milvan Rumike
6702:
6700:
6699:
6695:
6693:
6692:
6688:
6686:
6685:
6681:
6679:
6678:
6674:
6672:
6671:
6667:
6665:
6664:
6660:
6658:
6657:
6653:
6651:
6650:
6646:
6644:
6643:
6639:
6638:
6636:
6634:
6633:
6628:
6623:
6617:
6614:
6612:
6611:
6607:
6605:
6604:
6600:
6598:
6597:
6593:
6591:
6590:
6586:
6584:
6583:
6579:
6577:
6576:
6572:
6570:
6569:
6565:
6563:
6562:
6558:
6556:
6555:
6551:
6549:
6548:
6544:
6542:
6541:
6537:
6535:
6534:
6530:
6528:
6527:
6523:
6521:
6520:
6516:
6514:
6511:
6509:
6508:
6504:
6502:
6501:
6497:
6495:
6494:
6490:
6488:
6486:
6482:
6480:
6479:
6475:
6473:
6472:
6468:
6466:
6465:
6461:
6459:
6458:
6454:
6452:
6451:
6447:
6445:
6444:
6440:
6438:
6437:
6433:
6431:
6430:
6426:
6424:
6423:
6419:
6417:
6416:
6412:
6410:
6409:
6405:
6403:
6402:
6398:
6397:
6395:
6393:
6392:
6387:
6382:
6379:
6375:
6365:
6362:
6360:
6357:
6355:
6352:
6350:
6347:
6345:
6342:
6340:
6337:
6335:
6332:
6330:
6327:
6325:
6322:
6320:
6317:
6315:
6312:
6310:
6307:
6306:
6304:
6302:
6298:
6293:
6287:
6284:
6282:
6279:
6277:
6274:
6272:
6269:
6267:
6264:
6263:
6261:
6259:
6255:
6250:
6244:
6241:
6239:
6238:
6234:
6232:
6231:
6227:
6225:
6222:
6220:
6217:
6215:
6214:Victoria Park
6212:
6210:
6207:
6205:
6202:
6200:
6197:
6195:
6192:
6190:
6187:
6185:
6182:
6180:
6177:
6175:
6172:
6170:
6167:
6165:
6162:
6160:
6157:
6155:
6152:
6150:
6147:
6145:
6142:
6140:
6137:
6135:
6132:
6130:
6127:
6125:
6122:
6120:
6117:
6115:
6112:
6110:
6107:
6105:
6102:
6100:
6097:
6095:
6092:
6090:
6087:
6085:
6082:
6080:
6077:
6075:
6072:
6071:
6069:
6067:
6063:
6058:
6052:
6049:
6047:
6044:
6042:
6039:
6037:
6034:
6032:
6029:
6027:
6024:
6022:
6021:Sheppard West
6019:
6017:
6014:
6012:
6009:
6007:
6006:Lawrence West
6004:
6002:
5999:
5997:
5995:
5990:
5988:
5985:
5983:
5980:
5978:
5975:
5973:
5970:
5968:
5965:
5963:
5960:
5958:
5955:
5953:
5950:
5948:
5945:
5943:
5940:
5938:
5935:
5933:
5930:
5928:
5925:
5923:
5920:
5918:
5915:
5913:
5910:
5908:
5905:
5903:
5900:
5898:
5895:
5893:
5890:
5888:
5885:
5883:
5880:
5878:
5875:
5873:
5870:
5868:
5865:
5863:
5860:
5859:
5857:
5855:
5851:
5846:
5843:
5839:
5834:
5830:
5826:
5822:
5815:
5810:
5808:
5803:
5801:
5796:
5795:
5792:
5781:
5776:
5770:
5767:
5765:
5762:
5760:
5757:
5755:
5752:
5750:
5747:
5745:
5744:Accessibility
5742:
5741:
5739:
5737:Miscellaneous
5735:
5729:
5726:
5724:
5721:
5719:
5716:
5714:
5711:
5709:
5708:Don Mills LRT
5706:
5705:
5703:
5699:
5693:
5690:
5688:
5685:
5683:
5680:
5678:
5675:
5673:
5670:
5668:
5665:
5663:
5660:
5658:
5655:
5653:
5650:
5648:
5645:
5644:
5642:
5638:
5631:
5628:
5625:
5622:
5619:
5616:
5613:
5610:
5607:
5604:
5601:
5598:
5595:
5592:
5589:
5586:
5585:
5583:
5579:
5573:
5570:
5568:
5565:
5563:
5560:
5558:
5555:
5551:
5548:
5547:
5546:
