2078:(traditionally known in English as Blenheim) station after a long planning phase. Access takes place directly at the level crossing of the connecting road between Blindheim and Unterglauheim, The length of the platform is 140 m and the platform height is 55 cm. The platform itself was put into operation at the timetable change of December 2012, but the reconstruction of the surroundings had not yet been completed. Platform 1, which was previously used at the old station building, was to be replaced by a new platform next to platform 2, which was also new. The community of Blindheim would have liked to have a bike&ride facility after the actual work on the construction of the platform has been completed, with. in addition to parking spaces, a bus stop for better connections with public transport. The platform on track 2 previously used will no longer be available once the construction work has been completed. As of 2012, it was not known whether the entrance building in Blindheim, which was in very poor condition, would be preserved and modernised. 1974: 1900: 2006:, which runs together with the Ingolstadt–Neuoffingen railway to Seehof operations station. Seehof station has two tracks and various transfer options between the two lines. After leaving Seehof, the Ingolstadt–Augsburg railway branches off and the line now continues as a single track to Weichering station, where it returns to the original route from the entry signal. The old line has been completely dismantled up to that point. On 29 May 1995, a regional train running from Ingolstadt via Weichering to 29: 1486: 1990: 1523: 791: 733: 636: 1716: 1651: 1173: 314: 1688: 1591: 1530: 1456: 1306: 1210: 1087: 1057: 1025: 934: 798: 726: 608: 307: 1723: 1658: 1265: 1180: 1032: 541: 468: 423: 416: 377: 321: 1775: 1493: 1272: 601: 568: 534: 527: 492: 461: 454: 384: 643: 1747: 1621: 1561: 1537: 1426: 1396: 1366: 1336: 1240: 1145: 1115: 995: 964: 904: 876: 848: 761: 698: 668: 575: 499: 430: 391: 352: 345: 1982: 1966:
delivered in 1874. The first deliveries were made between 1 April and 30 June and amounted to 141,000 cubic metres. The dry pieces of peat could be a maximum of 25 cm long and 8 cm wide. However, the peat had too low a calorific value and therefore did not provide the locomotives with the required power. So this contract had to be cancelled.
1969:
The company eventually switched from steam to diesel operation. The construction of the Bertoldsheim power station in 1967 allowed the electrification of the line. The 97.5 km-long Ingolstadt–Neuoffingen section was electrified on 5 May 1980 and electric operations were officially inaugurated on
2039:
and Weichering are also used for scheduled train crossings. Unterhausen station is also important as a connecting point for the private freight wagon repair shop there, mainly for tank wagons. The braking distance between Weichering and Rain is reduced to 700 m, otherwise it is 1000 m. The
1928:
was responsible for building the crossing over the Lech at Rain, which required a railway bridge for the first time. Very long and high embankments were constructed so that rail operation would not be interrupted even during floods. The embankments caused significant changes to the landscape and cut
2059:
at the timetable change on 10 December 2006. Previously, Schwenningen had a split platform that was divided by the level crossing of the connecting road to Wolpertstetten. Due to the crossing signalling, trains had to stop behind the level crossing. After the modernisation of the crossing and
2052:
trains has always been a cause of delay for the Agilis local trains. The reconstruction of these stations needs to take into account the increasing freight traffic. The first work on clearing the old track bed and the first survey work were carried out at Weichering station in the autumn of 2012.
1965:
station would serve as a loading area. As a result, Weichering station was built with an exceptionally large station area, twelve km from Ingolstadt. The railway company had already signed a contract with the municipality of Obergrasheim for the purchase of 500,000 cubic metres of peat to be
2051:
Platform 3 in Weichering station, which was dismantled in 2003, was reinstalled in 2016. This allowed freight traffic to be handled outside the Ingolstadt node. Due to the passenger level crossings to platform 1 that have existed in both Weichering and Rohrenfeld stations, crossings with freight
1936:
Railway construction boosted the demand for labour and foreign workers were hired. Some of them were considered dubious. There were repeated brawls and injuries. A police station was therefore established at the Rohrenfeld stud farm and the Neuburg and Burgheim police stations were strengthened.
