announced that the project had been officially approved. €2.0 billion would be invested in the Wendlingen-Ulm high-speed line, along with €2.8 billion in Stuttgart 21. Baden-Württemberg agreed to provide funds of €950 million for the Wendlingen-Ulm line, but the Federal Government will not provide
1674: 1390:, which would allow the travel time between Frankfurt and Stuttgart to be reduced to one hour. Deutsche Bahn has shelved the proposed bypass because of opposition to it in Mannheim. 578: 255: 468: 1492:
funding for it before 2016. Preparatory construction work for the new line began in the autumn of 2010, and the ground-breaking ceremony was held on 7 May 2012.
1483:
Construction was initially planned to commence in 2005, but was pushed back due to budget cuts. This changed in 2007, when the Federal Government, the State of
860: 701: 832: 914: 1045: 967: 1387: 1793: 1746: 994: 804: 1849: 1512: 1859: 1323: 1724: 1382:
from over three and a half hours today to two and a half hours in the future. However, this timing can only be achieved with a by-pass of
1495:
The line was officially opened on 9 December 2022, in an official ceremony with the head of Deutsche Bahn and several local politicians.
1346:. The European Union provided up to 50 per cent funding of the planning phase of the project and ten per cent of its construction costs. 228: 1788: 941: 1783: 1864: 1576: 1436:
consists mainly of the approximately 8.8 km for the Bossler tunnel, two approximately 480  m-long bridges over the
1739: 1703: 1813: 385: 287: 1854: 1778: 1611: 1828: 145: 1217: 1542: 1806: 1732: 1810: 1803: 1754: 200: 130: 1543:"Deutschland-Stuttgart: Bauarbeiten für Eisenbahnlinien, 2019/S 143-351187, Bekanntmachung einer Änderung" 1299:
mountain range, with trains traveling at speeds up to 250 km/h (155 mph). It mostly follows the
1798: 1166: 317: 1393:
27.1 km of the 58 km line run in seven twin-tube tunnels. The estimated construction cost of
1653: 1823: 1818: 1656:(Press release) (in German). Federal Ministry of Transport, Building and Urban Affairs. 19 July 2007 1591: 1520: 1409:
A cross section of the line's route, showing the geolocial layers through which tunnels were built.
1241: 1343: 140: 1312: 1762: 1327: 1142: 1632: 1654:"Tiefensee: Durchbruch für die Neubaustrecke Stuttgart - Ulm - Augsburg und "Stuttgart 21"" 1484: 1292: 65: 8: 1679: 1117: 478: 1572: 1363: 517: 1460: 1397:
2 billion, is affected by the difficult geology that the tunnels will run through.
1300: 1193: 773: 1288: 1339: 122: 28: 1843: 1488: 1374:(network 21) concept, which envisages a reduction of the travel time between 1367: 161: 1430:
runs parallel with the A8, including the 8.3 km-long Albvorland tunnel.
1405: 1316: 1296: 626: 347: 94: 1437: 1421: 1362:
to 28 minutes rather than the previous 54 minutes, assuming no stop at
1375: 1355: 1308: 1021: 1383: 1335: 1773: 1304: 1757: 1519:(in German) (2010/S 158-244693). 17 August 2010. Archived from 1379: 1394: 1331: 1453: 1359: 1440:
and the approximately 4.8 km-long Steinbühl tunnel.