5539:
5535:
5533:
5530:
5528:
5525:
5523:
5520:
5518:
5515:
5513:
5510:
5508:
5505:
5503:
5500:
5496:
5493:
5491:
5488:
5487:
5486:
5483:
5481:
5478:
5476:
5473:
5471:
5468:
5466:
5463:
5461:
5458:
5457:
5455:
5453:
5449:
5443:
5442:Rolling stock
5440:
5438:
5435:
5433:
5430:
5428:
5427:512 St. Clair
5425:
5423:
5420:
5418:
5415:
5413:
5410:
5408:
5405:
5403:
5400:
5398:
5395:
5393:
5390:
5388:
5385:
5383:
5380:
5378:
5375:
5374:
5372:
5370:
5366:
5360:
5357:
5355:
5352:
5350:
5347:
5345:
5344:Rolling stock
5342:
5340:
5337:
5336:
5333:
5332:
5328:
5326:
5325:
5317:
5313:
5311:
5310:
5302:
5298:
5296:
5289:
5285:
5283:
5276:
5272:
5270:
5263:
5259:
5258:
5256:
5254:
5250:
5245:
5239:
5233:
5223:
5220:
5218:
5215:
5213:
5210:
5208:
5205:
5204:
5202:
5200:
5196:
5192:
5185:
5180:
5178:
5173:
5171:
5166:
5165:
5162:
5155:
5152:
5149:
5146:
5143:
5140:
5138:
5135:
5134:
5129:
5120:
5116:
5112:
5111:
5080:
5076:
5069:
5063:
5047:
5043:
5039:
5033:
5025:
5024:
5019:
5013:
5005:
5004:
4999:
4993:
4991:
4974:
4970:
4969:
4964:
4957:
4949:
4948:
4943:
4937:
4918:
4914:
4907:
4901:
4885:
4881:
4877:
4870:
4854:
4850:
4846:
4839:
4823:
4819:
4815:
4809:
4793:
4789:
4788:
4783:
4776:
4760:
4756:
4755:
4750:
4743:
4727:
4723:
4722:
4717:
4710:
4694:
4690:
4689:
4684:
4677:
4661:
4657:
4656:
4651:
4644:
4628:
4624:
4623:
4618:
4611:
4595:
4591:
4590:
4585:
4578:
4576:
4574:
4557:
4553:
4552:
4547:
4540:
4524:
4520:
4519:
4514:
4507:
4491:
4487:
4486:
4481:
4474:
4472:
4455:
4451:
4447:
4441:
4425:
4421:
4420:
4415:
4409:
4393:
4389:
4388:
4383:
4376:
4360:
4356:
4350:
4334:
4330:
4324:
4308:
4304:
4303:
4298:
4291:
4289:
4281:
4265:
4261:
4257:
4251:
4244:
4232:
4228:
4227:
4222:
4215:
4199:
4195:
4189:
4187:
4167:
4160:
4154:
4135:
4128:
4122:
4106:
4102:
4098:
4092:
4090:
4073:
4069:
4068:
4063:
4056:
4054:
4052:
4035:
4031:
4024:
4008:
4004:
3998:
3982:
3978:
3974:
3968:
3952:
3948:
3947:
3942:
3935:
3933:
3916:
3912:
3908:
3902:
3886:
3882:
3878:
3872:
3856:
3852:
3848:
3842:
3826:
3822:
3818:
3811:
3792:
3788:
3781:
3775:
3760:
3756:
3749:
3733:
3729:
3723:
3715:
3711:
3707:
3700:
3684:
3680:
3676:
3669:
3653:
3649:
3648:
3643:
3636:
3620:
3616:
3614:9789056997021
3610:
3606:
3605:
3597:
3582:
3578:
3572:
3564:
3563:
3558:
3552:
3541:
3537:
3530:
3524:
3522:
3520:
3518:
3516:
3507:
3506:
3501:
3495:
3487:
3486:
3481:
3474:
3459:
3455:
3448:
3432:
3428:
3427:
3422:
3415:
3413:
3396:
3392:
3386:
3370:
3366:
3362:
3356:
3337:
3330:
3324:
3317:. p. A3.
3316:
3309:
3293:
3289:
3285:
3279:
3271:
3264:
3248:
3244:
3238:
3222:
3218:
3212:
3196:
3192:
3186:
3170:
3166:
3160:
3141:
3134:
3128:
3113:
3107:
3091:
3087:
3086:
3081:
3075:
3059:
3055:
3051:
3045:
3043:
3041:
3039:
3037:
3021:
3017:
3014:Harvey, Lex.
