Knowledge

Morlais

Source 📝

77: 1985: 1996: 2008: 36: 124: 520:
T3 turbines, mounted on a multi-rotor frame that has a wing-like structure. The first phase is for 14 units each with two turbines rated at 340 kW, a total of 9.52 MW. Hydrowing Tidal Projects Ltd. was awarded a CfD for 10 MW in the CfD AR5 in September 2023, for delivery in 2027/28.
553:
and Duggan Energy, Verdant Isles plan to deploy an initial phase one of 4.9 MW by 2027/28 at berth BL3. Verdant Isles was awarded a CfD for 4.9 MW in CfD AR5 in September 2023. The Verdant Power device is a three-bladed horizontal axis tidal turbine that sits on a triangular frame on the
428:
was completed, with detailed independent studies on various aspects of the project construction, operation, and decommissioning. Environmental surveys are still ongoing, with a monitoring buoy equipped with cameras and other sensors deployed in July 2023, as part of the Marine Characterisation
495:
Modelling of the area around the site shows mean depth-averaged velocities of 1.7 m/s (3.3 knots) and peaks of 3.7 m/s (7.2 knots). Across most of the site, ebb and flood tides are misaligned by 0° to 15°, which may have a small impact on turbine performance.
613:
tested a 500 kW prototype in the Holyhead Deep, just to the west of Morlais in 2018 and 2019. They also had plans to develop an 80 MW array at this location, but withdrew from the project in March 2022 to focus on their projects in the
487:
The tidal site covers an area of approximately 35 km, situated between approximately 0.5 km and 6 km offshore. The water depth across the site is around 40 m on average, reaching 72 m
411:
in March 2022, possibly the last significant project from this fund. Following this, construction started in 2022, with phased installation so that any environmental impacts could be understood.
529:
Spanish developer Magallanes Renovables secured CfDs in both AR4 and AR5, for 1.5 MW by 2025/26 and 3 MW by 2027/28 respectively. They plan to deploy their next-generation floating
589:-based Sabella to each develop 6 MW of a 12 MW berth at Morlais. The first deployments were initially stated for 2023/24, but there have been no further announcements on this. 414:
The first devices to harvest power from the tides are expected to be installed in 2026. Before then, preparatory works including the grid connection are being constructed.
1113: 561:
In June 2024, Inyanga and Verdant Morlais announced they would collaborate in their projects at Morlais, to help unlock economies of scale and potentially reduce costs.
1614: 418:
officially opened the onshore substation in October 2023, noting that "Morlais is a groundbreaking project and a key part of our transition to a low carbon economy".
1684: 505: 1301: 766: 470: 541:
The Welsh subsidiary of QED-Naval, was awarded a CfD for 4.5 MW by 2026/27 in the CfD AR5 in September 2023. They plan to deploy at berth GO3.
1188: 403:
in 2010, as the West Anglesey Demonstration Zone, and has been leased for 45 years. Consent for the scheme was obtained in December 2021 from
1326: 824: 464: 1302:"A Milestone for Tidal Energy: Verdant Power Successfully Retrieves a Test Turbine After Six Months of Continuous Operation in New York" 678: 961: 508:(CfD) in Allocation Rounds AR4, AR5 and AR6 to supply power to the GB grid at a guaranteed price, at a specified future delivery year. 1498: 1238: 1213: 1162: 1037: 517: 458: 996:
Piano, M.; Neill, S. P.; Lewis, M. J.; Robins, P. E.; Hashemi, M. R.; Davies, A. G.; Ward, S. L.; Roberts, M. J. (1 December 2017).
492:
to the northwest of the site. The site can be classified as an isolated/quiet environment, with a mixture of soft and hard bottom.
484:
The onshore grid connection work was completed by civil engineering firm Jones Bros in June 2023, three months ahead of schedule.
