For most of its 5,798-metre (6,341 yd) length the tunnel runs in a straight line, but incorporates a gentle slope. The northern end is 1,918 m (6,293 ft) above sea level while the southern end is only 1,875 m (6,152 ft) above sea level. At both ends, the approach road to the
494:
in order to minimize the risk of access to the tunnel being temporarily blocked during bad weather. Any frontier formalities are handled at the tunnel's north end, although the actual national frontier is around 4,100 m (4,500 yd) from the Swiss tunnel entrance and 1,700 m
495:(1,900 yd) from the Italian entrance. Note that the Swiss manage 2,938 m (3,213 yd) of the tunnel, while Italians 2,860 m (3,130 yd), so the border between the two operating entities does not lie at the state border, but around one kilometre on the Swiss side. 742:
prompted a major review of road tunnel safety in several countries including Switzerland, and significant safety upgrades are planned for the Grand St Bernard Tunnel. A speed limit of 80 km/h (50 mph) is already in force inside the tunnel.
720:
The pass remains an option in summer, but is normally closed by snow between October and May, and sometimes for longer. The tunnel, on the other hand, is intended to be usable uninterruptedly for 365 days throughout the year.
775:
offer more direct or at least faster routes. This and the toll ensure that the Grand San Bernard Tunnel rarely suffers from the levels of holiday season congestion that plague the more popular Alpine crossing routes.
502:
who in AD 1049 founded the hospice high above the tunnel, which also bears his name. Tourists on the Swiss side additionally find themselves reminded by roadside billboards of the saint's association with
423: 179: 724:
Construction of the tunnel began in 1958 and it was opened to traffic on 19 March 1964, when it was the longest road tunnel in the world, surpassing the
113: 1269: 343: 374: 1557: 1522: 735:
The approach roads have been progressively improved, and most recently the avalanche covers have been extended on the southern side. The
359: 903: 1552: 1517: 1061: 1014: 1532: 1527: 828:
Vehicles with 2 or more axles, height measured from the front axle of less than 1.3m and total height not exceeding 2m
390: 1537: 504: 498:
The name of the tunnel comes directly from that of the Grand St Bernard Pass, and thereby indirectly from the
470:
There is a toll to use the tunnel, payable in full even for drivers who already display on their vehicles a
1542: 1254: 106: 1547: 1249: 1489: 1484: 1479: 1474: 1469: 1464: 1459: 1454: 1444: 1439: 1434: 1429: 1368: 1408: 1007: 710: 451: 206: 1376: 1352: 1495: 1449: 1360: 1320: 1244: 1239: 1224: 1219: 1214: 1209: 1204: 1199: 1194: 1189: 1184: 1179: 1174: 1169: 1164: 1159: 1154: 1149: 1144: 1138: 1132: 1127: 1122: 1117: 1112: 1107: 1102: 739: 1328: 1097: 1092: 1087: 1082: 1077: 1072: 1067: 1055: 1050: 706: 435: 189: 1413: 768: 8: 1023: 1000: 961: 471: 1259: 944: 714: 499: 475: 263: 227: 161: 1395: 980: 911: 736: 491: 511: 414: 69: 28: 837:
Vehicles with 2 or more axles, total height exceeding 2m and equal to/less than 3m
705:
Before the tunnel was constructed, the frontier was passable here only using the
427: 406: 83: 55: 1344: 1336: 1312: 1304: 1296: 1292: 1288: 1284: 1234: 1229: 1034: 759:
are only single-carriageway roads, and for most relevant city destinations in
1511: 725: 128: 115: 938: 772: 455: 364: 210: 760: 443: 222: 99: 992: 756: 729: 439: 479: 447: 395: 231: 764: 752: 483: 459: 201: 95: 819:
Motorcycle, motorcycle with sidecar, motorcycle with trailer
882:
Vehicles with 4 or more axles and total height exceeding 3m
713:, a monastery, and ultimately from the monastery's founder 305: 873:
3-axle passenger vehicle with a total height exceeding 3m
855:
2-axle passenger vehicle with a total height exceeding 3m
751:
The tunnel and most of the connecting roads between
864:
3-axle goods vehicle with total height exceeding 3m
846:
2-axle goods vehicle with total height exceeding 3m
16:
Road tunnel complementing the Great St Bernard Pass
1509: 514:has carried oil through the tunnel since 1966. 381: 350: 1008: 61: 75: 47: 1015: 1001: 943: 746: 474:. The tunnel comprises a section of the 1510: 1022: 996: 434:) is a road tunnel complementing the 732:in Spain which was opened in 1948. 13: 1558:1964 establishments in Switzerland 1523:Buildings and structures in Valais 14: 1569: 930: 281: 1268: 380: 373: 349: 342: 221: 200: 174: 165: 156: 27: 876: 867: 858: 709:, which took its name from the 517: 896: 849: 840: 831: 822: 813: 804: 795: 786: 465: 301: 1: 889: 432:Grosser-Sankt-Bernhard-Tunnel 419:Traforo del Gran San Bernardo 411:Tunnel du Grand Saint-Bernard 77:Grosser-Sankt-Bernhard-Tunnel 63:Traforo del Gran San Bernardo 49:Tunnel du Grand Saint-Bernard 1553:1964 establishments in Italy 972:World's longest road tunnel 962:Alfonso XIII (Vielha) Tunnel 334:1,875 m (6,152 ft) 326:1,918 m (6,293 ft) 296:5,798 m (6,341 yd) 7: 1518:Road tunnels in Switzerland 403:The Great St Bernard Tunnel 10: 1574: 910:. SISEX SA. Archived from 904:"TOLLS AND SPECIAL OFFERS" 700: 394:Location of the tunnel in 363:Location of the tunnel in 33:Italian side of the tunnel 1533:Tunnels completed in 1964 1528:Transport in Aosta Valley 1422: 1388: 1277: 1266: 1043: 1032: 977: 970: 958: 953: 661: 656: 651: 646: 631: 626: 621: 616: 566: 561: 492:gallery/avalanche shelter 330: 322: 314: 300: 292: 287: 277: 269: 258: 250: 242: 237: 216: 195: 185: 152: 144: 105: 91: 43: 38: 26: 1409:Bargagli-Ferriere Tunnel 779: 711:Great St Bernard Hospice 490:tunnel is covered by a 472:Swiss motorway vignette 22:Great St Bernard Tunnel 1538:Toll tunnels in Europe 431: 418: 410: 76: 62: 48: 747:Access and popularity 707:Great St Bernard Pass 452:Saint-Rhémy-en-Bosses 436:Great St Bernard Pass 310:2 (one per direction) 207:Saint-Rhémy-en-Bosses 190:Great St Bernard Pass 391:class=notpageimage| 360:class=notpageimage| 1543:Tunnels in the Alps 1401:T2 Great St Bernard 524:As of 