3010:
3008:
2999:
2998:
2993:
2986:
2984:
2975:
2971:
2967:
2960:
2952:
2946:
2930:
2926:
2922:
2916:
2900:
2896:
2892:
2886:
2870:
2866:
2865:
2860:
2853:
2851:
2849:
2847:
2830:
2826:
2822:
2816:
2800:
2796:
2795:
2790:
2783:
2781:
2764:
2760:
2754:
2747:
2735:
2731:
2727:
2721:
2705:
2701:
2695:
2687:
2681:
2662:
2655:
2649:
2645:
2637:
2635:
2634:Line 3 Busway
2630:
2628:
2624:
2620:
2605:
2602:
2599:
2598:
2594:
2590:
2587:
2586:
2582:
2579:
2576:
2575:
2571:
2568:
2565:
2564:
2560:
2557:
2554:
2553:
2547:
2544:
2533:
2529:
2520:
2514:
2509:
2505:
2490:
2487:
2483:
2479:
2469:
2454:
2451:
2446:
2434:
2430:
2422:
2418:
2413:
2409:
2405:
2402:
2400:
2395:
2391:
2387:
2383:
2380:
2376:
2371:
2369:
2368:
2354:
2349:
2347:
2343:
2339:
2335:
2331:
2326:
2324:
2320:
2316:
2312:
2308:
2304:
2300:
2291:
2286:
2276:
2274:
2270:
2266:
2261:
2257:
2252:
2250:
2241:
2229:
2216:
2214:
2212:
2210:
2208:
2206:
2204:
2203:
2199:
2198:
2190:
2181:
2179:
2176:
2173:
2168:
2141:
2139:
2136:
2127:
2126:
2122:
2121:
2115:
2077:
2075:
2072:
2063:
2062:
2058:
2057:
2051:
2013:
2011:
2008:
2003:
1997:
1988:
1986:
1983:
1980:
1975:
1966:
1964:
1961:
1957:
1946:
1923:
1921:
1918:
1913:
1904:
1902:
1899:
1894:
1889:
1884:
1881:
1879:
1845:
1843:
1840:
1837:
1836:
1832:
1828:
1827:
1816:
1811:
1809:
1804:
1802:
1797:
1796:
1794:
1793:
1785:
1783:
1778:
1774:
1770:
1766:
1762:
1758:
1754:
1744:
1742:
1738:
1733:
1731:
1727:
1721:
1718:
1710:
1707:
1704:
1700:
1696:
1692:
1687:
1684:
1680:
1676:
1672:
1668:
1664:
1660:
1652:
1648:
1644:
1639:
1630:
1628:
1627:Toronto gauge
1623:
1619:
1617:
1616:reaction rail
1611:
1603:
1601:
1596:
1594:
1590:
1586:
1582:
1577:
1573:
1569:
1565:
1561:
1556:
1554:
1550:
1545:
1541:
1537:
1533:
1528:
1526:
1525:Innovia Metro
1522:
1518:
1514:
1510:
1506:
1502:
1498:
1494:
1488:
1487:Innovia Metro
1484:
1478:
1470:
1465:
1458:
1453:
1447:Rolling stock
1437:
1432:
1428:
1421:
1416:
1409:
1404:
1400:
1393:
1388:
1387:
1386:
1383:
1373:
1370:
1365:
1362:
1357:
1348:
1346:
1342:
1338:
1333:
1331:
1327:
1322:
1319:
1314:
1311:
1304:
1299:
1295:
1293:
1289:
1285:
1281:
1276:
1274:
1270:
1266:
1261:
1259:
1255:
1251:
1247:
1239:
1238:reaction rail
1235:
1230:
1222:
1212:
1209:
1201:
1190:
1187:
1183:
1180:
1176:
1173:
1169:
1166:
1162:
1159: –
1158:
1154:
1153:Find sources:
1147:
1143:
1137:
1136:
1131:This section
1129:
1125:
1120:
1119:
1111:
1109:
1108:rapid transit
1098:
1096:
1090:
1088:
1084:
1080:
1075:
1070:
1067:
1066:Toronto gauge
1043:1,495 mm
1040:
1035:
1011:1,435 mm
1008:
1004:
1000:
997:, these were
996:
993:(TTC) as the
992:
987:
985:
981:
977:
973:
969:
965:
961:
957:
953:
949:
945:
941:
917:
912:
910:
905:
903:
898:
897:
892:
891:
884:
882:
880:
878:
876:
874:
872:
871:
862:
861:Union Station
858:
857:
854:
851:
850:
843:
834:
832:
829:
825:
824:
817:
769:
767:
764:
759:
754:
749:
744:
740:
736:
729:
645:
643:
640:
636:
635:
628:
594:
592:
589:
586:
585:Lawrence East