516:
Hydrowing, part of Inyanga Marine Energy Group, plan to deploy an initial phase of around 10 MW, using the next-generation
530: 396:
to be harnessed from the tides, using a mixture of seabed mounted and floating tidal energy devices from different companies.
1455: 799: 224: 142: 134: 504:
The site is split into multiple berths. Several developers have announced plans to deploy devices and have been awarded
1403: 408: 1793: 178: 160: 63: 2033: 569:
Several other developers have announced tentative plans to deploy at Morlais, however these have more uncertainty.
1580: 1378: 692:
Vogel, C. R.; Taira, D. T.; Carmo, B. S.; Assi, G. R. S.; Willden, R. H. J.; Meneghini, J. R. (1 November 2019).
425: 1892: 1653: 2043: 1528: 1491: 480:
Cable corridor between the landfall substation via the switchgear building to the grid connection substation.
474: 424:
expressed concerns about the scheme's potential impacts on wildlife, including guillemots and razorbills. An
1518: 1062: 978: 931: 632: 521:
Hydrowing was awarded a further 10 MW in the CfD AR6 in September 2024, also for delivery in 2027/28.
1352: 1798: 879: 694:"Prospects for Tidal Stream Energy in the UK and South America: A Review of Challenges and Opportunities" 1551: 1965: 1633: 1589: 627: 89: 1988: 1862: 1754: 1648: 1484: 489: 442: 49: 1668: 1619: 1604: 998:"Tidal stream resource assessment uncertainty due to flow asymmetry and turbine yaw misalignment" 404: 1827: 1744: 1663: 652: 1705: 1658: 437:
The project, as set out in the Environmental Statement will comprise the following elements:
381: 293: 2038: 1872: 1609: 1428: 1285: 1139: 8: 1857: 1700: 1456:"'Supply chain delays' hit plan for new underwater power plants off Anglesey this year" 721: 332: 1114:"HydroWing To demonstrate Next generation Tocardo Turbines at Morlais Tidal Demo-Zone" 1536: 1019: 774: 725: 713: 1719: 1009: 705: 400: 393: 1867: 1764: 1507: 1014: 997: 582: 94: 1923: 1734: 709: 597:
Orbital announced in 2018 that they planned to deploy their floating 2 MW
415: 24: 1877: 2027: 2000: 1902: 1887: 1882: 1778: 1570: 1558: 1023: 905: 850: 778: 739: 717: 693: 615: 550: 239: 226: 601:
turbines at Morlais. However, there has been no news on this project since.
399:
The 35 km (14 sq mi) site was designated for tidal energy by
389: 359: 19:
This article is about the tidal power station. For the medieval bishop, see
2012: 98: 55: 1379:"Orbital Marine Power to demonstrate floating tidal technology at Morlais" 76: 1937: 1287:
Tidal showcase – the path to pilot farms. Verdant Isles – Morlais Project
373: 1970: 1907: 1897: 825:"Official opening of Wales' first tidal stream energy site on Anglesey" 598: 555: 421: 767:"Could Anglesey's tidal energy project drive a new energy revolution?" 1842: 1812: 1759: 1749: 1563: 578: 377: 1739: 1541: 1263: 1476: 1995: 1087: 610: 586: 432: 350: 1546: 1327:"Tidal stream partners come together for 4.9MW Morlais project" 20: 906:"Morlais tidal energy: 'World-leading' buoy protects wildlife" 473:, southeast of Holyhead, where it connects to the 132 kV 1038:"Four tidal projects to deliver 41 MW in UK under CfD scheme" 679:
Annual Report: An Overview of Ocean Energy Activities in 2022
385: 1239:"Contracts for Difference (CfD) Allocation Round 4: results" 1214:"Contracts for Difference (CfD) Allocation Round 6: results" 1163:"Contracts for Difference (CfD) Allocation Round 5: results" 1189:"HydroWing unveils plans for tidal energy project in Wales" 1088:"Inyanga Marine Energy Group | Offshore Renewable Projects" 959: 851:"Power project could be 'devastating' for island seabirds" 564: 451:
Array cables and other offshore electrical infrastructure
740:"Morlais tidal project on Anglesey gets £31m EU funding" 388:. It is being developed by the social enterprise agency 454:
Up to nine export cables with associated cable landfall
448:
Tidal devices with associated moorings and foundations
392:. The site has the potential for up to 240 MW of 16:
Tidal stream power station under construction in Wales
1187:
International, Power Engineering (15 November 2023).
