Ceneri Base Tunnel

Source 📝

40: 615: 2570: 485: 341: 583:, clearing the way for detailing planning activity to proceed. Further Parliamentary approval of the selected route for the tunnel was received in 2003, and the first funds towards construction were released during 2005. During April 2007, AlpTransit Gotthard AG awarded a Sfr85m ($ 91.52m) contract for the construction of the first underground element of the tunnel to Consorzio Monte Ceneri (CMC) JV, a consortium of CSC, 427:. Construction of the two single-track bores started during March 2006. The official start of the CBT's construction phase was celebrated on 2 June 2006 with the laying of a foundation stone. The final breakthroughs took place on 21 January 2016 (west tube) and 26 January 2016 (east tube). Rail service started on 4 September 2020 and was operationalised for freight in December 2020. 644:
between Sigirino and Vigana occurred on 26 January 2016. That same day, it was announced that the excavation process had been completed, and the installation of railway infrastructure was the next major stage of the work. During February 2017, the final concrete block was placed in a ceremony marking the tunnel becoming structurally complete.
643:
Breakthrough in the west tube between Sigirino and Vezia occurred on 17 March 2015. Breakthrough in the east tube between Sigirino and Vezia occurred on 30 March 2015. On 21 January 2016, breakthrough was achieved in the west bore between Sigirino and Vigana, while the breakthrough in the east bore
639:
had begun on the main drives of the twin-bores. By the end of the year, the rate of tunneling had reportedly attained its full speed. A combination of conventional drilling and blasting techniques were used to bore approximately 37.49 kilometres (23.30 mi) of the tunnel (including the two main
568:
signalling, allowing for trains to traverse it at speeds of up to 250 kilometres per hour (160 mph). Although the technical maximum speed is 250 km/h (160 mph) through the Ceneri tunnel, the maximal authorized speed has been reduced to 230 km/h (140 mph) for ecological and
634:
and equipped with 483-millimetre (19.0 in) cutters, was used to bore the adit tunnel over the course of ten months during which it advanced at a rate of 18.5 metres (61 ft) per day. During the spring of 2010, work commenced upon the boring of the Ceneri Base Tunnel itself. During March
660:
regarding the awarding process. At one point, it looked as if the completion of the Ceneri Base Tunnel may be delayed as a consequence of legal disputes. However, the dispute was settled during September 2014, which unblocked the awarding of contracts as well as allowing for work to proceed.
652:-led CPC Consortium won a Sfr129 million ($ 138.89 million) contract to provide railway systems and overall tunnel co-ordination services. The planning, supply, installation and commissioning of the tunnel control systems, which are to be controlled from a control centre at 547:
The Ceneri Base Tunnel carries a pair of parallel bores, each containing a single-track, set 40 metres (130 ft) apart from one another and connected by cross passages at evenly spaced intervals of 325 metres (1,066 ft). Stretching between the towns of
414:
was excavated between 1999 and 2003 to gain geological data on the rock formations at the Ceneri Base Tunnel's level. Based on those data, it was decided to excavate most of the tunnel with traditional blasting methods and only drill a small part using a faster
430:
On opening, the Ceneri Base Tunnel has become an important southern feeder for the Gotthard Base Tunnel as the existing, proportionally steep and curvy track over Monte Ceneri is not suitable for high speeds or heavy freight trains. Another feeder is the
2068: 2124: 569:
economical reasons, while the operating speed of passenger trains is restricted to 200 km/h (124 mph) in order to accommodate the freight traffic, with the possibility to accelerate up to 230 km/h in case of delay.
556:, it possesses a total length of 39.78 kilometres (24.72 mi); the eastern bore has a length of 15.45 kilometres (9.60 mi) and the west bore is 15.28 kilometres (9.49 mi) long. An operations center controlling 606:. At the time, the tunnel was expected to be operational by December 2020. This contract was valued at Sfr987 million ($ 1.6 billion). The estimated total cost for the Ceneri Base Tunnel is Sfr2.4 billion ($ 2.58 billion). 647:
During August 2013, the Mons Ceneris Consortium, headed by Mancini & Marti, was awarded a Sfr96 million ($ 103.36 million) contract to provide railway track and logistics for the tunnel. That same month, the
2128: 2072: 683:
The tunnel was officially opened on 4 September 2020. Final testing concluded with a rescue test in October 2020, and routine operations began in December 2020. The construction has cost CHF 2.5bn.
2248: 2416: 572:
For handling emergency situations in the Ceneri Base Tunnel, the Swiss Federal Railways has acquired a fleet of dedicated rescue trains; these are equipped with specialised
680:
were laid in the northern end of the eastern bore. On 30 May 2018, the final railroad tie was laid, meaning that trains can now travel the entire length of the tunnel.