1914:
Another problem was the cutting at Unterhausen, which had a length of 1.3 km and a maximum depth of 17 m. At that time, machines were rare. The excavation had to be done with picks and shovels. The farmers transported around 300,000 cubic metres of humus near Unterhausen and around one
1886:
and Regensburg considered that they had been neglected by the Bavarian state parliament when it came to railways. They therefore founded a railway committee in 1863 and presented it with a memorandum. A deputation travelled to Munich on 20 October 1866 to underline the need for a line to be
2070:
The passenger trains are scheduled to cross in Dillingen between Donauwörth and Günzburg. The braking distance is largely 1000 m, with the exception of the Dillingen–Höchstädt section running towards Donauwörth, where the braking distance is only 700 m. The top speed is 140 km/h.
2091:
In contrast, the overpass that had been planned for more than 10 years was built between Tapfheim and Schwenningen in the summer 2012. In the Tapfheim area, a new overpass on "Am Wackerberg" was built over the railway line. The former level crossings at "Dettenhardter Straße" and "Brachstädter
2022:
and an expansion of the train service, the train crossings that used to take place almost exclusively in Unterhausen only occur there on weekends. Under the current timetable, train crossings now take place every two hours in Unterhausen and every two hours in Neuburg. There are three pairs of
1997:
The line between Ingolstadt Hauptbahnhof and Weichering station was completely rerouted from 1990 to 1995. The line previously ran north out of the station and ran in a loop across the city, but the line now runs south from Ingolstadt. The line initially runs with one track on each side of the
1895:
for the construction of this railway on 29 April 1869. A field inspection took place with the affected farmers for the first time in the spring of 1871. Numerous property negotiations had to be carried out and compensation had to be determined.
1944:
The first train ran tentatively from Ingolstadt to Neuburg on 20 April 1874 and the first train ran over the Lech Bridge on 28 May 1874. The first official steam train journey ran on the Ingolstadt–Donauwörth route on 15 August 1874.
1940:
The construction of a station in Donauwörth was not yet certain, so the line ended in Hamlar. It was not until the end of 1874 that work began on the Hamlar–Donauwörth section and the station was built at its current location.
1932:
The townscape in Neuburg was changed. The station was built on the road to Feldkirchen and the rail track cut the road. A new connecting road, including an underpass, were built to re-establish the connection to Feldkirchen.
2043:
Since the timetable change on 13 December 2015 the Agilis trains have also been arriving in Ingolstadt Nord from both directions (Donauwörth and Regensburg) from Monday to Friday in order to improve connections to the
2160: 1673: 2081:
The access points to the side ramp were upgraded when platform 1 in Blindheim was rebuilt in the spring of 2012. There has not been a freight customer in Blindheim for a long time.
1891:. As a result the proposal began to progress. A draft proposal was submitted to the Bavarian Landtag (Parliament) on 28 January 1868. The Landtag approved 1.595 million 2084:
Construction of a second platform in Tapfheim on track 2 had not started as of November 2012. The municipality of Tapfheim wanted to provide preliminary support for the project.
2063:
On the Ingolstadt–Neuoffingen section, Agilis operates through regional trains to/from Regensburg, usually every hour to Günzburg. The service to Ulm usually runs hourly, using
1918:
In addition to the construction of the line, water supply was also an important issue. A steam locomotive could not run more than 50 km without taking on water. Therefore,
2088:
had already agreed to build the second platform at Tapfheim, provided that a necessary underpass was built by the federal government and the Free State of Bavaria.
1546: 2168: 2196:
München – Mühldorf – Simbach. Glanz, Niedergang und Renaissance einer königlich bayerischen Eisenbahn. Bewegte Verkehrsgeschichte mit umwälzender Zukunft
2002:. The Ingolstadt–Neuoffingen services run regularly on the eastern track in both directions. The western track is mainly used by trains on the 2092:
Straße" were closed. Several collisions between rail and road vehicles had occurred at both level crossings, several involving fatalities.
400: 2003: 828: 553: 1929:
the terrain into two parts. Numerous railway overpasses became necessary. The bed of the Ach river had to be moved in Weichering.
2302: 2074:
To improve traffic control and to minimise delays after operational disruptions, a new outer platform was built at platform 2 at
1287: 2297: 2244: 2222: 2203: 439: 1291: 2282: 2263: 1863: 330: 2060:
platform, this is no longer necessary, so that a simple platform on the eastern side of the road is now sufficient.
