Hornsea Wind Farm

Source 📝

504:(641 MW) and Hornsea (737 MW) to unexpectedly disconnect a combined 1,878 MW (1,691 MW maximum single-time) supply within minutes, greater than the 1,000 MW limit. Grid frequency declined, initially below the 'exceptional circumstances' limit at 49.5 Hz, triggering additional generation and then more importantly below 48.8 Hz at which point the first stage of ‘Low Frequency Demand Disconnection’ (LFDD) a form of automatic load shedding commences to stabilise the grid. As part of this 1.1 million customers were disconnected; rail services were disrupted with 371 trains cancelled, 220 part cancelled, and 873 trains delayed. Power was restored at 17:37. Hornsea disconnected due to a software flaw, which was fixed the next day. 4311: 513: 2807: 313:. The Hornsea site ('Zone 4', also known as 'Holderness' zone) has a total area of 4,730 square kilometres (1,830 sq mi), and is 38 kilometres (24 mi) from land at the closest point; water depth in the zone is from 22 to 73 metres (72 to 240 ft), with a tidal range of 2 to 5 metres (6 ft 7 in to 16 ft 5 in), and typical annual wave height of 1.35 to 1.78 metres (4 ft 5 in to 5 ft 10 in). The surface of the seabed consists primarily of sands and gravel. 521:
zone. Project 2 was use the same route for its electrical export cable as Project One, and to use either HVAC or HVDC with a separate onshore substation. Suitable areas for the Project 2 development were identified as being adjacent to the north, east or west of the Zone 1, which was located in the shallowest area of the whole Hornsea zone. The design considered piled, suction pile, monopile or gravity base foundations for wind turbines of 5 to 15 MW rated power.
3629: 2821: 2793: 3617: 529:
the Project 1 area, with the cable export route following that of Project 1 adjacent on the northward side. Planning permission for the development was awarded in August 2016, for 300 turbines covering 300 square miles (780 km) at a height of 620 feet (190 m) each. At the time of the award, Dong had committed to building 174 turbines, but the whole project is the biggest marine wind farm in the world.
3641: 528:
In 2013 SMart wind signed lease agreements with the Crown Estate for the "Optimus Wind" and "Breesea" areas making up Project 2 of Hornsea wind farm. A planning application for Project 2 was submitted and accepted for examination in early 2015; its wind turbine area was located adjacent northwest of
469:
The first foundation of the new windpark was installed by DEME Group's subsidiary GeoSea in January 2018. The export cables were installed by Tideway Offshore Solutions, a subsidiary company of the Belgian DEME Group. The installation was completed in December 2018, several months ahead of schedule.
332:
The initial scoping report for "Project One" within the Hornsea zone identified it as a subzone of 629.6 square kilometres (243.1 sq mi) in the centre of the Hornsea zone, with an estimated potential wind farm of 1.2 GW, divided into two further subzones of 600 MW capacity each.
257:
The development has been split into a number of subzones. The 1.2 GW Project 1 gained planning consent in 2014. Construction of Hornsea One started in January 2018, and the first turbines began supplying power to the UK national electricity grid in February 2019. The turbines were all installed
520:
A scoping report for "Project Two" was published in October 2012. The subzone was expected to be developed in a number of phases, with a potential wind turbine capacity of 1.8 GW, in an area of around 400 square kilometres (150 sq mi) located in the centre of the Hornsea wind farm
323:
In 2016 Ørsted reached an agreement with the Crown Estate for amended plans for the Hornsea Two and Hornsea Three phases. Hornsea Three was split into two new projects, Hornsea Three and Hornsea Four; the new phases were expected to be developed in the 2020s. The changes increased the potential
612:
put forward a plan to add a fourth area to the Hornsea wind farm in 2018, with the area covering 600 square kilometres (230 sq mi), and being located adjacent, north-west of Hornsea Project 1. During 2018 and 2019, consultation with the local communities which will be affected by the
269:
In July 2023, British government officials gave the final approval for Hornsea Four, the fourth phase of the wind project. Hornsea Four is expected to generate 2.6GW, have 180 giant wind turbines, and has the capability to generate enough renewable energy to power 1 million homes in Britain.
373:
consisting of Bolders bank, Botney Cut and Eem formations – primarily sediments or tills – gravelley/sandy clays, overlying sediments were sands or gravels up to 2 to 3 metres (6 ft 7 in to 9 ft 10 in) thick, with waves within the area varying in height by 1 to 3 metres
552:
The first turbine was in place by the end of May 2021, and on 23 June 2021 Ørsted announced that the 16th turbine to be added to the Hornsea Two array was the 1,000th turbine they had installed in UK waters, fifteen years after they installed their first, which was part of the 30-turbine
2674: 557:, off the coast of Cumbria. Having completed the offshore substation, first power was achieved by 20 December 2021, and became fully operational in August 2022. By doing so, Hornsea Project 2 overtook Hornsea One as the largest offshore wind farm in the world. Hornsea Two has two 473:
Hornsea 1 began supplying power to the UK national electricity grid in February 2019, with full completion expected in the first quarter of 2020. The final monopile foundation was completed in April 2019 and as of 3 May 2019, 28 turbines out of 174 had been installed.
524:
As with Project 1 sea bed conditions and geology consisted of Quaternary period deposits, primarily sediments of sand, till and clays, with the overlying gravel or sand seabed including sandwaves, with the average water depth of 25 to 30 metres (82 to 98 ft).
613:
project took place, with a Development Consent Order application originally intended in the first quarter of 2020. However additional consultations and revisions delayed the submission until September 2021, with further analysis needed on the impacts to
320:(then named DONG Energy) became a partner in SMart Wind. In early 2015 Ørsted A/S became the 100% owner of the first phase, Project 1, of the scheme. Ørsted acquired rights to the remaining subzones of the Hornsea development (2 & 3) by August 2015. 2756: 400:
foundations on a third of the turbines at Hornsea. The rationale for use of the new foundation type is thought to be a simplified foundation installation, requiring only a heavy-lift crane to lower the foundation to the sea bed, reducing costs.
537:
By the time construction commenced in 2020, the selected area was to the east and north of Hornsea One and the specification had been set as 165 8 MW turbines giving a rated capacity of 1.4 GW. The inter-array cables were supplied by
2655: 2693: 261:
A second 1.4 GW Project 2 was given planning consent in 2016. First power was achieved in December 2021, and it became fully operational in August 2022 overtaking Hornsea One as the largest offshore wind farm in the world.
2363: 4330: 1263:"State aid SA.38758 (2014/N), SA.38759 (2014/N), SA.38761 (2014/N), SA.38763 (2014/N) & SA.38812 (2014/N) – United Kingdom – Support for five Offshore Wind Farms: Walney, Dudgeon, Hornsea, Burbo Bank and Beatrice" 2737: 573:) began consultation on the project's development in May 2016. Ørsted submitted a Development consent application in 2018 and consent was granted on 31 December 2020. In early 2023, consent was also given to a 337:
substation at Killingholme. A variety of configurations were considered – foundations of pile jacket, monopile or gravity base; turbines from 3.6 to 8 MW rated power; with electrical power export by
3679: 265:
In 2016 a third subzone was split into two projects Hornsea 3 and 4, with approximate capacities of 1–2 GW and 1 GW, increasing the capacity of the developed project to a maximum of 6 GW.
396:
7 MW turbines with 154 metres (505 ft) rotor turbines for the project – around 171 turbines would be used for the wind farm. In its 2015 financial report DONG stated it had chosen to use
4386: 404:
DONG Energy formally committed to building the wind farm in early 2016. The expected completion date for the project was 2020. A £25 million contract to construct the onshore substation at
2313: 569:
Project 3 will be to the east of Projects 1 and 2, with a capacity of 2.9 GW over 696 square kilometres (269 sq mi). DONG Energy (which in November 2017 changed its name to
3672: 3772: 3480: 2593: 286:
in 2008. Bids were received in March 2009, and Zone Development Agreements signed in December 2009. The Hornsea development zone was awarded to a joint venture (SMart Wind) of
3746: 4236: 2367: 2091: 3665: 640:
The project's capacity is unknown by Ørsted due to the ever increasing size of available wind turbines for the project. Government approval for phase four was given by
3973: 3968: 2906: 1992: 4026: 2721: 2639: 4161: 450:, UK. Dragados Offshore was awarded in early 2016, a contract for construction of four jacket type foundations for the AC platforms at its yard in Cádiz, Spain. 1095: 840: 258:
by October 2019 and the equipment fully commissioned in December 2019. With a capacity of 1,218 MW, it was the largest in the world on its completion.
1802: 549:
As of April 2021, a third of the turbine foundations had been installed and the remaining turbines are set to be installed during the second half of 2021.