995: 691: 1404:"Minesto Holyhead Deep - Non-grid connected DG500" 499: 2025: 979:"Jones Bros completes onshore works for Morlais" 1353:"Nova and Sabella secure 12MW Welsh tidal site" 577:Joint plans were announced in January 2022 by 572: 1492: 1186: 764: 433:Site description and environmental conditions 880:"Morlais Tidal Demonstration Zone | Tethys" 64:Learn how and when to remove these messages 1499: 1485: 932:"Marine Characterisation Research Project" 1137: 1013: 179:Learn how and when to remove this message 161:Learn how and when to remove this message 1376: 1141:Tidal showcase – the path to pilot farms 960:Menter Môn Morlais Limited (July 2019). 800:"Energy site official opening | Morlais" 554:seabed, previously tested in New York’s 524: 676: 592: 407:. The scheme was awarded £31m from the 2026: 1453: 1138:Parkinson, Richard (25 October 2023). 681:(Report). International Energy Agency. 565:Other potential devices and developers 1820: 1727: 1597: 1480: 1283: 1157: 1155: 1153: 1151: 955: 953: 874: 872: 765:Ungoed-Thomas, Jon (24 April 2022). 117: 70: 29: 1506: 1377:Husseini, Talal (5 December 2018). 1111: 13: 1148: 950: 409:European Regional Development Fund 133:tone or style may not reflect the 14: 2055: 1290:. Ocean Energy Europe, The Hauge. 1144:. Ocean Energy Europe, The Hauge. 967:(Report) – via PNNL Tethys. 869: 45:This article has multiple issues. 2006: 1994: 1984: 1983: 1429:"Minesto flies Wales tidal kite" 1284:Smith, Glenn (25 October 2023). 962:Morlais ES Non-Technical Summary 544: 143:guide to writing better articles 122: 75: 34: 1447: 1421: 1396: 1370: 1345: 1319: 1294: 1277: 1256: 1231: 1206: 1193:Power Engineering International 1180: 1131: 1105: 1080: 1055: 1030: 989: 971: 924: 898: 457:Onshore landfall substation at 426:environmental impact assessment 53:or discuss these issues on the 1529:Distribution network operators 1454:Hughes, Owen (18 March 2022). 1264:"Projects – QED Naval Limited" 843: 817: 792: 758: 732: 685: 670: 645: 500:Planned devices and developers 469:Grid connection substation at 288:Tidal power station 1: 653:"The Morlais story | Morlais" 638: 609:Swedish tidal kite developer 536: 351:https://www.morlaisenergy.com 1519:Energy in the United Kingdom 1015:10.1016/j.renene.2017.05.023 633:List of tidal power stations 511: 7: 621: 573:Nova Innovation and Sabella 380:just off the west coast of 88:to comply with Knowledge's 10: 2060: 1552:Western Power Distribution 710:10.1007/s41050-019-00017-y 604: 18: 1979: 1966:Renewable energy in Wales 1958: 1936: 1916: 1850: 1841: 1811: 1786: 1777: 1718: 1693: 1677: 1641: 1632: 1588: 1579: 1527: 1514: 628:Renewable energy in Wales 356: 346: 341: 331: 319: 315: 310: 302: 292: 287: 279: 271: 263: 255: 218: 210: 202: 198: 193: 549:A joint venture between 506:Contracts for Difference 443:environmental monitoring 101:may contain suggestions. 