2164: 1999: 477: 231: 104: 1195: 1888: 1813: 266: 216: 1437: 292: 2163:[Free State improves connections to the Audi site in Ingolstadt] (Press release) (in German). 2292: 2013:
The carriage of freight between Ingolstadt and Donauwörth was discontinued on 15 December 2002.
1632: 1859: 1784: 1732: 2028: 1908: 363: 226: 83: 1958: 1855: 1504: 2085: 2056: 2031:
on weekdays, which do not serve all stops. Due to these additional journeys, the stations of
1377: 2007: 1251: 1847: 772: 173: 8: 2287: 1973: 2259: 2240: 2218: 2199: 819: 2024: 1899: 1892: 1072: 2064: 1321: 208: 137: 28: 2276: 1606: 109: 52: 1851: 1812:
Source: DB Infrastructure register, German railway atlas, map of the Munich
2032: 1126: 1099: 1006: 1041: 1919: 1911:
would be built. This delayed the work between Weichering and Ingolstadt.
949: 180: 2253: 1883: 2114: 2055:
A new, modern and disabled-friendly platform was put into operation in
1962: 1843: 679: 507: 2129: 2075: 1989: 1407: 2036: 1572: 1347: 915: 1835: 127: 70: 2018: 1839: 1225: 2161:"Freistaat verbessert Anbindung des Audi-Standorts Ingolstadt" 2045: 1981: 1954: 1471: 1953:
The railway had plans to fuel the steam locomotives with
2048:
plant. There are some express trains that are not busy.
1922:
were established at both Neuburg and Burgheim stations.
2254:
Regensburger Eisenbahnfreunde RSWE e. V. (2000).
1915:million cubic metres of earth in the Neuburg area. 1834:is a single-track, electrified mainline railway in 2141: 2274: 2016:After the takeover of the transport services by 1985:Passenger and freight trains cross in Rohrenfeld 814: 261: 2198:(in German). Walpertskirchen: self-published. 2231: 2135: 1862:. The Ingolstadt–Neuoffingen railway and the 1957:. The material was obtained from the nearby 2258:(in German). Stuttgart: transpress Verlag. 1907:For a long time it was not clear where the 2010:was the first train to use the new route. 2215:Streifzug durch Neuburg und den Landkreis 1988: 1980: 1972: 1898: 1882:Thirteen towns along the Danube between 1977:A passenger train in Rohrenfeld station 2275: 2212: 2193: 2147: 2217:(in German). Berlin: Pro Business. 1858:to Neuoffingen, where it joins the 13: 1485: 14: 2314: 1522: 2167:. 1 October 2015. Archived from 2165:Bayerische Eisenbahngesellschaft 1773: 1745: 1721: 1714: 1686: 1656: 1650: 1649: 1619: 1589: 1559: 1535: 1528: 1521: 1491: 1484: 1454: 1424: 1394: 1364: 1334: 1304: 1270: 1263: 1238: 1208: 1178: 1171: 1143: 1113: 1085: 1055: 1030: 1023: 993: 962: 932: 902: 874: 846: 796: 789: 759: 731: 724: 696: 666: 641: 634: 606: 599: 573: 566: 539: 532: 525: 497: 490: 466: 459: 452: 428: 421: 414: 389: 382: 375: 350: 343: 319: 312: 305: 27: 16:Railway line in Bavaria, Germany 1687: 1590: 1529: 1455: 1305: 1209: 1086: 1056: 1024: 933: 797: 790: 732: 725: 635: 607: 2303:1874 establishments in Germany 2239:]. Schweers + Wall. 2017. 