Knowledge

Sotra Bridge

Source 📝

565:
the reasons for the removal of passenger tolls was the extra time used to count passengers, which increased the queues at the toll plaza, and that the company's debt would be covered anyway, even without the extra revenue. From 1 January 1981, scheduled buses were also exempt from tolls, under the condition that the funds saved were used by the bus companies to strengthen public transport on Sotra. From 1980, there was disagreement within the company as to whether the toll period should be extended to increase the subsidies to projects on Sotra and Øygarden, or if an as short as possible collection period was desirable. The board decided to terminate toll collections from 31 December 1983. A minority of the owners wanted to extend the period for another two years, which would have given an estimated additional NOK 20 million.
430:, would pass, while 50 meters (160 ft) would permissible for minor and inner parts of fjords, as well as passages where alternatives were available. The clearance of the Sotra Bridge would only be applicable for ships coming from the south, and even these had the option of sailing around Øygarden, an increased distance of 83 kilometres (52 mi). For ships from the east, the distance would be the same, while from the north they would not pass through the sound. The port authority stated on 11 November 1963 that they were willing to allow a smaller clearance, which was back up by Bergen City Council on 27 November. The ministry finalized the decision on 16 December, supporting a height of 50 metres (160 ft). 653:(BMSL), while the eastern tunnel would be 7.0 kilometers (4.3 mi) long and reach 140 meters (460 ft) BMSL. This would involve the current National Road 555 being reclassified as a local road. A tunnel would be 1.5 kilometers (0.93 mi) longer than a bridge, which would give higher costs of roughly NOK 1000 per year for an average commuter. The tunnel would catch long-distance travel (Straume and westwards), while the bridge would be used for local traffic. An alternate tunnel proposal was to build it roughly 2 kilometers (1.2 mi) south of the current bridge, between 528:
company NOK 2 million more in profits, as it could more quickly start collecting toll revenue. The company chose to accept this extra cost. The start of construction was delayed, first by the parliamentary decision coming right before the holidays, followed immediately by a national strike by engineers. The contract for the foundation and concrete work was won by Selmer, who started work in March 1969. The steel-work contracts were issued to Høsveis, Bofa and Alfred Andersen; despite them not having the lowest bid, the road administration chose to use the largest companies.
344:. In 1958, he took the initiative to conduct a traffic count, which along with estimates of increased traffic from other places that had replaced a ferry with a bridge, would give estimates for the revenue from tolls. Norwegian Talc also paid for a draft plan for a bridge. In 1959, Iversen presented an estimate that a bridge would cost NOK 15.5 million, and on 19 December 1959, the council voted unanimously to recommend that a committee be established to continue work on the bridge plans. In 1960, the bridge was included in the road plan for Hordaland. 480:, consisting of one series valued at NOK 15 million issued in 1968, and one valued at NOK 10 million issued in 1970, with an interest of 5.5% and 6.0%, respectively. There was a five years interest-only period, followed by ten years of repayment. The mortgage deed was secured in the right to collect tolls, supported by guarantees from the municipalities of Bergen, Fjell, Sund and Øygarden, and the county municipality. In addition, the company was granted loans from Bergens Privatbank, 496: 541: 303:, part of the Sotra archipelago, from the mainland and Bergen. The western part of the bridge, on Sotra, lies in Knarrevik in Fjell, while the eastern part lies in Drotningsvik in Bergen. The bridge is 1,236 metres (4,055 ft) long with a main span of 468 metres (1,535 ft). It carries two lanes of National Road 555, with a combined width of 7.5 metres (25 ft). In addition, it has a 0.8-meter (2 ft 7 in) wide sidewalk on each side. In 2009, it had an 611: 348: 634:. The Norwegian Public Roads Administration has proposed a four-lane motorway along National Road 555 from Stoavatnet to Straume. This will require a new crossing across Knarreviksundet. Such a motorway extension is estimated to cost between NOK 3 and 4 billion, and the government has allocated NOK 400 million in National Transport Plan 2010–2019 for the project. It is presumed that most of the project will be financed as a toll road. 292: 414: 33: 685:, connects with National Road 555 at Storavatnet. Without a bypass, the increased capacity from Sotra would not be achieved without expanding the motorway from Storavatnet to the city center. In 2010, an alternative was launched whereby a four-lane bridge would be built south of Norwegian Talc, and would immediately run into a tunnel and connect to the current motorway at 689:. This is the planned intersection between National Road 555 and County Road 557 (Ring Road West), which would result in traffic from Sotra towards southern Bergen would not take up capacity on the current 555 motorway until after traffic from both Sotra and Askøy heading towards southern Bergen have had a possibility to head onto County Road 557. 569:
the necessary repayments of the initial loan. Because the debt had been financed with bonds, the company chose to place revenue in the bank with a higher interest instead of paying off the bonds faster. The preferred shares were repaid in 1980, while all bonds had been repaid by 1985. A/S Sotrabrua was formally liquidated on 9 February 1989.