86:may need to be rewritten 2034:Power stations in Wales 1112:Jay (7 February 2022). 1063:"CfD Success | Morlais" 463:Switchgear building at 405:Natural Resources Wales 376:project located in the 333:Nameplate capacity 264:Construction began 533:devices at berth GR3. 324:Units operational 298:Tidal stream generator 23:. For the castle, see 1067:www.morlaisenergy.com 829:North Wales Chronicle 804:www.morlaisenergy.com 657:www.morlaisenergy.com 525:Magallanes Renovables 382:Holy Island, Anglesey 311:Power generation 214:Holy Island, Anglesey 2044:Tidal power in Wales 593:Orbital Marine Power 372:is a grid connected 240:53.30639°N 4.71667°W 1118:Marine Energy Wales 374:tidal stream energy 342:External links 236: /  938:. 5 September 2022 886:. 20 November 2023 429:Research Project. 337:240 MW (potential) 259:Under construction 245:53.30639; -4.71667 2021: 2020: 1954: 1953: 1932: 1931: 1837: 1836: 1807: 1806: 1773: 1772: 1714: 1713: 1628: 1627: 1537:National Grid plc 1042:Renewablesnow.com 831:. 20 October 2023 367: 366: 189: 188: 181: 171: 170: 163: 137:used on Knowledge 135:encyclopedic tone 116: 115: 90:quality standards 68: 2051: 2011: 2010: 2009: 1999: 1998: 1987: 1986: 1848: 1847: 1818: 1817: 1784: 1783: 1725: 1724: 1639: 1638: 1595: 1594: 1586: 1585: 1501: 1494: 1487: 1478: 1477: 1471: 1470: 1468: 1466: 1451: 1445: 1444: 1442: 1440: 1435:. 15 August 2019 1425: 1419: 1418: 1416: 1414: 1400: 1394: 1393: 1391: 1389: 1383:Power Technology 1374: 1368: 1367: 1365: 1363: 1349: 1343: 1342: 1340: 1338: 1323: 1317: 1316: 1314: 1312: 1298: 1292: 1291: 1281: 1275: 1274: 1272: 1270: 1260: 1254: 1253: 1251: 1249: 1235: 1229: 1228: 1226: 1224: 1210: 1204: 1203: 1201: 1199: 1184: 1178: 1177: 1175: 1173: 1159: 1146: 1145: 1135: 1129: 1128: 1126: 1124: 1109: 1103: 1102: 1100: 1098: 1084: 1078: 1077: 1075: 1073: 1059: 1053: 1052: 1050: 1048: 1034: 1028: 1027: 1017: 1002:Renewable Energy 993: 987: 986: 975: 969: 968: 966: 957: 948: 947: 945: 943: 928: 922: 921: 919: 917: 902: 896: 895: 893: 891: 876: 867: 866: 864: 862: 857:. 11 August 2020 847: 841: 840: 838: 836: 821: 815: 814: 812: 810: 796: 790: 789: 787: 785: 762: 756: 755: 753: 751: 736: 730: 729: 689: 683: 682: 677:IEA-OES (2023). 674: 668: 667: 665: 663: 649: 471:Orthios Eco-Park 401:The Crown Estate 394:renewable energy 360:edit on Wikidata 251: 250: 248: 247: 246: 241: 237: 234: 233: 232: 229: 191: 190: 184: 177: 166: 159: 155: 152: 146: 145:for suggestions. 