1354:
The line cut travel time for high-speed traffic between
1413:
The project was divided into seven planning sections:
1505: 1604: 1571:. Schweers + Wall. 2009. pp. 94, 104–05, 163. 1704:"Bahn-Neubaustrecke Wendlingen - Ulm ist eröffnet" 1625: 1569:Eisenbahnatlas Deutschland (German railway atlas) 1841: 1326:, the Wendlingen-Ulm line is a component of the 459: 195: 1315:is currently being redeveloped as part of the 1740: 1667: 1592:27 Kilometer Tunnel durch schwieriges Gestein 1561: 1424:with section 1.4 of the Stuttgart 21 project. 1646: 1612:"Einigung auf Finanzierung von Stuttgart 21" 1388:Rhine/Main–Rhine/Neckar high-speed rail line 1747: 1733: 1614:(in German). SWR3 Radio news. 19 July 2007 1444:Section 2.3 (Albhochfläche: Alb highlands) 1635:(in German). Spiegel online. 19 July 2007 1478: 1446:runs above ground and parallel to the A8. 1428:Section 2.1 c (Albvorland: Alb foothills) 1291:in Germany, entirely within the state of 1517:Electronic Journal of the European Union 1404: 1324:Stuttgart–Augsburg new and upgraded line 807:(~485 m), Geislingen–Wiesensteig railway 1452:runs through a tunnel into the city of 1842: 1728: 1633:"Finanzierung für Stuttgart 21 steht" 1450:Section 2.4 (Albabstieg: Alb descent) 1434:Section 2.2 (Albaufstieg: Alb ascent) 1513:"D-Stuttgart: Baustellenüberwachung" 1860:High-speed railway lines in Germany 1701: 1474:connects to the Neu-Ulm 21 project. 13: 1850:Railway lines in Baden-Württemberg 1675:"Bahn beginnt mit den Bauarbeiten" 14: 1876: 1459:The integration of the line with 1366:is made. The project was part of 725:Former Kirchheim–Weilheim railway 549:freight connection tunnel (203 m) 399: 242: 22:Wendlingen–Ulm high-speed railway 1756: 1230: 1206: 1179: 1155: 1131: 1106: 1081: 1059: 1034: 1009: 981: 953: 928: 900: 874: 846: 818: 787: 759: 736: 714: 690: 664: 653:Eastern portal Albvorland Tunnel 639: 615: 592: 567: 561: 560: 538: 531: 503: 496: 448: 441: 434: 412: 405: 398: 374: 367: 360: 336: 329: 307: 300: 276: 269: 241: 217: 27: 1070:Fils VR–Ulm Rbf connecting line 982: 954: 901: 847: 819: 760: 737: 691: 497: 442: 361: 81:59.575 km (37.018 mi) 33:Overview of the high-speed line 1695: 1585: 1535: 1472:Section 2.5 a2 (Danube bridge) 1285:Wendlingen-Ulm high-speed line 1156: 1132: 1107: 532: 435: 1: 1824:Vienna–Bratislava/Hegyeshalom 1498: 1269:Source: German railway atlas 1207: 1082: 1010: 788: 715: 640: 568: 539: 406: 375: 368: 337: 330: 301: 277: 270: 218: 171:open line: 3.1% (exceptional) 1865:Railway lines opened in 2022 1338:, which is supported by the 1060: 1035: 616: 605:Wendlingen Rübholz junction 593: 156:250 km/h (155 mph) 135:2,305 m (7,562 ft) 48:Neubaustrecke Wendlingen–Ulm 7: 1400: 1231: 1180: 929: 875: 665: 504: 449: 413: 308: 10: 1881: 749:Aichelberg Tunnel (252 m) 1769: 1549:(in German). 