4256: 2490: 3572: 2946: 4226: 377:
In 2011 Smart Wind signed lease agreements with the Crown Estate for "Heron Wind" and "Njord" areas making up the zone. The zone was given provisional
1957: 1339: 4095: 4055: 3644: 3590: 3289: 2117: 2338: 1044: 422:
were awarded €139 (c. $ 158) million and $ 250 million contracts to supply 220 kV AC export cables in March/April 2016. In late 2016
4391: 3014: 937: 431: 2291: 4109: 2899: 2570: 2239: 725: 4361: 1678: 1703: 4292: 3963: 1777: 644:
in July 2023. Pre-construction site enabling works are expected to commence in the first half of 2025 and completion is expected by 2030.
4216: 3988: 2040: 2221: 1369: 3633: 2936: 2892: 2464: 381:(CfD) renewable subsidies by the UK government in April 2014. Hornsea Project 1 was given planning consent in December 2014. The CfD 696: 324:
generating capacity of the wind farm to 6 GW, with Hornsea Three estimated at 1–2 GW and Hornsea Four at about 1 GW.
3329: 1206: 783: 462:. The wind farm was scheduled to be constructed between 2018 and 2020, and expected to provide an annual production of around 4.1 4381: 4356: 4371: 2861: 2931: 485:
In 2019 the failure of the plant was partially responsible for a large scale nationwide power cut on the evening of 9 August.
1521: 1421: 4366: 2873: 2169: 3424: 2143: 558: 374:(3 ft 3 in to 9 ft 10 in). Project 1 water depths were generally 25 to 30 metres (82 to 98 ft). 1750: 1651: 4156: 439: 209: 2194: 3374: 3339: 63: 634: 3550: 3359: 2915: 343: 4021: 3823: 3724: 3244: 1262: 1724: 3444: 3384: 2613: 3319: 3189: 574: 334: 426:
was contracted to supply 242 kilometres (150 mi) of inter-array subsea power cables for the wind farm;
4141: 4011: 4006: 3983: 3903: 3767: 2926: 2437: 501: 355: 2314:"Orsted wins green light for 'utility scale' battery plant linked to giant North Sea wind farm | Recharge" 3751: 3419: 3044: 2415: 653: 339: 385:
was £140 per MWh (in 2012 prices). In early 2015 DONG acquired all of the project, becoming 100% owner.
4266: 4166: 3913: 3863: 3853: 3735: 3449: 3324: 941: 2694:"Hornsea Offshore Wind Farm Project One : Environmental Statement – Non-Technical Summary (7.1a)" 4182: 3858: 3657: 3379: 3334: 3304: 554: 346:
export cables. The chosen cable export was planned to make landfall at Horseshoe Point (northeast of
2243: 2065: 4221: 3898: 3878: 3843: 3793: 3692: 3490: 3349: 3314: 3254: 3234: 3154: 3074: 3069: 459: 2092:"Hartlepool's JDR Cables wins multi-million pound contract for world's biggest offshore wind farm" 3993: 3918: 3908: 3893: 3873: 3833: 3595: 3521: 3229: 3194: 3164: 3064: 3049: 2826: 378: 4251: 3888: 3828: 3741: 3688: 3600: 3526: 3414: 3209: 3179: 3159: 3124: 4335: 4282: 4231: 4211: 4151: 3531: 3465: 3239: 3174: 3139: 3119: 3104: 3079: 477:
The final turbine was installed in October 2019 and the project was completed in early 2020.
310: 306: 103: 1547: 3998: 3868: 3848: 3409: 3224: 3214: 3094: 3059: 1875: 1853: 1625: 1599: 1313: 1236: 369:
Within the zone of Project 1 the primary underlying geology consisted of deposits from the
2389: 2170:"1,000 offshore wind turbines now installed by renewable energy giant Ørsted in UK waters" 1180: 814: 581:. The project began construction in 2023, and is expected to complete at the end of 2027. 442:
was awarded a contract for 96 tower transition pieces in early 2017, to be constructed at
388:
Seabed investigation including boreholes at turbine foundation positions was completed by
8: 4241: 3883: 3394: 3270: 3219: 3184: 3054: 3039: 3034: 3029: 1395: 2969: 2515: 2265: 1214: 754: 609: 570: 317: 118: 4261: 4070: 3934: 3838: 3729: 3565: 3429: 3309: 3249: 3129: 1287: 1070: 992: 405: 393: 363: 359: 173: 4310: 3788: 1958:"Hornsea Offshore Wind Farm (Zone 4) – Project 2 application accepted for examination" 1573: 1495: 873: 4075: 3621: 3558: 3470: 3399: 3389: 2541: 2022: 1443: 899: 848: 633:
Coast Special Protection Area. Part of the site is also scheduled for an underground
539: 370: 279: 239: 2017:
Pagnamenta, Robin (17 August 2016). "Biggest offshore wind farm gets the go-ahead".
697:"Construction begins for UK's 1.2GW Hornsea Project One windfarm - Power Technology" 4376: 4080: 4065: 4040: 3485: 3439: 3434: 3275: 3144: 2884: 2577: 673: 626: 512: 435: 354:), then passing 40 kilometres (25 mi) west and northwest to a substation near 250:, the eventual wind farm group is planned to have a total capacity of up to 6  2806: 2675:"Hornsea Project One – Addendum to Environmental Impact Assessment Scoping Report" 1902: 1018: 430:
was awarded a contract for 139 kilometres (86 mi) of inter-array cables; and
4126: 3364: 3354: 3149: 3099: 3089: 2994: 2364:"DONG Energy starts consultation on world's biggest potential offshore wind farm" 1372:[New offshore wind foundation to be tested at giant offshore wind farm]. 1469: 3511: 3134: 3109: 2989: 2984: 2812: 2798: 1876:"Appendices to the Technical Report on the events of 9 August 2019, Appendix D" 1803:"Construction of world's largest offshore wind farm in the UK, nearly complete" 409: 397: 298:. The development had an estimated potential generating capacity of 4 GW. 40: 3344: 4350: 4085: 3700: 3199: 3084: 3004: 2974: 2026: 1993:"Green-lit: World's largest offshore wind farm, just off the Yorkshire coast" 852: 598: 463: 78: 65: 2757:"Annex 4.5.4 Project One/Project Two Interface (Document Reference 7.4.5.4)" 4146: 4090: 4060: 3978: 3516: 3495: 3369: 2118:"Offshore Construction Progresses at 1.4 GW Hornsea Two Offshore Wind Farm" 1158: 1146: 641: 561:
crew ships, where crews stay for two weeks while maintaining the turbines.