2153: 2107: 1903:Cutting at Unterhausen station 1832:Ingolstadt–Neuoffingen railway 1722: 1715: 1657: 1264: 1179: 1172: 1031: 540: 467: 422: 415: 376: 320: 313: 22:Ingolstadt–Neuoffingen railway 1: 2095: 1948: 1889:Royal Bavarian State Railways 1864:Regensburg–Ingolstadt railway 1774: 1492: 1271: 600: 567: 533: 526: 491: 460: 453: 383: 306: 165:171.4 km (106.5 mi) 2298:Railway lines opened in 1874 2100: 2067:Continental multiple units. 2040:top speed is 140 km/h. 642: 7: 2004:Ingolstadt–Augsburg railway 1866:together form the Bavarian 1746: 1620: 1560: 1536: 1425: 1395: 1365: 1335: 1239: 1144: 1114: 994: 963: 903: 875: 847: 760: 697: 667: 574: 498: 429: 390: 351: 344: 242:140 km/h (87 mph) 10: 2319: 2256:Eisenbahnknoten Regensburg 2233:Eisenbahnatlas Deutschland 2187: 1877: 1838:, Germany. It runs in the 221:334 metres (1,096 ft) 138:Alstom Coradia Continental 2138:, pp. 96–97, 105–06. 2000:Ingolstadt–Munich railway 1782: 1767: 1739: 1730: 1708: 1701: 1680: 1671: 1643: 1613: 1604: 1583: 1553: 1547:metre-gauge line to Aalen 1544: 1515: 1478: 1469: 1448: 1418: 1388: 1358: 1328: 1319: 1298: 1285: 1257: 1250: 1232: 1223: 1202: 1193: 1165: 1137: 1107: 1097: 1079: 1070: 1049: 1039: 1017: 987: 956: 947: 926: 896: 868: 840: 811: 783: 753: 746: 718: 690: 660: 656: 628: 621: 593: 588: 560: 551: 519: 484: 475: 446: 437: 408: 398: 369: 362: 337: 328: 299: 277: 246: 238: 225: 215: 179: 169: 161: 156: 148: 143: 133: 123: 115: 100: 95: 76: 66: 58: 48: 40: 35: 26: 21: 2283:Railway lines in Bavaria 1926:Maschinenfabrik Augsburg 107:, passenger/freight rail 2213:Wagner, Ludwig (2008). 2115:"Infrastrukturregister" 2023:express trains between 2086:DB Station&Service 1994: 1986: 1978: 1959:Old Bavarian Donaumoos 1904: 1856:Dillingen an der Donau 2194:Bürger, Karl (2017). 2117:(in German). DB Netze 1992: 1984: 1976: 1909:station in Ingolstadt 1902: 1868:Danube Valley Railway 748:Neuburg-Grünau siding 2237:German railway atlas 1860:Augsburg–Ulm railway 1848:Neuburg an der Donau 554:to Augsburg-Hochzoll 234:AC overhead catenary 2171:on 18 November 2016 2136:Railway Atlas 2017 1995: 1987: 1979: 1970:24 May 1980. 1905: 1816:as of March 1952. 1633:Gundelfingen (Bay) 1378:Schwenningen (Bay) 859:Unterhausen (Bay) 2246:978-3-89494-146-8 2224:978-3-86805-254-1 2205:978-3-00-056474-1 1828: 1827: 1824: 1823: 1820: 1819: 1807: 1806: 1674:to Sontheim-Brenz 1505:Dillingen (Donau) 1438:Höchstädt (Donau) 1196:from Augsburg Hbf 834: 833: 2310: 2293:Transport in Ulm 2269: 2250: 2228: 2209: 2181: 2180: 2178: 2176: 2157: 2151: 2145: 2139: 2133: 2127: 2126: 2124: 2122: 2111: 1814:railway division 1777: 1776: 1749: 1748: 1725: 1724: 1718: 1717: 1698: 1690: 1689: 1668: 1660: 1659: 1653: 1652: 1623: 1622: 1601: 