528:
295:
The
Atlantic chapter of the Sierra Club has asked its members to oppose this project. New York wind energy producers currently cannot get their electricity carried to New York City. It is the Sierra club's contention that CHPE will stop any chance of New York City getting locally produced wind power
269:
TDI, whose board is chaired by Brian Kubeck, is backed by
Blackstone and was announced on February 23, 2010. Since then, the CHPE Project has made significant progress in terms of securing the governmental approvals. The Federal Energy Regulatory Commission authorized the Project developers to sell
278:
On
February 24, 2012, the parties participating in the detailed review of the project being conducted before the New York State Public Service Commission (PSC) announced that they had reached a settlement of all of the issues in the proceeding. On April 18, 2013, the New York State Public Service
462:
Despite its initial reaction, the Quebec utility intervened in support of the proposal before the FERC in May 2010, and the PSC in March 2012. In the March 2012 letter, HQ cited the CHPE project's potential to bring large quantities of renewable energy to downstate New York at no cost to New York
286:
According to the company's president and CEO, Donald
Jessome, choosing an underwater route avoids " disrupt communities with overhead transmission". The developer says that the cable also provides economic and environmental benefits to the state, bringing low-cost and clean power to critical load
282:
The CHPE project tries to avoid difficulties encountered by other proposals by presenting itself as an "environmentally benign" solution. By avoiding overhead wires and 10 story high towers, the promoter hopes to avoid the fate of previous projects, such as NYRI. The initial project involved two
283:
1,000 MW lines, the first one to New York, and the second going all the way to
Connecticut, via the Long Island Sound. The construction cost for the two lines and converter stations in the U.S. was estimated at $ 3.8 billion. The line to Connecticut was cancelled in July 2010.
363:
on their electricity bills over the first 10 years of operations, between 2015 and 2024. In addition, the proposed cable would have positive impacts on the electricity grid, since power carried by the cables could force the retirement of older, uneconomic power plants in New York.
213:
Over the years, a number of proposals to increase transmission capacity to the New York City and Long Island markets have encountered hostile reactions and determined opposition from environmental groups and communities along the planned paths. For instance, construction of the
1253:
304:
The proposed cable would have a length of approximately 339 miles (546 km) between the Canada-U.S. border and its southern terminal, in New York City. The two 5-inch (127 mm) cables would be buried at varying depths of 7 feet (213 cm) under
419:
The proposed CHPE project has been granted permits by the New York State Public
Service Commission, and the final Environmental Impact Statement (EIS) was issued by the U.S. Department of Energy for the project as of 2014.
1151:
1205:
574:
826:
347:
in the Bronx, traverses the East River to reach Queens, and terminates at a converter station on the large energy campus in the
Astoria neighborhood in the New York City borough of Queens.
1439:
416:
The CHPE is expected to create 1,400 jobs directly and thousands of indirect and induced jobs. The
Project will also reinforce the reliability of New York's bulk power delivery system.
270:
transmission rights at negotiated rates in July 2010. Less than a year later, the New York State
Department of State issued its Coastal Zone Consistency determination for the project.
246:, sold the land to the Village of Buchanan. The Village of Buchanan then sold the rights to use the land to the natural gas company Spectra for their new proposed natural gas pipeline.
443:
price tag for the Quebec section of the line. In addition, the CHPE could be seen as competing with a proposed 1,200 MW HVDC line to be built by the company in association with
1424:
1159:
1125:
428:
According to the promoter, the Quebec section of the line would start at a DC conversion station to connect with Hydro-Québec TransÉnergie's Hertel substation (735-315 kV) near
1292:
1213:
148:. Following completion of a review by the New York State Public Service Commission, construction began in 2022. The line is permitted and expected to be operational in 2026.