382: 351: 283: 130: 218: 4121: 3948: 3169: 2222:"From nets to nacelles: A day in the life of an offshore wind technician" 1827: 1424:(Press release). Department of Energy and Climate Change. 3 February 2016 841:"Hornsea Four offshore windfarm given green light after five-month delay" 493: 415: 347: 2849: 2339:"Ørsted takes final investment decision on Hornsea 3 Offshore Wind Farm" 637:, leading to conflict over the use of the seabed and the ocean surface. 4325: 4246: 4196: 3536: 3404: 3204: 3114: 2954: 578: 447: 423: 3687: 2656:"Hornsea Project One – Environmental Impact Assessment Scoping Report" 1704:"World's Largest Offshore Wind Farm Hornsea One Generates First Power" 1096:"DONG Energy reaches agreement with The Crown Estate for Hornsea zone" 2594:"Round 3 Offshore Wind Site Selection at National and Project Levels" 622: 618: 614: 497: 489: 458:
Construction of the onshore cable route was begun in late 2016 under
302: 243: 51: 2820: 2738:"Hornsea Project Two Environmental Impact Assessment Scoping Report" 1938: 1926: 4016: 2614:"Round 3 Zones : High-Level Risk Review of Physical Processes" 1370:"Nyt havmøllefundament skal stå sin prøve i gigantisk havmøllepark" 594: 543: 295: 251: 3709: 2959: 1778:"Final turbine installed at 'world's largest' offshore wind farm" 443: 287: 247: 36: 3616: 1828:"UK power cut: Andrea Leadsom launches government investigation" 1122: 815:"Hornsea 2: North Sea wind farm claims title of world's largest" 194: 4387:
Nationally Significant Infrastructure Projects (United Kingdom)
2999: 2964: 427: 2764:
Hornsea Offshore Wind Farm Project Two Environmental Statement
1110: 301:
The Hornsea site is one of three off the British coast in the
2266:"Consultation starts over Hornsea's third offshore wind farm" 2066:"Subsea 7 unit wins cable contract for wind farm offshore UK" 1914: 726:"Ørsted begins offshore construction for Hornsea Project One" 630: 389: 3808: 917: 597:
for kittiwakes were built on a pole offshore in 2023, near
590: 2837: 1422:"World's largest offshore wind farm to be built in the UK" 1134: 1045:"UK's offshore wind project pipeline further strengthened" 956: 2979: 1340:"Financial report full year 2015 – Investor Presentation" 784:"World's Largest Offshore Wind Farm Fully Up and Running" 419: 2366:(Press release). Dong Energy. 4 May 2016. Archived from 1960:(Press release). Planning Inspectorate. 20 February 2015 1679:"Biggest offshore windfarm to start UK supply this week" 492:
struck a 400 kV mainland transmission line between
1890: 1972: 672:
Suction bucket with jacket foundations were tested at
593:
over the impact on bird colonies in the region. 1,500
968: 2914: 2788: 1522:"JDR Strikes Gold with Hornsea Project One Contract" 1268:. European Commission. 23 July 2014. Table 2, pp.4–5 2722:"Hornsea Offshore Wind Farm (Zone 4) – Project Two" 2640:"Hornsea Offshore Wind Farm (Zone 4) – Project One" 938:"Winners of UK Round 3 offshore wind farm projects" 342:. Later DONG Energy added the consideration to use 333:The zone was to connect to an existing 400 kV 936:Fineren, Daniel; Nakanishi, Nao (8 January 2010). 282:offshore wind farm opportunities was begun by the 3591:List of offshore wind farms in the United Kingdom 1854:"Technical Report on the events of 9 August 2019" 1652:"Hornsea One Export Cable Installation Completed" 4348: 935: 434:was awarded a contract to supply 116 monopiles. 2516:"Hornsea Four wind farm approved by government" 2390:"Bird charity warns of harm from new wind farm" 2195:"MHO's New CTVs Have Zero-emissions Capability" 874:"Hornsea Four wind farm approved by government" 720: 718: 246:120 km (75 mi) off the east coast of 242:which began construction in 2018. Sited in the 2491:"BP hands out southern North Sea CCS contract" 2465:"Ørsted submits DCO application for Hornsea 4" 2416:"Orsted completes industry-first at Hornsea 3" 1751:"Bold Tern Installs Turbine 28 at Hornsea One" 778: 776: 3673: 2900: 809: 807: 805: 4331:Pre-nationalisation electric power companies 2592: 2569: 1991:Proctor, Kate; Woof, Alex (16 August 2016). 1175: 1173: 987: 985: 983: 962: 923: 755:"First power from world's biggest wind farm" 715: 2736: 1990: 1944: 1932: 1920: 1908: 1896: 773: 500:north of London, causing small generators, 3680: 3666: 2907: 2893: 2755: 2692: 2673: 2654: 2144:"Construction well underway for Hornsea 2" 2016: 1978: 1164: 1152: 1140: 1128: 1116: 1098:(Press release). Dong Energy. 8 March 2016 802: 2937:Offshore wind power in the United Kingdom 1436: 1345:. DONG Energy. 4 February 2016. p. 6 1306: 1280: 1229: 1199: 1170: 1011: 980: 929: 749: 747: 392:by April 2015. In mid 2015 DONG selected 305:, roughly halfway between the other two: 3330:European Offshore Wind Deployment Centre 1775: 511: 4392:Energy infrastructure completed in 2021 2611: 2462: 2356: 2318:Recharge | Latest renewable energy news 2219: 2167: 1676: 1364: 1362: 1360: 974: 838: 584: 210:Related media on Commons 4349: 2932:Renewable energy in the United Kingdom 2488: 2232: 1725:"Hornsea One Foundations All In Place" 744: 3661: 2888: 2571:"Round 3 zone appraisal and planning" 1950: 1776:Shrestha, Priyanka (3 October 2019). 488:At 16:52:33 on Friday 9 August 2019, 4362:Offshore wind farms in the North Sea 3640: 1357: 604: 564: 507: 327: 2850:"DONG Energy – Hornsea Project One" 2311: 2220:Vorrath, Sophie (5 December 2023). 13: 2862:"Hornsea Project One – Heron Wind" 2489:Penman, Hamish (19 January 2022). 1677:Vaughan, Adam (11 February 2019). 1181:"Hornsea duo signs on dotted line" 440:Offshore Structures (Britain) Ltd. 14: 4403: 2782: 1600:"Bladt, OSB secure Hornsea prize" 1548:"Nexans nails Hornsea 1 wire job" 993:"Dong takes control at Hornsea 1" 839:Ambrose, Jillian (12 July 2023). 589:Concerns have been raised by the 532: 4309: 3639: 3628: 3627: 3615: 2916:Wind power in the United Kingdom 2819: 2805: 2791: 2463:Russell, Tom (19 October 2021). 1626:"Hornsea 1 starts onshore links" 516:Hornsea 2 wind farm from the air 166:Siemens Gamesa SWT-7.0-154 (One) 2534: 2508: 2482: 2456: 2430: 2408: 2382: 2331: 2312:Lee, Andrew (11 January 2023). 2305: 2284: 2258: 2213: 2187: 2168:Laister, David (23 June 2021). 