1593: 1592: 1563: 1562: 1539: 1538: 1532: 1531: 1525: 1524: 1495: 1494: 1488: 1487: 1466: 1458: 1457: 1428: 1427: 1398: 1397: 1368: 1367: 1338: 1337: 1316: 1308: 1307: 1288:to Treuchtlingen 1282: 1274: 1273: 1267: 1266: 1242: 1241: 1220: 1212: 1211: 1190: 1182: 1181: 1175: 1174: 1147: 1146: 1117: 1116: 1089: 1088: 1067: 1059: 1058: 1034: 1033: 1027: 1026: 997: 996: 974: 966: 965: 944: 936: 935: 906: 905: 878: 877: 850: 849: 815: 808: 800: 799: 793: 792: 763: 762: 743: 735: 734: 728: 727: 700: 699: 670: 669: 653: 645: 644: 638: 637: 618: 610: 609: 603: 602: 585: 577: 576: 570: 569: 543: 542: 536: 535: 529: 528: 501: 500: 494: 493: 470: 469: 463: 462: 456: 455: 440:to Treuchtlingen 432: 431: 425: 424: 418: 417: 393: 392: 386: 385: 379: 378: 354: 353: 347: 346: 323: 322: 316: 315: 309: 308: 275: 274: 262: 248: 247: 211: 205: 203: 202: 198: 195: 187: 170:Number of tracks 31: 19: 18: 2318: 2317: 2313: 2312: 2311: 2309: 2308: 2307: 2273: 2272: 2266: 2247: 2225: 2206: 2190: 2185: 2184: 2174: 2172: 2159: 2158: 2154: 2146: 2142: 2134: 2130: 2120: 2118: 2113: 2112: 2108: 2103: 2098: 1951: 1880: 1787: 1778: 1763: 1755: 1750: 1735: 1726: 1719: 1704: 1699: 1696: 1691: 1676: 1669: 1666: 1661: 1654: 1639: 1629: 1624: 1609: 1602: 1599: 1594: 1579: 1569: 1564: 1549: 1540: 1533: 1526: 1511: 1501: 1496: 1489: 1474: 1467: 1464: 1459: 1444: 1434: 1429: 1414: 1404: 1399: 1384: 1374: 1369: 1354: 1344: 1339: 1324: 1317: 1314: 1309: 1294: 1283: 1280: 1275: 1268: 1248: 1243: 1228: 1221: 1218: 1213: 1198: 1191: 1188: 1183: 1176: 1161: 1153: 1148: 1133: 1123: 1118: 1103: 1095: 1090: 1075: 1073:Friedberger Ach 1068: 1065: 1060: 1045: 1035: 1028: 1013: 1003: 998: 983: 975: 972: 967: 952: 945: 942: 937: 922: 912: 907: 892: 884: 879: 864: 856: 851: 836: 809: 806: 801: 794: 779: 773:Neuburg (Donau) 769: 764: 749: 744: 741: 736: 729: 714: 706: 701: 686: 676: 671: 654: 651: 646: 639: 624: 619: 616: 611: 604: 586: 583: 578: 571: 556: 549: 544: 537: 530: 515: 502: 495: 480: 471: 464: 457: 442: 433: 426: 419: 404: 394: 387: 380: 360: 355: 348: 333: 331:from Regensburg 324: 317: 310: 295: 286: 269: 253: 239:Operating speed 227:Electrification 207: 200: 196: 193: 191: 190:4 ft  189: 185: 108: 91: 17: 12: 11: 5: 2316: 2306: 2305: 2300: 2295: 2290: 2285: 2271: 2270: 2264: 2251: 2245: 2229: 2223: 2210: 2204: 2189: 2186: 2183: 2182: 2152: 2140: 2128: 2105: 2104: 2102: 2099: 2097: 2094: 2065:Alstom Coradia 1993:Potato loading 1961:. The area of 1950: 1947: 1879: 1876: 1826: 1825: 1822: 1821: 1818: 1817: 1809: 1808: 1805: 1804: 1802: 1800: 1798: 1796: 1794: 1792: 1789: 1788: 1783: 1781: 1779: 1772: 1770: 1768: 1765: 1764: 1761: 1759: 1756: 1753: 1751: 1744: 1742: 1740: 1737: 1736: 1731: 1729: 1727: 1720: 1713: 1711: 1709: 1706: 1705: 1702: 1700: 1694: 1692: 1685: 1683: 1681: 