141:See Knowledge's 126: 125: 118: 111: 108: 102: 79: 71: 60: 38: 37: 30: 2059: 2058: 2054: 2053: 2052: 2050: 2049: 2048: 2024: 2023: 2022: 2017: 2007: 2005: 1993: 1975: 1950: 1928: 1912: 1833: 1803: 1769: 1710: 1689: 1673: 1624: 1575: 1523: 1510: 1508:Energy in Wales 1505: 1475: 1474: 1464: 1462: 1452: 1448: 1438: 1436: 1427: 1426: 1422: 1412: 1410: 1408:tethys.pnnl.gov 1402: 1401: 1397: 1387: 1385: 1375: 1371: 1361: 1359: 1351: 1350: 1346: 1336: 1334: 1325: 1324: 1320: 1310: 1308: 1300: 1299: 1295: 1282: 1278: 1268: 1266: 1262: 1261: 1257: 1247: 1245: 1237: 1236: 1232: 1222: 1220: 1212: 1211: 1207: 1197: 1195: 1185: 1181: 1171: 1169: 1161: 1160: 1149: 1136: 1132: 1122: 1120: 1110: 1106: 1096: 1094: 1086: 1085: 1081: 1071: 1069: 1061: 1060: 1056: 1046: 1044: 1036: 1035: 1031: 994: 990: 985:. 23 June 2023. 977: 976: 972: 964: 958: 951: 941: 939: 930: 929: 925: 915: 913: 904: 903: 899: 889: 887: 884:tethys.pnnl.gov 878: 877: 870: 860: 858: 849: 848: 844: 834: 832: 823: 822: 818: 808: 806: 798: 797: 793: 783: 781: 763: 759: 749: 747: 746:. 22 March 2022 738: 737: 733: 690: 686: 675: 671: 661: 659: 651: 650: 646: 641: 624: 607: 595: 583:Nova Innovation 575: 567: 547: 539: 527: 514: 502: 441:Navigation and 435: 363: 244: 242: 238: 235: 230: 227: 225: 223: 222: 185: 174: 173: 172: 167: 156: 150: 147: 140: 131:This article's 127: 123: 112: 106: 103: 93: 80: 39: 35: 28: 17: 12: 11: 5: 2057: 2047: 2046: 2041: 2036: 2019: 2018: 2016: 2015: 2003: 1991: 1980: 1977: 1976: 1974: 1973: 1968: 1962: 1960: 1956: 1955: 1952: 1951: 1949: 1948: 1942: 1940: 1934: 1933: 1930: 1929: 1927: 1926: 1924:Atlantic Array 1920: 1918: 1914: 1913: 1911: 1910: 1905: 1900: 1895: 1890: 1885: 1880: 1875: 1870: 1865: 1863:Brechfa Forest 1860: 1854: 1852: 1845: 1839: 1838: 1835: 1834: 1832: 1831: 1824: 1822: 1815: 1809: 1808: 1805: 1804: 1802: 1801: 1796: 1790: 1788: 1781: 1775: 1774: 1771: 1770: 1768: 1767: 1762: 1757: 1752: 1747: 1742: 1737: 1731: 1729: 1722: 1716: 1715: 1712: 1711: 1709: 1708: 1703: 1697: 1695: 1691: 1690: 1688: 1687: 1681: 1679: 1675: 1674: 1672: 1671: 1666: 1661: 1656: 1651: 1645: 1643: 1636: 1630: 1629: 1626: 1625: 1623: 1622: 1617: 1612: 1607: 1601: 1599: 1592: 1583: 1581:Power stations 1577: 1576: 1574: 1573: 1568: 1567: 1566: 1556: 1555: 1554: 1549: 1544: 1533: 1531: 1525: 1524: 1522: 1521: 1515: 1512: 1511: 1504: 1503: 1496: 1489: 1481: 1473: 1472: 1446: 1420: 1395: 1369: 1344: 1333:. 