2201: 2536: 2490: 439:
which is about to be upgraded by Italy in prospect of the opening of the Gotthard Base Tunnel. Both links meet in the Magadino Flat in the future Camorino Node (
2007: 656:, has been contracted to Tunnel Control Systems. The awarding of these contracts was not without controversy; a pair of appeals were subsequently upheld by the 564:. Operationally, the Ceneri Base Tunnel is anticipated to be used by in excess of 300 trains each day travelling in both directions. It shall be furnished with 599:. During June 2009, the Board of Directors of AlpTransit Gotthard AG announced that it had awarded the principal contract for the tunnel's construction to the 2507: 86: 1921: 2442: 2603: 631: 2675: 2255: 2022: 2420: 2149: 622:
During June 2006, construction work on the tunnel officially commenced. In November 2008, the excavation of a 2.4-kilometre-long (1.5 mi)
2216: 2593: 2164: 2037: 2182: 2468: 2566: 649: 2298: 2655: 565: 2108: 1882: 2316: 2232: 657: 2384: 1895: 2680: 626:
tunnel was completed, involving the excavation of 160,000 cubic metres (5.7 million cubic feet) of hard rock. A
1938: 1838: 460: 304: 2366: 532:(SBB). When it became operational in December 2020, the Ceneri Base Tunnel began working together with the longer 1855: 323:
Operating speed (passenger): 200 km/h (124 mph) (normal) up to 230 km/h (143 mph) (if delay)
2558: 2052: 2334: 2352: 1922:"Sommaruga zur Eröffnung des Ceneri-Basistunnels: "Der Tunnel bringt die Schweiz näher zusammen" | NZZ" 2660: 2446: 79: 2280: 2650: 557: 2125:"Ceneri Base Tunnel: Breakthrough in the west tube between Sigirino and Vezia: AlpTransit Gotthard AG" 399:. It is composed of two single-track tunnels, each 15.4 km (9.6 mi) long. It is part of the 2670: 2624: 1813: 517: 396: 24: 20: 1992: 299: 2398: 2093: 544:
by providing a flatter route for freight and passenger trains than previous conventional lines.
2608: 2499: 1818: 529: 516:. It allows traffic to bypass the conventional high-level railway running through the historic 250: 202: 129: 676:, and various safety and control systems commenced. During August 2017, the first sections of 2665: 2179: 627: 580: 416: 2299:"Newly completed Swiss tunnel to transform European rail travel | DW | 04.09.2020" 2588: 1808: 533: 420: 614: 39: 8: 2685: 256: 2551: 665: 588: 2462: 677: 440: 360: 68: 2202:"Ceneri Base Tunnel: Swiss Supreme Court confirms Railway Infrastructure Awards." 2186: 2629: 291: 1899: 536:
to significantly shorten the journey times between the Northern Swiss city of
447:). The CBT will ease local train traffic, mainly between the two major cities 2644: 2544: 2522: 2509: 2367:"CBT: Switzerland's Third Largest Railway Tunnel Project | Blend Plants" 673: 573: 436: 101: 88: 58: 2281:"Swiss complete trans-European rail route with Ceneri Tunnel under the Alps" 520:. It forms only one element of a wider effort, commonly referred to as the 497: 484: 376: 139: 2569: 576:
equipment and other useful facilities, such as independent air supplies.
368: 264: 72: 2417:"Ceneri train tunnel starts final stage of testing before grand opening" 2069:"Ceneri Base Tunnel: Blast-driving the main tunnel from Sigirino begins" 636: 603: 452: 404: 157: 640:
tubes and access tunnels), while the remainder was bored using a TBM.
2485: 2165:"Ceneri rail tunnel moves closer to completing new alpine rail link." 664:
During 2017 the installation of the track, electrical supply cables,
340: 537: 653: 561: 549: 505: 501: 411: 384: 380: 153: 149: 2495: 468: 448: 584: 513: 496:
The Ceneri Base Tunnel is the lowest of the routes through the
464: 456: 423:
were built under contract from the Swiss Federal Government by
392: 372: 179: 175: 161: 395:; it bypasses the former high-altitude rail route through the 669: 596: 553: 541: 509: 489: 432: 388: 171: 403:(NRLA) project for faster north-south rail links across the 2574: 1861:. Lucerne, Switzerland: AlpTransit Gotthard AG. 1 June 2016 1803: 623: 592: 525: 521: 400: 2399:"Ceneri Base Tunnel: The First Tracks | Blend Plants" 1794:
The monthly progress update graphic was available online.