1678: 1677: 1672: 1670: 1664: 1662: 1655: 1648: 1646: 1644: 1641: 1640: 1637: 1635: 1630: 1627: 1625: 1618: 1616: 1614: 1611: 1610: 1605: 1603: 1597: 1595: 1588: 1586: 1584: 1581: 1580: 1577: 1575: 1570: 1567: 1565: 1558: 1556: 1554: 1551: 1550: 1545: 1543: 1541: 1534: 1527: 1520: 1518: 1516: 1513: 1512: 1509: 1507: 1502: 1499: 1497: 1490: 1483: 1481: 1479: 1476: 1475: 1470: 1468: 1462: 1460: 1453: 1451: 1449: 1446: 1445: 1442: 1440: 1435: 1432: 1430: 1423: 1421: 1419: 1416: 1415: 1412: 1410: 1405: 1402: 1400: 1393: 1391: 1389: 1386: 1385: 1382: 1380: 1375: 1372: 1370: 1363: 1361: 1359: 1356: 1355: 1352: 1350: 1345: 1342: 1340: 1333: 1331: 1329: 1326: 1325: 1320: 1318: 1312: 1310: 1303: 1301: 1299: 1296: 1295: 1286: 1284: 1278: 1276: 1269: 1262: 1260: 1258: 1255: 1254: 1249: 1246: 1244: 1237: 1235: 1233: 1230: 1229: 1224: 1222: 1216: 1214: 1207: 1205: 1203: 1200: 1199: 1194: 1192: 1186: 1184: 1177: 1170: 1168: 1166: 1163: 1162: 1159: 1157: 1154: 1151: 1149: 1142: 1140: 1138: 1135: 1134: 1131: 1129: 1124: 1121: 1119: 1112: 1110: 1108: 1105: 1104: 1098: 1096: 1093: 1091: 1084: 1082: 1080: 1077: 1076: 1071: 1069: 1063: 1061: 1054: 1052: 1050: 1047: 1046: 1040: 1038: 1036: 1029: 1022: 1020: 1018: 1015: 1014: 1011: 1009: 1004: 1001: 999: 992: 990: 988: 985: 984: 981: 979: 976: 970: 968: 961: 959: 957: 954: 953: 948: 946: 940: 938: 931: 929: 927: 924: 923: 920: 918: 913: 910: 908: 901: 899: 897: 894: 893: 890: 888: 885: 882: 880: 873: 871: 869: 866: 865: 862: 860: 857: 854: 852: 845: 843: 841: 838: 837: 832: 831: 824: 823: 818:connection to 812: 810: 804: 802: 795: 788: 786: 784: 781: 780: 777: 775: 770: 767: 765: 758: 756: 754: 751: 750: 747: 745: 739: 737: 730: 723: 721: 719: 716: 715: 712: 710: 707: 704: 702: 695: 693: 691: 688: 687: 684: 682: 677: 674: 672: 665: 663: 661: 658: 657: 655: 649: 647: 640: 633: 631: 629: 626: 625: 622: 620: 614: 612: 605: 598: 596: 594: 591: 590: 587: 581: 579: 572: 565: 563: 561: 558: 557: 552: 550: 547: 545: 538: 531: 524: 522: 520: 517: 516: 513: 511: 505: 503: 496: 489: 487: 485: 482: 481: 476: 474: 472: 465: 458: 451: 449: 447: 444: 443: 438: 436: 434: 427: 420: 413: 411: 409: 406: 405: 399: 397: 395: 388: 381: 374: 372: 370: 367: 366: 364:Ingolstadt Hbf 361: 358: 356: 349: 342: 340: 338: 335: 334: 329: 327: 325: 318: 311: 304: 302: 300: 297: 296: 291: 289: 287: 284: 282: 280: 278: 271: 270: 265: 255: 254: 251: 244: 243: 240: 236: 235: 229: 223: 222: 219: 217:Minimum radius 213: 212: 209:standard gauge 183: 177: 176: 171: 167: 166: 163: 159: 158: 154: 153: 150: 146: 145: 141: 140: 135: 131: 130: 125: 121: 120: 117: 113: 112: 102: 98: 97: 93: 92: 90: 89: 86: 84:Ingolstadt Hbf 80: 78: 74: 73: 68: 64: 63: 60: 56: 55: 50: 46: 45: 42: 38: 37: 33: 32: 24: 23: 15: 9: 6: 4: 3: 2: 2315: 2304: 2301: 2299: 2296: 