After the second year of operation the plant has exceeded projected expectations. In 2013, the plant achieved continuous production, operating 24 hours per day for 36 consecutive days, a result which no other solar plant has attained so far. Total operation is 6,450 hours at full capacity per year,
367:
Gemasolar is the first commercial solar plant with central tower receiver and molten salt heat storage technology. It consists of a 30.5-hectare (75-acre) solar heliostat aperture area with a power island and 2,650 heliostats, each with a 120-square-metre (1,300 sq ft) aperture area and
375:, are its molten salt receiver, its heliostats aiming system and its control system. In addition, its storage system allows it to produce electricity for 15 hours without sunlight (at night or on cloudy days). This storage capacity makes its
379:
manageable so that it can be supplied based on demand. The plant has already been able to supply a full day of uninterrupted power supply to the grid, using thermal transfer technology developed by
640:
1459:
671:
1358:
623:
552:
368:
distributed in concentric rings around the 140-metre-high (460 ft) tower receiver. The total land use of the
Heliostats is 195 hectares (480 acres).
1368:
747:
394:
per year — enough to supply power to 27,500 homes. The plant has been operational since May 2011. Its official launch was held in
October 2011.
1212:
531:
1042:
504:
1118:
583:
81:
647:
364:, but is approximately three times the size. It makes use of several advances in technology after Solar Two was designed and built.
1449:
682:
466:
953:
1165:
1318:
591:
461:
1373:
1313:
1293:
1196:
740:
1308:
756:
595:
895:
810:
767:
1338:
1413:
1353:
1175:
1265:
1066:
620:
559:
1348:
1260:
1072:
855:
733:
1191:
349:
as its heat transfer fluid and energy storage medium. Originally called Solar Tres, it was renamed
Gemasolar.
1403:
1160:
1111:
710:
1454:
1333:
1328:
994:
923:
1418:
1378:
1303:
1150:
1054:
1036:
959:
917:
1155:
1084:
1383:
1170:
880:
283:
777:
1428:
1408:
971:
17:
528:
1239:
1104:
1048:
850:
357:
334:
306:
157:
1234:
1030:
1018:
865:
820:
800:
451:
174:
508:
310:
257:
65:
1393:
1388:
1135:
941:
935:
890:
870:
840:
830:
815:
795:
790:
785:
338:
1012:
885:
860:
835:
825:
805:
129:
1363:
1323:
1285:
875:
845:
476:
599:
471:
8:
1244:
1226:
1024:
988:
361:
353:
1275:
1078:
1006:
221:
309:
plant with a molten salt heat storage system. It is located within the city limits of
1423:
1060:
1000:
965:
725:
481:
330:
167:
672:"Gemasolare celebrates its second anniversary with an excellent operational record"
1127:
627:
535:
372:
234:
142:
39:
244:
720:
1443:
1398:
947:
96:
83:
437:
376:
352:
The project, which has received a subsidy of five million euros from the
346:
292:
1298:
911:
371:
The most innovative aspects of the plant, which belongs to the company
342:
445:
227:
1096:
715:
314:
69:
402:
250:
1270:
380:
318:
755:
427:
1460:
Buildings and structures in the
Province of Seville
360:, makes use of the Solar Two technology tested in
1441:
1112:
741:
721:Gemasolar Plant Construction Video at Youtube
324:
1119:
1105:
748:
734:
499:
497:
529:NREL CSP Technology Workshop: Solar Tres
401:
356:and a loan of 80 million euros from the
284:Related media on Commons
14:
1442:
494:
467:Renewable energy in the European Union
1100:
729:
505:"Gemasolar solar thermal power plant"
598:(DOE). 20 March 2017. Archived from
592:National Renewable Energy Laboratory
462:List of solar thermal power stations
1126:
337:and uses concepts pioneered in the
24:
757:Solar energy in the European Union
588:Concentrating Solar Power Projects
25:
1471:
768:European Renewable Energy Council
704:
542:, 2007-03-07, accessed 2007-05-31
540:SENER Ingeniería y Sistemas, S.A.