19 June 2024 1318: 1293: 1276: 1255: 1230: 1205: 1179: 1147: 1130: 1104: 1092:Inyanga Marine 1079: 1054: 1029: 988: 970: 949: 923: 897: 868: 842: 816: 791: 757: 731: 684: 669: 643: 642: 640: 637: 636: 635: 630: 623: 620: 606: 603: 594: 591: 574: 571: 566: 563: 546: 543: 538: 535: 526: 523: 513: 510: 501: 498: 482: 481: 478: 467: 461: 455: 452: 449: 446: 434: 431: 416:Mark Drakeford 365: 364: 357: 354: 353: 348: 344: 343: 339: 338: 335: 329: 328: 325: 321: 320: 317: 316: 313: 312: 308: 307: 304: 300: 299: 296: 290: 289: 285: 284: 281: 277: 276: 273: 269: 268: 265: 261: 260: 257: 253: 252: 220: 216: 215: 212: 208: 207: 204: 200: 199: 196: 195: 187: 186: 169: 168: 130: 128: 121: 114: 113: 83: 81: 74: 69: 43: 42: 40: 33: 25:Morlais Castle 15: 9: 6: 4: 3: 2: 2056: 2045: 2042: 2040: 2037: 2035: 2032: 2031: 2029: 2014: 2004: 2002: 1997: 1992: 1990: 1982: 1981: 1978: 1972: 1969: 1967: 1964: 1963: 1961: 1957: 1947: 1944: 1943: 1941: 1939: 1935: 1925: 1922: 1921: 1919: 1915: 1909: 1906: 1904: 1903:Pen y Cymoedd 1901: 1899: 1896: 1894: 1891: 1889: 1888:Mynydd Maendy 1886: 1884: 1883:Moel Maelogan 1881: 1879: 1876: 1874: 1871: 1869: 1866: 1864: 1861: 1859: 1856: 1855: 1853: 1849: 1846: 1844: 1840: 1829: 1826: 1825: 1823: 1819: 1816: 1814: 1810: 1800: 1797: 1795: 1792: 1791: 1789: 1785: 1782: 1780: 1776: 1766: 1763: 1761: 1758: 1756: 1753: 1751: 1748: 1746: 1743: 1741: 1738: 1736: 1733: 1732: 1730: 1726: 1723: 1721: 1720:Hydroelectric 1717: 1707: 1704: 1702: 1699: 1698: 1696: 1692: 1686: 1683: 1682: 1680: 1676: 1670: 1667: 1665: 1662: 1660: 1657: 1655: 1654:Connah's Quay 1652: 1650: 1647: 1646: 1644: 1640: 1637: 1635: 1631: 1621: 1618: 1616: 1613: 1611: 1608: 1606: 1603: 1602: 1600: 1596: 1593: 1591: 1587: 1584: 1582: 1578: 1572: 1571:Vattenfall UK 1569: 1565: 1562: 1561: 1560: 1559:ScottishPower 1557: 1553: 1550: 1548: 1545: 1543: 1540: 1539: 1538: 1535: 1534: 1532: 1530: 1526: 1520: 1517: 1516: 1513: 1509: 1502: 1497: 1495: 1490: 1488: 1483: 1482: 1479: 1461: 1460:Business Live 1457: 1450: 1434: 1430: 1424: 1409: 1405: 1399: 1384: 1380: 1373: 1358: 1354: 1348: 1332: 1328: 1322: 1307: 1303: 1297: 1289: 1288: 1280: 1265: 1259: 1244: 1240: 1234: 1219: 1215: 1209: 1194: 1190: 1183: 1168: 1164: 1158: 1156: 1154: 1152: 1143: 1142: 1134: 1119: 1115: 1108: 1093: 1089: 1083: 1068: 1064: 1058: 1043: 1039: 1033: 1025: 1021: 1016: 1011: 1008:: 1363–1375. 1007: 1003: 999: 992: 984: 980: 974: 963: 956: 954: 937: 933: 927: 912:. 3 July 2023 911: 907: 901: 885: 881: 875: 873: 856: 852: 846: 830: 826: 820: 805: 801: 795: 780: 776: 772: 768: 761: 745: 741: 735: 727: 723: 719: 715: 711: 707: 704:(1): 97–109. 