proposal. New Acland Coal also proposes to move the existing
Jondaryan rail coal load-out facility onto the mine site. An eight-kilometre rail spur would connect the facility to the existing rail line. Additional changes to the plan include leaving the Acland town area, including the Tom Doherty Park, the War Memorial and the Acland No 2 Colliery, in place.
315:
On 9 November 2012 the
Commonwealth Department of Sustainability, Environment, Water, Population and Communities confirmed it had accepted the modified project proposal. The controlling provisions for the assessment of the project under the Environment Protection and Biodiversity Conservation Act
307:
In response to concerns raised in March 2012 by the incoming
Queensland Government about the project's potential impacts, the proponent modified the project, including reducing its scope, resulting in a modified project proposal that was 63 per cent, or 2,300 hectares, smaller than the original
311:
The revised project has also been changed so that the mining operations will sit 10 km from the township of Oakey; the introduction of profiling and veneering technology at the project's rail loading facility and no longer require that the Lagoon Creek be diverted for mining operations.
303:
announced it did not support the proposed New Acland Coal Mine Stage 3 Project in its then current form. New Hope then entered into discussions with the State
Government about options to continue the operation at the mine.
343:
Documents obtained under
Queensland freedom of information laws show the state Department of Environment and Science believed the Darling Downs miner had committed a “major” breach of environmental laws.
347:
A formal “decision memo” detailed that the mine had conducted exploration drilling activities – including drilling at 27 sites and prepping 41 more – on land not designated for mining activity.
690:
332:
In August 2022, the
Queensland government finally gave approval for the mine's expansion. The expansion extends the mine's life by 12 years to 2034. Mining resumed in September 2023.
255:
To suppress coal dust impacts on communities through which the mine's coal is transported New Hope Coal announced plans to apply a water-based veneer to coal wagons in late 2012.
867:
296:
In preparation for the mine's expansion directly into the township of Acland most residents left. The last resident in the town, who has refused to leave, is Glenn Beutel.
945:
293:. This expansion would have extended the operating life of the mine until about 2042. It was planned that annual production would rise to 7.5 million tonnes.
267:. A total of 300 staff were expected to be working at the New Acland Mine in 2009, producing 4.2 million tonnes of coal a year. 60% of the coal was exported.
899:
350:
In 2020, the federal environment department found no wrong-doing on behalf of the mine. Investigations focused on non-compliance in the areas known as West Pit.
634:
662:
694:
821:
775:
319:
On 26 March 2013, the
Queensland Coordinator-General released the final Terms of Reference (ToR) for the New Acland Coal Mine Stage 3 Project.
565:
537:
103:
722:
286:. The graziers are concerned that the approval for the mine's expansion will threaten their Darling Downs community and water supply.
1055:
597:
1009:
282:
Stage 3 has been challenged and delayed by the Oakey Coal Action
Alliance since 2012. The local land owners are represented by the
926:
271:
798:
979:
1045:
727:
607:
575:
430:
76:
37:
322:
In 2016, the project passed through the
Queensland Land Court where it was described as the largest case of its kind.
1040:
477:
290:
500:
353:
On 22 August 2019, New Acland
Thermal coal mine workers were made redundant as the stage 3 deadline approached.
325:
Environmental approval was granted for Stage 3 in 2019. In 2020, the Oakey Coal Action Alliance appealed to the
283:
340:
New Acland Mine was caught drilling 27 illegal bores in 2018 and fined $ 3,152 by the Queensland government.
930:
566:"Controversial New Acland Coal mine issued with pre-enforcement letter following alleged illegal mining"
252:. Local reaction to property resumptions, workmen access and building activities was not well received.