581:
565:
563:
560:
557:
552:
536:
534:
531:
522:
518:
517:
514:
511:
510:
503:
480:
478:
475:
472:
467:
458:
456:
453:
448:
443:
441:
438:
436:
427:
425:
422:
419:
414:
387:
385:
382:
378:
372:
363:
361:
358:
355:
354:
350:
346:
345:
332:
331:
325:
324:
320:
317:
314:
311:
308:
306:
302:
299:
295:
293:
289:
285:
261:1,435 mm
259:
257:
253:
249:
245:
240:
226:
222:
208:
204:
199:
196:
193:
191:Rolling stock
189:
186:
183:
179:
175:
171:
168:
165:
161:
158:
155:
151:
146:
143:
140:
136:
132:
128:
122:
119:
117:
114:
113:
111:
107:
103:
100:
96:
93:
90:
86:
82:
78:
73:
69:
65:
59:
54:
50:
45:
40:
35:
30:
19:
7392:Queen (Peel)
7114:
7057:LRT projects
7014:Gary Webster
7009:Karen Stintz
6999:David Miller
6978:Transit City
6936:
6888:
6860:
6855:
6850:
6845:
6835:
6830:
6825:East Harbour
6823:
6816:
6809:
6794:
6789:
6776:Ontario Line
6774:
6752:
6745:
6738:
6731:
6724:
6719:Signet Arrow
6717:
6710:
6703:
6696:
6689:
6682:
6675:
6668:
6661:
6656:Martin Grove
6654:
6647:
6640:
6630:
6608:
6601:
6594:
6587:
6580:
6573:
6566:
6559:
6552:
6545:
6538:
6531:
6524:
6517:
6505:
6498:
6491:
6484:
6476:
6469:
6462:
6455:
6450:Mount Dennis
6448:
6441:
6434:
6427:
6420:
6413:
6408:Martin Grove
6406:
6399:
6389:
6309:Bingham Loop
6242:
6235:
6228:
6169:Castle Frank
5993:
5962:Queen's Park
5779:
5672:Leslie Barns
5652:Eglinton MSF
5581:Predecessors
5557:Transit City
5550:McCowan Yard
5544:
5480:Network 2011
5422:511 Bathurst
5331:Ontario Line
5329:
5323:
5308:
5108:
5086:. Retrieved
5062:
5050:. Retrieved
5041:
5032:
5023:Toronto Star
5021:
5012:
5003:Toronto Star
5001:
4977:. Retrieved
4968:Toronto Star
4966:
4956:
4947:Toronto Star
4945:
4936:
4924:. Retrieved
4917:the original
4900:
4890:December 10,
4888:. Retrieved
4880:Toronto Star
4879:
4869:
4859:November 13,
4857:. Retrieved
4848:
4838:
4828:November 12,
4826:. Retrieved
4817:
4808:
4796:. Retrieved
4787:Toronto Star
4785:
4775:
4763:. Retrieved
4754:Toronto Star
4752:
4742:
4730:. Retrieved
4721:Toronto Star
4719:
4709:
4697:. Retrieved
4686:
4676:
4664:. Retrieved
4655:Toronto Star
4653:
4643:
4631:. Retrieved
4622:Toronto Star
4620:
4610:
4598:. Retrieved
4589:Toronto Star
4587:
4560:. Retrieved
4551:Toronto Star
4549:
4539:
4527:. Retrieved
4518:Toronto Star
4516:
4506:
4496:November 19,
4494:. Retrieved
4485:Toronto Star
4483:
4458:. Retrieved
4450:Toronto Star
4449:
4440:
4430:September 4,
4428:. Retrieved
4417:
4408:
4396:. Retrieved
4385:
4375:
4363:. Retrieved
4359:the original
4349:
4337:. Retrieved
4333:the original
4323:
4313:November 20,
4311:. Retrieved
4302:Toronto Star
4300:
4275:
4268:. Retrieved
4256:Munro, Steve
4250:
4242:
4235:. Retrieved
4224:
4214:
4202:. Retrieved
4173:. Retrieved
4166:the original
4153:
4141:. Retrieved
4134:the original
4121:
4109:. Retrieved
4100:
4076:. Retrieved
4067:Toronto Star
4065:
4040:December 20,
4038:. Retrieved
4023:
4011:. Retrieved
3997:
3987:February 24,
3985:. Retrieved
3981:the original
