Dispatcher training simulator

Source 📝

179:, and is usually designed to mimic it as closely as possible. Operational scenarios are created on the DTS to represent the operator's transmission system under a variety of conditions. These may represent normal operating conditions, or be specially designed to test the student's responses to adverse circumstances, such as frequent line trips during severe weather. The DTS is administered by a team of instructors, who select scenarios and simulate operational events, monitoring the trainee's actions in response. 200:
To enable the training simulator to respond as realistically as possible to the student's actions, the power flow study at its heart must run on a frequent time basis, such as every few seconds. The simulation may model electrical networks consisting of many thousands of nodes and containing several
57:
linked by scaled-down representations of the interconnecting lines. The operator would simulate the operation of circuit breakers by physically operating their miniature replicas. As transmission systems grew in size and complexity, they could no longer be adequately represented in this manner, and
40:
forming the power system under various operating conditions, and its response to actions by the dispatchers. Student dispatchers may therefore develop their skills from exposure not only to routine operations but also to adverse operational situations without compromising the
197:, a factor similarly connected to earlier power failures. The joint US-Canadian task force investigating the incident recommended mandatory periods of simulation time for operators, and validation of the models against actual system characteristics. 275:
Dyliacco, T.; Enns, M.; Schoeffler, J.; Quada, J.; Rosa, D.; Jurkoshek, C.; Anderson, M.; et al. (1983). "Considerations in Developing and Utilizing Operator Training Simulators".
323: 127:
mismatch. The model will normally extend to the limits of the system operator's region of interest, and include representations of plant such as
81:. It also receives information transmitted back to an electricity control centre, such as the status of equipment or notification of alarms. The 250: 115:
to calculate power flows and voltages on the transmission system and to model its responses to disturbances such as line trips,
360: 398: 307: 260: 227: 344:
Clarke, Les (1996), "Operational and commercial training on National Grid Company's despatch training simulator",
403: 194: 172: 104:(Supervisory control and data acquisition) system, which provides collection and assimilation of data from 29: 182:
Scenarios may also represent circumstances that the system operator hopes never occur, such as complete
176: 128: 66: 25: 105: 154:
of generating units. Any generation's dynamic characteristics and limits, in particular its
132: 120: 8: 155: 42: 37: 303: 256: 223: 151: 94: 369: 280: 112: 86: 193:
Deficiencies in operator training were identified as a contributory cause of the
140: 124: 90: 74: 54: 150:
The system may additionally provide facilities for modelling and optimising the
183: 82: 392: 284: 147:. Optionally the subtransient behaviour of the system can also be modelled. 358: 186:, and allow it to develop strategies for restoration of service (known as 187: 136: 78: 85:
typically displays the state of the transmission system on computerised
70: 33: 346:
Fourth International Conference on Power System Control and Management
159: 144: 73:. The EMS enables remote operation of electrical equipment, such as 89:
with controllable points for simulated operation of plant such as
53:
Early simulations modelled the transmission system with banks of
116: 101: 274: 108:
and transmits operator instructions back to the same plant.
61:
A modern DTS combines or simulates the following elements:
175:) at the same time and from the same manufacturer as an 171:
A DTS is frequently purchased by a customer (such as a
359:U.S.-Canada Power System Outage Task Force (2004), 325:Operation Handbook, Policy 8: Operational Training 390: 277:IEEE Transactions on Power Apparatus and Systems 28:system for operators (known as dispatchers) of 69:(EMS): a computer system for controlling a 58:computerised simulations came to the fore. 300:Operation of Market-Oriented Power Systems 244: 242: 240: 238: 279:. Vol. PAS-102. pp. 3672–3679. 362:Final Report on the August 14th Blackout 297: 339: 337: 321: 235: 391: 343: 217: 298:Song, Yong-Hua; Wang, Xi-Fan (2003), 334: 248: 252:The Electrical Engineering Handbook 13: 14: 415: 255:, CRC Press, pp. 1482–1483, 45:on a real transmission system. 352: 315: 291: 268: 222:, Springer, pp. 209–223, 211: 48: 1: 204: 18:dispatcher training simulator 195:2003 North American blackout 173:transmission system operator 166: 7: 399:Electric power transmission 32:. It performs this role by 22:operator training simulator 10: 420: 218:Barret, Jean-Paul (1997), 201:hundred generating units. 158:, maximum generation, and 249:Dorf, Richard C. (1997), 162:are usually incorporated. 285:10.1109/TPAS.1983.317731 177:energy management system 160:rate of change of output 95:transformer tap-changers 67:energy management system 20:(DTS), also known as an 302:, Springer, p. 5, 220:Power System Simulation 26:computer-based training 30:electrical power grids 36:the behaviour of the 404:Industrial computing 348:, pp. 586–591 156:voltage regulation 43:security of supply 38:electrical network 152:economic dispatch 87:one-line diagrams 411: 383: 382: 381: 380: 374: 368:, archived from 367: 356: 350: 349: 341: 332: 331: 330: 322:ENTSO-E (2008), 319: 313: 312: 295: 289: 288: 272: 266: 265: 246: 233: 232: 215: 184:system shut-down 141:circuit breakers 91:circuit breakers 75:circuit breakers 55:analog computers 419: 418: 414: 413: 412: 410: 409: 408: 389: 388: 387: 386: 378: 376: 372: 365: 357: 353: 342: 335: 328: 320: 316: 310: 296: 292: 273: 269: 263: 247: 236: 230: 216: 212: 207: 169: 113:load-flow study 51: 12: 11: 5: 417: 407: 406: 401: 385: 384: 351: 333: 314: 308: 290: 267: 261: 234: 228: 209: 208: 206: 203: 168: 165: 164: 163: 148: 109: 98: 83:user interface 50: 47: 9: 6: 4: 3: 2: 416: 405: 402: 400: 397: 396: 394: 375:on 2012-05-04 371: 364: 363: 355: 347: 340: 338: 327: 326: 318: 311: 309:1-85233-670-6 305: 301: 294: 286: 282: 278: 271: 264: 262:0-8493-8574-1 258: 254: 253: 245: 243: 241: 239: 231: 229:0-412-63870-3 225: 221: 214: 210: 202: 198: 196: 191: 189: 185: 180: 178: 174: 161: 157: 153: 149: 146: 142: 138: 134: 130: 126: 122: 118: 114: 110: 107: 103: 99: 96: 92: 88: 84: 80: 76: 72: 68: 64: 63: 62: 59: 56: 46: 44: 39: 35: 31: 27: 23: 19: 377:, retrieved 370:the original 361: 354: 345: 324: 317: 299: 293: 276: 270: 251: 219: 213: 199: 192: 181: 170: 137:transformers 119:action, and 79:transformers 60: 52: 24:(OTS), is a 21: 17: 15: 188:black start 106:substations 49:Description 393:Categories 379:2008-02-23 205:References 145:capacitors 133:generators 71:power grid 34:simulating 167:Operation 121:generator 306:  259:  226:  125:demand 373:(PDF) 366:(PDF) 329:(PDF) 129:lines 117:relay 102:SCADA 304:ISBN 257:ISBN 224:ISBN 143:and 281:doi 190:). 93:or 77:or 65:An 395:: 336:^ 237:^ 139:, 135:, 131:, 111:A 100:A 16:A 287:. 283:: 123:- 97:.

Index

computer-based training
electrical power grids
simulating
electrical network
security of supply
analog computers
energy management system
power grid
circuit breakers
transformers
user interface
one-line diagrams
circuit breakers
transformer tap-changers
SCADA
substations
load-flow study
relay
generator
demand
lines
generators
transformers
circuit breakers
capacitors
economic dispatch
voltage regulation
rate of change of output
transmission system operator
energy management system

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.