703: 699: 695: 688: 680: 673: 658: 654: 648: 644: 634: 631: 629: 626: 625: 619: 617: 616:Faroe Islands 612: 602: 600: 590: 588: 584: 580: 570: 562: 559: 557: 552: 551:Verdant Power 545:Verdant Isles 542: 534: 532: 522: 519: 509: 507: 497: 493: 491: 485: 479: 476: 475:National Grid 472: 468: 466: 462: 460: 456: 453: 450: 447: 444: 440: 439: 438: 430: 427: 423: 419: 417: 412: 410: 406: 402: 397: 395: 391: 387: 383: 379: 375: 371: 361: 355: 352: 349: 345: 340: 336: 334: 330: 326: 323: 322: 318: 314: 309: 305: 301: 297: 295: 291: 286: 282: 278: 274: 270: 266: 262: 258: 254: 249: 221: 217: 213: 209: 205: 201: 197: 192: 183: 180: 165: 162: 154: 151:December 2023 144: 138: 136: 129: 120: 119: 110: 107:December 2023 100: 96: 91: 87: 84:This article 82: 78: 73: 72: 67: 65: 58: 57: 52: 51: 46: 41: 32: 31: 26: 22: 1945: 1830:(demolished) 1463:. Retrieved 1459: 1449: 1437:. Retrieved 1432: 1423: 1411:. Retrieved 1407: 1398: 1386:. Retrieved 1382: 1372: 1360:. Retrieved 1356: 1347: 1335:. Retrieved 1331:The Engineer 1330: 1321: 1309:. Retrieved 1305: 1296: 1286: 1279: 1267:. Retrieved 1258: 1246:. Retrieved 1242: 1233: 1221:. Retrieved 1217: 1208: 1196:. Retrieved 1192: 1182: 1170:. Retrieved 1166: 1140: 1133: 1121:. Retrieved 1117: 1107: 1095:. Retrieved 1091: 1082: 1070:. Retrieved 1066: 1057: 1045:. Retrieved 1041: 1032: 1005: 1001: 991: 982: 973: 940:. Retrieved 935: 926: 914:. Retrieved 909: 900: 888:. Retrieved 883: 859:. Retrieved 854: 845: 833:. Retrieved 828: 819: 807:. Retrieved 803: 794: 782:. Retrieved 771:The Observer 770: 760: 748:. Retrieved 743: 734: 701: 698:Polytechnica 697: 687: 672: 660:. Retrieved 656: 647: 608: 596: 576: 568: 560: 548: 540: 528: 515: 503: 494: 486: 483: 436: 420: 413: 398: 369: 368: 175: 157: 148: 132: 104: 95:You can help 85: 61: 54: 48: 47:Please help 44: 2039:Tidal power 1893:North Hoyle 1878:Gwynt y Môr 1794:Trawsfynydd 1765:Swansea Bay 1388:28 November 1362:28 November 1269:26 November 1248:26 November 1223:3 September 1172:26 November 1123:26 November 1072:26 November 809:26 November 662:26 November 327:None as yet 280:Operator(s) 243: / 219:Coordinates 2028:Categories 1971:Ynni Cymru 1908:Rhyl Flats 1898:Parc Cynog 1873:Cefn Croes 1843:Wind farms 1755:Ffestiniog 1649:Baglan Bay 1615:Rogerstone 1590:Coal-fired 1465:28 January 1439:28 January 1433:ReNEWS.biz 1413:28 January 1357:reNEWS.biz 1311:2 December 1306:Energy.gov 1198:2 December 1047:2 December 983:reNEWS.biz 942:1 December 936:Menter Môn 916:1 December 890:2 December 861:1 December 835:1 December 784:1 December 750:1 December 639:References 599:Orbital O2 556:East River 537:Môr Energy 422:RSPB Cymru 390:Menter Môn 283:Mentor Môn 275:Mentor Môn 228:53°18′23″N 50:improve it 1917:Cancelled 1858:Alltwalis 