3967:
3957:December 20,
3955:. Retrieved
3946:Toronto Star
3944:
3919:. Retrieved
3915:the original
3901:
3891:December 20,
3889:. Retrieved
3880:
3871:
3859:. Retrieved
3850:
3841:
3829:. Retrieved
3820:
3810:
3798:. Retrieved
3774:
3762:. Retrieved
3758:
3748:
3738:December 21,
3736:. Retrieved
3731:
3722:
3705:
3699:
3689:December 13,
3687:. Retrieved
3678:
3668:
3656:. Retrieved
3647:Toronto Star
3645:
3635:
3623:. Retrieved
3603:
3596:
3584:. Retrieved
3580:
3571:
3562:Toronto Star
3560:
3551:
3505:Toronto Star
3503:
3494:
3485:Toronto Star
3483:
3473:
3461:. Retrieved
3457:
3447:
3435:. Retrieved
3426:Toronto Star
3424:
3399:. Retrieved
3385:
3373:. Retrieved
3364:
3355:
3343:. Retrieved
3323:
3315:Toronto Star
3314:
3308:
3296:. Retrieved
3287:
3278:
3270:Toronto Star
3269:
3263:
3251:. Retrieved
3237:
3225:. Retrieved
3211:
3199:. Retrieved
3185:
3173:. Retrieved
3169:the original
3165:"TTC Subway"
3159:
3147:. Retrieved
3140:the original
3127:
3115:. Retrieved
3106:
3094:. Retrieved
3085:Toronto Star
3083:
3074:
3064:September 1,
3062:. Retrieved
3058:the original
3023:. Retrieved
3020:Toronto Star
3019:
2997:Toronto Star
2995:
2959:
2945:
2933:. Retrieved
2924:
2915:
2903:. Retrieved
2894:
2885:
2873:. Retrieved
2864:Toronto Star
2862:
2833:. Retrieved
2825:Toronto Star
2824:
2815:
2803:. Retrieved
2794:Toronto Star
2792:
2767:. Retrieved
2762:
2753:
2745:
2738:. Retrieved
2729:
2720:
2708:. Retrieved
2694:
2680:
2670:February 27,
2668:. Retrieved
2661:the original
2648:
2631:
2616:
2545:
2534:
2530:
2521:
2510:
2506:
2491:
2475:
2455:
2447:
2414:
2410:
2406:
2403:
2375:Karen Stintz
2372:
2365:
2350:
2327:
2319:Brimley Road
2296:
2253:
2225:
2194:
1750:
1737:McCowan Yard
1734:
1722:
1719:
1716:
1708:
1695:Bingham Loop
1688:
1679:McCowan Road
1671:Kennedy Road
1656:
1643:McCowan Road
1624:
1621:
1613:
1609:
1597:
1581:one operator
1557:
1529:
1517:People Mover
1490:
1379:
1366:
1358:
1354:
1334:
1323:
1315:
1312:
1308:
1277:
1262:
1254:KraussMaffei
1243:
1204:
1195:
1185:
1178:
1171:
1164:
1152:
1140:Please help
1135:verification
1132:
1104:
1091:
1071:
988:
947:
943:
939:
938:
821:
632:
377:McCowan Yard
185:McCowan Yard
29:
7321:Scarborough
7270:Relief Line
7239:Stouffville
7214:Locust Hill
6889:Scarborough
6698:Duncanwoods
6677:Mount Olive
6596:Golden Mile
6493:Forest Hill
6354:McCaul Loop
6344:Humber Loop
6209:Main Street
6159:Bloor–Yonge
6114:Dundas West
6046:Highway 407
5957:St. Patrick
5912:Bloor–Yonge
5692:Wilson Yard
5632:(1922–1927)
5626:(1921–1953)
5620:(1912–1921)
5614:(1904–1922)
5608:(1891–1921)
5602:(1885–1904)
5596:(1861–1891)
5590:(1849–1862)
5545:Scarborough
5512:2008 strike
5507:2006 strike
5475:Relief Line
5417:510 Spadina
5397:506 Carlton
5217:Wheel-Trans
5052:January 16,
5042:Toronto Sun
4926:October 17,
4849:Steve Munro
4798:February 6,
4666:October 26,
4633:October 24,
4600:October 24,
4204:December 1,
3679:Steve Munro
3658:December 8,