2161: 2136: 2110: 2084: 2058: 2033: 2010: 1984: 1868: 1846: 1820: 1795: 1769: 1743: 1717: 1696: 1670: 1644: 1618: 1592: 1566: 1540: 1514: 1488: 1462: 1414: 1396:"Dong commits to Hornsea build" 1388: 1332: 1255: 1213:. 23 April 2014. Archived from 1207:"UK awards contracts for 4.5GW" 1088: 1063: 1037: 666: 453: 168:Siemens Gamesa 8.0-167 DD (Two) 4382:2018 establishments in England 4357:Proposed wind farms in England 1911:, §1.1.1–1.1.5, §3.3.10–3.311. 1878:. 6 September 2019. p. 42 1288:"Fugro signs off at Hornsea 1" 892: 866: 832: 689: 1: 2874:"Hornsea Project One – Njord" 2599:. The Crown Estate. June 2013 2021:. No. 71991. p. 9. 1314:"Siemens 1.2GW monster order" 1237:"1.2GW Hornsea 1 green light" 1071:"Dong eyes 2GW Hornsea bonus" 1051:(Press release). 8 March 2016 683: 575:battery storage power station 546:, and operate at 66 kV. 3732:(co-fires, and full biomass) 2927:Energy in the United Kingdom 1807:constructionreviewonline.com 1496:"NKT to help wire Hornsea 1" 1376:(in Danish). 5 February 2016 502:Little Barford Power Station 7: 4372:Ørsted (company) wind farms 4367:Round 3 offshore wind farms 2854:www.hornseaprojectone.co.uk 2724:. The Planning Inspectorate 2661:. SMart Wind. November 2010 2642:. The Planning Inspectorate 1574:"EEW secures Hornsea prize" 1444:"Balfour grabs Hornsea gig" 654:List of offshore wind farms 647: 10: 4408: 2743:. SMart Wind. October 2012 2562: 2199:Offshore Engineer Magazine 1656:Offshore Engineer Magazine 356:Killingholme Power Station 292:Mainstream Renewable Power 278:The tendering process for 273: 16:Wind farm in the North Sea 4318: 4307: 4275: 4204: 4195: 4175: 4134: 4120: 4104: 4048: 4039: 3956: 3947: 3927: 3816: 3807: 3781: 3760: 3717: 3708: 3699: 3609: 3583: 3549: 3504: 3458: 3297: 3288: 3263: 3022: 3013: 2945: 2922: 2240:"Ørsted: A new beginning" 1019:"Dong grabs Hornsea zone" 940:. Reuters. Archived from 555:Barrow Offshore Wind Farm 480: 215: 205: 189: 184: 172: 148: 144: 139: 129: 124: 114: 102: 94: 57: 47: 32: 28: 23: 3854:Ferrybridge A, B & C 3693:Yorkshire and the Humber 3491:Sofia Offshore Wind Farm 2680:. SMart Wind. March 2012 2242:. Ørsted. Archived from 1167:, §5.2–5.14, §5.15–5.18. 1155:, §5.1.5–5.1.8, Fig 5.1. 1049:www.thecrownestate.co.uk 659: 379:Contracts for Difference 316:In 2011 the Danish firm 163:Make and model 3596:North Sea Offshore Grid 2827:Renewable energy portal 2699:. SMart Wind. July 2013 2292:"Planning Inspectorate" 2041:"Where is Hornsea Two?" 174:Nameplate capacity 4167:Ferrybridge Multi-fuel 3689:Electricity generation 3601:Wind power in Scotland 3375:Lynn and Inner Dowsing 2612:ABP mer (March 2009). 1470:"ABB wins Hornsea gem" 635:carbon dioxide storage 517: 153:Units operational 4336:Yorkshire Electricity 3736:Ferrybridge Multifuel 3622:Wind power portal 2546:hornseaprojects.co.uk 2343:hornseaproject3.co.uk 2096:Global Underwater Hub 2045:hornseaprojects.co.uk 1834:. BBC. 11 August 2019 904:hornseaprojects.co.uk 515: 311:East Anglia Wind Farm 307:Dogger Bank Wind Farm 140:Power generation 3551:Installation vessels 3445:West of Duddon Sands 2838:"SMart Wind Limited" 2442:Hornsea Project Four 1526:www.offshorewind.biz 585:Environmental impact 460:J. Murphy & Sons 408:had been awarded to 104:Commission date 3884:Monckton Coke Works 3290:Offshore wind farms 3190:Little Cheyne Court 2438:"About the project" 2270:BBC News Humberside 2174:business-live.co.uk 1217:on 20 February 2016 625:populations in the 185:External links 75: /  3789:ARBRE (Eggborough) 3015:Onshore wind farms 2878:www.4coffshore.com 2866:www.4coffshore.com 2619:. The Crown Estate 1997:The Yorkshire Post 1856:. 6 September 2019 1658:. 11 December 2018 1580:. 25 November 2016 1554:. 14 December 2016 1450:. 15 December 2015 1243:. 10 December 2014 944:on 3 February 2016 761:. 15 February 2019 518: 406:North Killingholme 394:Siemens Wind Power 364:North Lincolnshire 360:North Killingholme 180:1386 MW (Two) 178:1218 MW (One) 158:165 × 8.4 MW (Two) 110:2022 (Hornsea Two) 108:2020 (Hornsea One) 4344: 4343: 4305: 4304: 4301: 4300: 4191: 4190: 4116: 4115: 4035: 4034: 4022:South Humber Bank 3989:Humber Energy CHP 3943: 3942: 3824:Blackburn Meadows 3803: 3802: 3725:Blackburn Meadows 3655: 3654: 3545: 3544: 3284: 3283: 3045:Askam and Ireleth 1632:. 3 November 2016 1528:. 1 November 2016 1402:. 3 February 2016 999:. 4 February 2015 963:Crown Estate 2013 924:Crown Estate 2010 790:. 30 January 2020 732:. 26 January 2018 703:. 29 January 2018 605:Hornsea Project 4 565:Hornsea Project 3 540:JDR Cable Systems 508:Hornsea Project 2 371:Quaternary Period 328:Hornsea Project 1 290:and a consortium 240:Round 3 wind farm 236:Hornsea Wind Farm 226: 225: 24:Hornsea Wind Farm 4399: 4313: 4267:Westermost Rough 4202: 4201: 4132: 4131: 4046: 4045: 3954: 3953: 3814: 3813: 3715: 3714: 3706: 3705: 3682: 3675: 3668: 3659: 3658: 3643: 3642: 3631: 3630: 3620: 3619: 3486:Neart Na Gaoithe 3450:Westermost Rough 3425:Sheringham Shoal 3295: 3294: 3020: 3019: 2909: 2902: 2895: 2886: 2885: 2881: 2869: 2857: 2845: 2829: 2824: 2823: 2815: 2810: 2809: 2801: 2796: 2795: 2794: 2775: 2773: 2771: 2761: 2752: 2750: 2748: 2742: 2733: 2731: 2729: 2708: 2706: 2704: 2698: 2689: 2687: 2685: 2679: 2670: 2668: 2666: 2660: 2651: 2649: 2647: 2628: 2626: 2624: 2618: 2608: 2606: 2604: 2598: 2589: 2587: 2585: 2578:The Crown Estate 2575: 2557: 2556: 2554: 2552: 2538: 2532: 2531: 2529: 2527: 2512: 2506: 2505: 2503: 2501: 2486: 2480: 2479: 2477: 2475: 2460: 2454: 2453: 2451: 2449: 2434: 2428: 2427: 2425: 2423: 2412: 2406: 2405: 2403: 2401: 2396:. 2 January 2021 2386: 2380: 2379: 2377: 2375: 2360: 2354: 2353: 2351: 2349: 2335: 2329: 2328: 2326: 2324: 2309: 2303: 2302: 2300: 2298: 2288: 2282: 2281: 2279: 2277: 2262: 2256: 2255: 2253: 2251: 2236: 2230: 2229: 2217: 2211: 2210: 2208: 2206: 2201:. 26 August 2021 2191: 2185: 2184: 2182: 2180: 2165: 2159: 2158: 2156: 2154: 2140: 2134: 2133: 2131: 2129: 2114: 2108: 2107: 2105: 2103: 2098:. 30 August 2018 2088: 2082: 2081: 2079: 2077: 2070:Power Technology 2062: 2056: 2055: 2053: 2051: 2037: 2031: 2030: 2014: 2008: 2007: 2005: 2003: 1988: 1982: 1976: 1970: 1969: 1967: 1965: 1954: 1948: 1947:, §5.1.2–5.1.11. 1945:SMart Wind 2012a 1942: 1936: 1935:, §3.4.7–3.4.14. 