1 August 2020 458:, in north western 129:45.8645°N 7.17266°E 125: /  23: 1548:Cross-border roads 1025:Motorways in Italy 985:11.61 km (7.22 mi) 810:Two years validity 801:Two years validity 769:St Gotthard Tunnel 715:Bernard of Menthon 228:Bourg-Saint-Pierre 44:Other name(s) 21: 1505: 1504: 1381: 1373: 1372:(Reggio Calabria) 1365: 1357: 1349: 1341: 1333: 1325: 1317: 1309: 1301: 1255:Sistiana-Rabuiese 991: 990: 986: 981:Mont Blanc Tunnel 978:Succeeded by 967: 966:5.24 km (3.26 mi) 737:Mont Blanc tunnel 698: 697: 338: 337: 323:Highest elevation 1565: 1379: 1371: 1363: 1355: 1347: 1339: 1331: 1323: 1315: 1307: 1299: 1272: 1250:Catania-Siracusa 1037: 1026: 1017: 1010: 1003: 994: 993: 984: 965: 959:Preceded by 951: 950: 947: 942: 941: 939:Official website 924: 923: 921: 919: 908:www.letunnel.com 900: 883: 880: 874: 871: 865: 862: 856: 853: 847: 844: 838: 835: 829: 826: 820: 817: 811: 808: 802: 799: 793: 790: 529: 528: 426: 384: 383: 377: 353: 352: 346: 331:Lowest elevation 303: 226: 225: 205: 204: 178: 177: 169: 168: 160: 159: 140: 139: 137: 136: 135: 134:45.8645; 7.17266 130: 126: 123: 122: 121: 118: 87: 79: 73: 65: 59: 51: 31: 24: 20: 1573: 1572: 1568: 1567: 1566: 1564: 1563: 1562: 1508: 1507: 1506: 1501: 1418: 1384: 1273: 1264: 1039: 1035: 1028: 1024: 1021: 987: 983: 974: 968: 964: 937: 936: 933: 928: 927: 917: 915: 902: 901: 897: 892: 887: 886: 881: 877: 872: 868: 863: 859: 854: 850: 845: 841: 836: 832: 827: 823: 818: 814: 809: 805: 800: 796: 791: 787: 782: 749: 740:tragedy of 1999 703: 693: 688: 683: 678: 663: 658: 653: 648: 633: 628: 623: 618: 608: 603: 598: 593: 583: 578: 568: 563: 558: 553: 520: 505:St Bernard dogs 468: 422: 400: 399: 398: 393: 387: 386: 385: 369: 368: 367: 362: 356: 355: 354: 315:Operating speed 220: 199: 175: 166: 157: 133: 131: 127: 124: 119: 116: 114: 112: 111: 81: 74: 67: 60: 53: 34: 17: 12: 11: 5: 1571: 1561: 1560: 1555: 1550: 1545: 1540: 1535: 1530: 1525: 1520: 1503: 1502: 1500: 1499: 1492: 1487: 1482: 1477: 1472: 1467: 1462: 1457: 1452: 1447: 1442: 1437: 1432: 1426: 1424: 1420: 1419: 1417: 1416: 1411: 1403: 1398: 1392: 1390: 1386: 1385: 1383: 1382: 1374: 1366: 1358: 1350: 1342: 1334: 1326: 1318: 1310: 1302: 1281: 1279: 1275: 1274: 1267: 1265: 1263: 1262: 1257: 1252: 1247: 1242: 1237: 1232: 1227: 1222: 1217: 1212: 1207: 1202: 1197: 1192: 1187: 1182: 1177: 1172: 1167: 1162: 1157: 1152: 1147: 1142: 1135: 1130: 1125: 1120: 1115: 1110: 1105: 1100: 1095: 1090: 1085: 1080: 1075: 1070: 1065: 1058: 1053: 1047: 1045: 1041: 1040: 1036:Roads in Italy 1033: 1030: 1029: 1020: 1019: 1012: 1005: 997: 989: 988: 979: 976: 969: 960: 956: 955: 949: 948: 932: 931:External links 929: 926: 925: 914:on 30 May 2022 894: 893: 891: 888: 885: 884: 875: 866: 857: 848: 839: 830: 821: 812: 803: 794: 792:Within 30 days 784: 783: 781: 778: 767:the toll-free 748: 745: 702: 699: 696: 695: 690: 685: 680: 675: 671: 670: 666: 665: 660: 655: 650: 645: 641: 640: 636: 635: 630: 625: 620: 615: 611: 610: 605: 600: 595: 590: 586: 585: 580: 575: 