29:
421:
435:
337:, the plant was substantially renovated between 2007 and 2010. A new 400 feet (120 m) twin FGD stack was built to replace the existing 700 feet (210 m) stacks, which have been capped and are inoperative. Flue gas from the boilers is routed through the emissions control system that sprays the exhaust with a
393:
found that the shutdown would pose unacceptable grid reliability risks, so they have not approved its closure. For this reason, the power plant may stay online until 2028. Clean energy advocates have accused PJM of failing to proactively plan for the shutdown of the power plant, and explore other
501:
385:
On
November 10, 2020, Talen Energy (parent company of Raven Power) announced that it will stop burning coal at the Brandon Shores and Wagner plants by the end of 2025. The plants will be converted to use alternative fuel sources.
732:
373:, for approximately $ 400 million. Exelon had committed to divest the plants as condition for regulatory approval of its merger with Constellation Energy to alleviate concerns regarding potential
1134:
508:
317:
issued a fine of $ 1 million to
Constellation. Nearby residents filed a lawsuit against Constellation and in 2008 the company settled the case for $ 54 million.
66:
739:
536:
208:
1129:
1124:
1139:
683:
961:
1144:
1098:
314:
369:, Brandon Shores, and Herbert A. Wagner Generating Stations to Raven Power Holdings LLC, a newly formed portfolio company of
880:
833:
784:
267:
773:
725:
612:
366:
982:
748:
448:
406:
659:
274:(FGD) system stacks. In April 2023, Talen notified their grid operator, PJM, that they intended to close the station.
1088:
475:
349:
and fly ash for use in concrete. The system uses treated municipal wastewater from the Anne
Arundel County Cox Creek
901:
389:
In April 2023, Talen notified grid operator PJM that they instead intended to close
Brandon Shores. However, the
875:
638:
870:
820:
803:
298:
270:. The Brandon Shores plant dominates the site with its 700-foot (210 m) exhaust and 400-foot (120 m)
361:
The plant was originally constructed by a predecessor company of
Constellation Energy, which was purchased by
838:
792:
236:
54:
593:
574:
1082:
896:
825:
779:
1062:
891:
843:
797:
1058:
1042:
468:
851:
537:"Owner of Brandon Shores and Wagner power plants in Pasadena will stop burning coal by end of 2025"
966:
271:
365:
in 2012. On August 9, 2012, Exelon announced that it had reached an agreement for the sale of the
290:
into the site, it is unused and would require improvements to restore it to an operational state.
998:
232:
943:
555:
935:
310:
244:
106:
282:
The
Brandon Shores and Wagner Generating Stations consume approximately 4.8 million tons of
377:
in the regional wholesale electricity market. The sale was completed on
November 30, 2012.
8:
1029:
403:
390:
370:
306:
248:
1072:
174:
1102:
620:
334:
247:, and is operated by Raven Power Holdings, Inc. Brandon Shores consists of a pair of
711:
198:
1092:
350:
252:
502:"Environmental Review of Proposed Air Pollution Control Project at Brandon Shores"
1014:
953:
426:
136:
402:
The electrical output of
Brandon Shores Generating Station is dispatched by the
1068:
925:
330:
326:
263:
146:
28:
639:"Exelon Agrees to Sell Three Maryland Coal Plants to Raven Power Holdings LLC"
255:
steam turbine. The station has a combined nominal generating capacity of 1370
1118:
920:
717:
624:
440:
81:
68:
507:. Maryland Department of Natural Resources. February 5, 2007. Archived from
286:
annually. Coal for both stations is delivered by barge. Although there is a
1037:
374:
121:
231:
is an electric generating station located on Fort
Smallwood Road north of
287:
217:
1024:
562:. Vol. 87, no. 8. Washington, DC: American Chemical Society.
338:
752:
240:
613:"Top Plant: Brandon Shores Generating Station, Pasadena, Maryland"
434:
346:
302:
262:
The station shares a 483-acre (195 ha) site adjacent to the
259:. Unit 1 went into operation in May 1984 and Unit 2 in May 1991.