378:
326:
1050:
460:
238:
717:
245:
206:
598:"New Acland Coal mine saga headed to High Court after leave granted to hear farmers' appeal"
402:
987:
602:
570:
464:
234:
8:
505:
868:"New Acland coalmine expansion: activists' lawyers stress water risk in final arguments"
229:
The mine began operations in 2002. It was officially opened on 13 March 2003 by Premier
190:
164:
2019, the mine is currently mothballed as extension applications have not been approved
69:
980:"New Acland coal mine investigation drags on for years, leading to landowners' anger"
953:
370:
300:
194:
946:"New Acland coalmine caught drilling illegally at 27 sites – and fined just $ 3,152"
663:"New Acland coalmine: Queensland farmers win reprieve in battle to stop expansion"
214:
844:
752:
542:
407:
218:
177:
237:
and both domestic and international markets. The mine has previously supplied
1034:
957:
435:
249:
230:
198:
118:
105:
904:
872:
819:
773:
667:
639:
635:"New Acland coalmine expansion to be reassessed after high court judgment"
248:
has indicated its preferred fuel source will be New Acland connected by a
900:"Queensland resources minister approves expansion of New Acland coalmine"
264:
202:
81:
510:
440:
91:
263:
Stage 2 of the mine was opened on the 21 March 2007 by
596:
Morris, Nathan; Robinson, Lucy; Bradfield, Elly (5 June 2020).
799:"New Hope releases new plans in bid for expansion green light"
335:
1010:"Acland workers offered redundancies as deadline approaches"
693:. Department of Infrastructure and Planning. Archived from
210:
595:
360:
209:and contains more than 500 million tonnes of
746:
744:
403:"Moving Out One by One as Australia Pursues Coal"
1032:
842:
564:Morris, Nathan; Bradfield, Elly (26 June 2020).
400:
796:
715:
563:
498:
274:for breaching noise limits more than 30 times.
244:To supply Tarong Power Station beyond 2010 the
741:
824:. Queensland Coordinator General's Department
820:Queensland Coordinator General's Department.
774:Queensland Coordinator General's Department.
428:
205:, Australia. Geologically it is part of the
535:
270:In 2019, the mine was fined $ 9,461 by the
897:
750:
691:"New Acland Coal Mine - Stage 3 Expansion"
467:. 23 April 2007. Retrieved on 18 May 2007.
336:Allegations of breach of environmental law
977:
865:
671:. Guardian News & Media. 5 June 2020
478:"New Acland to veneer coal train wagons"
927:NSW coal mine to restart after 18 years
718:"Mine expansion sends Qld town packing"
272:Department of Environment & Science
44:
1033:
893:
891:
822:"New Acland Coal Mine Stage 3 Project"
776:"New Acland Coal Mine Stage 3 Project"
628:
626:
624:
501:"Chance to strike 'gold' at coal mine"
461:Residents angry at conveyer belt plans
1007:
396:
394:
943:
866:Robertson, Joshua (5 October 2016).
859:
716:Francene Norton (15 February 2006).
531:
529:
527:
499:Madeleine Logan (16 February 2009).
217:. The mine is owned and operated by
193:township, about 10 km north of
888:
728:Australian Broadcasting Corporation
632:
621:
608:Australian Broadcasting Corporation
576:Australian Broadcasting Corporation
289:In 2010, Stage 3 was undergoing an
13:
898:Hinchliffe, Joe (26 August 2022).
709:
391:
14:
1067:
536:Jamie Freed (24 September 2008).
524:
401:Norimitsu Onishi (28 June 2010).
1056:2002 establishments in Australia
978:Bradfield, Elly (15 June 2021).
778:. Queensland Coordinator General
480:. New Hope Coal. 26 October 2012
431:"Fighting for Acland's survival"
429:Peter Hackney (24 August 2010).
363:
43:
36:
1001:
971:
937:
920:
836:
813:
790:
767:
683:
655:
291:environmental impact assessment
753:"About the New Acland Project"
589:
557:
538:"New Hope will share the loot"
492:
470:
454:
422:
284:Environmental Defenders Office
1:
633:Cox, Lisa (3 February 2021).
384:
316:1999 (Cwlth) were unchanged.
16:Mine in Queensland, Australia
299:In March 2012, the incoming
7:
931:Australian Financial Review
908:. Guardian News & Media
876:. Guardian News & Media
643:. Guardian News & Media
356:
233:. New Acland Mine supplies
10:
1072:
1046:Surface mines in Australia
944:Smee, Ben (29 July 2019).