26 July 2019 1239: 1224: 1215: 1200: 1191: 1173: 1164: 1149: 1140: 1125: 1115: 1100: 1093: 1075: 1068: 1053: 1043: 1028: 1018: 1003: 993: 975: 965: 947: 940: 922: 912: 894: 886: 868: 858: 840: 830: 812: 802: 781: 771: 753: 748: 730: 723: 708: 699: 684: 676: 658: 651: 633: 624: 609: 604: 586: 576: 554: 547: 525: 515: 490: 457: 428: 421: 392: 383: 354: 345: 323: 316: 294: 285: 263: 253: 235: 226: 211: 180: 160: 152: 139: 129: 93: 85: 77: 72: 61: 53: 47: 43: 38: 26: 21: 1855:Railway lines in Bavaria 1307:station in the east and 256:Wendlingen Neckar bridge 229:Stuttgart–Wendlingen HSL 1596:Stuttgarter Nachrichten 1547:tenders electronic date 1349: 1344:Trans-European Networks 1295:. The line crosses the 887:Merklingen-Widderstall 469:Little Wendlingen Curve 16:Railway line in Germany 1479:Construction timetable 1410: 1313:Stuttgart Hauptbahnhof 1303:, connecting with the 1779:Strasbourg–Appenweier 1763:Magistrale for Europe 1408: 1328:Magistrale for Europe 1829:Hegyeshalom–Budapest 1322:As a section of the 318:Wendlingen am Neckar 148:AC overhead catenary 1784:Appenweier–Bruchsal 1680:Stuttgarter Zeitung 1523:on 28 November 2011 1118:Fils Valley Railway 861:Tunnel under the A8 702:Lindach rail bridge 1794:Stuttgart–Augsburg 1789:Bruchsal–Stuttgart 1702:Aktuell, S. W. R. 1598:of 4 October 2006 1463:is carried out in 1411: 1289:high-speed railway 1218:to Friedrichshafen 915:Widderstall Tunnel 579:freight connection 479:Neckar-Alb Railway 1837: 1836: 1578:978-3-89494-139-0 1485:Baden-Württemberg 1364:Stuttgart Airport 1293:Baden-Württemberg 1281: 1280: 1277: 1276: 1273: 1272: 1264: 1263: 1046:Albabstieg Tunnel 968:Merklingen Tunnel 518:Albvorland Tunnel 485: 484: 481: 471: 66:Baden-Württemberg 1872: 1804:Munich–Rosenheim 1774:Paris–Strasbourg 1761: 1760: 1749: 1742: 1735: 1726: 1725: 1719: 1718: 1716: 1715: 1699: 1693: 1692: 1690: 1688: 1671: 1665: 1664: 1662: 1661: 1650: 1644: 1643: 1641: 1640: 1629: 1623: 1622: 1620: 1619: 1608: 1602: 1601: 1589: 1583: 1582: 1565: 1559: 1558: 1556: 1554: 1539: 1533: 1532: 1530: 1528: 1509: 1418:Section 2.1 a/b 1386:on the proposed 1234: 1233: 1210: 1209: 1183: 1182: 1167:from Sigmaringen 1159: 1158: 1135: 1134: 1110: 1109: 1085: 1084: 1063: 1062: 1038: 1037: 1013: 1012: 985: 984: 957: 956: 932: 931: 904: 903: 878: 877: 850: 849: 833:Steinbühl Tunnel 822: 821: 799: 791: 790: 763: 762: 740: 739: 718: 717: 694: 693: 668: 667: 643: 642: 619: 618: 596: 595: 571: 570: 564: 563: 542: 541: 535: 534: 507: 506: 500: 499: 476: 467: 460: 452: 451: 445: 444: 438: 437: 416: 415: 409: 408: 402: 401: 378: 377: 371: 370: 364: 363: 340: 339: 333: 332: 311: 310: 304: 303: 280: 279: 273: 272: 245: 244: 221: 220: 209: 208: 196: 182: 181: 168:in Ulm Hbf: 3.5% 125: 119: 