29: 421: 435: 337:, the plant was substantially renovated between 2007 and 2010. A new 400 feet (120 m) twin FGD stack was built to replace the existing 700 feet (210 m) stacks, which have been capped and are inoperative. Flue gas from the boilers is routed through the emissions control system that sprays the exhaust with a 393:
found that the shutdown would pose unacceptable grid reliability risks, so they have not approved its closure. For this reason, the power plant may stay online until 2028. Clean energy advocates have accused PJM of failing to proactively plan for the shutdown of the power plant, and explore other
501: 385:
On November 10, 2020, Talen Energy (parent company of Raven Power) announced that it will stop burning coal at the Brandon Shores and Wagner plants by the end of 2025. The plants will be converted to use alternative fuel sources.
732: 373:, for approximately $ 400 million. Exelon had committed to divest the plants as condition for regulatory approval of its merger with Constellation Energy to alleviate concerns regarding potential 1134: 508: 317:
issued a fine of $ 1 million to Constellation. Nearby residents filed a lawsuit against Constellation and in 2008 the company settled the case for $ 54 million.
66: 739: 536: 208: 1129: 1124: 1139: 683: 961: 1144: 1098: 314: 369:, Brandon Shores, and Herbert A. Wagner Generating Stations to Raven Power Holdings LLC, a newly formed portfolio company of 880: 833: 784: 267: 773: 725: 612: 366: 982: 748: 448: 406: 659: 274:(FGD) system stacks. In April 2023, Talen notified their grid operator, PJM, that they intended to close the station. 1088: 475: 349:
and fly ash for use in concrete. The system uses treated municipal wastewater from the Anne Arundel County Cox Creek
901: 389:
In April 2023, Talen notified grid operator PJM that they instead intended to close Brandon Shores. However, the
875: 638: 870: 820: 803: 298: 270:. The Brandon Shores plant dominates the site with its 700-foot (210 m) exhaust and 400-foot (120 m) 361:
The plant was originally constructed by a predecessor company of Constellation Energy, which was purchased by
838: 792: 236: 54: 593: 574: 1082: 896: 825: 779: 1062: 891: 843: 797: 1058: 1042: 468: 851: 537:"Owner of Brandon Shores and Wagner power plants in Pasadena will stop burning coal by end of 2025" 966: 271: 365:
in 2012. On August 9, 2012, Exelon announced that it had reached an agreement for the sale of the
290:
into the site, it is unused and would require improvements to restore it to an operational state.
998: 232: 943: 555: 935: 310: 244: 106: 282:
The Brandon Shores and Wagner Generating Stations consume approximately 4.8 million tons of
377:
in the regional wholesale electricity market. The sale was completed on November 30, 2012.
8: 1029: 403: 390: 370: 306: 248: 1072: 174: 1102: 620: 334: 247:, and is operated by Raven Power Holdings, Inc. Brandon Shores consists of a pair of 711: 198: 1092: 350: 252: 502:"Environmental Review of Proposed Air Pollution Control Project at Brandon Shores" 1014: 953: 426: 136: 402:
The electrical output of Brandon Shores Generating Station is dispatched by the
1068: 925: 330: 326: 263: 146: 28: 639:"Exelon Agrees to Sell Three Maryland Coal Plants to Raven Power Holdings LLC" 255:
steam turbine. The station has a combined nominal generating capacity of 1370
1118: 920: 717: 624: 440: 81: 68: 507:. Maryland Department of Natural Resources. February 5, 2007. Archived from 286:
annually. Coal for both stations is delivered by barge. Although there is a
1037: 374: 121: 231:
is an electric generating station located on Fort Smallwood Road north of
287: 217: 1024: 562:. Vol. 87, no. 8. Washington, DC: American Chemical Society. 338: 752: 240: 613:"Top Plant: Brandon Shores Generating Station, Pasadena, Maryland" 434: 346: 302: 262:
The station shares a 483-acre (195 ha) site adjacent to the
259:. Unit 1 went into operation in May 1984 and Unit 2 in May 1991. 16:
Electric generating station in Anne Arundel County, Maryland, US
1019: 469:"Existing Electric Generating Units in the United States, 2006" 362: 342: 1078: 684:"Zombie coal plants could threaten the US energy transition" 283: 1135:
Buildings and structures in Anne Arundel County, Maryland
325:
In order to meet Maryland requirements for reductions of
256: 180: 594:"Constellation, Gambrills residents settle fly-ash suit" 353:
as the source of water for making the limestone slurry.