2023:"Thales awarded Ceneri Base Tunnel signalling contract." 1939:"Ceneri Base Tunnel Officially Open Completing the NRLA" 1839:"Ceneri Base Tunnel Officially Open Completing the NRLA" 579:
The Ceneri Base Tunnel was approved in July 2001 by the
2491:
AlpTransit Gotthard AG - Status of construction: Ceneri
2071:. AlpTransit Gotthard AG. 10 March 2009. Archived from 1856:"Project data – raw construction Gotthard Base Tunnel" 320:
Maximum authorized speed: 230 km/h (140 mph)
1878: 1876: 317:
Technical maximum speed: 250 km/h (160 mph)
326:
Minimum speed (freight): 100 km/h (62 mph)
488:Gotthard and Ceneri Base Tunnel. The route through 1933: 1931: 1873: 560:and logistical activities has been constructed at 2642: 2008:"SBB prepares for Gotthard base tunnel opening." 2419:. worldradio.ch. 18 August 2020. Archived from 2287:. 4 September 2020 – via www.reuters.com. 1928: 2486:AlpTransit Gotthard AG - Official company site 2180:"Ceneri Base Tunnel: two-year delay possible." 524:(NRLA) programme, which is being developed by 130:Swiss Federal Railways (SBB CFF FFS) 2552: 2385:"Ceneri Base Tunnel set for December opening" 1850: 1848: 1783:percentage of 39.780 km (24.718 mi) 1988: 1986: 1984: 1982: 1980: 2233:"Tracklaying begins in Ceneri Base Tunnel." 1978: 1976: 1974: 1972: 1970: 1968: 1966: 1964: 1962: 1960: 2559: 2545: 1845: 471:to Lugano dropped from 50 to 22 minutes. 2150:"First Ceneri base tunnel breakthrough." 1957: 613: 528:(ATG), a wholly owned subsidiary of the 483: 2676:High-speed railway lines in Switzerland 2335:"Ceneri Base Tunnel is officially open" 2643: 2575:New Railway Link through the Alps NRLA 2467:: CS1 maint: archived copy as title ( 2217:"Ceneri base tunnel dispute resolved." 2109:"Ceneri base tunnel blasting begins ." 2540: 595:, Rothpletz, Lienhard & Cie, and 16:Railway tunnel through the Swiss Alps 658:Federal Supreme Court of Switzerland 13: 339: 14: 2697: 2479: 540:and the Northern Italian city of 401:New Railway Link through the Alps 365:Galleria di base del Monte Ceneri 2568: 2353:"Ceneri Base Tunnel inaugurated" 2317:"Ceneri Base Tunnel inaugurated" 38: 2435: 2409: 2391: 2377: 2359: 2345: 2327: 2309: 2291: 2273: 2241: 2225: 2210: 2195: 2173: 2158: 2143: 2117: 2102: 2087: 2061: 2046: 2031: 1898:. AlpTransit AG. Archived from 1777: 609: 2656:Railway tunnels in Switzerland 2016: 2001: 1914: 1888: 1831: 687:Construction monthly progress 522:New Rail Link through the Alps 246: 1: 2321:Railway Gazette International 1883:Axe nord-sud du Saint-Gothard 1824: 672:systems, automation systems, 618:Final works in the west tube. 479: 635:2010, it was announced that 451:and Lugano but also between 7: 2038:"SBB orders rescue trains." 1797: 1765: 1751: 1734: 1720: 1706: 1692: 1678: 1664: 1650: 1636: 1622: 1608: 1594: 1580: 1563: 1549: 1535: 1521: 1507: 1493: 1479: 1465: 1451: 1437: 1423: 1409: 1392: 1378: 1364: 1350: 1336: 1322: 1308: 1294: 1280: 1266: 1252: 1238: 1221: 1207: 1193: 1179: 1165: 1151: 1137: 1123: 1109: 1095: 1081: 1067: 1050: 1036: 1022: 1008: 994: 980: 966: 952: 938: 924: 910: 896: 879: 865: 851: 837: 823: 809: 795: 781: 767: 753: 739: 725: 410:An exploration tunnel near 10: 2702: 2192:, Retrieved: 10 June 2018. 2099:, Retrieved: 10 June 2018. 1998:, Retrieved: 10 June 2018. 1568: 1397: 1226: 1055: 884: 713: 474: 241:15.4 km (9.6 mi) 18: 2681:Tunnels completed in 2020 2617: 2581: 1770: 1739: 697: 694: 691: 338: 333: 310: 298: 263: 245: 237: 232: 224: 216: 208: 198: 190: 185: 167: 145: 135: 125: 117: 78: 64: 54: 49: 37: 601:Consorzio Condotte Cossi 492:follows the lake shores. 