1813:Oil-fired 1760:Maentwrog 1750:Dolgarrog 1634:Gas-fired 1564:SP Manweb 1024:0960-1481 779:0029-7712 726:256464354 718:2520-8063 579:Edinburgh 512:Hydrowing 465:Parc Cybi 445:equipment 378:Irish Sea 306:Irish Sea 231:4°43′00″W 99:talk page 56:talk page 1989:Category 1828:Pembroke 1745:Dinorwig 1740:Cwm Dyli 1735:Blaencwm 1685:Abernedd 1664:Pembroke 1620:Uskmouth 1605:Aberthaw 1542:Infralec 910:BBC News 855:BBC News 744:BBC News 622:See also 272:Owner(s) 211:Location 1946:Morlais 1779:Nuclear 1706:Shotton 1659:Deeside 1337:23 June 1097:23 June 611:Minesto 605:Minesto 587:Quimper 581:-based 518:Tocardo 459:Ty-Mawr 370:Morlais 347:Website 303:Crosses 203:Country 194:Morlais 2001:Energy 1851:Active 1821:Closed 1787:Closed 1728:Active 1694:Closed 1678:Future 1669:Severn 1642:Active 1610:Llynfi 1598:Closed 1547:SWALEC 1243:GOV.UK 1218:GOV.UK 1167:GOV.UK 1022:  777:  724:  716:  256:Status 97:. The 21:Morfyw 2013:Wales 1959:Other 1938:Tidal 1868:Carno 1799:Wylfa 1701:Barry 965:(PDF) 722:S2CID 386:Wales 358:[ 206:Wales 1467:2024 1441:2024 1415:2024 1390:2023 1364:2023 1339:2024 1313:2023 1271:2023 1250:2023 1225:2024 1200:2023 1174:2023 1125:2023 1099:2024 1074:2023 1049:2023 1020:ISSN 944:2023 918:2023 892:2023 863:2023 837:2023 811:2023 786:2023 775:ISSN 752:2023 714:ISSN 664:2023 585:and 531:ATIR 294:Type 267:2022 1010:doi 1006:114 706:doi 490:LAT 2030:: 1458:. 1431:. 1406:. 1381:. 1355:. 1329:. 1304:. 1241:. 1216:. 1191:. 1165:. 1150:^ 1116:. 1090:. 1065:. 1040:. 1018:. 1004:. 1000:. 981:. 952:^ 934:. 908:. 882:. 871:^ 853:. 827:. 802:. 773:. 769:. 742:. 720:. 712:. 700:. 696:. 655:. 618:. 558:. 384:, 59:. 1500:e 1493:t 1486:v 1469:. 1443:. 1417:. 1392:. 1366:. 1341:. 1315:. 1273:. 1252:. 1227:. 1202:. 1176:. 1127:. 1101:. 1076:. 1051:. 1026:. 1012:: 946:. 920:. 894:. 865:. 839:. 813:. 788:. 754:. 728:. 708:: 702:2 666:. 477:. 362:] 182:) 176:( 164:) 158:( 153:) 149:( 139:. 109:) 105:( 92:. 66:) 62:( 27:.

Index

Morfyw
Morlais Castle
improve it
talk page
Learn how and when to remove these messages

quality standards
You can help
talk page
encyclopedic tone
guide to writing better articles
Learn how and when to remove this message
Learn how and when to remove this message
53°18′23″N 4°43′00″W / 53.30639°N 4.71667°W / 53.30639; -4.71667
Type
Nameplate capacity
https://www.morlaisenergy.com
edit on Wikidata
tidal stream energy
Irish Sea
Holy Island, Anglesey
Wales
Menter Môn
renewable energy
The Crown Estate
Natural Resources Wales
European Regional Development Fund
Mark Drakeford
RSPB Cymru
environmental impact assessment

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.