305:
from Brandon Shores at a former sand and gravel mine in
394:
options that could maintain grid stability without it.
33:
Brandon Shores Generating Station viewed from the south
416: 1116: 530: 528: 747: 619:. Vol. 154, no. 10. pp. 30–32. 733: 525: 962:Montgomery County Resource Recovery Facility 293: 740: 726: 397: 496: 494: 492: 1130:Energy infrastructure completed in 1991 1125:Energy infrastructure completed in 1984 610: 572: 553: 534: 209:Related media on Commons 1117: 1099:Southern Maryland Electric Cooperative 489: 315:Maryland Department of the Environment 1140:Coal-fired power stations in Maryland 721: 604: 251:coal-fired boilers which each feed a 848:Philadelphia Road Generating Station 641:(Press release). Exelon. Aug 9, 2012 380: 268:Herbert A. Wagner Generating Station 591: 13: 554:Johnson, Jeffrey W. (2009-02-23). 449:List of power stations in Maryland 407:regional transmission organization 14: 1156: 1089:Old Dominion Electric Cooperative 705: 478:, U.S. Department of Energy. 2006 476:Energy Information Administration 229:Brandon Shores Generating Station 22:Brandon Shores Generating Station 902:Rock Springs Generation Facility 433: 419: 277: 128:Thermal power station 27: 1145:1984 establishments in Maryland 676: 560:Chemical & Engineering News 556:"The Foul Side Of 'Clean Coal'" 535:Pacella, Rachael (2020-11-11). 885:Notch Cliff Generating Station 652: 631: 611:Peltier, Robert (2010-10-01). 585: 575:"Coal Ash Dump in City Fought" 566: 547: 461: 1: 454: 320: 309:during 1996 to 2007. The ash 55:Anne Arundel County, Maryland 888:Panda Brandywine Power Plant 356: 7: 906:Westport Generating Station 573:Wheeler, Tim (2009-09-07). 412: 10: 1161: 814:Oil-fired peaking stations 351:wastewater treatment plant 1051: 1007: 991: 975: 952: 934: 913: 860: 813: 759: 592:Cho, Hanah (2008-11-01). 214: 204: 194: 189: 173: 161: 157: 152: 142: 132: 127: 117: 105: 97: 60: 50: 42: 38: 26: 21: 967:Wheelabrator Incinerator 311:contaminated groundwater 294:Environmental violations 272:flue-gas desulfurization 398:Dispatch of electricity 371:Riverstone Holdings LLC 313:with heavy metals. The 175:Nameplate capacity 944:Criterion Wind Project 166:Units operational 1083:Washington Metro Area 153:Power generation 82:39.18139°N 76.53778°W 861:Natural gas stations 712:Brandon Shores Plant 341:slurry and collects 299:Constellation Energy 249:Babcock & Wilcox 199:Brandon Shores Plant 107:Commission date 1030:PJM Interconnection 762:generating stations 404:PJM Interconnection 391:PJM Interconnection 307:Gambrills, Maryland 237:Anne Arundel County 190:External links 143:Cooling source 87:39.18139; -76.53778 78: /  914:Hydroelectric dams 867:Easton Power Plant 830:Easton Power Plant 660:"PJM memo to FERC" 1112: 1111: 1103:Southern Maryland 598:The Baltimore Sun 579:The Baltimore Sun 541:The Baltimore Sun 381:Scheduled closure 225: 224: 133:Primary fuel 113:Unit 2: May, 1991 111:Unit 1: May, 1984 1152: 1093:Western Maryland 1063:Central Maryland 1043:Waste Management 