257:(NYRI) had a 1,200 megawatts capacity. It was shelved by its developers in early 2009 after two years of staunch opposition from several groups concerned by the impact of
222:, was authorized in 2002, but its commissioning was delayed for a year because of a dispute involving the promoter and the state of Connecticut. Another project, the
1434:
996:
1419:
482:. The project includes the deployment of a DC terminal at Hertel TS, but in contrast to the US part of the line, Hydro-Québec excludes running the line in the
1414:
175:
1333:
470:
formally filed a project notice to build the Quebec part of the line to the Quebec
Minister of Sustainable Development, Environment, Wildlife and Parks,
320:. On its way to the Hudson, the cables would be routed briefly along State Route 22 and then parallel the Delaware & Hudson Railroad right-of-way to
628:
885:
731:
1058:
757:
1041:
Projected Energy Market, Capacity Market and Emissions Impact Analysis of the Champlain-Hudson Power Express Transmission Project for New York
954:"Application of Champlain Hudson Power Express, Inc. for a Certificate of Environmental Compatibility and Public Need Pursuant to Article VII"
249:
However, a 400 kilovolts DC line 306 kilometres (190 mi) between the Rock Tavern substation, 60 miles north of New York, and the
1429:
953:
202:
is compounded by the fact that the area uses two-thirds of the state's electricity while most generation and import capacity is located
772:
852:
316:
The cables would cross the border under Lake Champlain and would run southward to the Town of Dresden north of the Village of
235:
1277:
546:
360:
359:
in July 2010, London Economics International estimates that the projected line would save New York customers $ 8.1 billion
971:
463:
ratepayers and the CHPE project's progress before the PSC as the reasons for entering into "active discussions" with TDI.
190:
Power rates in the New York metro area and Long Island have long been among the highest in the U.S. and according to the
1004:
492:
After a period of public consultation, HQ came back with a new 58-kilometer path running alongside a 735 kV power line,
356:
1180:
1126:"Final Environmental Impact Statement Issued by the U.S. Department of Energy for the Champlain Hudson Power Express"
1404:
509:
194:, New York City is the "epicenter" of grid congestion in the eastern United States. The congestion problem in the
1399:
1073:
1023:"Stop CHPE: No need to import Canadian energy from 1,200 miles away" in the Sierra Atlantic Volume 41 Spring 2015
505:
1235:"Motion to Intervene of H.Q. Energy Services (U.S.) Inc. and Comments in Support of Application under ER10-1175"
773:"Governor Pataki hails agreement on Cross Sound Cable and gives order to energize cable and make it operational"
706:
1371:
1318:
893:
940:"Press Release: TDI ANNOUNCES IMPORTANT MILESTONE IN THE DEVELOPMENT OF THE CHAMPLAIN HUDSON POWER EXPRESS"
344:
336:
167:. Construction costs for this project are estimated at US$ 2.2 billion for the section located in the
685:
Application for Authority to Sell Transmission Rights at Negotiated Rates and Request for Expedited Action
238:, that would have interconnected the grid from a substation in Athens, New York to a substation near the
133:
740:
367:
The planned line, which would carry 7.64 terawatt-hours of renewable electricity per year, would lower
321:
317:
239:
1234:
683:
339:, where the CSX railroad right-of-way is again relied on until the cables re-enter the Hudson in the
329:
191:
913:
471:
1409:
801:
279:
Commission granted the CHPE project a Certificate of Environmental Compatibility and Public Need.
633:
1099:
513:
780:
436:
340:
861:
8:
493:
448:
1366:
U.S. Department of Energy Web site for development of the Environmental Impact Statement
253:
hub in central New York, has been marred by controversy. Launched in 2006, the proposed
226:
has been operational since 2007. The 65 miles (105 km) 500 kV cable connects
1312:
475:
429:
325:
164:
1334:"Interconnexion Hertel-New York. information sur la solution retenue • Septembre 2013"
939:
1052:
751:
551:
258:
242:
was tabled when the landowner where the southern converter station would be located,
219:
215:
432:, and would reach the junction point at the international border in Lake Champlain.
501:
497:
474:. The ±320 kV power line would start at the Hertel transmission station, near
440:
203:
168:
152:
72:
1039:
629:"Can Quebec's Dams Power New York City? Blackstone Is Betting $ 4.5 Billion on It"
483:
451:, which was expected to increase exports of Quebec hydropower to the neighboring
444:
250:
145:
575:"Opponents of 1,250-MW power line into New York City cite winter deliverability"
467:
179:
82:
479:
456:
401:
369:
306:
231:
1393:
533:
223:
195:
141:
55:
413:
emissions by nearly 37 million tonnes during the first decade of operation.
1372:"NYC's Big Clean-Energy Project Poses A Major Climate Test For The Country"
707:"Con Ed electric prices highest of any major utility, federal numbers show"
656:
310:
296:
and in general dampen the market for local alternative energy production.