419:(TBM). Both the CBT and 25:Monte Ceneri Road Tunnel 21:Monte Ceneri Rail Tunnel 19:Not to be confused with 2625:Lötschberg Base Tunnel 2609:Zimmerberg Base Tunnel 2500:Swiss Federal Archives 2053:"Ceneri tunnel start." 1996:railway-technology.com 1819:Zimmerberg Base Tunnel 1814:Lötschberg Base Tunnel 619: 530:Swiss Federal Railways 526:AlpTransit Gotthard AG 493: 444: 425:Alptransit Gotthard AG 364: 344: 2097:therobbinscompany.com 2094:"Ceneri Base Tunnel." 1993:"Ceneri Base Tunnel." 628:tunnel boring machine 617: 581:Swiss Federal Council 487: 459:. Travel time on the 421:Gotthard Base Tunnels 417:tunnel boring machine 367:) is a Swiss railway 343: 228:Passenger and freight 212:SBB CFF FFS 2589:Gotthard Base Tunnel 2523:46.11917°N 8.99083°E 2249:"AlpTransit history" 2222:, 14 September 2014. 2185:12 June 2018 at the 2028:, 16 September 2016. 1896:"Ceneri Base Tunnel" 1809:Gotthard Base Tunnel 534:Gotthard Base Tunnel 102:46.11917°N 8.99083°E 44:North portal in 2018 2661:Tunnels in the Alps 2519: /  2355:. 4 September 2020. 1902:on 28 November 2020 1841:. 14 December 2020. 688: 630:(TBM), provided by 518:Monte Ceneri Tunnel 397:Monte Ceneri Tunnel 98: /  34: 2599:Ceneri Base Tunnel 2449:on 6 February 2016 2205:tunnel-online.info 2190:tunnel-online.info 2170:, 8 February 2017. 2043:, 7 February 2016. 1945:. 14 December 2020 1885:(SBB/CFF website). 695:Month   686: 666:telecommunications 620: 500:axis and connects 494: 375:. It passes under 353:Ceneri Base Tunnel 345: 203:SBB Infrastructure 33:Ceneri Base Tunnel 32: 2651:Tunnels in Ticino 2638: 2637: 2528:46.11917; 8.99083 2496:AlpTransit Portal 2423:on 18 August 2020 2405:. 27 August 2020. 2373:. 27 August 2020. 1792: 1791: 692:Year   678:ballastless track 349: 348: 107:46.11917; 8.99083 2693: 2671:Gotthard railway 2573: 2572: 2561: 2554: 2547: 2538: 2537: 2534: 2533: 2531: 2530: 2529: 2524: 2520: 2517: 2516: 2515: 2512: 2473: 2472: 2466: 2458: 2456: 2454: 2445:. Archived from 2439: 2433: 2432: 2430: 2428: 2413: 2407: 2406: 2395: 2389: 2388: 2387:. 8 August 2020. 2381: 2375: 2374: 2363: 2357: 2356: 2349: 2343: 2342: 2339:SWI swissinfo.ch 2331: 2325: 2324: 2313: 2307: 2306: 2295: 2289: 2288: 2277: 2271: 2270: 2268: 2266: 2260: 2254:. Archived from 2253: 2245: 2239: 2238:, 1 August 2017. 2229: 2223: 2214: 2208: 2199: 2193: 2177: 2171: 2162: 2156: 2155:, 18 March 2015. 2147: 2141: 2140: 2138: 2136: 2131:on 17 March 2015 2127:. Archived from 2121: 2115: 2114:, 30 March 2010. 2106: 2100: 2091: 2085: 2084: 2082: 2080: 2075:on 15 April 2012 2065: 2059: 2058:, 1 August 2005. 2050: 2044: 2035: 2029: 2020: 2014: 2005: 1999: 1990: 1955: 1954: 1952: 1950: 1935: 1926: 1925: 1918: 1912: 1911: 1909: 1907: 1892: 1886: 1880: 1871: 1870: 1868: 1866: 1860: 1852: 1843: 1842: 1835: 1784: 1781: 698:Total excavated 689: 685: 445:Nodo di Camorino 373:canton of Ticino 289: 287: 286: 282: 279: 271: 248: 194:4 September 2020 180:canton of Ticino 162:canton of Ticino 113: 112: 110: 109: 108: 103: 99: 96: 95: 94: 91: 42: 35: 31: 2701: 2700: 2696: 2695: 2694: 2692: 2691: 2690: 2641: 2640: 2639: 2634: 2618:Lötschberg axis 2613: 2604:Urmiberg Tunnel 2577: 2567: 2565: 2527: 2525: 2521: 2518: 2513: 2510: 2508: 2506: 2505: 2482: 2477: 2476: 2460: 2459: 2452: 2450: 2443:"Archived copy" 2441: 2440: 2436: 2426: 2424: 2415: 2414: 2410: 2397: 2396: 2392: 2383: 2382: 2378: 2365: 2364: 2360: 2351: 2350: 2346: 2333: 2332: 2328: 2315: 2314: 2310: 2297: 2296: 2292: 2279: 2278: 2274: 2264: 2262: 2261:on 14 July 2019 2258: 2251: 2247: 2246: 2242: 2236:railjournal.com 2231:Barrow, Keith. 