992:Energy terminals 742: 735: 728: 719: 718: 699: 698: 696: 695: 680: 674: 673: 671: 670: 656: 650: 649: 647: 646: 635: 629: 628: 608: 602: 601: 589: 583: 582: 570: 564: 563: 551: 545: 544: 532: 523: 522: 520: 519: 514:on March 7, 2013 513: 506: 498: 487: 486: 484: 483: 473: 465: 443: 438: 437: 429: 424: 423: 422: 367:Charles P. Crane 253:General Electric 218:edit on Wikidata 93: 92: 90: 89: 88: 83: 79: 76: 75: 74: 71: 31: 19: 18: 1160: 1159: 1155: 1154: 1153: 1151: 1150: 1149: 1115: 1114: 1113: 1108: 1047: 1015:AES Corporation 1003: 987: 971: 954:Waste-to-energy 948: 930: 909: 856: 809: 761: 755: 746: 708: 703: 702: 693: 691: 682: 681: 677: 668: 666: 658: 657: 653: 644: 642: 637: 636: 632: 609: 605: 590: 586: 571: 567: 552: 548: 533: 526: 517: 515: 511: 504: 500: 499: 490: 481: 479: 471: 467: 466: 462: 457: 439: 432: 427:Maryland portal 425: 420: 418: 415: 400: 383: 359: 327:nitrogen oxides 323: 296: 280: 221: 184: 137:Bituminous coal 112: 86: 84: 80: 77: 72: 69: 67: 65: 64: 34: 17: 12: 11: 5: 1158: 1148: 1147: 1142: 1137: 1132: 1127: 1110: 1109: 1107: 1106: 1096: 1086: 1076: 1069:Delmarva Power 1066: 1055: 1053: 1049: 1048: 1046: 1045: 1040: 1035: 1032: 1027: 1022: 1017: 1011: 1009: 1005: 1004: 1002: 1001: 995: 993: 989: 988: 986: 985: 983:Calvert Cliffs 979: 977: 976:Nuclear plants 973: 972: 970: 969: 964: 958: 956: 950: 949: 947: 946: 940: 938: 932: 931: 929: 928: 923: 917: 915: 911: 910: 908: 907: 904: 899: 894: 889: 886: 883: 878: 873: 868: 864: 862: 858: 857: 855: 854: 849: 846: 841: 836: 831: 828: 823: 817: 815: 811: 810: 808: 807: 801: 795: 790: 787: 782: 777: 771: 769:Brandon Shores 765: 763: 757: 756: 749:Power stations 745: 744: 737: 730: 722: 716: 715: 714:- Talen Energy 707: 706:External links 704: 701: 700: 675: 651: 630: 617:Power Magazine 603: 584: 565: 546: 524: 488: 459: 458: 456: 453: 452: 451: 445: 444: 430: 414: 411: 399: 396: 382: 379: 358: 355: 331:sulfur dioxide 322: 319: 295: 292: 279: 276: 264:Patapsco River 223: 222: 215: 212: 211: 206: 202: 201: 196: 192: 191: 187: 186: 182: 177: 171: 170: 167: 163: 162: 159: 158: 155: 154: 150: 149: 147:Chesapeake Bay 144: 140: 139: 134: 130: 129: 125: 124: 119: 115: 114: 109: 103: 102: 99: 95: 94: 62: 58: 57: 52: 48: 47: 44: 40: 39: 36: 35: 32: 24: 23: 15: 9: 6: 4: 3: 2: 1157: 1146: 1143: 1141: 1138: 1136: 1133: 1131: 1128: 1126: 1123: 1122: 1120: 1104: 1100: 1097: 1094: 1090: 1087: 1084: 1080: 1077: 1074: 1070: 1067: 1064: 1060: 1057: 1056: 1054: 1050: 1044: 1041: 1039: 1036: 1033: 1031: 1028: 1026: 1023: 1021: 1018: 1016: 1013: 1012: 1010: 1006: 1000: 997: 996: 994: 990: 984: 981: 980: 978: 974: 968: 965: 963: 960: 959: 957: 955: 951: 945: 942: 941: 939: 937: 933: 927: 924: 922: 919: 918: 916: 912: 905: 903: 900: 898: 895: 893: 890: 887: 884: 882: 879: 877: 874: 872: 869: 866: 865: 863: 859: 853: 850: 847: 845: 842: 840: 837: 835: 832: 829: 827: 824: 822: 819: 818: 816: 812: 805: 802: 799: 796: 794: 791: 788: 786: 783: 781: 778: 775: 772: 770: 767: 766: 764: 758: 754: 750: 743: 738: 736: 