2294: 2291: 2289: 2286: 2284: 2281: 2280: 2278: 2267: 2265:3-613-71135-4 2261: 2257: 2252: 2248: 2242: 2238: 2234: 2230: 2226: 2220: 2216: 2211: 2207: 2201: 2197: 2192: 2191: 2170: 2166: 2162: 2156: 2149: 2144: 2137: 2132: 2116: 2110: 2106: 2093: 2089: 2087: 2082: 2079: 2077: 2072: 2068: 2066: 2061: 2058: 2053: 2049: 2047: 2041: 2038: 2034: 2030: 2026: 2021: 2020: 2014: 2011: 2009: 2005: 2001: 1991: 1983: 1975: 1971: 1967: 1964: 1960: 1956: 1946: 1942: 1938: 1934: 1930: 1927: 1923: 1921: 1916: 1912: 1910: 1901: 1897: 1894: 1890: 1887:built by the 1885: 1875: 1873: 1869: 1865: 1861: 1857: 1853: 1849: 1845: 1841: 1837: 1833: 1815: 1811: 1810: 1803: 1801: 1799: 1797: 1795: 1793: 1791: 1790: 1786: 1780: 1771: 1769: 1766: 1760: 1757: 1752: 1743: 1741: 1738: 1734: 1733:from Augsburg 1728: 1712: 1710: 1707: 1693: 1684: 1682: 1679: 1675: 1663: 1647: 1645: 1642: 1636: 1634: 1631: 1626: 1617: 1615: 1612: 1608: 1596: 1587: 1585: 1582: 1576: 1574: 1571: 1566: 1557: 1555: 1552: 1548: 1542: 1519: 1517: 1514: 1508: 1506: 1503: 1498: 1482: 1480: 1477: 1473: 1461: 1452: 1450: 1447: 1441: 1439: 1436: 1431: 1422: 1420: 1417: 1411: 1409: 1406: 1401: 1392: 1390: 1387: 1381: 1379: 1376: 1371: 1362: 1360: 1357: 1351: 1349: 1346: 1341: 1332: 1330: 1327: 1323: 1311: 1302: 1300: 1297: 1293: 1292:to Nördlingen 1289: 1277: 1261: 1259: 1256: 1253: 1245: 1236: 1234: 1231: 1227: 1215: 1206: 1204: 1201: 1197: 1185: 1169: 1167: 1164: 1158: 1155: 1150: 1141: 1139: 1136: 1130: 1128: 1125: 1120: 1111: 1109: 1106: 1101: 1092: 1083: 1081: 1078: 1074: 1062: 1053: 1051: 1048: 1043: 1037: 1021: 1019: 1016: 1010: 1008: 1005: 1000: 991: 989: 986: 980: 977: 969: 960: 958: 955: 951: 939: 930: 928: 925: 919: 917: 914: 909: 900: 898: 895: 889: 886: 881: 872: 870: 867: 861: 858: 853: 844: 842: 839: 830: 826: 825: 821: 817: 816: 803: 787: 785: 782: 776: 774: 771: 766: 757: 755: 752: 738: 722: 720: 717: 711: 708: 703: 694: 692: 689: 683: 681: 678: 673: 664: 662: 659: 648: 632: 630: 627: 613: 597: 595: 592: 580: 564: 562: 559: 555: 546: 523: 521: 518: 512: 509: 506: 504: 488: 486: 483: 479: 473: 450: 448: 445: 441: 435: 412: 410: 407: 402: 396: 373: 371: 368: 365: 357: 341: 339: 336: 332: 326: 303: 301: 298: 294: 290: 288: 283: 281: 279: 276: 273: 272: 268: 264: 263: 260: 257: 256: 250: 249: 245: 241: 237: 233: 232:15 kV/16.7 Hz 230: 228: 224: 220: 218: 214: 210: 186:1,435 mm 184: 182: 178: 175: 172: 168: 164: 160: 155: 151: 147: 142: 139: 136: 134:Rolling stock 132: 129: 126: 122: 118: 114: 111: 110:Regional rail 106: 103: 99: 94: 87: 85: 82: 81: 79: 75: 72: 69: 65: 61: 57: 54: 53:Deutsche Bahn 51: 47: 43: 39: 34: 30: 25: 20: 2255: 2236: 2232: 2214: 2195: 2173:. Retrieved 2169:the original 2155: 2143: 2131: 2119:. Retrieved 2109: 2090: 2083: 2080: 2073: 2069: 2062: 2057:Schwenningen 