571: 570: 565: 560: 555: 550: 546: 545: 542: 539: 536: 533: 532:Vehicle class 527: 526: 519: 516: 512:Rhône Pipeline 478:route linking 467: 464: 389: 388: 379: 378: 372: 371: 370: 358: 357: 348: 347: 341: 340: 339: 336: 335: 332: 328: 327: 324: 320: 319: 318:80km/h (50mph) 316: 312: 311: 308: 298: 297: 294: 290: 289: 285: 284: 279: 275: 274: 271: 267: 266: 260: 256: 255: 252: 248: 247: 244: 240: 239: 235: 234: 218: 214: 213: 197: 193: 192: 187: 183: 182: 154: 150: 149: 146: 142: 141: 109: 103: 102: 93: 89: 88: 45: 41: 40: 36: 35: 32: 15: 9: 6: 4: 3: 2: 1570: 1559: 1556: 1554: 1551: 1549: 1546: 1544: 1541: 1539: 1536: 1534: 1531: 1529: 1526: 1524: 1521: 1519: 1516: 1515: 1513: 1498: 1497: 1493: 1491: 1488: 1486: 1483: 1481: 1478: 1476: 1473: 1471: 1468: 1466: 1463: 1461: 1458: 1456: 1453: 1451: 1448: 1446: 1443: 1441: 1438: 1436: 1433: 1431: 1428: 1427: 1425: 1421: 1415: 1412: 1410: 1407: 1404: 1402: 1399: 1397: 1396:T1 Mont Blanc 1394: 1393: 1391: 1387: 1378: 1375: 1370: 1367: 1362: 1359: 1354: 1351: 1346: 1343: 1338: 1335: 1330: 1327: 1322: 1319: 1314: 1311: 1306: 1303: 1298: 1294: 1290: 1286: 1283: 1282: 1280: 1276: 1271: 1261: 1258: 1256: 1253: 1251: 1248: 1246: 1243: 1241: 1238: 1236: 1233: 1231: 1228: 1226: 1223: 1221: 1218: 1216: 1213: 1211: 1208: 1206: 1203: 1201: 1198: 1196: 1193: 1191: 1188: 1186: 1183: 1181: 1178: 1176: 1173: 1171: 1168: 1166: 1163: 1161: 1158: 1156: 1153: 1151: 1148: 1146: 1143: 1141: 1140: 1136: 1134: 1131: 1129: 1126: 1124: 1121: 1119: 1116: 1114: 1111: 1109: 1106: 1104: 1101: 1099: 1096: 1094: 1091: 1089: 1086: 1084: 1081: 1079: 1076: 1074: 1071: 1069: 1066: 1064: 1063: 1059: 1057: 1054: 1052: 1049: 1048: 1046: 1042: 1038: 1031: 1027: 1018: 1013: 1011: 1006: 1004: 999: 998: 995: 982: 973: 963: 957: 952: 946: 940: 935: 934: 913: 909: 905: 899: 895: 879: 870: 861: 852: 843: 834: 825: 816: 807: 798: 789: 785: 777: 774: 770: 766: 762: 758: 754: 744: 741: 738: 733: 731: 727: 726:Vielha tunnel 722: 718: 716: 712: 708: 691: 686: 681: 676: 673: 672: 668: 667: 643: 642: 638: 637: 613: 612: 606: 601: 596: 591: 588: 587: 581: 576: 573: 572: 556: 551: 548: 547: 544:20 crossings 543: 541:10 crossings 540: 537: 534: 531: 530: 525: 522: 521: 515: 513: 508: 506: 501: 496: 493: 487: 485: 481: 477: 473: 463: 461: 457: 453: 449: 445: 441: 437: 433: 429: 425: 420: 416: 412: 408: 404: 397: 392: 376: 366: 361: 345: 333: 329: 325: 321: 317: 313: 309: 307: 299: 295: 291: 286: 283: 280: 276: 272: 268: 265: 261: 257: 254:19 March 1964 253: 249: 245: 241: 236: 233: 229: 224: 219: 215: 212: 208: 203: 198: 194: 191: 188: 184: 181: 172: 163: 155: 151: 147: 143: 138: 110: 108: 104: 101: 97: 94: 90: 85: 78: 71: 64: 57: 50: 46: 42: 37: 30: 25: 19: 1494: 1405: 1400: 1389:Road tunnels 1137: 1060: 1044:Major routes 971: 916:. Retrieved 912:the original 907: 898: 878: 869: 860: 851: 842: 833: 824: 815: 806: 797: 788: 773:Simplon Pass 750: 734: 723: 719: 704: 523: 518:Toll charges 509: 497: 488: 469: 456:Aosta Valley 402: 401: 365:Aosta