44:The Gemasolar power plant in 2021
681:. 3 October 2013. Archived from
444:
430:
411:preventing about 30,000 tons of
38:
553:"CSP: Concentrated Solar Power"
1261:La Camocha, Asturias coal mine
664:
633:
614:
576:
545:
522:
397:
345:demonstration projects, using
27:Concentrated solar power plant
13:
1:
1450:Solar power stations in Spain
584:"Gemasolar Thermosolar Plant"
487:
905:Solar thermal power stations
7:
1359:La Magascona and Magasquila
1266:Maghreb–Europe Gas Pipeline
982:Photovoltaic power stations
621:Gemasolar, energía non stop
421:
245:Annual net output
10:
1476:
1284:
1253:
1225:
1205:
1184:
1143:
1134:
981:
904:
776:
763:
641:"Gemasolar: how it works"
325:Design and specifications
289:
279:
274:
256:
243:
233:
220:
208:
204:
199:
191:
183:
173:
163:
153:
148:
138:
128:
120:
112:
75:
61:
53:
49:
37:
32:
358:European Investment Bank
307:concentrated solar power
1369:Lucainena de las Torres
630:Spanish 26 October 2011
452:Renewable energy portal
222:Nameplate capacity
195:520 acres (210 ha)
121:Construction began
778:Solar power by country
407:
213:Units operational
97:37.558086°N 5.329056°W
1213:Santa María de Garoña
405:
390:of power, can supply
258:Storage capacity
200:Power generation
1354:Hoya de Los Vicentes
1073:Senftenberg/Schipkau
596:U.S. Dept. of Energy
477:Solar thermal energy
418:emissions per year.
386:Gemasolar, with its
329:The plant is of the
311:Fuentes de Andalucía
235:Capacity factor
130:Commission date
102:37.558086; -5.329056
66:Fuentes de Andalucía
1455:Energy in Andalusia
362:Barstow, California
354:European Commission
313:in the province of
275:External links
164:CSP technology
93: /
1319:Casas de Los Pinos
1276:Teruel Power Plant
1043:Montalto di Castro
995:Brandenburg-Briest
626:2021-10-17 at the
534:2007-09-30 at the
408:
184:Site resource
1437:
1436:
1424:Termosolar Borges
1221:
1220:
1094:
1093:
966:Termosolar Borges
482:The Solar Project
472:Sener Aeronáutica
406:Gemasolar in 2012
331:solar power tower
300:
299:
168:Solar power tower
16:(Redirected from
1467:
1141:
1140:
1121:
1114:
1107:
1098:
1097:
750:
743:
736:
727:
726:
698:
697:
695:
693:
687:
676:
668:
662:
661:
659:
658:
652:
646:. Archived from
645:
637:
631:
618:
612:
611:
609:
607:
580:
574:
573:
571:
570:
564:
558:. Archived from
557:
549:
543:
526:
520:
519:
517:
516:
507:. Archived from
501:
454:
449:
448:
440:
435:
434:
433:
417:
393:
389:
293:edit on Wikidata
262:299 :) MW·h
149:Solar farm
108:
107:
105:
104:
103:
98:
94:
91:
90:
89:
86:
42:
30:
29:
21:
1475:
1474:
1470:
1469:
1468:
1466:
1465:
1464:
1440:
1439:
1438:
1433:
1280:
1249:
1217:
1201:
1197:Valdecaballeros
1180:
1130:
1128:Energy in Spain
1125:
1095:
1090:
977:
900:
772:
759:
754:
716:Torresol Energy
707:
702:
701:
691:
689:
688:on 14 July 2014
685:
679:Torresol Energy
674:
670:
669:
665:
656:
654:
650:
643:
639:
638:
634:
628:Wayback Machine
619:
615:
605:
603:
582:
581:
577:
568:
566:
562:
555:
551:
550:
546:
536:Wayback Machine
527:
523:
514:
512:
503:
502:
495:
490:
458:
457:
450:
443:
436:
431:
429:
424:
416:
412:
400:
391:
387:
373:Torresol Energy
327:
296:
269:
265:
143:Torresol Energy
101:
99:
95:
92:
87:
84:
82:
80:
79:
45:
28:
23:
22:
15:
12:
11:
5:
1473:
1463:
1462:
1457:
1452:
1435:
1434:
1432:
1431:
1426:
1421:
1416:
1411:
1406:
1401:
1396:
1391:
1386:
1384:Osa de la Vega
1381:
1376:
1371:
1366:
1361:
1356:
1351:
1346:
1341:
1336:
1331:
1326:
1321:
1316:
1311:
1306:
1301:
1296:
1290:
1288:
1282:
1281:
1279:
1278:
1273:
1268:
1263:
1257:
1255:
1251:
1250:
1248:
1247:
1242:
1237:
1231:
1229:
1223:
1222:
1219:
1218:
1216:
1215:
1209:
1207:
1203:
1202:
1200:
1199:
1194:
1188:
1186:
1182:
1181:
1179:
1178:
1173:
1168:
1163:
1158:
1153:
1147:
1145:
1138:
1136:Nuclear plants
1132:
1131:
1124:
1123:
1116:
1109:
1101:
1092:
1091:
1089:
1088:
1082:
1076:
1070:
1064:
1058:
1052:
1046:
1040:
1034:
1028:
1022:
1016:
1010:
1004:
998:
992:
985:
983:
979:
978:
976:
975:
969:
963:
957:
951:
945:
939:
933:
927:
921:
915:
908:
906:
902:
901:
899:
898:
896:United Kingdom
893:
888:
883:
878:
873:
868:
863:
858:
853:
848:
843:
838:
833:
828:
823:
818:
813:
811:Czech Republic
808:
803:
798:
793:
788:
782:
780:
774:
773:
771:
770:
764:
761:
760:
753:
752:
745:
738:
730:
724:
723:
718:
713:
706:
705:External links
703:
700:
699:
663:
632:
613:
602:on 16 May 2021
575:
544:
521:
492:
491:
489:
486:
485:
484:
479:
474:
469:
464:
456:
455:
441:
426:
425:
423:
420:
414:
399:
396:
326:
323:
298:
297:
290:
287:
286:
281:
277:
276:
272:
271:
267:
263:
260:
254:
253:
247:
241:
240:
237:
231:
230:
224:
218:
217:
214:
210:
209:
206:
205:
202:
201:
197:
196:
193:
192:Site area
189:
188:
187:2,172 kWh/m/yr
185:
181:
180:
177:
171:
170:
165:
161:
160:
155:
151:
150:
146:
145:
140:
136:
135:
132:
126:
125:
122:
118:
117:
114:
110:
109:
77:
73:
72:
63:
59:
58:
55:
51:
50:
47:
46:
43:
35:
34:
26:
9:
6:
4:
3:
2:
1472:
1461:
1458:
1456:
1453:
1451:
1448:
1447:
1445:
1430:
1427:
1425:
1422:
1420:
1417:
1415:
1412:
1410:
1407:
1405:
1402:
1400:
1399:Puerto Errado
1397:
1395:
1392:
1390:
1387:
1385:
1382:
1380:
1377:
1375:
1372:
1370:
1367:
1365:
1362:
1360:
1357:
1355:
1352:
1350:
1347:
1345:
1342:
1340:
1337:
1335:
1332:
1330:
1327:
1325:
1322:
1320:
1317:
1315:
1312:
1310:
1307:
1305:
1302:
1300:
1297:
1295:
1292:
1291:
1289:
1287:
1283:
1277:
1274:
1272:
1269:
1267:
1264:
1262:
1259:
1258:
1256:
1252:
1246:
1243:
1241:
1240:Elgea-Urkilla
1238:
1236:
1235:El Marquesado
1233:
1232:
1230:
1228:
1224:
1214:
1211:
1210:
1208:
1204:
1198:
1195:
1193:
1190:
1189:
1187:
1183:
1177:
1174:
1172:
1169:
1167:
1164:
1162:
1159:
1157:
1154:
1152:
1149:
1148:
1146:
1142:
1139:
1137:
1133:
1129:
1122:
1117:
1115:
1110:
1108:
1103:
1102:
1099:
1086:
1085:Toul-Rosières
1083:
1080:
1077:
1074:
1071:
1068:
1065:
1062:
1059:
1056:
1053:
1050:
1049:Neuhardenberg
1047:
1044:
1041:
1038:
1035:
1032:
1029:
1026:
1023:
1020:
1017:
1014:
1011:
1008:
1005:
1002:
999:
996:
993:
990:
987:
986:
984:
980:
973:
970:
967:
964:
961:
958:
955:
952:
949:
948:Puerto Errado
946:
943:
940:
937:
934:
931:
928:
925:
922:
919:
916:
913:
910:
909:
907:
903:
897:
894:
892:
889:
887:
884:
882:
879:
877:
874:
872:
869:
867:
864:
862:
859:
857:
854:
852:
849:
847:
844:
842:
839:
837:
834:
832:
829:
827:
824:
822:
819:
817:
814:
812:
809:
807:
804:
802:
799:
797:
794:
792:
789:
787:
784:
783:
781:
779:
775:
769:
766:
765:
762:
758:
751:
746:
744:
739:
737:
732:
731:
728:
722:
719:
717:
714:
712:
709:
708:
684:
680:
673:
667:
653:on 2017-06-15
649:
642:
636:
629:
625:
622:
617:
601:
597:
593:
589:
585:
579:
565:on 2022-01-20
561:
554:
548:
541:
537:
533:
530:
525:
511:on 2020-02-07
510:
506:
500:
498:
493:
483:
480:
478:
475:
473:
470:
468:
465:
463:
460:
459:
453:
447:
442:
439:
428:
419:
404:
395:
384:
382:
378:
374:
369:
365:
363:
359:
355:
350:
348:
344:
340:
336:
332:
322:
320:
316:
312:
308:
304:
294:
288:
285:
282:
278:
273:
261:
259:
255:
252:
248:
246:
242:
238:
236:
232:
229:
225:
223:
219:
215:
212:
211:
207:
203:
198:
194:
190:
186:
182:
178:
176:
172:
169:
166:
162:
159:
156:
152:
147:
144:
141:
137:
133:
131:
127:
123:
119:
115:
111:
106:
78:
74:
71:
67:
64:
60:
56:
52:
48:
41:
36:
31:
19:
1349:Guadarranque
1343:
1339:Fuente Álamo
1254:Fossil fuels
1166:José Cabrera
1031:Karadzhalovo
1019:Finsterwalde
929:
690:. Retrieved
683:the original
678:
666:
655:. Retrieved
648:the original
635:
616:
604:. Retrieved
600:the original
587:
578:
567:. Retrieved
560:the original
547:
539:
524:
513:. Retrieved
509:the original
438:Spain portal
409:
388:19.9 MW
385:
370:
366:
351:
328:
302:
301:
1404:Puertollano
1286:Solar power
1013:Finow Tower
954:Puertollano
881:Switzerland
856:Netherlands
606:10 December
398:Performance
392:80 GWh
377:solar power
347:molten salt
116:Operational
100: /
76:Coordinates
1444:Categories
1374:Monte Alto
1329:El Coronil
1314:Calasparra
1299:Alvarado I
1227:Wind farms
912:Alvarado I
657:2012-03-19
569:2019-12-10
515:2019-12-10
488:References
175:Collectors
124:March 2009
85:37°33′29″N
1409:Salamanca
1379:Olmedilla
1364:Lobosillo
1344:Gemasolar
1309:Beneixama
1245:Maranchon
1185:Cancelled
1176:Vandellòs
1161:Cofrentes
1055:Olmedilla
1037:Lieberose
989:Alt Daber
930:Gemasolar
851:Lithuania
343:Solar Two
339:Solar One
303:Gemasolar
266:(670 MW·h
88:5°19′45″W
33:Gemasolar
18:Gemasolar
1334:Extresol
1324:Dulcinea
1294:Abertura
1087:(115 MW)
1081:(128 MW)
1075:(168 MW)
1063:(100 MW)
1051:(145 MW)
1025:Gabardan
974:(100 MW)
962:(150 MW)
926:(150 MW)
924:Extresol
920:(150 MW)
866:Portugal
801:Bulgaria
624:Archived
594:(NREL),
532:Archived
422:See also
139:Owner(s)
134:May 2011
62:Location
1419:Solnova
1414:Sevilla
1304:Andasol
1192:Lemóniz
1151:Almaraz
1079:Templin
1069:(72 MW)
1057:(60 MW)
1045:(84 MW)
1039:(71 MW)
1033:(60 MW)
1027:(67 MW)
1021:(81 MW)
1015:(85 MW)
1009:(84 MW)
1007:Eggebek
1003:(60 MW)
997:(91 MW)
991:(68 MW)
968:(25 MW)
960:Solnova
956:(50 MW)
950:(31 MW)
944:(20 MW)
938:(11 MW)
932:(20 MW)
918:Andasol
914:(50 MW)
891:Ukraine
871:Romania
841:Hungary
831:Germany
821:Finland
816:Denmark
796:Belgium
791:Austria
786:Albania
692:13 July
315:Seville
280:Commons
70:Sevilla
54:Country
1271:Medgaz
1206:Closed
1171:Trillo
1144:Active
1067:Rovigo
1061:Perovo
1001:Crucey
886:Turkey
861:Poland
836:Greece
826:France
806:Cyprus
711:CIEMAT
113:Status
1429:Valle
972:Valle
876:Spain
846:Italy
686:(PDF)
675:(PDF)
651:(PDF)
644:(PDF)
563:(PDF)
556:(PDF)
381:SENER
333:type
319:Spain
305:is a
291:[
239:45.9%
226:19.9
179:2,650
57:Spain
1394:PS20
1389:PS10
1156:Ascó
942:PS20
936:PS10
694:2014
608:2019
341:and
251:GW·h
154:Type
335:CSP
249:80
158:CSP
1446::
677:.
590:.
586:.
538:,
496:^
413:CO
383:.
321:.
317:,
228:MW
68:,
1120:e
1113:t
1106:v
749:e
742:t
735:v
696:.
660:.
610:.
572:.
518:.
415:2
295:]
270:)
268:t
264:e
216:1
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.