452:
328:
rail line, continuing southwards until it enters the Hudson River in the
218:, a 328-MW submarine DC cable linking Connecticut to Long Island via the
207:
199:
486:
243:
227:
160:
156:
151:
The venture, being developed by Transmission Developers Inc. (TDI), a
455:
states. Reflecting on the project in April 2010, Hydro-Quebec's CEO,
799:
459:, stated that it was technically "very complex" and "very costly".
335:
Once the cables are in the Hudson River, they continue south to the
1037:
729:
439:
to the CHPE project was mixed, considering the 400 to 500 million
136:(HVDC) underwater and underground power cable project linking the
527:
234:
and has a capacity of 660 megawatts. A proposed HVDC line,
155:, L.P. (Blackstone) portfolio company, would carry clean energy—
355:
In an economic analysis filed on behalf of the promoter to the
137:
45:
350:
174:
The Quebec section of the line would be built and operated by
163:
from eastern Canada—and feed it directly in the New York City
1360:
382:
1365:
1299:(in French). Archived from the original on February 19, 2013
681:
654:
1440:
Proposed electric power infrastructure in the United States
1254:"Hydro-Quebec gets behind proposed transmission line to US"
1232:
1074:"Canadian Renewable Hydropower Is Heading To New York City"
541:
16:
Planned power cable project linking Quebec to New York City
600:
387:
1425:
Electric power transmission systems in the United States
854:
An Introduction to New York Regional Interconnection
733:
2009 National Electric Transmission Congestion Study
730:
United States Department of Energy (December 2009),
523:
171:. The estimated total cost is US$ 4.5 billion.
1293:"Projet d'exportation d'Hydro-Québec vers New York"
1206:"Hydro-Québec: "on va livrer ce qui a été demandé""
1152:"Une ligne de 2000 MW entre le Québec et New York?"
324:, at which point it accesses the right-of-way of a
800:Neptune Regional Tramsmission System (July 2007),
677:
675:
435:The initial reaction of Hydro-Québec (HQ) and the
1149:
1038:London Economics International LLC (2010-07-16),
997:"Canadian electric cable won't reach Connecticut"
770:
688:, Federal Energy Regulatory Commission, p. 7
1435:Proposed electric power infrastructure in Canada
1391:
672:
1420:Electric power transmission systems in Canada
827:"Cortlandt gets $ 2.8M from pipeline project"
626:
1415:Proposed electric power transmission systems
1331:
1233:H.Q. Energy Services (U.S.) (May 24, 2010),
914:"Meet the Transmission Developers Inc. Team"
739:, Washington, pp. 45–48, archived from
1033:
1031:
1029:
682:Transmission Developers Inc. (2010-05-03),
351:Economics, emission levels, and reliability
1057:: CS1 maint: location missing publisher (
756:: CS1 maint: location missing publisher (
622:
620:
618:
423:
1290:
825:Wilson, David McKay (February 26, 2016).
704:
478:, to reach the US border on the shore of
1251:
1026:
994:
965:
963:
568:
566:
343:. The cables next make landfall in the
290:
1178:
972:"Canadians plan under-water power line"
615:
230:and Long Island. It runs buried in the
1392:
883:
824:
1291:St-Pierre, Annie (January 29, 2013).
1212:(in French), Montreal, archived from
1203:
1158:(in French), Montreal, archived from
1071:
969:
960:
886:"NYRI quits; Power line project dead"
655:Transmission Developers Inc. (2010),
563:
1239:Federal Energy Regulatory Commission
850:
572:
399:emissions by 10,800 tonnes and
224:Neptune Regional Transmission System
1181:"Quebec puts its power on the line"
956:. NYS Department of Public Service.
603:. Transmission Developers Inc. 2021
581:. S&P Global Commodity Insights
13:
1072:Riley, Shantal (4 November 2021).
627:Ryan Dezember (18 February 2022).
357:New York Public Service Commission
14:
1451:
1354:
942:. Champlain Hudson Power Express.
579:S&P Global Commodity Insights
547:Quebec – New England Transmission
1252:Larocque, Sylvain (2010-07-09),
1150:Presse canadienne (2010-03-02),
1106:. Champlain Hudson Power Express
1003:, Middletown, CT, archived from
920:. Champlain Hudson Power Express
884:Cooper, Elizabeth (2009-04-04),
771:State of New York (2004-06-25),
526:
1332:Hydro-Québec (September 2013).