16:
Electric generating station in Anne
Arundel County, Maryland, US
1019:
469:"Existing Electric Generating Units in the United States, 2006"
362:
342:
1078:
684:"Zombie coal plants could threaten the US energy transition"
283:
1135:
Buildings and structures in Anne Arundel County, Maryland
325:
In order to meet Maryland requirements for reductions of
256:
180:
594:"Constellation, Gambrills residents settle fly-ash suit"
353:
as the source of water for making the limestone slurry.
305:
from Brandon Shores at a former sand and gravel mine in
394:
options that could maintain grid stability without it.
33:
Brandon Shores Generating Station viewed from the south
416:
1116:
530:
528:
747:
619:. Vol. 154, no. 10. pp. 30–32.
733:
525:
962:Montgomery County Resource Recovery Facility
293:
740:
726:
397:
496:
494:
492:
1130:Energy infrastructure completed in 1991
1125:Energy infrastructure completed in 1984
610:
572:
553:
534:
209:Related media on Commons
1117:
1099:Southern Maryland Electric Cooperative
489:
315:Maryland Department of the Environment
1140:Coal-fired power stations in Maryland
721:
604:
251:coal-fired boilers which each feed a
848:Philadelphia Road Generating Station
641:(Press release). Exelon. Aug 9, 2012
380:
268:Herbert A. Wagner Generating Station
591:
13:
554:Johnson, Jeffrey W. (2009-02-23).
449:List of power stations in Maryland
407:regional transmission organization
14:
1156:
1089:Old Dominion Electric Cooperative
705:
478:, U.S. Department of Energy. 2006
476:Energy Information Administration
229:Brandon Shores Generating Station
22:Brandon Shores Generating Station
902:Rock Springs Generation Facility
433:
419:
277:
128:Thermal power station
27:
1145:1984 establishments in Maryland
676:
560:Chemical & Engineering News
556:"The Foul Side Of 'Clean Coal'"
535:Pacella, Rachael (2020-11-11).
885:Notch Cliff Generating Station
652:
631:
611:Peltier, Robert (2010-10-01).
585:
575:"Coal Ash Dump in City Fought"
566:
547:
461:
1:
454:
320:
309:during 1996 to 2007. The ash
55:Anne Arundel County, Maryland
888:Panda Brandywine Power Plant
356:
7:
906:Westport Generating Station
573:Wheeler, Tim (2009-09-07).
412:
10:
1161:
814:Oil-fired peaking stations
351:wastewater treatment plant
1051:
1007:
991:
975:
952:
934:
913:
860:
813:
759:
592:Cho, Hanah (2008-11-01).
214:
204:
194:
189:
173:
161:
157:
152:
142:
132:
127:
117:
105:
97:
60:
50:
42:
38:
26:
21:
967:Wheelabrator Incinerator
311:contaminated groundwater
294:Environmental violations
272:flue-gas desulfurization
398:Dispatch of electricity
371:Riverstone Holdings LLC
313:with heavy metals. The
175:Nameplate capacity
944:Criterion Wind Project
166:Units operational
1083:Washington Metro Area
153:Power generation
82:39.18139°N 76.53778°W
861:Natural gas stations
712:Brandon Shores Plant
341:slurry and collects
299:Constellation Energy
249:Babcock & Wilcox
199:Brandon Shores Plant
107:Commission date
1030:PJM Interconnection
762:generating stations