557:, NOK 30 for buses, NOK 20 for trucks, NOK 12 for cars, NOK 5 for motorcycles, NOK 4 for bicycles, NOK 2 for adults and 1 for children. Discounts were available at the same rates as for ferries. The four people who had worked the longest on the ferry were offered the job as 700:
to Sotra was to be made part of the extension plans in the period until 2040. For the light rail to use existing infrastructure, a bridge would have to be chosen. The road project has been criticized by environmentalists because it uniformly bases growth in transport to the archipelago based on cars,
664:
The company Sotrasambandet AS has been established to lobby for and potentially debt-finance the construction, which potentially could include other parts of National Roads 555 and 561. In 2008, the company estimated that it might be possible to start construction in 2013, and complete the project by
391:
to start planning, and this was sent onwards to the Directorate for Public Roads. They concluded that it would be possible to finance the bridge with tolls collected over 13 to 14 years, with the state paying for one-third of the bridge. The plans called for the bridge to run south of Norwegian Talc,
568:
The company collected NOK 73.5 million in tolls, in addition to accumulating NOK 16.3 million in interest. Costs, mostly for running of the toll plaza, were NOK 7.6 million, in addition to financial costs of NOK 20.0 million. This gave a profit of NOK 62.4 million, including
564:
In 1972, the company collected NOK 3.07 million in tolls, 21% more than estimated. By 1977, the annual income had reached NOK 5.03 million, which was up 28% from the estimates. From 1978, the tolls for people were removed, resulting in about NOK 1 million less revenue per year. One of
511:
on 1 July 1968. The construction of the road would be done by Hordaland Public Road Administration, who would receive two-thirds of the financing of costs up to NOK 34 million from the company. The company would also advance the state's part of the costs, which would be repaid to the company as
409:
supported a taller bridge, but were more willing to reduce the height than the port authority. The port authority reduced its preferred height to 62 metres (203 ft), with the road authority responding that such a clearance only existed in a very few places in the world, and that the extra costs
459:
to individuals and the companies, and managed to secure NOK 1.7 million. An exception to the rules was made, and the company was allowed to start detailed planning before the loans had been finalized. An estimate from 1966 showed that the bridge itself would cost NOK 27 million, while the
641:, one involved building a second, two-lane bridge immediately adjacent to the current one, which would give the impression of a single bridge, another involved a new four-lane bridge slightly to the south, and the last involved a new bridge considerably further to the south, which would connect to 536:
took place on 25 May 1972. The bridge cost NOK 39.8 million to construct. This included NOK 650,000 for the county road between Knarrevik and Brattholmen, which had been paid for by the state. The cost the company had to pay was NOK 23.45 million. The final estimates for the project
359:
archipelagos, meaning that the entire twin archipelago would have ferry-free access to the mainland, should the Sotra Bridge be built. The plans had been spurred by a large decrease in fishing during the late 1950s, and the need for increased tax revenue from new industries. The framework for the
399:
The plans from 1959 called for a height of 60 meters (200 ft), but the Public Roads Administration stated that a height of 50 metres (160 ft) would be sufficient, and also help to reduce the construction costs. In 1962, the extra costs for the higher height were estimated at NOK 4
527:
Initial plans had called for the bridge to be completed by October 1972. On 28 December 1968, the company asked the road administration if construction could be quickened. They estimated that the bridge could be completed by December 1971 for a price increase of NOK 750,000. This gave the
515:
The optimal crossing point ran over Norwegian Talc's plant, and would involve placing the western pylon in the middle of their area. The company offered the authorities free land on the condition that they received a satisfactory intersection with the bridge. A formal agreement was reached in
593:
in 1974. The rest of the subsidies were given as grants. The main project was National Road 561, which ran from Kollveit northwards through Øygarden, for which the company paid NOK 28.6 million. It paid a further NOK 9.3 million for other projects in Sotra and Øygarden, including
438:
On 2 January 1965, the bridge committee recommended that a limited company be established to finance the bridge. The three archipelago municipalities, Fjell, Sund and Øygarden, would purchase shares for NOK 500,000, while another NOK 200,000 would be purchased from the mainland
648:
A tunnel would consist of two sections, one from Kolltveit to Arefjord, where there would be an intersection, and one from Arefjord to Storavatnet. Both would be subsea tunnels, where the westernmost would be 4.7 kilometers (2.9 mi) long and reach 80 meters (260 ft) below
512:
NOK 1 million per year, for an estimated advance of NOK 8.3 million. The company would be responsible for any interest, including that which would be accumulated during construction, and would have the right to collect tolls on all traffic on the bridge.
460:
auxiliary roads would cost NOK 4 million, excluding inflation and interest during construction. On 23 November 1966, the county council supported a proposal that one third of the construction costs be covered by national road funds. On 10 August 1967, the
271:, which were collected until 1983. When it opened, it was the longest suspension bridge in Norway, but is now the seventh longest. There exist plans to build a second bridge to either expand the road to four lanes, or carry a proposed extension of the 333:, but they both concluded that there were more pressing needs on the islands' road network, so they did not want to prioritize a bridge. National Road 555 was completed in 1957, and the following years various road projects were completed. 531:
On 11 December 1971, the bridge opened for traffic, and on the same day, the Alvøy–Brattholmen Ferry was terminated. In February 1972, there were twice as many cars as there had been on the ferry in February 1971. The official opening by
425:
who had the final word in the matter. A national committee was established in 1963 to make guidelines for clearances, and it recommended that 60 meters (200 ft) be used in fjords and sounds where very large ships, in particular
447:
to collect tolls on a new bridge; if the tolls gave a profit beyond covering the debt of the bridge, it was to be used for further construction of roads on Sotra and Øygarden. The company was formally registered on 12 January 1966.