Valley 211:Aosta Valley 170: 18: 761:Switzerland 466:Description 132: / 107:Coordinates 100:Switzerland 1512:Categories 975:1964–1965 918:4 November 890:References 694:CHF 2,282 664:CHF 1,510 654:CHF 186.50 649:CHF 116.50 634:CHF 1,040 624:CHF 129.50 584:CHF 47.30 564:CHF 118.50 446:canton of 438:, linking 273:Automotive 243:Work begun 117:45°51′52″N 1423:Junctions 1414:T4 Fréjus 1380:(Catania) 1364:(Bologna) 689:CHF 1,333 599:CHF 73.50 579:CHF 29.50 559:CHF 23.50 554:CHF 17.50 424:‹See Tfd› 288:Technical 238:Operation 120:7°10′22″E 1348:(Varese) 1332:(Venice) 1324:(Naples) 1278:Beltways 954:Records 757:Martigny 730:Pyrenees 609:CHF 367 569:CHF 159 535:One way 454:(in the 442:(in the 440:Martigny 282:See list 259:Operator 92:Location 39:Overview 1353:A90–GRA 1316:(Turin) 1308:(Pavia) 1300:(Milan) 728:in the 701:History 684:CHF 282 679:CHF 177 659:CHF 874 629:CHF 597 604:CHF 276 602:€260.50 538:Return 480:Belfort 450:) with 415:Italian 270:Traffic 186:Crosses 70:Italian 1356:(Rome) 1340:(Como) 692:€2,153 687:€1,257 662:€1,424 619:CHF 80 617:€75.50 597:€69.30 594:CHF 46 592:€43.40 582:€44.60 577:€27.80 557:€22.10 552:€16.50 448:Valais 428:German 407:French 396:Valais 293:Length 262:SISEX 251:Opened 232:Valais 145:Status 84:German 80:  66:  56:French 52:  1496:RA 17 1490:RA 16 1485:RA 14 1480:RA 13 1475:RA 12 1470:RA 11 1465:RA 10 1377:RA 15 780:Notes 765:Italy 753:Aosta 717:. 500:saint 484:Aosta 482:with 460:Italy 444:Swiss 306:lanes 196:Start 153:Route 96:Italy 1460:RA 9 1455:RA 8 1450:RA 7 1445:RA 6 1440:RA 5 1435:RA 3 1430:RA 2 1369:RA 4 1361:RA 1 920:2020 771:and 763:and 755:and 682:€266 677:€167 657:€825 652:€176 647:€110 632:€981 627:€563 622:€122 607:€346 567:€150 562:€112 510:The 278:Toll 264:S.A. 246:1958 148:Open 1345:A60 1337:A59 1329:A57 1321:A56 1313:A55 1305:A54 1297:A58 1293:A52 1289:A51 1285:A50 1260:SPV 1245:A91 1240:A53 1235:A36 1230:A35 1225:A34 1220:A33 1215:A32 1210:A31 1205:A30 1200:A29 1195:A28 1190:A27 1185:A26 1180:A25 1175:A24 1170:A23 1165:A22 1160:A21 1155:A20 1150:A19 1145:A18 1139:A17 1133:A16 1128:A15 1123:A14 1118:A13 1113:A12 1108:A11 1103:A10 669:3B 639:B3 476:E27 462:). 304:of 302:No. 217:End 180:H21 171:T 2 162:E27 1514:: 1406:T3 1295:, 1291:, 1287:, 1098:A9 1093:A8 1088:A7 1083:A6 1078:A5 1073:A4 1068:A3 1062:A2 1056:A2 1051:A1 906:. 644:3A 614:B2 589:B1 574:A2 549:A1 507:. 486:. 430:: 421:, 417:: 413:, 409:: 230:, 209:, 1016:e 1009:t 1002:v 922:. 674:4 405:( 173:/ 164:/ 98:/ 86:) 82:( 72:) 68:( 58:) 54:(

Index


French
Italian
German
Italy
Switzerland
Coordinates
45°51′52″N 7°10′22″E / 45.8645°N 7.17266°E / 45.8645; 7.17266
E27
T 2
H21
Great St Bernard Pass
Italy
Saint-Rhémy-en-Bosses
Aosta Valley
Switzerland
Bourg-Saint-Pierre
Valais
S.A.
See list
lanes
Great St Bernard Tunnel is located in Aosta Valley
class=notpageimage|
Aosta Valley
Great St Bernard Tunnel is located in Canton of Valais
class=notpageimage|
Valais
French
Italian
‹See Tfd›

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.