731: 729: 724: 723: 720: 713: 710: 709: 689: 685: 679: 665: 661: 655: 640: 634: 626: 622: 618: 614: 607: 599: 595: 588: 580: 576: 569: 561: 557: 550: 542: 538: 531: 529: 510: 503: 497: 495: 493: 477: 470: 464: 460: 450: 447: 446: 442: 441:Energy portal 436: 431: 428: 417: 410: 408: 405: 395: 392: 387: 378: 376: 372: 368: 364: 354: 352: 348: 344: 340: 336: 332: 328: 318: 316: 312: 308: 304: 300: 291: 289: 288:railroad spur 285: 278:Coal delivery 275: 273: 269: 265: 260: 258: 254: 250: 246: 242: 238: 234: 233:Orchard Beach 230: 219: 213: 210: 207: 203: 200: 197: 193: 188: 185: 178: 176: 172: 168: 165: 164: 160: 156: 151: 148: 145: 141: 138: 135: 131: 126: 123: 120: 116: 110: 108: 104: 100: 96: 91: 63: 59: 56: 53: 49: 46:United States 45: 41: 37: 30: 25: 20: 1038:Talen Energy 876:Gould Street 768: 692:. Retrieved 690:. 2024-05-14 688:Canary Media 687: 678: 667:. Retrieved 663: 654: 643:. Retrieved 633: 616: 606: 597: 587: 578: 568: 559: 549: 540: 516:. Retrieved 509:the original 480:. Retrieved 463: 401: 388: 384: 375:market power 360: 324: 297: 281: 261: 228: 226: 122:Talen Energy 1034:Raven Power 871:Chalk Point 821:Chalk Point 804:Warrior Run 760:Coal-fired 345:for use in 245:Glen Burnie 101:Operational 85: / 61:Coordinates 1119:Categories 1025:NRG Energy 999:Cove Point 936:Wind farms 926:Deep Creek 839:Morgantown 793:Morgantown 694:2024-05-15 669:2023-11-02 645:2012-08-13 518:2008-12-30 482:2008-07-14 455:References 321:Renovation 73:76°32′16″W 70:39°10′53″N 1052:Companies 1008:Operators 921:Conowingo 897:Riverside 826:Dickerson 789:Luke Mill 780:Dickerson 625:0032-5929 357:2012 sale 347:wallboard 339:limestone 301:disposed 266:with the 1073:Delmarva 892:Perryman 844:Perryman 806:(closed) 800:(closed) 776:(closed) 753:Maryland 413:See also 241:Maryland 118:Owner(s) 51:Location 472:(Excel) 335:mercury 303:fly ash 243:, near 205:Commons 195:Website 43:Country 1020:Exelon 881:Wagner 852:Vienna 834:Wagner 785:Wagner 623:  363:Exelon 343:gypsum 98:Status 1079:Pepco 798:Smith 774:Crane 512:(pdf) 505:(PDF) 216:[ 179:1370 621:ISSN 333:and 284:coal 227:The 1059:BGE 751:in 664:PJM 257:MWe 235:in 1121:: 686:. 662:. 615:. 596:. 577:. 558:. 539:. 527:^ 491:^ 474:. 409:. 329:, 239:, 181:MW 1105:) 1101:( 1095:) 1091:( 1085:) 1081:( 1075:) 1071:( 1065:) 1061:( 741:e 734:t 727:v 697:. 672:. 648:. 627:. 600:. 581:. 543:. 521:. 485:. 220:] 183:e 169:2

Index


Anne Arundel County, Maryland
39°10′53″N 76°32′16″W / 39.18139°N 76.53778°W / 39.18139; -76.53778
Commission date
Talen Energy
Bituminous coal
Chesapeake Bay
Nameplate capacity
MWe
Brandon Shores Plant
Related media on Commons
edit on Wikidata
Orchard Beach
Anne Arundel County
Maryland
Glen Burnie
Babcock & Wilcox
General Electric
MWe
Patapsco River
Herbert A. Wagner Generating Station
flue-gas desulfurization
coal
railroad spur
Constellation Energy
fly ash
Gambrills, Maryland
contaminated groundwater
Maryland Department of the Environment
nitrogen oxides

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.