1933:SMart Wind 2012a 1930: 1924: 1921:SMart Wind 2012a 1918: 1912: 1909:SMart Wind 2012a 1906: 1900: 1897:SMart Wind 2012a 1894: 1888: 1887: 1885: 1883: 1872: 1866: 1865: 1863: 1861: 1850: 1844: 1843: 1841: 1839: 1824: 1818: 1817: 1815: 1813: 1799: 1793: 1792: 1790: 1788: 1782:Energy Live News 1773: 1767: 1766: 1764: 1762: 1747: 1741: 1740: 1738: 1736: 1721: 1715: 1714: 1712: 1710: 1700: 1694: 1693: 1691: 1689: 1674: 1668: 1667: 1665: 1663: 1648: 1642: 1641: 1639: 1637: 1622: 1616: 1615: 1613: 1611: 1606:. 5 January 2017 1596: 1590: 1589: 1587: 1585: 1570: 1564: 1563: 1561: 1559: 1544: 1538: 1537: 1535: 1533: 1518: 1512: 1511: 1509: 1507: 1492: 1486: 1485: 1483: 1481: 1466: 1460: 1459: 1457: 1455: 1440: 1434: 1433: 1431: 1429: 1418: 1412: 1411: 1409: 1407: 1392: 1386: 1385: 1383: 1381: 1366: 1355: 1354: 1352: 1350: 1344: 1336: 1330: 1329: 1327: 1325: 1310: 1304: 1303: 1301: 1299: 1284: 1278: 1277: 1275: 1273: 1267: 1259: 1253: 1252: 1250: 1248: 1233: 1227: 1226: 1224: 1222: 1203: 1197: 1196: 1194: 1192: 1177: 1168: 1162: 1156: 1150: 1144: 1138: 1132: 1126: 1120: 1114: 1108: 1107: 1105: 1103: 1092: 1086: 1085: 1083: 1081: 1067: 1061: 1060: 1058: 1056: 1041: 1035: 1034: 1032: 1030: 1025:. 21 August 2015 1015: 1009: 1008: 1006: 1004: 989: 978: 972: 966: 960: 954: 953: 951: 949: 933: 927: 921: 915: 914: 912: 910: 896: 890: 889: 887: 885: 870: 864: 863: 861: 859: 836: 830: 829: 827: 825: 811: 800: 799: 797: 795: 788:OffshoreWIND.biz 780: 771: 770: 768: 766: 751: 742: 741: 739: 737: 722: 713: 712: 710: 708: 701:Power Technology 693: 677: 674:Borkum Riffgrund 670: 436:Bladt Industries 230:Wind farm layout 219:edit on Wikidata 201: 198: 196: 156:174 × 7 MW (One) 90: 89: 87: 86: 85: 80: 79:53.885°N 1.791°E 76: 73: 72: 71: 68: 21: 20: 4407: 4406: 4402: 4401: 4400: 4398: 4397: 4396: 4347: 4346: 4345: 4340: 4314: 4297: 4276:Proposed/future 4271: 4187: 4171: 4124: 4112: 4105:Proposed/future 4100: 4031: 3974:Conoco Phillips 3939: 3923: 3799: 3777: 3773:Stallingborough 3761:Proposed/future 3756: 3695: 3686: 3656: 3651: 3614: 3605: 3579: 3541: 3500: 3454: 3355:Hywind Scotland 3335:Greater Gabbard 3280: 3259: 3150:Goonhilly Downs 3009: 2995:Talisman Energy 2941: 2918: 2913: 2872: 2860: 2848: 2842:smartwind.co.uk 2836: 2833: 2832: 2825: 2818: 2811: 2804: 2797: 2792: 2790: 2785: 2780: 2769: 2767: 2759: 2746: 2744: 2740: 2727: 2725: 2720: 2702: 2700: 2696: 2683: 2681: 2677: 2664: 2662: 2658: 2645: 2643: 2638: 2622: 2620: 2616: 2602: 2600: 2596: 2583: 2581: 2573: 2565: 2560: 2550: 2548: 2540: 2539: 2535: 2525: 2523: 2514: 2513: 2509: 2499: 2497: 2487: 2483: 2473: 2471: 2461: 2457: 2447: 2445: 2436: 2435: 2431: 2421: 2419: 2414: 2413: 2409: 2399: 2397: 2388: 2387: 2383: 2373: 2371: 2362: 2361: 2357: 2347: 2345: 2337: 2336: 2332: 2322: 2320: 2310: 2306: 2296: 2294: 2290: 2289: 2285: 2275: 2273: 2264: 2263: 2259: 2249: 2247: 2246:on 3 April 2018 2238: 2237: 2233: 2218: 2214: 2204: 2202: 2193: 2192: 2188: 2178: 2176: 2166: 2162: 2152: 2150: 2142: 2141: 2137: 2127: 2125: 2124:. 21 April 2021 2116: 2115: 2111: 2101: 2099: 2090: 2089: 2085: 2075: 2073: 2064: 2063: 2059: 2049: 2047: 2039: 2038: 2034: 2015: 2011: 2001: 1999: 1989: 1985: 1979:SMart Wind 2015 1977: 1973: 1963: 1961: 1956: 1955: 1951: 1943: 1939: 1931: 1927: 1919: 1915: 1907: 1903: 1895: 1891: 1881: 1879: 1874: 1873: 1869: 1859: 1857: 1852: 1851: 1847: 1837: 1835: 1826: 1825: 1821: 1811: 1809: 1801: 1800: 1796: 1786: 1784: 1774: 1770: 1760: 1758: 1749: 1748: 1744: 1734: 1732: 1731:. 26 April 2019 1723: 1722: 1718: 1708: 1706: 1702: 1701: 1697: 1687: 1685: 1675: 1671: 1661: 1659: 1650: 1649: 1645: 1635: 1633: 1624: 1623: 1619: 1609: 1607: 1598: 1597: 1593: 1583: 1581: 1572: 1571: 1567: 1557: 1555: 1546: 1545: 1541: 1531: 1529: 1520: 1519: 1515: 1505: 1503: 1494: 1493: 1489: 1479: 1477: 1476:. 31 March 2016 1468: 1467: 1463: 1453: 1451: 1442: 1441: 1437: 1427: 1425: 1420: 1419: 1415: 1405: 1403: 1394: 1393: 1389: 1379: 1377: 1368: 1367: 1358: 1348: 1346: 1342: 1338: 1337: 1333: 1323: 1321: 1312: 1311: 1307: 1297: 1295: 1294:. 23 March 2015 1286: 1285: 1281: 1271: 1269: 1265: 1261: 1260: 1256: 1246: 1244: 1235: 1234: 1230: 1220: 1218: 1205: 1204: 1200: 1190: 1188: 1187:. 24 April 2013 1179: 1178: 1171: 1165:SMart Wind 2010 1163: 1159: 1153:SMart Wind 2013 1151: 1147: 1141:SMart Wind 2012 1139: 1135: 1129:SMart Wind 2010 1127: 1123: 1117:SMart Wind 2010 1115: 1111: 1101: 1099: 1094: 1093: 1089: 1079: 1077: 1069: 1068: 1064: 1054: 1052: 1043: 1042: 1038: 1028: 1026: 1017: 1016: 1012: 1002: 1000: 991: 990: 981: 973: 969: 961: 957: 947: 945: 934: 930: 922: 918: 908: 906: 898: 897: 893: 883: 881: 872: 871: 867: 857: 855: 837: 833: 823: 821: 813: 812: 803: 793: 791: 782: 781: 774: 764: 762: 753: 752: 745: 735: 733: 724: 723: 716: 706: 704: 695: 694: 690: 686: 681: 680: 671: 667: 662: 650: 607: 601:and Lowestoft. 587: 567: 559:diesel-electric 542:, installed by 535: 510: 483: 456: 330: 276: 233: 232: 231: 222: 195:hornseaproject3 193: 179: 167: 157: 125:Wind farm 109: 83: 81: 77: 74: 69: 66: 64: 62: 61: 17: 12: 11: 5: 4405: 4395: 4394: 4389: 4384: 4379: 4374: 4369: 4364: 4359: 4342: 4341: 4339: 4338: 4333: 4328: 4322: 4320: 4316: 4315: 4308: 4306: 4303: 4302: 4299: 4298: 4296: 4295: 4290: 4285: 4279: 4277: 4273: 4272: 4270: 4269: 4264: 4259: 4254: 4249: 4244: 4239: 4234: 4229: 4224: 4222:Humber Gateway 4219: 4214: 4208: 4206: 4199: 4193: 4192: 4189: 4188: 4186: 4185: 4179: 4177: 4173: 4172: 4170: 4169: 4164: 4159: 4154: 4149: 4144: 4138: 4136: 4129: 4118: 4117: 4114: 4113: 4108: 4106: 4102: 4101: 4099: 4098: 4093: 4088: 4083: 4078: 4073: 4068: 4063: 4058: 4052: 4050: 4043: 4037: 4036: 4033: 4032: 4030: 4029: 4024: 4019: 4014: 4012:Killingholme B 4009: 4007:Killingholme A 4004: 3996: 3991: 3986: 3984:Glanford Brigg 3981: 3976: 3971: 3966: 3960: 3958: 3951: 3945: 3944: 3941: 3940: 3938: 3937: 3931: 3929: 3925: 3924: 3922: 3921: 3916: 3911: 3906: 3904:Skelton Grange 3901: 3896: 3891: 3886: 3881: 3876: 3871: 3866: 3861: 3856: 3851: 3846: 3841: 3836: 3831: 3826: 3820: 3818: 3811: 3805: 3804: 3801: 3800: 3798: 3797: 3791: 3785: 3783: 3779: 3778: 3776: 3775: 3770: 3764: 3762: 3758: 3757: 3755: 3754: 3749: 3747:Markham Grange 3744: 3739: 3733: 3727: 3721: 3719: 3712: 3703: 3701:Power stations 3697: 3696: 