117: 116: 112: 109: 101: 86:Number of tracks 49: 31: 19: 18: 1880: 1879: 1875: 1874: 1873: 1871: 1870: 1869: 1840: 1839: 1838: 1833: 1819:Salzburg–Vienna 1811:Munich–Mühldorf 1799:Augsburg–Munich 1765: 1755: 1753: 1723: 1722: 1713: 1711: 1700: 1696: 1686: 1684: 1673: 1672: 1668: 1659: 1657: 1652: 1651: 1647: 1638: 1636: 1631: 1630: 1626: 1617: 1615: 1610: 1609: 1605: 1599: 1590: 1586: 1579: 1567: 1566: 1562: 1552: 1550: 1541: 1540: 1536: 1526: 1524: 1511: 1510: 1506: 1501: 1481: 1403: 1352: 1342:as part of its 1244: 1235: 1220: 1211: 1189: 1184: 1169: 1160: 1145: 1136: 1121: 1111: 1096: 1091: 1086: 1071: 1064: 1049: 1039: 1024: 1014: 999: 991: 986: 971: 963: 958: 938: 933: 918: 910: 905: 890: 884: 879: 864: 856: 851: 836: 828: 823: 808: 800: 797: 792: 777: 769: 764: 746: 741: 726: 719: 704: 695: 680: 674: 669: 654: 649: 644: 629: 620: 602: 597: 582: 581:from Wendlingen 572: 565: 550: 543: 536: 521: 513: 508: 501: 453: 446: 439: 424: 417: 410: 403: 388: 379: 372: 365: 350: 341: 334: 312: 305: 290: 288:from Plochingen 281: 274: 259: 251: 246: 231: 222: 203: 187: 174:otherwise: 2.5% 162:Maximum incline 153:Operating speed 141:Electrification 121: 114: 110: 107: 105: 104:4 ft  103: 99: 34: 17: 12: 11: 5: 1878: 1868: 1867: 1862: 1857: 1852: 1835: 1834: 1832: 1831: 1826: 1821: 1816: 1801: 1796: 1791: 1786: 1781: 1776: 1770: 1767: 1766: 1752: 1751: 1744: 1737: 1729: 1721: 1720: 1694: 1666: 1645: 1624: 1603: 1584: 1577: 1560: 1534: 1503: 1502: 1500: 1497: 1480: 1477: 1476: 1475: 1468: 1465:Section 2.5 a1 1457: 1447: 1441: 1431: 1425: 1402: 1399: 1351: 1348: 1340:European Union 1279: 1278: 1275: 1274: 1271: 1270: 1266: 1265: 1262: 1261: 1259: 1257: 1255: 1253: 1251: 1249: 1246: 1245: 1240: 1238: 1236: 1229: 1227: 1225: 1222: 1221: 1216: 1214: 1212: 1205: 1203: 1201: 1198: 1197: 1190: 1187: 1185: 1178: 1176: 1174: 1171: 1170: 1165: 1163: 1161: 1154: 1152: 1150: 1147: 1146: 1141: 1139: 1137: 1130: 1128: 1126: 1123: 1122: 1120:from Stuttgart 1116: 1114: 1112: 1105: 1103: 1101: 1098: 1097: 1094: 1092: 1089: 1087: 1080: 1078: 1076: 1073: 1072: 1069: 1067: 1065: 1058: 1056: 1054: 1051: 1050: 1044: 1042: 1040: 1033: 1031: 1029: 1026: 1025: 1019: 1017: 1015: 1008: 1006: 1004: 1001: 1000: 997: 992: 989: 987: 980: 978: 976: 973: 972: 966: 964: 961: 959: 952: 950: 948: 945: 944: 939: 936: 934: 927: 925: 923: 920: 919: 913: 911: 908: 906: 899: 897: 895: 892: 891: 888: 885: 882: 880: 873: 871: 869: 866: 865: 859: 857: 854: 852: 845: 843: 841: 838: 837: 831: 829: 826: 824: 817: 815: 813: 810: 809: 803: 801: 795: 793: 786: 784: 782: 779: 778: 772: 770: 767: 765: 758: 756: 754: 751: 750: 747: 744: 742: 735: 733: 731: 728: 727: 724: 722: 720: 713: 711: 709: 706: 705: 700: 698: 696: 689: 687: 685: 682: 681: 678: 675: 672: 670: 663: 661: 