2054: 2050: 2042: 2017: 2015: 2012: 1996: 1968: 1952: 1943: 1939: 1935: 1931: 1925: 1924: 1920:water cranes 1917: 1913: 1906: 1881: 1872:Donautalbahn 1871: 1867: 1842:valley from 1831: 1829: 1758:Neuoffingen 1127:Genderkingen 401:to Nuremberg 258: 174:Single track 116:Route number 2148:Bürger 2017 950:Kleine Paar 887:Straß-Moos 822:Unterhausen 709:Rohrenfeld 181:Track gauge 162:Line length 124:Operator(s) 88:Neuoffingen 59:Line number 44:Operational 2288:Ingolstadt 2277:Categories 2096:References 2029:Regensburg 2008:Donauwörth 1963:Weichering 1949:Operations 1852:Donauwörth 1844:Ingolstadt 1252:Donauwörth 978:Staudheim 680:Weichering 508:Ingolstadt 105:Heavy rail 2101:Footnotes 2076:Blindheim 1408:Blindheim 1042:Südzucker 589:Haunwöhr 478:to Munich 252:Route map 157:Technical 2037:Burgheim 1884:Günzburg 1573:Lauingen 1348:Tapfheim 916:Burgheim 510:-Seehof 204: in 36:Overview 2188:Sources 1878:History 1836:Bavaria 1638:431.3 m 1156:Hamlar 1102:(190 m) 827:of the 199:⁄ 144:History 128:DB Netz 96:Service 77:Termini 71:Bavaria 2262:  2243:  2221:  2202:  2175:8 July 2121:7 July 2019:agilis 1893:Gulden 1840:Danube 1785:to Ulm 1754:96.810 1703:Danube 1628:89.031 1568:84.230 1500:79.384 1433:72.182 1403:67.322 1373:65.066 1343:60.492 1322:Kessel 1247:52.944 1226:Danube 1152:47.704 1122:43.467 1094:42.489 1044:siding 1002:40.333 911:32.874 883:30.827 855:27.046 829:VTG AG 768:20.720 705:14.568 267:Legend 259: 149:Opened 67:Locale 41:Status 2235:[ 1762:440 m 1607:Brenz 1578:437 m 1510:433 m 1443:422 m 1413:421 m 1383:420 m 1353:417 m 1160:402 m 1132:402 m 1012:403 m 982:403 m 921:405 m 891:401 m 863:419 m 835: 813: 778:392 m 713:379 m 685:373 m 675:9.294 548:2.181 514:370 m 403:(HSR) 359:0.000 49:Owner 2260:ISBN 2241:ISBN 2219:ISBN 2200:ISBN 2177:2020 2123:2020 2046:Audi 2033:Rain 2027:and 1955:peat 1854:and 1846:via 1830:The 1695:95.9 1665:89.6 1598:88.7 1472:Egau 1463:76.1 1313:59.7 1290:and 1279:53.6 1217:52.5 1187:53.6 1100:Lech 1064:40.6 1007:Rain 971:36.8 941:36.0 805:26.2 740:16.2 582:3.13 293:elev 152:1874 101:Type 62:5381 2025:Ulm 1874:). 820:PAW 650:8.6 623:Ach 615:8.4 119:993 2279:: 2035:, 1850:, 1697:00 1667:00 1600:00 1465:00 1315:00 1281:00 1219:00 1189:00 1066:00 973:00 943:00 807:00 742:00 652:00 617:00 285:km 206:) 2268:. 2249:. 2227:. 2208:. 2179:. 2150:. 2125:. 1870:( 584:0 201:2 197:1 194:+ 192:8 188:(

Index


Deutsche Bahn
Bavaria
Ingolstadt Hbf
Heavy rail
Regional rail
DB Netz
Alstom Coradia Continental
Single track
Track gauge
standard gauge
Minimum radius
Electrification
15 kV/16.7 Hz
Legend
elev
from Regensburg
Ingolstadt Hbf
to Nuremberg
to Treuchtlingen
to Munich
Ingolstadt
to Augsburg-Hochzoll
Weichering
Neuburg (Donau)
PAW
VTG AG
Burgheim
Kleine Paar
Rain

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.