3625:November 1,
3586:October 10,
3298:December 7,
3201:October 23,
3175:January 24,
2875:February 4,
2805:January 20,
2740:February 3,
2619:linear park
2513:Olivia Chow
2448:Councillor
2433:Andy Byford
2429:Josh Matlow
2394:Glen Murray
2240:Steve Munro
1956:Highway 401
1258:West German
1252:. However,
964:Scarborough
256:Track gauge
247:Line length
173:Operator(s)
7473:Categories
7428:Brock Road
7377:Green Lane
7311:Hurontario
7306:Finch West
6992:Proponents
6985:Key people
6785:Exhibition
6760:Finch West
6632:Finch West
6603:Birchmount
6457:Keelesdale
6429:Royal York
6334:Gunns Loop
6329:Fleet Loop
6164:Sherbourne
6149:St. George
6084:Royal York
6031:Finch West
5972:St. George
5947:St. Andrew
5902:Summerhill
5892:Davisville
5877:York Mills
5667:Keele Yard
5640:Facilities
5522:514 Cherry
5485:Gray Coach
5392:505 Dundas
5369:Streetcars
5339:Public art
5324:Finch West
4460:October 8,
3149:August 26,
3025:August 24,
2925:www.ttc.ca
2769:August 24,
2640:References
2600:2027–2030
2283:See also:
1713:Operations
1691:Blue Night
1663:GO Transit
1553:third rail
1481:See also:
1337:Bombardier
1288:GO Transit
1273:GO Transit
1168:newspapers
958:system in
305:Signalling
298:fifth rail
234:2023-07-24
216:1985-03-22
7453:Trafalgar
7382:Highway 7
7296:Don Mills
7192:Kitchener
7064:Don Mills
7035:Doug Ford
7023:Opponents
6907:Ellesmere
6811:Moss Park
6747:Tobermory
6740:Driftwood
6691:Pearldale
6670:Stevenson
6485:Cedarvale
6464:Caledonia
6422:Islington
6286:Don Mills
6276:Bessarion
6194:Greenwood
6174:Broadview
6129:Ossington
6119:Lansdowne
6104:High Park
6099:Runnymede
6079:Islington
6001:Glencairn
5994:Cedarvale
5917:Wellesley
5897:St. Clair
5833:streetcar
5759:Personnel
5754:Metrolinx
5460:Incidents
5377:501 Queen
4365:March 10,
4339:March 10,
4270:April 24,
4237:April 24,
4175:August 5,
4111:August 9,
4078:March 15,
3921:April 16,
3714:0319-0714
3437:April 19,
3401:March 30,
3375:March 10,
3345:March 10,
2935:August 9,
2905:August 9,
2835:August 3,
2710:March 10,
2627:Manhattan
2623:High Line
2555:Effective
2528:minutes.
2504:million.
2486:John Tory
2478:Doug Ford
2344:issued a
2334:Metrolinx
1589:T1 series
1576:operators
1509:Vancouver
1401:concourse
1265:streetcar
1198:June 2018
1083:Doug Ford
950:), was a
556:Ellesmere
327:Route map
296:600 V DC
242:Technical
7301:Eglinton
7069:Eglinton
7030:Rob Ford
6818:Corktown
6754:Sentinel
6649:Westmore
6582:Pharmacy
6575:O'Connor
6513:Eglinton
6471:Fairbank
6436:Scarlett
6401:Renforth
6391:Eglinton
6258:Sheppard
6204:Woodbine
6189:Donlands
6139:Bathurst
6134:Christie
6124:Dufferin
6089:Old Mill
6011:Yorkdale
5907:Rosedale
5887:Eglinton
5882:Lawrence
5769:Typeface
5723:Jane LRT
5701:Proposed
5387:504 King
5359:Trackage
5354:Stations
5309:Eglinton
5295:Sheppard
5110:KML file
5079:Archived
5046:Archived
4979:April 8,
4973:Archived
4884:Archived
4853:Archived
4822:Archived
4792:Archived
4765:June 27,
4759:Archived
4726:Archived
4699:July 14,
4693:Archived