2230: 2226: 2220:Railway Gazette 2215: 2211: 2200: 2196: 2187:Wayback Machine 2178: 2174: 2163: 2159: 2153:Railway Gazette 2148: 2144: 2134: 2132: 2123: 2122: 2118: 2112:Railway Gazette 2107: 2103: 2092: 2088: 2078: 2076: 2067: 2066: 2062: 2056:Railway Gazette 2051: 2047: 2041:Railway Gazette 2036: 2032: 2026:Railway Gazette 2021: 2017: 2011:Railway Gazette 2006: 2002: 1991: 1958: 1948: 1946: 1937: 1936: 1929: 1920: 1919: 1915: 1905: 1903: 1894: 1893: 1889: 1881: 1874: 1864: 1862: 1858: 1854: 1853: 1846: 1837: 1836: 1832: 1827: 1800: 1788: 1787: 1782: 1778: 632:Robbins Company 612: 482: 477: 329: 311:Operating speed 284: 280: 277: 275: 274:4 ft  273: 269: 106: 104: 100: 97: 92: 89: 87: 85: 84: 45: 28: 17: 12: 11: 5: 2699: 2689: 2688: 2683: 2678: 2673: 2668: 2663: 2658: 2653: 2636: 2635: 2633: 2632: 2630:Simplon Tunnel 2627: 2621: 2619: 2615: 2614: 2612: 2611: 2606: 2601: 2596: 2591: 2585: 2583: 2579: 2578: 2564: 2563: 2556: 2549: 2541: 2503: 2502: 2493: 2488: 2481: 2480:External links 2478: 2475: 2474: 2434: 2408: 2390: 2376: 2358: 2344: 2326: 2308: 2290: 2272: 2240: 2224: 2209: 2194: 2172: 2157: 2142: 2116: 2101: 2086: 2060: 2045: 2030: 2015: 2000: 1956: 1927: 1913: 1887: 1872: 1844: 1829: 1828: 1826: 1823: 1822: 1821: 1816: 1811: 1806: 1799: 1796: 1790: 1789: 1786: 1785: 1775: 1774: 1768: 1767: 1764: 1761: 1758: 1754: 1753: 1750: 1747: 1744: 1741: 1737: 1736: 1733: 1730: 1727: 1723: 1722: 1719: 1716: 1713: 1709: 1708: 1705: 1702: 1699: 1695: 1694: 1691: 1688: 1685: 1681: 1680: 1677: 1674: 1671: 1667: 1666: 1663: 1660: 1657: 1653: 1652: 1649: 1646: 1643: 1639: 1638: 1635: 1632: 1629: 1625: 1624: 1621: 1618: 1615: 1611: 1610: 1607: 1604: 1601: 1597: 1596: 1593: 1590: 1587: 1583: 1582: 1579: 1576: 1573: 1570: 1566: 1565: 1562: 1559: 1556: 1552: 1551: 1548: 1545: 1542: 1538: 1537: 1534: 1531: 1528: 1524: 1523: 1520: 1517: 1514: 1510: 1509: 1506: 1503: 1500: 1496: 1495: 1492: 1489: 1486: 1482: 1481: 1478: 1475: 1472: 1468: 1467: 1464: 1461: 1458: 1454: 1453: 1450: 1447: 1444: 1440: 1439: 1436: 1433: 1430: 1426: 1425: 1422: 1419: 1416: 1412: 1411: 1408: 1405: 1402: 1399: 1395: 1394: 1391: 1388: 1385: 1381: 1380: 1377: 1374: 1371: 1367: 1366: 1363: 1360: 1357: 1353: 1352: 1349: 1346: 1343: 1339: 1338: 1335: 1332: 1329: 1325: 1324: 1321: 1318: 1315: 1311: 1310: 1307: 1304: 1301: 1297: 1296: 1293: 1290: 1287: 1283: 1282: 1279: 1276: 1273: 1269: 1268: 1265: 1262: 1259: 1255: 1254: 1251: 1248: 1245: 1241: 1240: 1237: 1234: 1231: 1228: 1224: 1223: 1220: 1217: 1214: 1210: 1209: 1206: 1203: 1200: 1196: 1195: 1192: 1189: 1186: 1182: 1181: 1178: 1175: 1172: 1168: 1167: 1164: 1161: 1158: 1154: 1153: 1150: 1147: 1144: 1140: 1139: 1136: 1133: 1130: 1126: 1125: 1122: 1119: 1116: 1112: 1111: 1108: 1105: 1102: 1098: 1097: 1094: 1091: 1088: 1084: 1083: 1080: 1077: 1074: 1070: 1069: 1066: 1063: 1060: 1057: 1053: 1052: 1049: 1046: 1043: 1039: 1038: 1035: 1032: 1029: 1025: 1024: 1021: 1018: 1015: 1011: 1010: 1007: 1004: 1001: 997: 996: 993: 990: 987: 983: 982: 979: 976: 973: 969: 968: 965: 962: 959: 955: 954: 951: 948: 945: 941: 940: 937: 934: 931: 927: 926: 923: 920: 917: 913: 912: 909: 906: 903: 899: 898: 895: 892: 889: 886: 882: 881: 878: 875: 872: 868: 867: 864: 861: 858: 854: 853: 850: 847: 844: 840: 839: 836: 833: 830: 826: 825: 822: 819: 816: 812: 811: 808: 805: 802: 798: 797: 794: 791: 788: 784: 783: 780: 777: 774: 770: 769: 766: 763: 760: 756: 755: 752: 749: 746: 742: 741: 738: 735: 732: 728: 727: 724: 721: 718: 715: 711: 710: 707: 704: 700: 699: 696: 693: 674:overhead lines 611: 608: 481: 478: 476: 473: 347: 346: 336: 335: 331: 330: 