659: 656: 655: 652: 650: 647: 645: 638: 636: 634: 631: 630: 625: 623: 621: 614: 612: 610: 607: 606: 603: 600: 598: 591: 589: 587: 584: 583: 577: 575: 573: 566: 559: 557: 555: 552: 551: 548: 546: 544: 537: 530: 528: 526: 523: 522: 516: 514: 511: 509: 502: 495: 493: 491: 488: 487: 483: 482: 473: 472: 456: 454: 447: 440: 433: 431: 429: 426: 425: 423:tunnel (375 m) 422: 420: 418: 411: 404: 397: 395: 393: 390: 389: 384: 382: 380: 373: 366: 359: 357: 355: 352: 351: 346: 344: 342: 335: 328: 326: 324: 321: 320: 315: 313: 306: 299: 297: 295: 292: 291: 286: 284: 282: 275: 268: 266: 264: 261: 260: 254: 252: 249: 247: 240: 238: 236: 233: 232: 227: 225: 223: 216: 214: 212: 205: 204: 199: 189: 188: 185: 178: 177: 176: 175: 172: 169: 164: 158: 157: 154: 150: 149: 143: 137: 136: 133: 131:Minimum radius 127: 126: 123:standard gauge 97: 91: 90: 87: 83: 82: 79: 75: 74: 70: 69: 63: 59: 58: 55: 51: 50: 45: 41: 40: 36: 35: 32: 24: 23: 15: 9: 6: 4: 3: 2: 1877: 1866: 1863: 1861: 1858: 1856: 1853: 1851: 1848: 1847: 1845: 1830: 1827: 1825: 1822: 1820: 1817: 1815: 1812: 1808: 1805: 1802: 1800: 1797: 1795: 1792: 1790: 1787: 1785: 1782: 1780: 1777: 1775: 1772: 1771: 1768: 1764: 1759: 1750: 1745: 1743: 1738: 1736: 1731: 1730: 1727: 1709: 1705: 1698: 1682: 1681: 1676: 1670: 1655: 1649: 1634: 1628: 1613: 1607: 1597: 1593: 1588: 1580: 1574: 1570: 1564: 1548: 1544: 1538: 1522: 1518: 1514: 1508: 1504: 1496: 1493: 1490: 1489:Deutsche Bahn 1486: 1473: 1469: 1466: 1462: 1458: 1455: 1451: 1448: 1445: 1442: 1439: 1435: 1432: 1429: 1426: 1423: 1419: 1416: 1415: 1414: 1407: 1398: 1396: 1391: 1389: 1385: 1381: 1377: 1373: 1369: 1368:Deutsche Bahn 1365: 1361: 1357: 1347: 1345: 1341: 1337: 1333: 1329: 1325: 1320: 1318: 1314: 1311:in the west. 1310: 1306: 1302: 1298: 1294: 1290: 1286: 1268: 1267: 1260: 1258: 1256: 1254: 1252: 1250: 1248: 1247: 1243: 1237: 1228: 1226: 1223: 1219: 1213: 1204: 1202: 1199: 1196: 1195: 1186: 1177: 1175: 1172: 1168: 1162: 1153: 1151: 1148: 1144: 1138: 1129: 1127: 1124: 1119: 1113: 1104: 1102: 1099: 1088: 1079: 1077: 1074: 1066: 1057: 1055: 1052: 1047: 1041: 1032: 1030: 1027: 1023: 1016: 1007: 1005: 1002: 996: 995:Imberg Tunnel 988: 979: 977: 974: 969: 960: 951: 949: 946: 943: 935: 926: 924: 921: 916: 907: 898: 896: 893: 881: 872: 870: 867: 862: 853: 844: 842: 839: 834: 825: 816: 814: 811: 806: 794: 785: 783: 780: 775: 774:Boßler Tunnel 766: 757: 755: 752: 743: 734: 732: 729: 721: 712: 710: 707: 703: 697: 688: 686: 683: 671: 662: 660: 657: 646: 637: 635: 632: 628: 622: 613: 611: 608: 599: 590: 588: 585: 580: 574: 558: 556: 553: 545: 529: 527: 524: 519: 510: 494: 492: 489: 480: 475: 474: 470: 465: 462: 461: 455: 432: 430: 427: 419: 396: 394: 391: 387: 381: 358: 356: 353: 349: 343: 327: 325: 322: 319: 314: 298: 296: 293: 289: 283: 267: 265: 262: 257: 248: 239: 237: 234: 230: 224: 215: 213: 210: 207: 206: 202: 198: 197: 194: 191: 190: 184: 183: 179: 173: 170: 167: 166: 165: 163: 159: 155: 151: 147: 146:15 kV/16.7 Hz 144: 142: 138: 134: 132: 128: 124: 100:1,435 mm 98: 96: 92: 88: 84: 80: 76: 71: 67: 64: 60: 56: 52: 46: 42: 37: 30: 25: 20: 1712:. Retrieved 1707: 1697: 1685:. Retrieved 1683:. 