580:
to the bridge, part of National Road 555. In 1976, the company issued NOK 5 million in an interest-free loan to the project, which was repaid in 1982 and 1983. Similar conditions were imposed for NOK 2 million for
392:
but it was later routed slightly north, so that the span could be reduced from 520 to 500 meters (1,710 to 1,640 ft). The optimal location would be within the Norwegian Talc plant, and by placing the western pylon on a
705:. Criticism has also been raised against the Norwegian Public Roads Administration being responsible for planning the public transport, as they have failed to produce efficient public transport systems in Bergen. 669:
stated that the government would support a bridge, but did not indicate if a two-lane or four-lane solution would be chosen. The Norwegian Public Roads Administration has recommended a four-lane bridge, while the
404:
stated in 1963 that they required a height of 66 metres (217 ft), while the local newspapers felt that 50 metres (160 ft) was sufficient. Bergen City Council voted in favor of the shortest proposal. The
384:, and the inter-municipal council recommended a similar model. However, they wanted a separate company for Sotra and Øygarden, so extra tolls could be used to help finance road projects on the archipelago. 307:
of 25,494 vehicles. Because it is located across the sound, the bridge is vulnerable to winds from the north and south. It is closed whenever the wind speed exceeds 30 metres per second (98 ft/s).
561:
employees. From 1972, the bookkeeping of the company was transferred from the company's secretary to Bergens Privatbank's branch in Sotra, while the auditing was placed at Hordaland County Auditing.
260:. The bridge is 1,236 metres (4,055 ft) long, has a main span of 468 metres (1,535 ft) and a clearance of 50 metres (160 ft). In 2007, on average 25,494 vehicles used it per day. 341: 443:. The company was established as A/S Sotrabrua on 16 October 1965, with the head office located in Fjell. The company was given authority by its owners to apply for a 20-year 677:
A four-lane bridge is estimated to cost NOK 2 billion. It could either be located immediately north of the current bridge, or south of Norwegian Talc. The traffic from
642: 582: 321:
The first discussion of a bridge in a public forum was in 1954, when Anton P. Torsvik proposed a bridge to the major and municipal engineer of Fjell. Torsvik lived in
553:
Since the bridge would be the only road from the mainland to the archipelago, tolls could be collected in only one direction. The tolls were set to NOK 40 for
590: 373: 1589: 1556: 674:
has recommended the two-lane bridge. It is largely up to the city councils of Bergen and Fjell to determine which of the bridge alternatives will be chosen.
586: 477: 1490: 1287: 381: 1457: 1424: 1372: 422: 618:
In 2005, 8,000 people commuted between Sotra and Bergen, and the bridge had an average daily traffic of 22,000 vehicles. On National Road 555 between
1249: 508: 1523: 658: 1339: 1599: 47: 654: 537:
were for NOK 34 million, and the whole cost above this was covered by the state. When it opened, the bridge was the longest in Norway.
1701: 686: 360:
plan started in 1961 with the creation of an inter-municipal cooperation, which in 1964 resulted in the merger of the municipalities of
1114: 572:
Among the company's other goals was that of helping finance road projects on Øygarden. The most pressing issue was the section from
831: 738: 1638: 2005: 1985: 1970: 1634: 1409: 1324: 1110: 734: 129: 1975: 1980: 488:
for NOK 3 million, although these were never used. The state's part of the financing was through a loan from the
1990: 1670: 1566: 671: 520:
had to be made, which was approved on 19 May 1967. The necessary land not already owned by the municipalities was
1995: 1694: 263:
The bridge became operational on 11 December 1971, although not officially opened until 1972. It cost 40 million
1533: 1297: 368:
to create Øygarden. On 8 May 1962, an inter-municipal road committee was established, which recommended that a
1500: 440: 1434: 1382: 461: 336:
Another person who took up the initiative in the late 1950s was Rangvald Iversen, who was plant manager at
304: 40: 1259: 245: 83: 1687: 1467: 1349: 1710: 682: 489: 693: 388: 355:
There were also some plans for the future which would remove the last ferries within the Sotra and
1947: 451:
To get satisfactory conditions for the loan, the company was recommended by banks to increase the
329:
for various other bridge projects. The issue was discussed in the municipal councils of Fjell and
225: 1794: 1905: 1819: 661:. This would connect to County Road 557 about 1 kilometer (0.62 mi) south of Liavatnet. 517: 444: 401: 1926: 1639:"Sotrasambandet – Delprosjekt 1: Fastlandssambandet Sotra – Bergen – Kommunedelplan med KU" 504: 406: 2000: 1784: 1118: 340:
at Knarrevik. The plant had large costs freighting their products across the sound on the
8: 1931: 1890: 1749: 742: 233: 1642: 842: 507:
on 5 June 1968. An agreement regarding financing was made between A/S Sotrabrua and the
468:
gave permission that the company could borrow up to NOK 25 million. The loan was a
1774: 473: 455:
to 10% of the loan. The share capital was insufficient, so the company started issuing
205: 1658: 1666: 838: 697: 481: 377: 272: 213: 167: 144: 1824: 637:
Four main proposals were suggested for the new fixed link. One involved a four-lane
1910: 1900: 1885: 1859: 1814: 1789: 1779: 1769: 1744: 1724: 701:
and lacks any plans for inclusion of public transport, whether by light rail or as
533: 452: 326: 1829: 1880: 1809: 1804: 1594: 1561: 1528: 1495: 1462: 1429: 1377: 1344: 1292: 1254: 485: 456: 264: 217: 93: 1734: 1729: 1839: 1799: 1754: 666: 650: 619: 469: 465: 337: 499:
The bridge seen from the north, with Bergen to the left and Sotra to the right
1964: 1864: 1834: 1764: 1739: 638: 276: 62: 49: 495: 1849: 1759: 1408:
harvnb error: no target: CITEREFNorwegian_Public_Roads_Administration1989 (
1323:
harvnb error: no target: CITEREFNorwegian_Public_Roads_Administration1989 (
540: 521: 369: 330: 299:
The concrete bridge crosses Knarreviksundet, which separates the island of
229: 1679: 1895: 1854: 623: 577: 554: 427: 253: 387:
On 29 June 1962, Fjell Municipality sent an official application to the
356: 107: 610: 558: 300: 249: 1633: 1403: 1318: 1109: 766: 733: 631: 573: 268: 221: 396:, it was possible to reduce the span to 468 metres (1,535 ft). 832:"Historisk oversikt over endringer i kommune- og fylkesinndelingen" 702: 627: 280: 237: 678: 595: 347: 291: 267:(NOK) to build, of which NOK 23.5 million was paid for with 413: 393: 365: 361: 244:. It carries two road lanes and two narrow pedestrian paths of 241: 111: 103: 32: 599: 257: 322: 589:
and NOK 1.2 million for the establishment of the
410:could result in the whole project being abandoned. 1364: 544:Bergen in the foreground, Sotra in the background 372:be established to finance the bridge. In Bergen, 1962: 1665:(in Norwegian). Bergen: Vigmostad & Bjørge. 1449: 548: 1695: 1488: 1281: 1279: 1277: 433: 1709: 1455: 1702: 1688: 1404:Norwegian Public Roads Administration 1989 1319:Norwegian Public Roads Administration 1989 1274: 767:Norwegian Public Roads Administration 2006 762: 760: 1554: 1337: 423:Ministry of Fisheries and Coastal Affairs 665:2016. On 21 April 2009, State Secretary 609: 539: 509:Ministry of Transport and Communications 494: 412: 346: 290: 1657: 866: 757: 417:The bridge looking towards the mainland 1963: 1093: 1091: 1054: 1052: 919: 917: 904: 902: 877: 875: 829: 1683: 1635:Norwegian Public Roads Administration 1629:(in Norwegian). Fjell: A/S Sotrabrua. 