328: 327: 324: 321: 318: 314: 312: 308: 307: 302: 296: 295: 292:standard gauge 267: 261: 260: 253: 243: 242: 239: 235: 234: 230: 229: 226: 222: 221: 218: 214: 213: 210: 206: 205: 200: 196: 195: 192: 188: 187: 183: 182: 169: 165: 164: 147: 143: 142: 137: 133: 132: 127: 123: 122: 119: 115: 114: 82: 76: 75: 66: 62: 61: 56: 52: 51: 47: 46: 43: 15: 9: 6: 4: 3: 2: 2698: 2687: 2684: 2682: 2679: 2677: 2674: 2672: 2669: 2667: 2664: 2662: 2659: 2657: 2654: 2652: 2649: 2648: 2646: 2631: 2628: 2626: 2623: 2622: 2620: 2616: 2610: 2607: 2605: 2602: 2600: 2597: 2595: 2592: 2590: 2587: 2586: 2584: 2582:Gotthard axis 2580: 2576: 2571: 2562: 2557: 2555: 2550: 2548: 2543: 2542: 2539: 2535: 2532: 2501: 2497: 2494: 2492: 2489: 2487: 2484: 2483: 2470: 2464: 2448: 2444: 2438: 2422: 2418: 2412: 2404: 2400: 2394: 2386: 2380: 2372: 2368: 2362: 2354: 2348: 2340: 2336: 2330: 2322: 2318: 2312: 2304: 2300: 2294: 2286: 2282: 2276: 2257: 2250: 2244: 2237: 2234: 2228: 2221: 2218: 2213: 2206: 2203: 2198: 2191: 2188: 2184: 2181: 2176: 2169: 2166: 2161: 2154: 2151: 2146: 2130: 2126: 2120: 2113: 2110: 2105: 2098: 2095: 2090: 2074: 2070: 2064: 2057: 2054: 2049: 2042: 2039: 2034: 2027: 2024: 2019: 2013:, 1 May 2015. 2012: 2009: 2004: 1997: 1994: 1989: 1987: 1985: 1983: 1981: 1979: 1977: 1975: 1973: 1971: 1969: 1967: 1965: 1963: 1961: 1944: 1940: 1934: 1932: 1923: 1917: 1901: 1897: 1891: 1884: 1879: 1877: 1857: 1851: 1849: 1840: 1834: 1830: 1820: 1817: 1815: 1812: 1810: 1807: 1805: 1802: 1801: 1795: 1780: 1776: 1773: 1769: 1762: 1759: 1756: 1755: 1748: 1745: 1742: 1738: 1731: 1728: 1725: 1724: 1717: 1714: 1711: 1710: 1703: 1700: 1697: 1696: 1689: 1686: 1683: 1682: 1675: 1672: 1669: 1668: 1661: 1658: 1655: 1654: 1647: 1644: 1641: 1640: 1633: 1630: 1627: 1626: 1619: 1616: 1613: 1612: 1605: 1602: 1599: 1598: 1591: 1588: 1585: 1584: 1577: 1574: 1571: 1567: 1560: 1557: 1554: 1553: 1546: 1543: 1540: 1539: 1532: 1529: 1526: 1525: 1518: 1515: 1512: 1511: 1504: 1501: 1498: 1497: 1490: 1487: 1484: 1483: 1476: 1473: 1470: 1469: 1462: 1459: 1456: 1455: 1448: 1445: 1442: 1441: 1434: 1431: 1428: 1427: 1420: 1417: 1414: 1413: 1406: 1403: 1400: 1396: 1389: 1386: 1383: 1382: 1375: 1372: 1369: 1368: 1361: 1358: 1355: 1354: 1347: 1344: 1341: 1340: 1333: 1330: 1327: 1326: 1319: 1316: 1313: 1312: 1305: 1302: 1299: 1298: 1291: 1288: 1285: 1284: 1277: 1274: 1271: 1270: 1263: 1260: 1257: 1256: 1249: 1246: 1243: 1242: 1235: 1232: 1229: 1225: 1218: 1215: 1212: 1211: 1204: 1201: 1198: 1197: 1190: 1187: 1184: 1183: 1176: 1173: 1170: 1169: 1162: 1159: 1156: 1155: 1148: 1145: 1142: 1141: 1134: 1131: 1128: 1127: 1120: 1117: 1114: 1113: 1106: 1103: 1100: 1099: 1092: 1089: 1086: 1085: 1078: 1075: 1072: 1071: 1064: 1061: 1058: 1054: 1047: 1044: 1041: 1040: 1033: 1030: 1027: 1026: 1019: 1016: 1013: 1012: 1005: 1002: 999: 998: 991: 988: 985: 984: 977: 974: 971: 970: 963: 960: 957: 956: 949: 946: 943: 942: 935: 932: 929: 928: 921: 918: 915: 914: 907: 904: 901: 900: 893: 890: 887: 883: 876: 873: 870: 869: 862: 859: 856: 855: 848: 845: 842: 841: 834: 831: 828: 827: 820: 817: 814: 813: 806: 803: 800: 799: 792: 789: 786: 785: 778: 775: 772: 771: 764: 761: 758: 757: 750: 747: 744: 743: 736: 733: 730: 729: 722: 719: 716: 712: 708: 705: 702: 701: 690: 684: 681: 679: 675: 671: 667: 662: 659: 655: 651: 645: 641: 638: 633: 629: 625: 616: 607: 605: 602: 598: 594: 590: 586: 582: 577: 575: 574:fire fighting 570: 567: 563: 559: 555: 551: 545: 543: 539: 535: 531: 527: 523: 519: 515: 511: 507: 503: 499: 491: 486: 472: 470: 466: 462: 458: 454: 450: 446: 442: 438: 437:Lake Maggiore 434: 428: 426: 