3685: 3684: 3677: 3670: 3662: 3653: 3652: 3650: 3649: 3637: 3625: 3610: 3607: 3606: 3604: 3603: 3598: 3593: 3587: 3585: 3581: 3580: 3578: 3577: 3570: 3567:MPI Resolution 3563: 3555: 3553: 3547: 3546: 3543: 3542: 3540: 3539: 3534: 3529: 3524: 3519: 3514: 3512:Atlantic Array 3508: 3506: 3502: 3501: 3499: 3498: 3493: 3488: 3483: 3478: 3473: 3468: 3462: 3460: 3456: 3455: 3453: 3452: 3447: 3442: 3437: 3432: 3427: 3422: 3417: 3412: 3407: 3402: 3397: 3392: 3387: 3382: 3377: 3372: 3367: 3362: 3357: 3352: 3350:Humber Gateway 3347: 3342: 3340:Gunfleet Sands 3337: 3332: 3327: 3322: 3317: 3312: 3307: 3301: 3299: 3292: 3286: 3285: 3282: 3281: 3279: 3278: 3273: 3267: 3265: 3261: 3260: 3258: 3257: 3255:Winscales Moor 3252: 3247: 3242: 3237: 3235:Trimdon Grange 3232: 3227: 3222: 3217: 3212: 3207: 3202: 3197: 3192: 3187: 3182: 3177: 3172: 3167: 3162: 3157: 3155:Great Eppleton 3152: 3147: 3142: 3137: 3132: 3127: 3122: 3117: 3112: 3110:Cold Northcott 3107: 3102: 3097: 3092: 3087: 3082: 3077: 3075:Brechfa Forest 3072: 3070:Braes of Doune 3067: 3062: 3057: 3052: 3050:Beinn an Tuirc 3047: 3042: 3037: 3032: 3026: 3024: 3017: 3011: 3010: 3008: 3007: 3002: 2997: 2992: 2990:SSE Renewables 2987: 2985:Siemens Gamesa 2982: 2977: 2972: 2967: 2962: 2957: 2951: 2949: 2943: 2942: 2940: 2939: 2934: 2929: 2923: 2920: 2919: 2912: 2911: 2904: 2897: 2889: 2883: 2882: 2870: 2858: 2846: 2831: 2830: 2816: 2813:Weather portal 2802: 2799:England portal 2787: 2786: 2784: 2783:External links 2781: 2779: 2778: 2777: 2776: 2766:. January 2015 2753: 2717: 2716: 2712: 2711: 2710: 2709: 2690: 2671: 2635: 2634: 2630: 2629: 2609: 2590: 2566: 2564: 2561: 2559: 2558: 2542:"Hornsea Four" 2533: 2522:. 14 July 2023 2507: 2481: 2469:4Coffshore.com 2455: 2429: 2418:. 21 July 2023 2407: 2381: 2355: 2330: 2304: 2283: 2257: 2231: 2212: 2186: 2160: 2135: 2109: 2083: 2072:. 24 July 2019 2057: 2032: 2009: 1983: 1971: 1949: 1937: 1925: 1913: 1901: 1889: 1867: 1845: 1819: 1794: 1768: 1742: 1716: 1695: 1669: 1643: 1617: 1591: 1565: 1539: 1513: 1502:. 5 April 2016 1487: 1461: 1435: 1413: 1387: 1356: 1331: 1305: 1279: 1254: 1228: 1198: 1169: 1157: 1145: 1133: 1121: 1109: 1087: 1062: 1036: 1010: 979: 967: 955: 928: 916: 900:"Hornsea Four" 891: 880:. 14 July 2023 865: 831: 801: 772: 743: 714: 687: 685: 682: 679: 678: 664: 663: 661: 658: 657: 656: 649: 646: 606: 603: 586: 583: 566: 563: 534: 531: 509: 506: 482: 479: 464:terawatt-hours 455: 452: 446:, Denmark and 412:in late 2015. 410:Balfour Beatty 398:suction bucket 329: 326: 275: 272: 229: 228: 227: 224: 223: 216: 213: 212: 207: 203: 202: 191: 187: 186: 182: 181: 176: 170: 169: 164: 160: 159: 154: 150: 149: 146: 145: 142: 141: 137: 136: 133: 127: 126: 122: 121: 116: 112: 111: 106: 100: 99: 96: 92: 91: 59: 55: 54: 49: 45: 44: 41:United Kingdom 34: 30: 29: 26: 25: 15: 9: 6: 4: 3: 2: 4404: 4393: 4390: 4388: 4385: 4383: 4380: 4378: 4375: 4373: 4370: 4368: 4365: 4363: 4360: 4358: 4355: 4354: 4352: 4337: 4334: 4332: 4329: 4327: 4324: 4323: 4321: 4319:Organisations 4317: 4312: 4294: 4291: 4289: 4286: 4284: 4281: 4280: 4278: 4274: 4268: 4265: 4263: 4260: 4258: 4255: 4253: 4250: 4248: 4245: 4243: 4240: 4238: 4235: 4233: 4230: 4228: 4225: 4223: 4220: 4218: 4215: 4213: 4210: 4209: 4207: 4203: 4200: 4198: 4194: 4184: 4181: 4180: 4178: 4174: 4168: 4165: 4163: 4160: 4158: 4155: 4153: 4150: 4148: 4145: 4143: 4142:Allerton Park 4140: 4139: 4137: 4133: 4130: 4128: 4123: 4119: 4111: 4107: 4103: 4097: 4094: 4092: 4089: 4087: 4084: 4082: 4079: 4077: 4074: 4072: 4069: 4067: 4064: 4062: 4059: 4057: 4054: 4053: 4051: 4047: 4044: 4042: 4038: 4028: 4025: 4023: 4020: 4018: 4015: 4013: 4010: 4008: 4005: 4003: 4000: 3997: 3995: 3992: 3990: 3987: 3985: 3982: 3980: 3977: 3975: 3972: 3970: 3967: 3965: 3962: 3961: 3959: 3955: 3952: 3950: 3946: 3936: 3933: 3932: 3930: 3926: 3920: 3917: 3915: 3912: 3910: 3907: 3905: 3902: 3900: 3897: 3895: 3892: 3890: 3887: 3885: 3882: 3880: 3877: 3875: 3872: 3870: 3867: 3865: 3862: 3860: 3857: 3855: 3852: 3850: 3847: 3845: 3842: 3840: 3837: 3835: 3832: 3830: 3827: 3825: 3822: 3821: 3819: 3815: 3812: 3810: 3806: 3795: 3792: 3790: 3787: 3786: 3784: 3780: 3774: 3771: 3769: 3766: 3765: 3763: 3759: 3753: 3752:Templeborough 3750: 3748: 3745: 3743: 3740: 3737: 3734: 3731: 3728: 3726: 3723: 3722: 3720: 3716: 3713: 3711: 3707: 3704: 3702: 3698: 3694: 3690: 3683: 3678: 3676: 3671: 3669: 3664: 3663: 3660: 3648: 3647: 3638: 3636: 3635: 3626: 3624: 3623: 3618: 3612: 3611: 3608: 3602: 3599: 3597: 3594: 3592: 3589: 3588: 3586: 3582: 3576: 3575: 3574:MPI Discovery 3571: 3569: 3568: 3564: 3562: 3561: 3560:MPI Adventure 3557: 3556: 3554: 3552: 3548: 3538: 3535: 3533: 3530: 3528: 3525: 3523: 3522:Docking Shoal 3520: 3518: 3515: 3513: 3510: 3509: 3507: 3503: 3497: 3494: 3492: 3489: 3487: 3484: 3482: 3479: 3477: 3474: 3472: 3469: 3467: 3464: 3463: 3461: 3457: 3451: 3448: 3446: 3443: 3441: 3438: 3436: 3433: 3431: 3428: 3426: 3423: 3421: 3418: 3416: 3413: 3411: 3408: 3406: 3403: 3401: 3398: 3396: 3393: 3391: 3388: 3386: 3383: 3381: 3378: 3376: 3373: 3371: 3368: 3366: 3363: 3361: 3360:Kentish Flats 3358: 3356: 3353: 3351: 3348: 3346: 3343: 3341: 3338: 3336: 3333: 3331: 3328: 3326: 3323: 3321: 3318: 3316: 3313: 3311: 3308: 3306: 3303: 3302: 3300: 3296: 3293: 3291: 3287: 3277: 3274: 3272: 3269: 3268: 3266: 3262: 3256: 3253: 3251: 3248: 3246: 3243: 3241: 3238: 3236: 3233: 3231: 3230:Slieve Rushen 3228: 3226: 3223: 3221: 3218: 3216: 3213: 3211: 3208: 3206: 3203: 3201: 3200:Moel Maelogan 3198: 3196: 3195:Milton Keynes 3193: 3191: 3188: 3186: 3183: 3181: 3178: 3176: 3173: 3171: 3168: 3166: 3165:Holmside Hall 3163: 3161: 3158: 3156: 3153: 3151: 3148: 3146: 3143: 3141: 3138: 3136: 3133: 3131: 3128: 3126: 3123: 3121: 3118: 3116: 3113: 3111: 3108: 3106: 3103: 3101: 3098: 3096: 3093: 3091: 3088: 3086: 3085:Carland Cross 3083: 3081: 3078: 3076: 3073: 3071: 3068: 3066: 3065:Blyth Harbour 3063: 3061: 3058: 3056: 3053: 3051: 3048: 3046: 3043: 3041: 3038: 3036: 3033: 3031: 3028: 3027: 3025: 3021: 3018: 3016: 3012: 3006: 3005:ScottishPower 3003: 3001: 2998: 2996: 2993: 2991: 2988: 2986: 2983: 2981: 2978: 2976: 2975:REG WindPower 2973: 2971: 2968: 2966: 2963: 2961: 2958: 2956: 2953: 2952: 2950: 2948: 2944: 2938: 2935: 2933: 2930: 