1624: 1557:"– Bybane til Sotra talar for ny bru" 1235: 1223: 1211: 1199: 1187: 1175: 1163: 1151: 1139: 1111:Norwegian Public Roads Administration 1097: 1082: 1070: 1058: 1043: 1031: 1019: 1007: 995: 983: 971: 959: 947: 935: 923: 908: 893: 881: 817: 805: 801: 799: 790: 778: 735:Norwegian Public Roads Administration 721: 622:, the municipal center of Fjell, and 130:Norwegian Public Roads Administration 1587: 1521: 1422: 1370: 1285: 1247: 626:, where National Road 555 becomes a 1229: 1217: 1205: 1193: 1181: 1169: 1157: 1145: 1088: 1076: 1064: 1049: 1037: 1025: 1013: 1001: 989: 977: 965: 953: 941: 929: 914: 899: 887: 872: 13: 1489:Øyvind Lefdal (25 February 2010). 811: 796: 784: 772: 516:mid-1970. On the eastern side, an 14: 2017: 1524:"– Ny Sotrabro, sier Regjeringen" 1288:"– Ny Sotrabro, sier Regjeringen" 696:decided that an extension of the 286: 672:Institute of Transport Economics 31: 1581: 1548: 1515: 1491:"Vil stoppe nytt gigantveikrys" 1482: 1416: 1397: 1331: 1312: 1241: 1133: 1103: 630:, there are long queues during 503:The bridge was approved by the 1641:(in Norwegian). Archived from 1598:(in Norwegian). Archived from 1590:""Alt forspilt og intet lært"" 1565:(in Norwegian). Archived from 1555:Christian (28 December 2008). 1532:(in Norwegian). Archived from 1499:(in Norwegian). Archived from 1466:(in Norwegian). Archived from 1433:(in Norwegian). Archived from 1425:"Bilistane får heile rekninga" 1381:(in Norwegian). Archived from 1373:"Firefelts hengebro til Sotra" 1348:(in Norwegian). Archived from 1338:Christian (3 September 2008). 1296:(in Norwegian). Archived from 1258:(in Norwegian). Archived from 1117:(in Norwegian). Archived from 860: 823: 741:(in Norwegian). Archived from 727: 715: 1: 2006:Former toll bridges in Norway 1986:1971 establishments in Norway 1250:"400 mill til Sotrasambandet" 708: 441:Hordaland County Municipality 1971:Suspension bridges in Norway 1456:Pål Andreas (11 June 2010). 1115:"Nøkkeltal Statens Vegvesen" 739:"ÅDT nivå-1 punkt Hordaland" 549:Tolls and auxiliary projects 351:The bridge from the mainland 305:annual average daily traffic 154:1,236 metres (4,055 ft) 7: 1976:Norwegian National Road 555 316: 10: 2022: 434:Financing and construction 311: 279:could be built to carry a 162:468 metres (1,535 ft) 16:Bridge in Vestland, Norway 1981:Bridges completed in 1971 1940: 1919: 1873: 1717: 1458:"Krever bybane til Sotra" 1423:John (29 February 2008). 605: 490:Regional Development Fund 194: 189: 181: 176: 166: 158: 150: 140: 135: 125: 117: 99: 89: 78: 39: 30: 23: 1991:Road bridges in Vestland 1625:Fjell, Ragnvald (1989). 1340:"Tunnel blir bensinsluk" 830:Juvkam, Dag (May 1999). 694:Hordaland County Council 376:had similarly built the 1711:Major bridges in Norway 342:Alvøy–Brattholmen Ferry 172:50 metres (160 ft) 1996:Road bridges in Bergen 1522:John (21 April 2009). 1286:John (21 April 2009). 1248:John (13 March 2009). 615: 545: 500: 418: 374:Bro og Tunnelselskapet 352: 296: 209: 1588:Olav (19 June 2008). 1371:John (17 June 2009). 613: 543: 518:area development plan 498: 416: 402:Bergen Port Authority 350: 294: 226:Øygarden Municipality 1874:Cable-stayed bridges 1637:(30 November 2006). 1602:on 16 September 2012 1569:on 16 September 2012 1470:on 16 September 2012 1437:on 16 September 2012 1385:on 16 September 2012 1352:on 16 September 2012 1300:on 16 September 2012 505:Parliament of Norway 407:Royal Norwegian Navy 325:and had worked with 63:60.37250°N 5.16583°E 1503:on 28 February 2010 614:A bus on the bridge 587:Nordra Straumsundet 478:Samvirke Forsikring 462:Ministry of Finance 439:municipalities and 275:. Alternatively, a 234:Bergen Municipality 232:on the mainland of 59: /  1718:Suspension bridges 1645:on 14 January 2011 1262:on 8 December 2010 745:on 30 January 2011 616: 591:Solsvik–Rong Ferry 546: 501: 474:Bergens