422: 418: 413: 408: 406: 402: 398: 394: 390: 386: 382: 378: 374: 370: 366: 362: 358: 354: 342: 337: 332: 325: 322: 319: 316: 315: 313: 309: 306: 305:15 kV 16.7 Hz 303: 301: 297: 293: 270:1,435 mm 268: 266: 262: 258: 254: 252: 244: 240: 236: 231: 227: 223: 219: 215: 211: 207: 204: 201: 197: 193: 189: 184: 181: 177: 173: 170: 166: 163: 159: 155: 151: 148: 144: 141: 138: 134: 131: 128: 124: 120: 116: 111: 83: 81: 77: 74: 70: 67: 63: 60: 59:Gotthard Line 57: 53: 48: 41: 36: 30: 26: 22: 2666:Base tunnels 2598: 2504: 2451:. Retrieved 2447:the original 2437: 2425:. Retrieved 2421:the original 2411: 2403:Railway-News 2402: 2393: 2379: 2371:Railway-News 2370: 2361: 2347: 2338: 2329: 2320: 2311: 2302: 2293: 2284: 2275: 2263:. Retrieved 2256:the original 2243: 2235: 2227: 2219: 2212: 2207:, June 2014. 2204: 2197: 2189: 2175: 2167: 2160: 2152: 2145: 2133:. Retrieved 2129:the original 2119: 2111: 2104: 2096: 2089: 2077:. Retrieved 2073:the original 2063: 2055: 2048: 2040: 2033: 2025: 2018: 2010: 2003: 1995: 1947:. Retrieved 1943:Railway-News 1942: 1916: 1904:. Retrieved 1900:the original 1890: 1863:. Retrieved 1833: 1793: 1779: 1771: 1684:1 September 1513:1 September 1342:1 September 1171:1 September 1000:1 September 829:1 September 682: 663: 646: 642: 621: 610:Construction 600: 578: 571: 566:ETCS Level 2 546: 495: 429: 424: 409: 377:Monte Ceneri 356: 352: 350: 257:single-track 140:Monte Ceneri 29: 2594:Axen Tunnel 2526: / 2168:thelocal.ch 2079:12 November 1949:27 December 1865:15 December 1757:1 February 1726:1 December 1712:1 November 1586:1 February 1555:1 December 1541:1 November 1415:1 February 1384:1 December 1370:1 November 1244:1 February 1213:1 December 1199:1 November 1073:1 February 1042:1 December 1028:1 November 902:1 February 871:1 December 857:1 November 731:1 February 558:ventilation 435:link along 369:base tunnel 300:Electrified 265:Track gauge 121:Operational 105: / 80:Coordinates 73:Switzerland 2686:Bellinzona 2645:Categories 2511:46°07′09″N 2453:5 February 1825:References 1743:1 January 1698:1 October 1572:1 January 1527:1 October 1401:1 January 1356:1 October 1230:1 January 1185:1 October 1059:1 January 1014:1 October 888:1 January 843:1 October 717:1 January 604:consortium 480:Background 453:Bellinzona 405:Swiss Alps 158:Bellinzona 156:Flat near 90:46°07′09″N 2514:8°59′27″E 2427:18 August 1670:1 August 1499:1 August 1328:1 August 1157:1 August 986:1 August 815:1 August 387:Flat and 334:Route map 233:Technical 225:Character 186:Operation 93:8°59′27″E 2463:cite web 2183:Archived 2135:17 March 1906:14 April 1798:See also 1614:1 April 1600:1 March 1443:1 April 1429:1 March 1272:1 April 1258:1 March 1101:1 April 1087:1 March 930:1 April 916:1 March 759:1 April 745:1 March 654:Pollegio 637:blasting 589:Frutiger 562:Sigirino 550:Camorino 508:Flat to 506:Magadino 502:Camorino 412:Sigirino 385:Magadino 381:Camorino 379:between 288: in 209:Operator 154:Magadino 150:Camorino 65:Location 50:Overview 2498:of the 2285:Reuters 2265:14 July 1760:39.780 1746:39.670 1729:39.430 1715:38.970 1701:38.660 1687:38.280 1673:38.090 1659:37.680 1656:1 July 1645:37.350 1642:1 June 1631:36.810 1617:36.330 1603:35.910 1589:35.350 1575:34.750 1558:34.400 1544:33.980 1530:33.490 1516:32.830 1502:32.590 1488:31.930 1485:1 July 1474:31.280 1471:1 June 1460:30.620 1446:30.230 1432:29.700 1418:29.400 1404:28.500 1387:28.500 1373:27.850 1359:27.300 1345:26.800 1331:26.400 1317:26.120 1314:1 July 1303:25.670 1300:1 June 1289:25.160 1275:24.600 1261:24.000 1247:23.500 1233:23.000 1216:22.800 1202:22.300 1188:21.800 1174:21.300 