2928: 2925: 2924: 2921: 2917: 2910: 2905: 2903: 2898: 2896: 2891: 2890: 2887: 2879: 2875: 2871: 2867: 2863: 2859: 2855: 2851: 2847: 2843: 2839: 2835: 2834: 2828: 2822: 2817: 2814: 2808: 2803: 2800: 2789: 2765: 2758: 2754: 2739: 2735: 2734: 2723: 2719: 2718: 2714: 2713: 2695: 2691: 2676: 2672: 2657: 2653: 2652: 2641: 2637: 2636: 2632: 2631: 2615: 2610: 2595: 2591: 2579: 2572: 2568: 2567: 2547: 2543: 2537: 2521: 2517: 2511: 2496: 2492: 2485: 2470: 2466: 2459: 2443: 2439: 2433: 2417: 2411: 2395: 2391: 2385: 2370:on 8 May 2016 2369: 2365: 2359: 2344: 2340: 2334: 2319: 2315: 2308: 2293: 2287: 2271: 2267: 2261: 2245: 2241: 2235: 2227: 2223: 2216: 2200: 2196: 2190: 2175: 2171: 2164: 2149: 2145: 2139: 2123: 2122:Offshore Wind 2119: 2113: 2097: 2093: 2087: 2071: 2067: 2061: 2046: 2042: 2036: 2028: 2024: 2020: 2013: 1998: 1994: 1987: 1980: 1975: 1959: 1953: 1946: 1941: 1934: 1929: 1922: 1917: 1910: 1905: 1898: 1893: 1877: 1871: 1855: 1849: 1833: 1829: 1823: 1808: 1804: 1798: 1783: 1779: 1772: 1756: 1755:Offshore Wind 1752: 1746: 1730: 1729:Offshore Wind 1726: 1720: 1705: 1699: 1684: 1680: 1673: 1657: 1653: 1647: 1631: 1627: 1621: 1605: 1601: 1595: 1579: 1575: 1569: 1553: 1549: 1543: 1527: 1523: 1517: 1501: 1497: 1491: 1475: 1471: 1465: 1449: 1445: 1439: 1423: 1417: 1401: 1397: 1391: 1375: 1371: 1365: 1363: 1361: 1341: 1335: 1320:. 3 July 2015 1319: 1315: 1309: 1293: 1289: 1283: 1264: 1258: 1242: 1238: 1232: 1216: 1212: 1208: 1202: 1186: 1182: 1176: 1174: 1166: 1161: 1154: 1149: 1142: 1137: 1131:, §3.29–3.55. 1130: 1125: 1118: 1113: 1097: 1091: 1076: 1072: 1066: 1050: 1046: 1040: 1024: 1020: 1014: 998: 994: 988: 986: 984: 976: 971: 965:, p. 10. 964: 959: 943: 939: 932: 925: 920: 905: 901: 895: 879: 875: 869: 854: 850: 846: 842: 835: 820: 816: 810: 808: 806: 789: 785: 779: 777: 760: 756: 750: 748: 731: 727: 721: 719: 702: 698: 692: 688: 675: 669: 665: 655: 652: 651: 645: 643: 638: 636: 632: 628: 624: 620: 616: 611: 602: 600: 599:RSPB Minsmere 596: 592: 582: 580: 576: 572: 562: 560: 556: 550: 547: 545: 541: 530: 526: 522: 514: 505: 503: 499: 495: 491: 486: 478: 475: 471: 467: 465: 461: 451: 449: 445: 441: 437: 433: 429: 425: 421: 417: 413: 411: 407: 402: 399: 395: 391: 386: 384: 380: 375: 372: 367: 365: 361: 357: 353: 349: 345: 341: 336: 335:National Grid 325: 321: 319: 314: 312: 308: 304: 299: 297: 293: 289: 285: 281: 271: 267: 263: 259: 255: 253: 249: 245: 241: 237: 220: 214: 211: 208: 204: 200: 192: 188: 183: 177: 175: 171: 165: 162: 161: 155: 152: 151: 147: 143: 138: 134: 132: 128: 123: 120: 117: 113: 107: 105: 101: 97: 93: 88: 84:53.885; 1.791 60: 56: 53: 50: 46: 42: 38: 35: 31: 27: 22: 19: 4287: 4252:Ovenden Moor 4122:Incinerators 4071:Linton Falls 4002:(mothballed) 4001: 3979:East Knapton 3914:Thorpe Marsh 3864:Huddersfield 3645: 3632: 3613: 3573: 3566: 3559: 3527:First Flight 3517:Celtic Array 3496:Triton Knoll 3475: 3415:Scroby Sands 3370:London Array 3210:Ovenden Moor 3180:Langley Park 3160:Hadyard Hill 2877: 2865: 2853: 2841: 2768:. Retrieved 2763: 2745:. Retrieved 2726:. Retrieved 2701:. Retrieved 2682:. Retrieved 2663:. Retrieved 2644:. Retrieved 2621:. Retrieved 2601:. Retrieved 2582:. Retrieved 2580:. 7 May 2010 2549:. Retrieved 2545: 2536: 2524:. Retrieved 2519: 2510: 2498:. Retrieved 2495:Energy Voice 2494: 2484: 2472:. Retrieved 2468: 2458: 2446:. Retrieved 2441: 2432: 2420:. Retrieved 2410: 2398:. Retrieved 2393: 2384: 2372:. Retrieved 2368:the original 2358: 2346:. Retrieved 2342: 2333: 2321:. Retrieved 2317: 2307: 2295:. Retrieved 2286: 2274:. Retrieved 2272:. 4 May 2016 2269: 2260: 2248:. Retrieved 2244:the original 2234: 2226:RenewEconomy 2225: 2215: 2205:11 September 2203:. Retrieved 2198: 2189: 2177:. Retrieved 2173: 2163: 2151:. Retrieved 2147: 2138: 2126:. Retrieved 2121: 2112: 2100:. Retrieved 2095: 2086: 2074:. Retrieved 2069: 2060: 2048:. Retrieved 2044: 2035: 2018: 2012: 2000:. Retrieved 1996: 1986: 1974: 1962:. Retrieved 1952: 1940: 1928: 1916: 1904: 1892: 1880:. Retrieved 1870: 1858:. Retrieved 1848: 1836:. Retrieved 1831: 1822: 1810:. Retrieved 1806: 1797: 1785:. Retrieved 1781: 1771: 1759:. Retrieved 1757:. 3 May 2019 1754: 1745: 1733:. Retrieved 1728: 1719: 1707:. Retrieved 1698: 1686:. Retrieved 1683:The Guardian 1682: 1672: 1660:. Retrieved 1655: 1646: 1634:. Retrieved 1629: 1620: 1608:. Retrieved 1603: 1594: 1582:. Retrieved 1577: 1568: 1556:. Retrieved 1551: 1542: 1530:. Retrieved 1525: 1516: 1504:. Retrieved 1499: 1490: 1478:. Retrieved 1473: 1464: 1452:. Retrieved 1447: 1438: 1426:. Retrieved 1416: 1404:. Retrieved 1399: 1390: 1378:. Retrieved 1373: 1347:. Retrieved 1334: 1322:. Retrieved 1317: 1308: 1296:. Retrieved 1291: 1282: 1270:. Retrieved 1257: 1245:. Retrieved 1240: 1231: 1219:. Retrieved 1215:the original 1210: 1201: 1189:. Retrieved 1184: 1160: 1148: 1136: 1124: 1112: 1100:. Retrieved 1090: 1078:. Retrieved 1074: 1065: 1053:. Retrieved 1048: 1039: 1027:. Retrieved 1022: 1013: 1001:. Retrieved 996: 975:ABP mer 2009 970: 958: 946:. Retrieved 942:the original 931: 919: 907:. Retrieved 903: 894: 882:. Retrieved 877: 868: 856:. Retrieved 845:The Guardian 844: 834: 822:. Retrieved 818: 794:20 September 792:. Retrieved 787: 763:. Retrieved 758: 734:. Retrieved 730:orsted.co.uk 729: 705:. Retrieved 700: 691: 668: 642:Grant Shapps 639: 608: 588: 568: 551: 548: 536: 533:Construction 527: 523: 519: 487: 484: 476: 472: 468: 457: 454:Construction 414: 403: 387: 383:strike price 376: 368: 352:East Lindsey 331: 322: 315: 300: 291: 284:Crown Estate 277: 268: 264: 260: 256: 235: 234: 18: 4283:Dogger Bank 4232:Knabs Ridge 4212:Fraisthorpe 4183:Foss Island 4076:Linton Lock 3859:Foss Island 3532:Navitus Bay 3471:East Anglia 3466:Dogger Bank 3385:North Hoyle 3345:Gwynt y Môr 3240:West Durham 3175:Knabs Ridge 3170:Kilgallioch 3140:Fraisthorpe 3120:Crystal Rig 3105:Coal Clough 3080:Burton Wold 2728:16 February 2646:16 February 2551:29 December 2474:20 December 2348:29 December 2148:4c Offshore 1812:11 February 1709:18 February 1688:12 February 1662:12 February 1349:16 February 1119:, §1.1–1.4. 