Privatbank 419: 353: 297: 1956: 1955: 1121:on 5 January 2011 839:Statistics Norway 698:Bergen Light Rail 583:National Road 561 482:Bergens Sparebank 378:Puddefjord Bridge 273:Bergen Light Rail 246:National Road 555 214:suspension bridge 198: 197: 145:Suspension bridge 84:National Road 555 68:60.37250; 5.16583 2013: 1800:Kjerringstraumen 1795:Kjellingstraumen 1704: 1697: 1690: 1681: 1680: 1676: 1659:Rødland, Kjartan 1654: 1652: 1650: 1630: 1612: 1611: 1609: 1607: 1585: 1579: 1578: 1576: 1574: 1552: 1546: 1545: 1543: 1541: 1519: 1513: 1512: 1510: 1508: 1486: 1480: 1479: 1477: 1475: 1453: 1447: 1446: 1444: 1442: 1420: 1414: 1413: 1401: 1395: 1394: 1392: 1390: 1368: 1362: 1361: 1359: 1357: 1335: 1329: 1328: 1316: 1310: 1309: 1307: 1305: 1283: 1272: 1271: 1269: 1267: 1245: 1239: 1233: 1227: 1221: 1215: 1209: 1203: 1197: 1191: 1185: 1179: 1173: 1167: 1161: 1155: 1149: 1143: 1142:, pp. 42–43 1137: 1131: 1130: 1128: 1126: 1107: 1101: 1095: 1086: 1080: 1074: 1068: 1062: 1056: 1047: 1041: 1035: 1029: 1023: 1017: 1011: 1005: 999: 993: 987: 981: 975: 969: 963: 957: 951: 945: 939: 933: 927: 921: 912: 906: 897: 891: 885: 879: 870: 864: 858: 857: 855: 853: 848:on 13 March 2011 847: 841:. Archived from 837:(in Norwegian). 836: 827: 821: 815: 809: 803: 794: 788: 782: 776: 770: 764: 755: 754: 752: 750: 731: 725: 719: 457:preferred shares 453:ownership equity 327:public relations 185:11 December 1971 74: 73: 71: 70: 69: 64: 60: 57: 56: 55: 52: 35: 21: 20: 2021: 2020: 2016: 2015: 2014: 2012: 2011: 2010: 1961: 1960: 1957: 1952: 1941:Bascule bridges 1936: 1920:Pontoon bridges 1915: 1869: 1713: 1708: 1673: 1648: 1646: 1616: 1615: 1605: 1603: 1595:Bergens Tidende 1586: 1582: 1572: 1570: 1562:Bergens Tidende 1553: 1549: 1539: 1537: 1536:on 14 June 2010 1529:Bergens Tidende 1520: 1516: 1506: 1504: 1496:Bergens Tidende 1487: 1483: 1473: 1471: 1463:Bergens Tidende 1454: 1450: 1440: 1438: 1430:Bergens Tidende 1421: 1417: 1407: 1402: 1398: 1388: 1386: 1378:Bergens Tidende 1369: 1365: 1355: 1353: 1345:Bergens Tidende 1336: 1332: 1322: 1317: 1313: 1303: 1301: 1293:Bergens Tidende 1284: 1275: 1265: 1263: 1255:Bergens Tidende 1246: 1242: 1234: 1230: 1222: 1218: 1210: 1206: 1198: 1194: 1186: 1182: 1174: 1170: 1162: 1158: 1150: 1146: 1138: 1134: 1124: 1122: 1108: 1104: 1096: 1089: 1081: 1077: 1069: 1065: 1057: 1050: 1042: 1038: 1030: 1026: 1018: 1014: 1006: 1002: 994: 990: 982: 978: 970: 966: 958: 954: 946: 942: 934: 930: 922: 915: 907: 900: 892: 888: 880: 873: 865: 861: 851: 849: 845: 834: 828: 824: 816: 812: 804: 797: 789: 785: 777: 773: 765: 758: 748: 746: 732: 728: 720: 716: 711: 683:County Road 562 643:County Road 557 608: 594:connections to 551: 486:Vestlandsbanken 436: 389:County Governor 370:limited company 319: 314: 295:The bridge deck 289: 265:Norwegian krone 218:Knarreviksundet 168:Clearance below 136:Characteristics 94:Knarreviksundet 67: 65: 61: 58: 53: 50: 48: 46: 45: 26: 17: 12: 11: 5: 2019: 2009: 2008: 2003: 1998: 1993: 1988: 1983: 1978: 1973: 1954: 1953: 1951: 1950: 1948:Tønsberg Canal 1944: 1942: 1938: 1937: 1935: 1934: 1929: 1923: 1921: 1917: 1916: 1914: 1913: 1908: 1906:Stavanger City 1903: 1898: 1893: 1888: 1883: 1877: 1875: 1871: 1870: 1868: 1867: 1862: 1857: 1852: 1847: 1842: 1837: 1832: 1827: 1822: 1817: 1812: 1807: 1802: 1797: 1792: 1787: 1782: 1777: 1772: 1767: 1762: 1757: 1752: 1747: 1742: 1737: 1732: 1727: 1721: 1719: 1715: 1714: 1707: 1706: 1699: 1692: 1684: 1678: 1677: 1671: 1655: 1631: 1621: 1620: 1614: 1613: 1580: 1547: 1514: 1481: 1448: 1415: 1396: 1363: 1330: 1311: 1273: 1240: 1228: 1216: 1204: 1192: 1180: 1168: 1156: 1144: 1132: 1102: 1087: 1075: 1063: 1048: 1036: 1024: 1012: 1000: 988: 976: 964: 952: 940: 928: 913: 898: 886: 871: 859: 822: 810: 795: 783: 771: 756: 726: 713: 712: 710: 707: 692:In June 2010, 667:Geir Pollestad 651:mean sea level 607: 