1160:21.100 1146:20.600 1143:1 July 1132:20.000 1129:1 June 1118:19.200 1104:18.600 1090:17.900 1076:17.390 1062:16.800 1045:16.270 1031:15.550 1017:14.780 1003:14.240 989:13.960 975:13.580 972:1 July 961:13.140 958:1 June 947:12.660 933:12.345 919:11.890 905:11.360 891:10.820 874:10.460 801:1 July 787:1 June 504:in the 475:History 469:Locarno 467:, from 449:Locarno 441:Italian 383:in the 371:in the 361:Italian 283:⁄ 220:Railway 217:Traffic 152:in the 136:Crosses 2303:DW.COM 1628:1 May 1457:1 May 1286:1 May 1115:1 May 944:1 May 860:9.962 846:9.466 832:9.102 818:8.816 804:8.344 790:8.101 776:7.880 773:1 May 762:7.731 748:7.673 734:7.637 720:7.600 650:Cablex 585:Lugano 538:Zürich 514:Lugano 498:Ceneri 465:S-Bahn 457:Lugano 393:Lugano 251:tracks 238:Length 191:Opened 176:Lugano 126:System 118:Status 69:Ticino 2259:(PDF) 2252:(PDF) 1859:(PDF) 1772:Note: 1763:24.72 1752:99.7 1749:24.65 1735:99.1 1732:24.50 1721:97.9 1718:24.21 1707:97.2 1704:24.02 1693:96.2 1690:23.79 1679:95.7 1676:23.67 1665:94.7 1662:23.41 1651:93.8 1648:23.21 1637:92.5 1634:22.87 1623:91.3 1620:22.57 1609:90.2 1606:22.31 1595:88.8 1592:21.97 1581:87.3 1578:21.59 1564:86.4 1561:21.38 1550:85.4 1547:21.11 1536:84.1 1533:20.81 1522:82.5 1519:20.40 1508:81.9 1505:20.25 1494:80.2 1491:19.84 1480:78.6 1477:19.44 1466:76.9 1463:19.03 1452:76.0 1449:18.78 1438:74.8 1435:18.45 1424:73.9 1421:18.27 1410:71.7 1407:17.71 1393:71.7 1390:17.71 1379:70.0 1376:17.31 1365:68.6 1362:16.96 1351:67.4 1348:16.65 1337:66.5 1334:16.40 1323:65.6 1320:16.23 1309:64.5 1306:15.95 1295:63.2 1292:15.63 1281:61.8 1278:15.29 1267:60.5 1264:14.91 1253:59.0 1250:14.60 1239:57.9 1236:14.29 1222:57.3 1219:14.17 1208:56.0 1205:13.86 1194:54.8 1191:13.55 1180:53.7 1177:13.24 1166:53.1 1163:13.11 1152:51.8 1149:12.80 1138:50.3 1135:12.43 1124:48.3 1121:11.93 1110:46.9 1107:11.56 1096:45.2 1093:11.12 1082:43.7 1079:10.81 1068:42.4 1065:10.44 1051:40.9 1048:10.11 1037:39.1 1023:37.2 1009:35.8 995:35.1 981:34.2 967:33.0 953:31.8 939:31.0 925:29.9 911:28.6 897:27.2 880:26.3 866:25.0 852:23.8 838:22.9 824:22.2 810:21.0 796:20.4 782:19.8 768:19.4 754:19.1 740:19.0 726:18.9 670:radio 597:Aarau 554:Vezia 542:Milan 512:near 510:Vezia 490:Luino 463:, an 433:Luino 391:near 389:Vezia 259:tubes 199:Owner 174:near 172:Vezia 146:Start 2469:link 2455:2016 2429:2020 2267:2019 2137:2015 2081:2011 1951:2020 1908:2016 1867:2016 1804:NRLA 1766:100 1740:2016 1569:2015 1398:2014 1227:2013 1056:2012 1034:9.66 1020:9.18 1006:8.85 992:8.67 978:8.44 964:8.16 950:7.87 936:7.67 922:7.39 908:7.06 894:6.72 885:2011 877:6.50 863:6.19 849:5.88 835:5.66 821:5.48 807:5.18 793:5.03 779:4.90 765:4.80 751:4.77 737:4.75 723:4.72 714:2010 668:and 624:adit 593:Thun 552:and 461:TILO 455:and 351:The 55:Line 706:mi 703:km 357:CBT 290:) ( 249:of 247:No. 168:End 23:or 2647:: 2465:}} 2461:{{ 2401:. 2369:. 2337:. 2319:. 2301:. 2283:. 1959:^ 1941:. 1930:^ 1875:^ 1847:^ 709:% 591:, 587:, 443:: 407:. 363:: 359:, 255:2 178:, 160:, 71:, 2560:e 2553:t 2546:v 2471:) 2457:. 2431:. 2341:. 2323:. 2305:. 2269:. 2139:. 2083:. 1953:. 1924:. 1910:. 1869:. 355:( 294:) 285:2 281:1 278:+ 276:8 272:( 27:.

Index

Monte Ceneri Rail Tunnel
Monte Ceneri Road Tunnel

Gotthard Line
Ticino
Switzerland
Coordinates
46°07′09″N 8°59′27″E / 46.11917°N 8.99083°E / 46.11917; 8.99083
Swiss Federal Railways (SBB CFF FFS)
Monte Ceneri
Camorino
Magadino
Bellinzona
canton of Ticino
Vezia
Lugano
canton of Ticino
SBB Infrastructure
tracks
single-track
Track gauge
standard gauge
Electrified
15 kV 16.7 Hz

Italian
base tunnel
canton of Ticino
Monte Ceneri
Camorino