1325:
1284:
1270:
1245:
1226:
1197:
1172:
1143:
1118:
1092:
1065:
1017:
995:Turmelle, Luther (2010-07-09),
988:
946:
932:
906:
877:
844:
818:
1430:Canada–United States relations
1278:"Article VII Public Documents"
793:
764:
723:
705:Sanderson, Bill (2010-01-29),
698:
661:Champlain Hudson Power Express
648:
601:"Transmissions Developers Inc"
593:
255:New York Regional Interconnect
126:Champlain Hudson Power Express
22:Champlain Hudson Power Express
1:
1179:Rulison, Larry (2010-03-16),
657:"Project Details: Background"
557:
504:and rural roads to reach the
273:
185:
1204:Baril, Hélène (2010-04-09),
345:Harlem River Intermodal Yard
70:Transmission Developers Inc.
7:
892:, Utica, NY, archived from
777:Long Island Power Authority
519:
313:, Harlem, and East Rivers.
134:high-voltage direct current
10:
1456:
970:Bosch, Adam (2010-02-26),
264:
261:along the proposed route.
240:Indian Point Energy Center
178:, the transmission arm of
1317:: CS1 maint: unfit URL (
803:Neptune: Project Overview
192:U.S. Department of Energy
114:
110:339 mi (546 km)
106:
101:
93:
88:
78:
66:
61:
51:
41:
31:
26:
21:
510:Saint-Bernard-de-Lacolle
299:
89:Construction information
1405:HVDC transmission lines
1187:, Albany, NY, p. 1
1047:, Boston, pp. 8–11
890:Utica Observer-Dispatch
634:The Wall Street Journal
424:Hydro-Québec's position
1400:Submarine power cables
472:Yves-François Blanchet
466:Late in January 2013,
291:Opposition to project
102:Technical information
62:Ownership information
1001:The Middletown Press
506:international border
976:Times-Herald Record
851:NYRI (2010-04-08),
449:Northeast Utilities
381:emissions by 6,800
337:Town of Stony Point
236:West Point Partners
1185:Albany Times-Union
341:Town of Clarkstown
326:CSX Transportation
165:electricity market
1258:Canadian Business
573:Anderson, Jared.
552:Cross Sound Cable
516:border crossing.
498:Quebec Routes 202
437:Quebec government
220:Long Island Sound
216:Cross Sound Cable
169:State of New York
122:
121:
1447:
1386:
1384:
1383:
1361:Official website
1349:
1348:
1346:
1344:
1338:
1329:
1323:
1322:
1316:
1308:
1306:
1304:
1288:
1282:
1281:
1274:
1268:
1267:
1266:
1265:
1260:, Canadian Press
1249:
1243:
1242:
1230:
1224:
1223:
1222:
1221:
1201:
1195:
1194:
1193:
1192:
1176:
1170:
1169:
1168:
1167:
1147:
1141:
1140:
1138:
1136:
1122:
1116:
1115:
1113:
1111:
1096:
1090:
1089:
1087:
1085:
1069:
1063:
1062:
1056:
1048:
1046:
1035:
1024:
1021:
1015:
1014:
1013:
1012:
992:
986:
985:
984:
983:
967:
958:
957:
950:
944:
943:
936:
930:
929:
927:
925:
910:
904:
903:
902:
901:
881:
875:
874:
873:
872:
866:
860:, archived from
859:
848:
842:
841:
839:
837:
822:
816:
815:
814:
813:
808:
797:
791:
790:
789:
788:
779:, archived from
768:
762:
761:
755:
747:
745:
738:
727:
721:
720:
719:
718:
702:
696:
695:
694:
693:
679:
670:
669:
668:
667:
652:
646:
645:
643:
641:
624:
613:
612:
610:
608:
597:
591:
590:
588:
586:
570:
536:
531:
530:
441:Canadian dollars
412:
410:
409:
398:
396:
395:
380:
378:
377:
330:Town of Catskill
153:Blackstone Group
144:neighborhood of
73:Blackstone Group
19:
18:
1455:
1454:
1450:
1449:
1448:
1446:
1445:
1444:
1390:
1389:
1381:
1379:
1370:
1357:
1352:
1342:
1340:
1336:
1330:
1326:
1310:
1309:
1302:
1300:
1289:
1285:
1276:
1275:
1271:
1263:
1261:
1250:
1246:
1231:
1227:
1219:
1217:
1202:
1198:
1190:
1188:
1177:
1173:
1165:
1163:
1148:
1144:
1134:
1132:
1124:
1123:
1119:
1109:
1107:
1098:
1097:
1093:
1083:
1081:
1070:
1066:
1050:
1049:
1044:
1036:
1027:
1022:
1018:
1010:
1008:
993:
989:
981:
979:
968:
961:
952:
951:
947:
938:
937:
933:
923:
921:
912:
911:
907:
899:
897:
882:
878:
870:
868:
864:
857:
849:
845:
835:
833:
823:
819:
811:
809:
806:
798:
794:
786:
784:
769:
765:
749:
748:
743:
736:
728:
724:
716:
714:
703:
699:
691:
689:
680:
673:
665:
663:
653:
649:
639:
637:
625:
616:
606:
604:
599:
598:
594:
584:
582:
571:
564:
560:
532:
525:
522:
426:
408:
405:
404:
403:
400:
394:
391:
390:
389:
386:
376:
373:
372:
371:
368:
353:
302:
293:
276:
267:
188:
146:Astoria, Queens
132:) is a planned
71:
36:
17:
12:
11:
5:
1453:
1443:
1442:
1437:
1432:
1427:
1422:
1417:
1412:
1407:
1402:
1388:
1387:
1368:
1363:
1356:
1355:External links
1353:
1351:
1350:
1324:
1283:
1269:
1244:
1225:
1196:
1171:
1142:
1130:TDI CHPExpress
1117:
1104:Chpexpress.com
1091:
1064:
1025:
1016:
987:
959:
945:
931:
918:Chpexpress.com
905:
876:
843:
817:
792:
763:
722:
697:
671:
647:
614:
592:
561:
559:
556:
555:
554:
549:
544:
538:
537:
521:
518:
480:Lake Champlain
457:Thierry Vandal
425:
422:
406:
392:
374:
352:
349:
307:Lake Champlain
301:
298:
292:
289:
275:
272:
266:
263:
232:Atlantic Ocean
187:
184:
120:
119:
116:
112:
111:
108:
104:
103:
99:
98:
95:
91:
90:
86:
85:
80:
76:
75:
68:
64:
63:
59:
58:
53:
49:
48:
43:
39:
38:
33:
29:
28:
24:
23:
15:
9:
6:
4:
3:
2:
1452:
1441:
1438:
1436:
1433:
1431:
1428:
1426:
1423:
1421:
1418:
1416:
1413:
1411:
1408:
1406:
1403:
1401:
1398:
1397:
1395:
1377:
1373:
1369:
1367:
1364:
1362:
1359:
1358:
1343:September 24,
1335:
1328:
1320:
1314:
1298:
1294:
1287:
1279:
1273:
1259:
1255:
1248:
1240:
1236:
1229:
1216:on 2010-04-10
1215:
1211:
1207:
1200:
1186:
1182:
1175:
1162:on 2010-03-04
1161:
1157:
1153:
1146:
1131:
1127:
1121:
1105:
1101:
1095:
1079:
1075:
1068:
1060:
1054:
1043:
1042:
1034:
1032:
1030:
1020:
1007:on 2012-03-05
1006:
1002:
998:
991:
977:
973:
966:
964:
955:
949:
941:
935:
919:
915:
909:
896:on 2013-02-05
895:
891:
887:
880:
867:on 2011-02-25
863:
856:
855:
847:
832:
831:www.lohud.com
828:
821:
805:
804:
796:
783:on 2011-07-18
782:
778:
774:
767:
759:
753:
746:on 2010-05-27
742:
735:
734:
726:
712:
711:New York Post
708:
701:
687:
686:
678:
676:
662:
658:
651:
636:
635:
630:
623:
621:
619:
602:
596:
580:
576:
569:
567:
562:
553:
550:
548:
545:
543:
540:
539:
535:
534:energy portal
529:
524:
517:
515:
511:
507:
503:
499:
495:
490:
488:
485:
481:
477:
473:
469:
464:
460:
458:
454:
450:
446:
442:
438:
433:
431:
421:
417:
414:
411:
397:
384:
379:
365:
362:
358:
348:
346:
342:
338:
333:
331:
327:
323:
319:
314:
312:
308:
297:
288:
284:
280:
271:
262:
260:
256:
252:
247:
245:
241:
237:
233:
229:
225:
221:
217:
211:
209:
206:and near the
205:
201:
197:
196:New York City
193:
183:
181:
177:
172:
170:
166:
162:
158:
154:
149:
147:
143:
142:New York City
139:
135:
131:
127:
118:1,200 MW
117:
113:
109:
105:
100:
96:
92:
87:
84:
81:
77:
74:
69:
65:
60:
57:
56:New York City
54:
50:
47:
44:
40:
37:United States
34:
30:
25:
20:
1410:Hydro-Québec
1380:. Retrieved
1378:. 2022-04-13
1375:
1341:. Retrieved
1327:
1301:. Retrieved
1296:
1286:
1272:
1262:, retrieved
1257:
1247:
1241:, Washington
1238:
1228:
1218:, retrieved
1214:the original
1209:
1199:
1189:, retrieved
1184:
1174:
1164:, retrieved
1160:the original
1155:
1145:
1133:. Retrieved
1129:
1120:
1108:. Retrieved
1103:
1094:
1082:. Retrieved
1077:
1067:
1040:
1019:
1009:, retrieved
1005:the original
1000:
990:
980:, retrieved
978:, Albany, NY
975:
948:
934:
922:. Retrieved
917:
908:
898:, retrieved
894:the original
889:
879:
869:, retrieved
862:the original
853:
846:
834:. Retrieved
830:
820:
810:, retrieved
802:
795:
785:, retrieved
781:the original
776:
766:
741:the original
732:
725:
715:, retrieved
710:
700:
690:, retrieved
684:
664:, retrieved
660:
650:
638:. Retrieved
632:
605:. Retrieved
595:
583:. Retrieved
578:
514:Rouses Point
508:west of the
494:Autoroute 15
491:
468:Hydro-Québec
465:
461:
434:
427:
418:
415:
366:
354:
334:
315:
311:Hudson River
303:
294:
285:
281:
277:
268:
254:
248:
212:
198:area and on
189:
180:Hydro-Québec
176:TransÉnergie
173:
150:
140:area to the
129:
125:
123:
115:Power rating
107:Total length
83:TransÉnergie
1339:(in French)
1303:January 29,
836:January 28,
453:New England
208:Great Lakes
200:Long Island
1394:Categories
1382:2022-04-17
1280:. NYS DPS.
1264:2010-07-10
1220:2010-04-09
1191:2010-03-19
1166:2010-03-02
1011:2010-08-02
982:2010-03-02
900:2010-08-02
871:2010-08-02
812:2010-08-02
787:2009-11-29
717:2010-08-02
713:, New York
692:2010-08-02
666:2010-08-02
558:References
476:La Prairie
430:La Prairie
274:Settlement
244:Con Edison
228:New Jersey
186:Background
161:wind power
157:hydropower
1313:cite news
1210:La Presse
1156:La Presse
1100:"Permits"
1078:Gothamist
484:Richelieu
322:Rotterdam
318:Whitehall
287:centers.
1376:HuffPost
1135:15 March
1110:14 March
1084:14 March
1053:citation
924:14 March
752:citation
640:14 March
585:14 March
520:See also
487:riverbed
309:and the
94:Expected
79:Operator
67:Partners
27:Location
265:Project
204:upstate
32:Country
1297:Argent
1080:. WNYC
607:1 June
383:tonnes
361:(2010)
259:pylons
138:Quebec
46:Quebec
35:Canada
1337:(PDF)
1045:(PDF)
865:(PDF)
858:(PDF)
807:(PDF)
744:(PDF)
737:(PDF)
445:NSTAR
300:Route
251:Marcy
1345:2021
1319:link
1305:2013
1137:2022
1112:2022
1086:2022
1059:link
926:2022
838:2020
758:link
642:2022
609:2021
587:2022
542:HVDC
447:and
159:and
130:CHPE
124:The
97:2026
42:From
502:221
1396::
1374:.
1315:}}
1311:{{
1295:.
1256:,
1237:,
1208:,
1183:,
1154:,
1128:.
1102:.
1076:.
1055:}}
1051:{{
1028:^
999:,
974:,
962:^
916:.
888:,
829:.
775:,
754:}}
750:{{
709:,
674:^
659:,
631:.
617:^
577:.
565:^
512:/
500:,
496:,
489:.
402:CO
388:NO
385:,
370:SO
332:.
210:.
182:.
52:To
1385:.
1347:.
1321:)
1307:.
1139:.
1114:.
1088:.
1061:)
928:.
840:.
760:)
644:.
611:.
589:.
407:2
393:x
375:2
128:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.