604: 550: 547: 466:Bank of Norway 435: 432: 382:Eidsvåg Tunnel 338:Norwegian Talc 318: 315: 313: 310: 288: 287:Specifications 285: 248:, providing a 216:which crosses 196: 195: 192: 191: 187: 186: 183: 179: 178: 174: 173: 170: 164: 163: 160: 156: 155: 152: 148: 147: 142: 138: 137: 133: 132: 127: 123: 122: 119: 115: 114: 101: 97: 96: 91: 87: 86: 80: 76: 75: 43: 37: 36: 28: 27: 24: 15: 9: 6: 4: 3: 2: 2018: 2007: 2004: 2002: 1999: 1997: 1994: 1992: 1989: 1987: 1984: 1982: 1979: 1977: 1974: 1972: 1969: 1968: 1966: 1959: 1949: 1946: 1945: 1943: 1939: 1933: 1930: 1928: 1925: 1924: 1922: 1918: 1912: 1909: 1907: 1904: 1902: 1899: 1897: 1894: 1892: 1889: 1887: 1884: 1882: 1879: 1878: 1876: 1872: 1866: 1863: 1861: 1858: 1856: 1853: 1851: 1848: 1846: 1843: 1841: 1838: 1836: 1833: 1831: 1828: 1826: 1823: 1821: 1818: 1816: 1813: 1811: 1808: 1806: 1803: 1801: 1798: 1796: 1793: 1791: 1788: 1786: 1783: 1781: 1778: 1776: 1773: 1771: 1768: 1766: 1763: 1761: 1758: 1756: 1753: 1751: 1748: 1746: 1743: 1741: 1738: 1736: 1733: 1731: 1728: 1726: 1723: 1722: 1720: 1716: 1712: 1705: 1700: 1698: 1693: 1691: 1686: 1685: 1682: 1674: 1672:82-419-0300-6 1668: 1664: 1660: 1656: 1644: 1640: 1636: 1632: 1628: 1623: 1622: 1618: 1617: 1601: 1597: 1596: 1591: 1584: 1568: 1564: 1563: 1558: 1551: 1535: 1531: 1530: 1525: 1518: 1502: 1498: 1497: 1492: 1485: 1469: 1465: 1464: 1459: 1452: 1436: 1432: 1431: 1426: 1419: 1411: 1405: 1400: 1384: 1380: 1379: 1374: 1367: 1351: 1347: 1346: 1341: 1334: 1326: 1320: 1315: 1299: 1295: 1294: 1289: 1282: 1280: 1278: 1261: 1257: 1256: 1251: 1244: 1237: 1232: 1225: 1220: 1213: 1208: 1201: 1196: 1189: 1184: 1177: 1172: 1165: 1160: 1153: 1148: 1141: 1136: 1120: 1116: 1112: 1106: 1099: 1094: 1092: 1084: 1079: 1072: 1067: 1060: 1055: 1053: 1045: 1040: 1033: 1028: 1021: 1016: 1009: 1004: 997: 992: 985: 980: 973: 968: 961: 956: 949: 944: 937: 932: 925: 920: 918: 910: 905: 903: 895: 890: 883: 878: 876: 868: 863: 844: 840: 833: 826: 819: 814: 807: 802: 800: 792: 787: 780: 775: 768: 763: 761: 744: 740: 736: 730: 723: 718: 714: 706: 704: 699: 695: 690: 688: 684: 680: 675: 673: 668: 662: 660: 656: 652: 646: 644: 640: 639:subsea tunnel 635: 633: 629: 625: 621: 612: 603: 601: 597: 592: 588: 584: 579: 575: 570: 566: 562: 560: 556: 542: 538: 535: 529: 525: 523: 519: 513: 510: 506: 497: 493: 491: 487: 483: 479: 475: 471: 467: 463: 458: 454: 449: 446: 442: 431: 429: 424: 415: 411: 408: 403: 397: 395: 390: 385: 383: 379: 375: 371: 367: 363: 358: 349: 345: 343: 339: 334: 332: 328: 324: 309: 306: 302: 293: 284: 282: 278: 277:subsea tunnel 274: 270: 266: 261: 259: 255: 251: 247: 243: 239: 235: 231: 227: 223: 219: 215: 211: 207: 203: 193: 188: 184: 180: 175: 171: 169: 165: 161: 157: 153: 149: 146: 143: 139: 134: 131: 128: 126:Maintained by 124: 120: 118:Official name 116: 113: 109: 105: 102: 98: 95: 92: 88: 85: 82:Two lanes of 81: 77: 72: 44: 42: 38: 34: 29: 22: 19: 1958: 1932:Nordhordland 1891:Nordhordland 1844: 1750:Einang Sound 1662: 1647:. Retrieved 1643:the original 1626: 1619:Bibliography 1604:. Retrieved 1600:the original 1593: 1583: 1571:. Retrieved 1567:the original 1560: 1550: 1538:. Retrieved 1534:the original 1527: 1517: 1505:. Retrieved 1501:the original 1494: 1484: 1472:. Retrieved 1468:the original 1461: 1451: 1439:. Retrieved 1435:the original 1428: 1418: 1406:, p. 49 1399: 1387:. Retrieved 1383:the original 1376: 1366: 1354:. Retrieved 1350:the original 1343: 1333: 1321:, p. 48 1314: 1302:. Retrieved 1298:the original 1291: 1264:. Retrieved 1260:the original 1253: 1243: 1238:, p. 53 1231: 1226:, p. 51 1219: 1214:, p. 50 1207: 1202:, p. 58 1195: 1190:, p. 55 1183: 1178:, p. 49 1171: 1166:, p. 48 1159: 1154:, p. 43 1147: 1135: 1123:. Retrieved 1119:the original 1105: 1100:, p. 47 1085:, p. 46 1078: 1073:, p. 44 1066: 1061:, p. 42 1046:, p. 39 1039: 1034:, p. 