7 May 2012 1678: 1669: 1658:. Retrieved 1648: 1637:. Retrieved 1627: 1616:. Retrieved 1606: 1595: 1587: 1568: 1563: 1551:. Retrieved 1546: 1537: 1525:. Retrieved 1521:the original 1516: 1507: 1494: 1482: 1471: 1464: 1449: 1443: 1433: 1427: 1417: 1412: 1392: 1371: 1353: 1321: 1317:Stuttgart 21 1297:Swabian Jura 1284: 1282: 1192: 805:Fils Viaduct 627:Teck Railway 463: 348:Teck Railway 192: 1710:(in German) 1600:(in German) 1461:Ulm station 1438:Fils valley 1301:A8 motorway 1242:to Augsburg 889:(crossover) 679:(crossover) 386:to Tübingen 95:Track gauge 78:Line length 54:Line number 44:Native name 1844:Categories 1714:2022-12-11 1708:swr.online 1660:2007-07-20 1639:2007-07-20 1618:2007-07-20 1499:References 1422:Wendlingen 1143:from Aalen 1095:Portal Ulm 942:Merklingen 1814:–Salzburg 1807:–Salzburg 1527:6 January 1420:connects 1376:Frankfurt 1356:Stuttgart 1319:project. 1309:Stuttgart 1022:Dornstadt 466:junction 464:Neckartal 186:Route map 73:Technical 68:, Germany 1470:Finally 1401:Sections 1384:Mannheim 1336:Budapest 1048:(5897 m) 835:(4847 m) 776:(8808 m) 520:(8174 m) 118: in 39:Overview 1553:28 July 1372:Netz 21 1305:Neu-Ulm 1194:Ulm Hbf 1020:Portal 998:(499 m) 970:(384 m) 917:(962 m) 863:(378 m) 677:Nabern 258:(136 m) 113:⁄ 1575:  1380:Munich 1188:89.373 1090:87.874 990:72.721 962:65.012 937:63.866 909:61.225 883:60.845 855:59.962 827:54.651 768:45.367 745:43.320 673:38.375 648:38.342 601:30.537 512:30.168 486: 250:29.314 201:Legend 193: 62:Locale 1687:9 May 1332:Paris 1330:from 1287:is a 796:54.18 458: 1689:2015 1573:ISBN 1555:2019 1529:2018 1487:and 1378:and 1358:and 1350:Line 1283:The 57:4813 1454:Ulm 1370:'s 1360:Ulm 1334:to 477:to 1846:: 1809:/ 1706:. 1677:. 1594:, 1545:. 1515:. 120:) 1748:e 1741:t 1734:v 1717:. 1691:. 1663:. 1642:. 1621:. 1581:. 1557:. 1531:. 1467:. 1456:. 1395:€ 798:0 115:2 111:1 108:+ 106:8 102:( 89:2

Index


Baden-Württemberg
Track gauge
standard gauge
Minimum radius
Electrification
15 kV/16.7 Hz
Maximum incline
Legend
Stuttgart–Wendlingen HSL
Wendlingen Neckar bridge
from Plochingen
Wendlingen am Neckar
Teck Railway
to Tübingen
Little Wendlingen Curve
Neckar-Alb Railway
Albvorland Tunnel
freight connection
Teck Railway
Lindach rail bridge
Boßler Tunnel
Fils Viaduct
Steinbühl Tunnel
Tunnel under the A8
Widderstall Tunnel
Merklingen
Merklingen Tunnel
Imberg Tunnel
Dornstadt

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.