277:
258:
224:
801:. The Toowoomba Chronicle
173:
168:
160:
152:
147:
139:
134:
97:
87:
75:
65:
31:
26:
1041:Coal mines in Queensland
379:Coal mining in Australia
327:High Court of Australia
213:that is removed by the
189:is located adjacent to
847:. New Hope Corporation
843:New Hope Corporation.
239:Swanbank Power Station
797:Toowoomba Chronicle.
246:Queensland Government
207:Walloon Coal Measures
57:Location in Australia
845:"New Acland Project"
511:APN News & Media
441:APN News & Media
235:Tarong Power Station
115: /
23:
21:
371:Queensland portal
301:Newman government
183:
182:
1063:
1025:
1024:
1022:
1020:
1008:Gillespie, Tom.
1005:
999:
998:
996:
994:
975:
969:
968:
966:
964:
941:
935:
934:30 November 2023
924:
918:
917:
915:
913:
895:
886:
885:
883:
881:
863:
857:
856:
854:
852:
840:
834:
833:
831:
829:
817:
811:
810:
808:
806:
794:
788:
787:
785:
783:
771:
765:
764:
762:
760:
755:. New Hope Group
751:New Hope Group.
748:
739:
738:
736:
734:
713:
707:
706:
704:
702:
697:on 29 March 2010
687:
681:
680:
678:
676:
659:
653:
652:
650:
648:
630:
619:
618:
616:
614:
593:
587:
586:
584:
582:
561:
555:
554:
552:
550:
533:
522:
521:
519:
517:
496:
490:
489:
487:
485:
474:
468:
458:
452:
451:
449:
447:
426:
420:
419:
417:
415:
398:
373:
368:
367:
366:
130:
129:
127:
126:
125:
120:
119:27.30°S 151.63°E
116:
113:
112:
111:
108:
47:
46:
40:
24:
20:
1071:
1070:
1066:
1065:
1064:
1062:
1061:
1060:
1031:
1030:
1029:
1028:
1018:
1016:
1006:
1002:
992:
990:
976:
972:
962:
960:
942:
938:
925:
921:
911:
909:
896:
889:
879:
877:
864:
860:
850:
848:
841:
837:
827:
825:
818:
814:
804:
802:
795:
791:
781:
779:
772:
768:
758:
756:
749:
742:
732:
730:
723:The World Today
714:
710:
700:
698:
689:
688:
684:
674:
672:
661:
660:
656:
646:
644:
631:
622:
612:
610:
594:
590:
580:
578:
562:
558:
548:
546:
534:
525:
515:
513:
497:
493:
483:
481:
476:
475:
471:
459:
455:
445:
443:
427:
423:
413:
411:
399:
392:
387:
369:
364:
362:
359:
338:
280:
261:
227:
215:open cut method
187:New Acland Mine
123:
121:
117:
114:
109:
106:
104:
102:
101:
61:
60:
59:
58:
55:
54:
53:
52:
51:New Acland Mine
48:
22:New Acland Mine
17:
12:
11:
5:
1069:
1059:
1058:
1053:
1048:
1043:
1027:
1026:
1000:
970:
936:
919:
887:
858:
835:
812:
789:
766:
740:
708:
682:
654:
620:
588:
556:
543:Brisbane Times
523:
491:
469:
453:
421:
408:New York Times
389:
388:
386:
383:
382:
381:
375:
374:
358:
355:
337:
334:
279:
276:
260:
257:
226:
223:
219:New Hope Group
181:
180:
178:New Hope Group
175:
171:
170:
166:
165:
162:
158:
157:
154:
150:
149:
145:
144:
141:
137:
136:
132:
131:
124:-27.30; 151.63
99:
95:
94:
89:
85:
84:
79:
73:
72:
67:
63:
62:
56:
50:
49:
42:
41:
35:
34:
33:
32:
29:
28:
15:
9:
6:
4:
3:
2:
1068:
1057:
1054:
1052:
1051:Darling Downs
1049:
1047:
1044:
1042:
1039:
1038:
1036:
1015:
1011:
1004:
989:
985:
981:
974:
959:
955:
951:
947:
940:
933:
932:
928:
923:
907:
906:
901:
894:
892:
875:
874:
869:
862:
846:
839:
823:
816:
800:
793:
777:
770:
754:
747:
745:
729:
725:
724:
719:
712:
696:
692:
686:
670:
669:
664:
658:
642:
641:
636:
629:
627:
625:
609:
605:
604:
599:
592:
577:
573:
572:
567:
560:
545:
544:
539:
532:
530:
528:
512:
508:
507:
506:The Chronicle
502:
495:
479:
473:
466:
462:
457:
442:
438:
437:
436:Daily Mercury
432:
425:
410:
409:
404:
397:
395:
390:
380:
377:
376:
372:
361:
354:
351:
348:
345:
341:
333:
330:
328:
323:
320:
317:
313:
309:
305:
302:
297:
294:
292:
287:
285:
275:
273:
268:
266:
256:
253:
251:
250:conveyor belt
247:
242:
240:
236:
232:
231:Peter Beattie
222:
220:
216:
212:
208:
204:
200:
199:Darling Downs
196:
192:
188:
179:
176:
172:
167:
163:
159:
155:
151:
146:
142:
138:
133:
128:
100:
96:
93:
90:
86:
83:
80:
78:
74:
71:
68:
64:
39:
30:
25:
19:
1017:. Retrieved
1013:
1003:
991:. Retrieved
983:
973:
961:. Retrieved
950:The Guardian
949:
939:
929:
922:
910:. Retrieved
905:The Guardian
903:
878:. Retrieved
873:The Guardian
871:
861:
849:. Retrieved
838:
826:. Retrieved
815:
803:. Retrieved
792:
780:. Retrieved
769:
757:. Retrieved
731:. Retrieved
721:
711:
699:. Retrieved
695:the original
685:
673:. Retrieved
668:The Guardian
666:
657:
645:. Retrieved
640:The Guardian
638:
611:. Retrieved
601:
591:
579:. Retrieved
569:
559:
547:. Retrieved
541:
514:. Retrieved
504:
494:
482:. Retrieved
472:
456:
444:. Retrieved
434:
424:
412:. Retrieved
406:
352:
349:
346:
342:
339:
331:
324:
321:
318:
314:
310:
306:
298:
295:
288:
281:
269:
262:
254:
243:
228:
186:
184:
143:Thermal coal
18:
701:5 September
549:5 September
516:5 September
446:5 September
414:5 September
122: /
98:Coordinates
1035:Categories
1019:7 November
993:28 October
984:abc.net.au
963:7 November
880:29 October
733:23 October
675:29 October
647:29 October
613:28 October
581:28 October
385:References
265:Anna Bligh
203:Queensland
135:Production
82:Queensland
1014:Chronicle
958:0261-3077
912:27 August
484:1 October
92:Australia
988:ABC News
603:ABC News
571:ABC News
465:ABC News
357:See also
140:Products
110:151°38′E
66:Location
27:Location
278:Stage 3
259:Stage 2
225:Stage 1
197:on the
174:Company
148:History
107:27°18′S
88:Country
956:
851:4 July
828:4 July
805:4 July
782:4 July
759:4 July
191:Acland
161:Closed
153:Opened
70:Acland
195:Oakey
169:Owner
77:State
1021:2019
995:2021
965:2019
954:ISSN
914:2022
882:2021
853:2013
830:2013
807:2013
784:2013
761:2013
735:2009
703:2010
677:2021
649:2021
615:2021
583:2021
551:2010
518:2010
486:2013
448:2010
416:2010
211:coal
185:The
156:2002
201:in
1037::
1012:.
986:.
982:.
952:.
948:.
902:.
890:^
870:.
743:^
726:.
720:.
665:.
637:.
623:^
606:.
600:.
574:.
568:.
540:.
526:^
509:.
503:.
463:.
439:.
433:.
405:.
393:^
329:.
241:.
221:.
1023:.
997:.
967:.
916:.
884:.
855:.
832:.
809:.
786:.
763:.
737:.
705:.
679:.
651:.
617:.
585:.
553:.
520:.
488:.
450:.
418:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.