40 1027: 1022:, p. 37 1015: 1010:, p. 36 1003: 998:, p. 35 991: 986:, p. 34 979: 974:, p. 32 967: 962:, p. 27 955: 950:, p. 22 943: 938:, p. 21 931: 926:, p. 20 911:, p. 19 896:, p. 18 889: 884:, p. 16 869:, p. 42 867:Rødland 2003 862: 850:. Retrieved 843:the original 825: 820:, p. 14 813: 808:, p. 13 793:, p. 12 786: 781:, p. 11 774: 747:. Retrieved 743:the original 729: 717: 691: 676: 663: 647: 636: 617: 571: 567: 563: 555:semitrailers 552: 530: 526: 522:expropriated 514: 502: 450: 437: 428:cruise ships 420: 398: 386: 354: 335: 320: 298: 262: 230:Drotningsvik 202:Sotra Bridge 201: 199: 159:Longest span 151:Total length 25:Sotra Bridge 18: 1927:Bergsøysund 1775:Gjemnessund 769:, p. 8 724:, p. 5 659:Håkonshella 655:Brattholmen 624:Storavatnet 578:Store Sotra 534:King Olav V 421:It was the 254:archipelago 66: / 41:Coordinates 1965:Categories 1785:Hålogaland 1649:14 January 1606:14 January 1573:14 January 1540:14 January 1507:14 January 1474:14 January 1441:14 January 1389:14 January 1356:14 January 1304:14 January 1266:14 January 1236:Fjell 1989 1224:Fjell 1989 1212:Fjell 1989 1200:Fjell 1989 1188:Fjell 1989 1176:Fjell 1989 1164:Fjell 1989 1152:Fjell 1989 1140:Fjell 1989 1125:18 January 1098:Fjell 1989 1083:Fjell 1989 1071:Fjell 1989 1059:Fjell 1989 1044:Fjell 1989 1032:Fjell 1989 1020:Fjell 1989 1008:Fjell 1989 996:Fjell 1989 984:Fjell 1989 972:Fjell 1989 960:Fjell 1989 948:Fjell 1989 936:Fjell 1989 924:Fjell 1989 909:Fjell 1989 894:Fjell 1989 882:Fjell 1989 852:30 January 818:Fjell 1989 806:Fjell 1989 791:Fjell 1989 779:Fjell 1989 749:30 January 722:Fjell 1989 709:References 559:toll plaza 445:concession 301:Litlesotra 250:fixed link 51:60°22′21″N 1901:Skarnsund 1886:Helgeland 1860:Tjeldsund 1820:Nærøysund 1815:Lysefjord 1790:Hardanger 1780:Hagelsund 1770:Fyksesund 1745:Djupfjord 1725:Alversund 1663:Sotrabrua 1627:Sotrabrua 703:bus lanes 687:Liavatnet 632:rush hour 574:Kolltveit 400:million. 222:Knarrevik 210:Sotrabrua 206:Norwegian 121:Sotrabrua 54:5°09′57″E 2001:Øygarden 1881:Grenland 1810:Lokkaren 1805:Kvalsund 1661:(2003). 1113:(2009). 737:(2010). 681:, along 628:motorway 472:sold by 464:and the 357:Øygarden 317:Planning 281:motorway 252:for the 240:county, 238:Vestland 220:between 190:Location 108:Øygarden 1911:Ypsilon 1840:Skjomen 1825:Osterøy 1755:Erfjord 620:Straume 312:History 212:) is a 177:History 90:Crosses 79:Carries 1865:Varodd 1835:Rombak 1830:Randøy 1765:Fossum 1740:Brevik 1669:  606:Future 394:skerry 366:Herdla 362:Hjelme 242:Norway 182:Opened 141:Design 112:Norway 104:Bergen 100:Locale 1850:Stord 1845:Sotra 1760:Folda 1735:Bømla 1730:Askøy 846:(PDF) 835:(PDF) 679:Askøy 600:Misje 596:Turøy 269:tolls 258:Sotra 1896:Sami 1855:Tana 1667:ISBN 1651:2011 1608:2011 1575:2011 1542:2011 1509:2011 1476:2011 1443:2011 1410:help 1391:2011 1358:2011 1325:help 1306:2011 1268:2011 1127:2011 854:2011 751:2011 657:and 598:and 484:and 476:and 470:bond 380:and 364:and 331:Sund 323:Oslo 228:and 200:The 106:and 585:to 576:on 256:of 236:in 224:in 1967:: 1592:. 1559:. 1526:. 1493:. 1460:. 1427:. 1375:. 1342:. 1290:. 1276:^ 1252:. 1090:^ 1051:^ 916:^ 901:^ 874:^ 798:^ 759:^ 645:. 602:. 524:. 492:. 283:. 208:: 110:, 1703:e 1696:t 1689:v 1675:. 1653:. 1610:. 1577:. 1544:. 1511:. 1478:. 1445:. 1412:) 1393:. 1360:. 1327:) 1308:. 1270:. 1129:. 856:. 753:. 204:(

Index


Coordinates
60°22′21″N 5°09′57″E / 60.37250°N 5.16583°E / 60.37250; 5.16583
National Road 555
Knarreviksundet
Bergen
Øygarden
Norway
Norwegian Public Roads Administration
Suspension bridge
Clearance below
Norwegian
suspension bridge
Knarreviksundet
Knarrevik
Øygarden Municipality
Drotningsvik
Bergen Municipality
Vestland
Norway
National Road 555
fixed link
archipelago
Sotra
Norwegian krone
tolls
Bergen Light Rail
subsea tunnel
motorway

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.