404:PJM Interconnection
391:PJM Interconnection
307:Gambrills, Maryland
237:Anne Arundel County
190:External links
143:Cooling source
87:39.18139; -76.53778
78: /
914:Hydroelectric dams
867:Easton Power Plant
830:Easton Power Plant
660:"PJM memo to FERC"
1112:
1111:
1103:Southern Maryland
598:The Baltimore Sun
579:The Baltimore Sun
541:The Baltimore Sun
381:Scheduled closure
225:
224:
133:Primary fuel
113:Unit 2: May, 1991
111:Unit 1: May, 1984
1152:
1093:Western Maryland
1063:Central Maryland
1043:Waste Management
992:Energy terminals
742:
735:
728:
719:
718:
699:
698:
696:
695:
680:
674:
673:
671:
670:
656:
650:
649:
647:
646:
635:
629:
628:
608:
602:
601:
589:
583:
582:
570:
564:
563:
551:
545:
544:
532:
523:
522:
520:
519:
514:on March 7, 2013
513:
506:
498:
487:
486:
484:
483:
473:
465:
443:
438:
437:
429:
424:
423:
422:
367:Charles P. Crane
253:General Electric
218:edit on Wikidata
93:
92:
90:
89:
88:
83:
79:
76:
75:
74:
71:
31:
19:
18:
1160:
1159:
1155:
1154:
1153:
1151:
1150:
1149:
1115:
1114:
1113:
1108:
1047:
1015:AES Corporation
1003:
987:
971:
954:Waste-to-energy
948:
930:
909:
856:
809:
761:
755:
746:
708:
703:
702:
693:
691:
682:
681:
677:
668:
666:
658:
657:
653:
644:
642:
637:
636:
632:
609:
605:
590:
586:
571:
567:
552:
548:
533:
526:
517:
515:
511:
504:
500:
499:
490:
481:
479:
471:
467:
466:
462:
457:
439:
432:
427:Maryland portal
425:
420:
418:
415:
400:
383:
359:
327:nitrogen oxides
323:
296:
280:
221:
184:
137:Bituminous coal
112:
86:
84:
80:
77:
72:
69:
67:
65:
64:
34:
17:
12:
11:
5:
1158:
1148:
1147:
1142:
1137:
1132:
1127:
1110:
1109:
1107:
1106:
1096:
1086:
1076:
1069:Delmarva Power
1066:
1055:
1053:
1049:
1048:
1046:
1045:
1040:
1035:
1032:
1027:
1022:
1017:
1011:
1009:
1005:
1004:
1002:
1001:
995:
993:
989:
988:
986:
985:
983:Calvert Cliffs
979:
977:
976:Nuclear plants
973:
972:
970:
969:
964:
958:
956:
950:
949:
947:
946:
940:
938:
932:
931:
929:
928:
923:
917:
915:
911:
910:
908:
907:
904:
899:
894:
889:
886:
883:
878:
873:
868:
864:
862:
858:
857:
855:
854:
849:
846:
841:
836:
831:
828:
823:
817:
815:
811:
810:
808:
807:
801:
795:
790:
787:
782:
777:
771:
769:Brandon Shores
765:
763:
757:
756:
749:Power stations
745:
744:
737:
730:
722:
716:
715:
714:- Talen Energy
707:
706:External links
704:
701:
700:
675:
651:
630:
617:Power Magazine
603:
584:
565:
546:
524:
488:
459:
458:
456:
453:
452:
451:
445:
444:
430:
414:
411:
399:
396:
382:
379:
358:
355:
331:sulfur dioxide
322:
319:
295:
292:
279:
276:
264:Patapsco River
223:
222:
215:
212:
211:
206:
202:
201:
196:
192:
191:
187:
186:
182:
177:
171:
170:
167:
163:
162:
159:
158:
155:
154:
150:
149:
147:Chesapeake Bay
144:
140:
139:
134:
130:
129:
125:
124:
119:
115:
114:
109:
103:
102:
99:
95:
94:
62:
58:
57:
52:
48:
47:
44:
40:
39:
36:
35:
32:
24:
23:
15:
9:
6:
4:
3:
2:
1157:
1146:
1143:
1141:
1138:
1136:
1133:
1131:
1128:
1126:
1123:
1122:
1120:
1104:
1100:
1097:
1094:
1090:
1087:
1084:
1080:
1077:
1074:
1070:
1067:
1064:
1060:
1057:
1056:
1054:
1050:
1044:
1041:
1039:
1036:
1033:
1031:
1028:
1026:
1023:
1021:
1018:
1016:
1013:
1012:
1010:
1006:
1000:
997:
996:
994:
990:
984:
981:
980:
978:
974:
968:
965:
963:
960:
959:
957:
955:
951:
945:
942:
941:
939:
937:
933:
927:
924:
922:
919:
918:
916:
912:
905:
903:
900:
898:
895:
893:
890:
887:
884:
882:
879:
877:
874:
872:
869:
866:
865:
863:
859:
853:
850:
847:
845:
842:
840:
837:
835:
832:
829:
827:
824:
822:
819:
818:
816:
812:
805:
802:
799:
796:
794:
791:
788:
786:
783:
781:
778:
775:
772:
770:
767:
766:
764:
758:
754:
750:
743:
738:
736:
731:
729:
724:
723:
720:
713:
710:
709:
689:
685:
679:
665:
661:
655:
640:
634:
626:
622:
618:
614:
607:
599:
595:
588:
580:
576:
569:
561:
557:
550:
542:
538:
531:
529:
510:
503:
497:
495:
493:
477:
470:
464:
460:
450:
447:
446:
442:
441:Energy portal
436:
431:
428:
417:
410:
408:
405:
395:
392:
387:
378:
376:
372:
368:
364:
354:
352:
348:
344:
340:
336:
332:
328:
318:
316:
312:
308:
304:
300:
291:
289:
288:railroad spur
285:
278:Coal delivery
275:
273:
269:
265:
260:
258:
254:
250:
246:
242:
238:
234:
233:Orchard Beach
230:
219:
213:
210:
207:
203:
200:
197:
193:
188:
185:
178:
176:
172:
168:
165:
164:
160:
156:
151:
148:
145:
141:
138:
135:
131:
126:
123:
120:
116:
110:
108:
104:
100:
96:
91:
63:
59:
56:
53:
49:
46:United States
45:
41:
37:
30:
25:
20:
1038:Talen Energy
876:Gould Street
768:
692:. Retrieved
690:. 2024-05-14
688:Canary Media
687:
678:
667:. Retrieved
663:
654:
643:. Retrieved
633:
616:
606:
597:
587:
578:
568:
559:
549:
540:
516:. Retrieved
509:the original
480:. Retrieved
463:
401:
388:
384:
375:market power
360:
324:
297:
281:
261:
228:
226:
122:Talen Energy
1034:Raven Power
871:Chalk Point
821:Chalk Point
804:Warrior Run
760:Coal-fired
345:for use in
245:Glen Burnie
101:Operational
85: /
61:Coordinates
1119:Categories
1025:NRG Energy
999:Cove Point
936:Wind farms
926:Deep Creek
839:Morgantown
793:Morgantown
694:2024-05-15
669:2023-11-02
645:2012-08-13
518:2008-12-30
482:2008-07-14
455:References
321:Renovation
73:76°32′16″W
70:39°10′53″N
1052:Companies
1008:Operators
921:Conowingo
897:Riverside
826:Dickerson
789:Luke Mill
780:Dickerson
625:0032-5929
357:2012 sale
347:wallboard
339:limestone
301:disposed
266:with the
1073:Delmarva
892:Perryman
844:Perryman
806:(closed)
800:(closed)
776:(closed)
753:Maryland
413:See also
241:Maryland
118:Owner(s)
51:Location
472:(Excel)
335:mercury
303:fly ash
243:, near
205:Commons
195:Website
43:Country
1020:Exelon
881:Wagner
852:Vienna
834:Wagner
785:Wagner
623:
363:Exelon
343:gypsum
98:Status
1079:Pepco
798:Smith
774:Crane
512:(pdf)
505:(PDF)
216:[
179:1370
621:ISSN
333:and
284:coal
227:The
1059:BGE
751:in
664:PJM
257:MWe
235:in
1121::
686:.
662:.
615:.
596:.
577:.
558:.
539:.
527:^
491:^
474:.
409:.
329:,
239:,
181:MW
1105:)
1101:(
1095:)
1091:(
1085:)
1081:(
1075:)
1071:(
1065:)
1061:(
741:e
734:t
727:v
697:.
672:.
648:.
627:.
600:.
581:.
543:.
521:.
485:.
220:]
183:e
169:2
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.