765:17 February 627:Flamborough 494:Eaton Socon 348:Marshchapel 98:Operational 82: / 58:Coordinates 4351:Categories 4326:Drax Group 4293:Sober Hill 4247:Out Newton 4081:River Bain 4066:Kirkthorpe 4056:Brotherton 3969:Castleford 3964:A.H. Marks 3935:White Rose 3899:Sculcoates 3879:Mexborough 3844:Eggborough 3796:(co-fired) 3794:Eggborough 3738:(co-fires) 3537:Shell Flat 3481:Moray East 3410:Robin Rigg 3405:Rhyl Flats 3320:Burbo Bank 3225:Scout Moor 3215:Pates Hill 3205:Out Newton 3115:Conisholme 3095:Cefn Croes 3060:Blood Hill 2955:Ecotricity 2770:27 January 2747:27 January 2703:27 January 2684:27 January 2665:27 January 2623:27 January 2603:27 January 2584:27 January 2323:12 January 1964:27 January 1636:3 November 1630:renews.biz 1604:renews.biz 1578:renews.biz 1552:renews.biz 1532:1 November 1500:renews.biz 1474:renews.biz 1454:27 January 1448:renews.biz 1428:3 February 1406:3 February 1400:renews.biz 1380:5 February 1324:27 January 1318:renews.biz 1298:27 January 1292:renews.biz 1272:3 February 1247:27 January 1241:renews.biz 1221:27 January 1211:renews.biz 1191:27 January 1185:renews.biz 1075:renews.biz 1029:27 January 1023:renews.biz 1003:27 January 997:renews.biz 948:27 January 736:31 January 684:References 595:nest boxes 579:Swardeston 448:Billingham 424:JDR Cables 416:NKT Cables 318:Ørsted A/S 294:including 67:53°53′06″N 43:(offshore) 4242:Royd Moor 4217:Hook Moor 4157:Sheffield 4096:Thrybergh 4027:Thornhill 3994:Immingham 3919:Wakefield 3909:Thornhill 3894:Rotherham 3874:Kirkstall 3834:Doncaster 3505:Cancelled 3395:Race Bank 3271:Den Brook 3220:Royd Moor 3185:Lindhurst 3055:Black Law 3040:Arecleoch 3035:Ardrossan 3030:Alltwalis 2947:Companies 2400:2 January 2297:1 January 2027:0140-0460 2019:The Times 2002:16 August 1923:, §3.3.7. 1882:6 October 1860:6 October 1838:12 August 1787:6 October 1610:5 January 1584:5 January 1558:5 January 853:0261-3077 824:31 August 623:guillemot 619:razorbill 615:kittiwake 498:Wymondley 490:lightning 303:North Sea 244:North Sea 70:1°47′28″E 52:North Sea 4262:Teesside 4257:Rusholme 4162:Wheldale 4152:Newlincs 4147:Kirklees 4017:Salt End 3928:Proposed 3889:Neepsend 3829:Bradford 3742:Glanford 3634:Category 3459:Proposed 3430:Teesside 3420:Seagreen 3310:Beatrice 3264:Proposed 3250:Whitelee 3245:Westmill 3130:Delabole 3125:Dagenham 2520:BBC News 2500:11 March 2448:2 August 2444:. Ørsted 2394:BBC News 2153:15 April 2128:21 April 1832:BBC News 1480:31 March 878:BBC News 819:BBC News 759:BBC News 707:18 March 648:See also 544:Seaway 7 296:Hochtief 252:gigawatt 135:Offshore 115:Owner(s) 48:Location 4377:Hornsea 4288:Hornsea 4237:Lissett 4086:Ruswarp 3710:Biomass 3646:Commons 3476:Hornsea 3400:Rampion 3390:Ormonde 3325:Dudgeon 2960:Equinor 2563:Sources 2526:15 July 2422:25 July 2179:28 June 2102:6 April 2076:6 April 2050:14 June 1761:28 June 1735:28 June 1506:5 April 1143:, §1.2. 1102:8 March 1080:8 March 1055:8 March 926:, §1.1. 909:18 July 884:18 July 858:18 July 466:(TWh). 444:Aalborg 288:Siemens 280:Round 3 274:History 248:England 206:Commons 190:Website 37:England 33:Country 4227:Keadby 4205:Active 4176:Closed 4135:Active 4110:Naburn 4091:Settle 4061:Burley 4049:Active 3999:Keadby 3957:Active 3869:Keadby 3849:Elland 3817:Closed 3782:Closed 3718:Active 3440:Walney 3435:Thanet 3380:Methil 3305:Barrow 3298:Active 3276:Viking 3145:Garves 3023:Active 3000:Vestas 2970:Ørsted 2965:Innogy 2715:Zone 2 2633:Zone 1 2025:  1374:ing.dk 851:  610:Ørsted 571:Ørsted 481:Events 428:Nexans 254:(GW). 119:Ørsted 95:Status 4127:waste 4041:Hydro 3768:Brigg 3584:Other 3365:Lincs 3315:Blyth 3100:Clyde 3090:Carno 2760:(PDF) 2741:(PDF) 2697:(PDF) 2678:(PDF) 2659:(PDF) 2617:(PDF) 2597:(PDF) 2574:(PDF) 2374:4 May 2276:4 May 2250:1 May 1343:(PDF) 1266:(PDF) 977:, §6. 660:Notes 631:Filey 390:Fugro 238:is a 217:[ 4197:Wind 3839:Drax 3809:Coal 3730:Drax 3135:Farr 2772:2016 2749:2016 2730:2016 2705:2016 2686:2016 2667:2016 2648:2016 2625:2016 2605:2016 2586:2016 2553:2023 2528:2023 2502:2022 2476:2021 2450:2020 2424:2023 2402:2021 2376:2016 2350:2023 2325:2023 2299:2021 2278:2016 2252:2018 2207:2021 2181:2021 2155:2021 2130:2021 2104:2022 2078:2022 2052:2021 2023:ISSN 2004:2016 1966:2016 1884:2019 1862:2019 1840:2019 1814:2020 1789:2019 1763:2019 1737:2019 1711:2019 1690:2019 1664:2019 1638:2016 1612:2017 1586:2017 1560:2017 1534:2016 1508:2016 1482:2016 1456:2016 1430:2016 1408:2016 1382:2016 1351:2016 1326:2016 1300:2016 1274:2016 1249:2016 1223:2016 1193:2016 1104:2016 1082:2016 1057:2016 1031:2016 1005:2016 950:2016 911:2023 886:2023 860:2023 849:ISSN 826:2022 796:2020 767:2019 738:2018 709:2018 629:and 621:and 591:RSPB 496:and 418:and 344:HVAC 340:HVDC 309:and 131:Type 3949:Gas 3691:in 2980:RWE 577:at 432:EEW 420:ABB 362:in 199:.uk 197:.co 4353:: 2876:. 2864:. 2852:. 2840:. 2762:. 2576:. 2544:. 2518:. 2493:. 2467:. 2440:. 2392:. 2341:. 2316:. 2268:. 2224:. 2197:. 2172:. 2146:. 2120:. 2094:. 2068:. 2043:. 1995:. 1830:. 1805:. 1780:. 1753:. 1727:. 1681:. 1654:. 1628:. 1602:. 1576:. 1550:. 1524:. 1498:. 1472:. 1446:. 1398:. 1359:^ 1316:. 1290:. 1239:. 1209:. 1183:. 1172:^ 1073:. 1047:. 1021:. 995:. 982:^ 902:. 876:. 847:. 843:. 817:. 804:^ 786:. 775:^ 757:. 746:^ 728:. 717:^ 699:. 617:, 366:. 358:, 350:, 39:, 4125:/ 3681:e 3674:t 3667:v 2908:e 2901:t 2894:v 2880:. 2868:. 2856:. 2844:. 2774:. 2751:. 2732:. 2707:. 2688:. 2669:. 2650:. 2627:. 2607:. 2588:. 2555:. 2530:. 2504:. 2478:. 2452:. 2426:. 2404:. 2378:. 2352:. 2327:. 2301:. 2280:. 2254:. 2228:. 2209:. 2183:. 2157:. 2132:. 2106:. 2080:. 2054:. 2029:. 2006:. 1981:. 1968:. 1899:. 1886:. 1864:. 1842:. 1816:. 1791:. 1765:. 1739:. 1713:. 1692:. 1666:. 1640:. 1614:. 1588:. 1562:. 1536:. 1510:. 1484:. 1458:. 1432:. 1410:. 1384:. 1353:. 1328:. 1302:. 1276:. 1251:. 1225:. 1195:. 1106:. 1084:. 1059:. 1033:. 1007:. 952:. 913:. 888:. 862:. 828:. 798:. 769:. 740:. 711:. 676:. 438:/ 221:]

Index

England
United Kingdom
North Sea
53°53′06″N 1°47′28″E / 53.885°N 1.791°E / 53.885; 1.791
Commission date
Ørsted
Type
Nameplate capacity
hornseaproject3.co.uk
Related media on Commons
edit on Wikidata
Round 3 wind farm
North Sea
England
gigawatt
Round 3
Crown Estate
Siemens
Hochtief
North Sea
Dogger Bank Wind Farm
East Anglia Wind Farm
Ørsted A/S
National Grid
HVDC
HVAC
Marshchapel
East Lindsey
Killingholme Power Station
North Killingholme

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.