4660:Archived
4627:Archived
4594:Archived
4562:June 30,
4556:Archived
4529:July 13,
4523:Archived
4490:Archived
4454:Archived
4424:Archived
4392:Archived
4307:Archived
4264:Archived
4231:Archived
4198:Archived
4143:March 9,
4105:Archived
4072:Archived
4034:Archived
4007:Archived
3951:Archived
3885:Archived
3855:Archived
3825:Archived
3791:Archived
3764:June 11,
3683:Archived
3652:Archived
3619:Archived
3540:Archived
3463:July 30,
3431:Archived
3395:Archived
3369:Archived
3336:Archived
3292:Archived
3253:July 19,
3247:Archived
3227:July 19,
3221:Archived
3195:Archived
3090:Archived
2929:Archived
2899:Archived
2869:Archived
2829:Archived
2799:Archived
2734:Archived
2726:"Subway"
2704:Archived
1645:between
1591:and the
1544:aluminum
1515:and the
1513:SkyTrain
1505:Hamilton
1341:S-series
1303:S-series
1246:GO-Urban
1081:premier
1061: in
1029: in
995:S series
968:stations
732:Kennedy
279: in
195:S series
181:Depot(s)
130:Stations
75:Overview
64:S-series
7433:McCowan
7103:Related
6937:Italics
6922:McCowan
6912:Midland
6897:Kennedy
6846:Cosburn
6836:Gerrard
6800:Osgoode
6616:Kennedy
6610:Ionview
6561:Wynford
6526:Leaside
6500:Chaplin
6478:Oakwood
6415:Kipling
6271:Bayview
6224:Kennedy
6199:Coxwell
6179:Chester
6144:Spadina
6074:Kipling
5977:Spadina
5952:Osgoode
5922:College
5841:Present
5835:systems
5827:of the
5780:Italics
5452:History
5349:Signals
5088:May 29,
4732:June 1,
4398:July 3,
4013:June 7,
3831:June 8,
3800:June 8,
3117:July 4,
2974:Twitter
2763:Toronto
2592:Roads.
2323:Midland
2307:Malvern
2271:or the
2172:McCowan
2064:McCowan
1564:SelTrac
1540:magnets
1521:Detroit
1351:Closure
1292:GO-ALRT
1182:scholar
1114:History
1056:⁄
1024:⁄
984:McCowan
980:Kennedy
960:Toronto
521:Old Elm
471:Midland
418:McCowan
313:SelTrac
274:⁄
232: (
214: (
201:History
148:Service
138:Website
121:McCowan
116:Kennedy
109:Termini
102:Toronto
7443:Simcoe
7367:Dundas
7336:T-Line
7291:B-Line
7286:A-Line
7253:Subway
7234:Seaton
7224:Milton
7187:Bolton
7182:Barrie
6876:Former
6663:Albion
6568:Sloane
6507:Avenue
6377:Future
6281:Leslie
6219:Warden
6016:Wilson
5982:Dupont
5967:Museum
5927:Dundas
5542:
5320:
5305:
5292:
5279:
5266:
5253:Subway
5212:Routes
4278:
3861:May 4,
3732:Trains
3712:
3611:
3365:BlogTO
3096:May 2,
2595:17–22
2583:18–25
2572:20–30
2541:
2537:
2525:
2517:
2502:
2498:
2494:
2466:
2462:
2458:
2442:
2437:
2425:
2384:), at
2362:
2358:
2260:Line 2
2244:
2236:
2232:
2133:
2128:
2069:
2059:
1831:Legend
1747:Future
1471:, 2021
1369:Systra
1326:Presto
1184:
1177:
1170:
1163:
1155:
349:Legend
342:
310:Thales
224:Closed
206:Opened
163:System
98:Locale
83:Closed
80:Status
7423:Brant
7407:Yonge
6805:Queen
6712:Emery
6533:Laird
6109:Keele
5942:Union
5932:Queen
5862:Finch
5825:loops
5749:Fares
5437:Loops
5082:(PDF)
5071:(PDF)
4920:(PDF)
4909:(PDF)
4169:(PDF)
4162:(PDF)
4137:(PDF)
4130:(PDF)
3794:(PDF)
3783:(PDF)
3543:(PDF)
3532:(PDF)
3339:(PDF)
3332:(PDF)
3143:(PDF)
3136:(PDF)
2970:Tweet
2664:(PDF)
2657:(PDF)
2118:
2054:
1633:Route
1606:Track
1549:truck
1189:JSTOR
1175:books
867:
847:
527:
507:
88:Owner
7316:Jane
7079:Jane
6841:Pape
6443:Jane
6184:Pape
6094:Jane
5937:King
5831:and
5823:and
5119:help
5115:edit
5090:2024
5054:2019
4981:2022
4928:2020
4892:2020
4861:2022
4830:2022
4800:2021
4767:2016
4734:2016
4701:2016
4668:2016
4635:2016
4602:2016
4564:2016
4531:2016
4498:2015
4462:2013
4432:2013
4400:2013
4367:2013
4341:2013
4315:2015
4272:2017
4239:2017
4206:2015
4177:2013
4145:2012
4113:2019
4080:2020
4042:2022
4015:2017
3989:2021
3959:2022
3923:2018
3893:2022
3863:2014
3833:2017
3802:2017
3766:2024
3740:2023
3710:ISSN
3691:2022
3660:2007
3627:2020
3609:ISBN
3588:2023
3465:2023
3439:2017
3403:2019
3377:2015
3347:2013
3300:2010
3255:2014
3229:2014
3203:2013
3177:2015
3151:2014
3119:2023
3098:2023
3066:2023
3027:2023
2937:2019
2907:2019
2877:2021
2837:2017
2807:2016
2771:2023
2742:2017
2712:2013
2672:2022
2123:Yard
2004:East
1771:and
1649:and
1562:'s "
1485:and
1427:Meta
1161:news
1101:Name
915:edit
908:talk
901:view
316:CBTC
153:Type
6154:Bay
5199:Bus
2606:15
2228:ART
2195:to
1677:to
1665:'s
1519:in
1511:'s
1301:An
1278:At
1144:by
948:SRT
859:to
735:TTC
519:to
62:An
7475::
5117:•
5073:.
5040:.
5020:.
5000:.
4989:^
4971:.
4965:.
4944:.
4911:.
4882:.
4878:.
4851:.
4847:.
4820:.
4816:.
4790:.
4784:.
4757:.
4751:.
4724:.
4718:.
4691:.
4685:.
4658:.
4652:.
4625:.
4619:.
4592:.
4586:.
4572:^
4554:.
4548:.
4521:.
4515:.
4488:.
4482:.
4470:^
4448:.
4416:.
4390:.
4384:.
4305:.
4299:.
4287:^
4274:.
4262:.
4241:.
4229:.
4223:.
4185:^
4103:.
4099:.
4088:^
4070:.
4064:.
4050:^
3975:.
3949:.
3943:.
3931:^
3909:.
3879:.
3853:.
3849:.
3823:.
3819:.
3785:.
3757:.
3730:.
3681:.
3677:.
3650:.
3644:.
3617:.
3579:.
3559:.
3534:.
3514:^
3502:.
3482:.
3456:.
3429:.
3423:.
3411:^
3393:.
3367:.
3363:.
3290:.
3286:.
3245:.
3193:.
3082:.
3052:.
3035:^
3018:.
3006:^
2994:.
2982:^
2927:.
2923:.
2897:.
2893:.
2867:.
2861:.
2845:^
2823:.
2797:.
2791:.
2779:^
2761:.
2744:.
2728:.
2629:.
2275:.
1784:.
1661:/
1595:.
1527:.
1069:.
1063:)
1049:10
1031:)
739:GO
737:│
281:)
7154:e
7147:t
7140:v
6970:e
6963:t
6956:v
5996:)
5813:e
5806:t
5799:v
5183:e
5176:t
5169:v
5121:)
5113:(
5092:.
5056:.
4983:.
4930:.
4894:.
4863:.
4832:.
4802:.
4769:.
4736:.
4703:.
4670:.
4637:.
4604:.
4566:.
4533:.
4500:.
4464:.
4434:.
4402:.
4369:.
4343:.
4317:.
4208:.
4179:.
4147:.
4115:.
4082:.
4044:.
4017:.
3991:.
3961:.
3925:.
3895:.
3865:.
3835:.
3804:.
3768:.
3742:.
3716:.
3693:.
3662:.
3629:.
3590:.
3488:.
3467:.
3441:.
3405:.
3379:.
3349:.
3302:.
3257:.
3231:.
3205:.
3179:.
3153:.
3121:.
3100:.
3068:.
3029:.
3000:.
2976:.
2968:(
2953:.
2939:.
2909:.
2879:.
2839:.
2809:.
2773:.
2714:.
2674:.
1814:e
1807:t
1800:v
1211:)
1205:(
1200:)
1196:(
1186:·
1179:·
1172:·
1165:·
1138:.
1058:8
1054:7
1051:+
1045:(
1026:2
1022:1
1019:+
1017:8
1013:(
946:(
276:2
272:1
269:+
267:8
263:(
236:)
218:)
133:6
36:.
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.