Knowledge

Trolleybuses in Córdoba

Source 📝

489: 136: 429: 465: 453: 406: 386: 366: 773: 766: 759: 752: 745: 738: 731: 724: 717: 441: 477: 311: 617: 891: 522: 22: 508: 267: 306:
of model 683c were added to the fleet. They incorporated thyristor technology, which ensured more effective control. By 1992, Córdoba had 32 conventional and 12 articulated ZiU-brand trolleybuses. The latter vehicles had a capacity of 46 seats and 166 passengers with a total length of 17.5 m.
285:
As part of an ambitious municipal public transport improvement program, the city of Córdoba decided in the late 1980s to incorporate trolleybuses into Córdoba's urban transport system.
488: 605: 583: 598: 318:
In 2000, 16 Chinese-built Norinco Shenfeng trolleybuses entered service on the system. These did not last long and were all withdrawn by 2013.
591: 428: 94: 66: 43: 924: 929: 792: 778: 613: 73: 329:
trolleybuses were delivered. These include 5 low-entry vehicles of the type Optima and 2 low-floor vehicles of the type Megapolis.
288:
The Soviet firm "VVO Technoexport" was responsible for the turnkey installation of the trolleybus system, which initially used
80: 258:
Opened in 1989, the system presently comprises three lines, with a total length of approximately 50 km (31 mi).
919: 62: 772: 765: 758: 751: 744: 737: 730: 723: 716: 113: 51: 274:
articulated trolleybuses on line B in 2011. All remaining ZiU-10s in the fleet received a modernised front end and
464: 452: 47: 914: 810: 248: 440: 696: 87: 630: 872: 833: 815: 540: 476: 135: 706: 558: 32: 851: 846: 36: 805: 240: 154: 681: 275: 8: 646: 821: 686: 666: 651: 405: 385: 365: 292:
trolleybuses, model 682b, manufactured in Russia by ZiU (Zavod imeni Uritskogo, now
895: 800: 527: 332:
Companies that have operated the Córdoba trolleybus system have been successively:
278: 236: 228: 867: 535: 877: 573: 303: 691: 671: 622: 908: 638: 322: 348:
Transporte Automotor Municipal Sociedad del Estado (TAMSE): since July 2004.
676: 513: 244: 310: 788: 656: 222: 661: 616: 252: 158: 21: 325:
entered service. The latest fleet renewal occurred in 2015 when 7
569: 326: 300: 293: 271: 207: 289: 626: 314:
A Norinco trolleybus in Córdoba, near Patio Olmos, in 2007
266: 199:
Transporte Automotor Municipal Sociedad del Estado (TAMSE)
577: 494:
ZIU-10 trolleybus in 2022, wearing the current livery
339:
Transportes Eléctricos Cañadenses: from 1993 to 1996;
503: 906: 357:These are Córdoba's present trolleybus lines: 321:In 2010 a prototype articulated trolleybus by 599: 342:Municipalidad de Córdoba: from 1996 to 1997; 140:A ZIU trolleybus in the city centre in 2009 50:. Unsourced material may be challenged and 606: 592: 580:– in various languages, including English. 134: 114:Learn how and when to remove this message 309: 265: 434:Trolleybus wires along Sarmiento Street 907: 345:Trolecor S.A.: from 1998 to July 2004; 587: 336:Expreso Emir S.A.: from 1989 to 1993; 48:adding citations to reliable sources 15: 13: 404: 384: 364: 14: 941: 925:Trolleybus transport in Argentina 551: 930:1989 establishments in Argentina 889: 771: 764: 757: 750: 743: 736: 729: 722: 715: 615: 570:Córdoba database / photo gallery 520: 506: 487: 475: 463: 451: 439: 427: 233:Sistema de trolebuses de Córdoba 20: 1: 546: 373:From Barrio Mariano Fragueiro 446:Trolleybus wire intersection 7: 499: 208:http://www.tam-se.com.ar/es 10: 946: 920:Trolleybus systems by city 873:Red de Expresos Regionales 559:"Trolleybus city: Córdoba" 541:List of trolleybus systems 420: 261: 886: 860: 832: 787: 705: 637: 400: 380: 360: 203: 195: 187: 179: 164: 150: 145: 133: 129:Córdoba trolleybus system 128: 63:"Trolleybuses in Córdoba" 482:ZiU-9 trolleybus in 2007 393:From Barrio Alto Alberdi 352: 304:articulated trolleybuses 574:Córdoba trolleybus list 578:Urban Electric Transit 458:Trolleybus wire switch 409: 389: 369: 315: 299:In 1990, Russian-made 282: 281:between 2009 and 2011. 270:One of Córdoba's 1990 232: 416:To Barrio San Vicente 408: 388: 376:To Plaza las Américas 368: 313: 269: 896:Argentina portal 806:Metrotranvía Mendoza 682:Santa Fe Urban Train 413:From Barrio Ameghino 396:To Barrio Pueyrredón 168:7 May 1989 44:improve this article 811:BA Historic Tramway 915:Córdoba, Argentina 687:Tren al Desarrollo 410: 390: 370: 316: 283: 902: 901: 279:destination signs 235:) is part of the 217: 216: 124: 123: 116: 98: 937: 894: 893: 892: 822:Tranvía del Este 801:Tren de la Costa 779:List of stations 775: 768: 761: 754: 747: 740: 733: 726: 719: 697:University Train 620: 619: 608: 601: 594: 585: 584: 566: 530: 528:Argentina portal 525: 524: 523: 516: 511: 510: 509: 491: 479: 470:Trolleybus depot 467: 455: 443: 431: 249:Córdoba Province 237:public transport 213: 175: 173: 138: 126: 125: 119: 112: 108: 105: 99: 97: 56: 24: 16: 945: 944: 940: 939: 938: 936: 935: 934: 905: 904: 903: 898: 890: 888: 882: 878:Rosario Tramway 856: 828: 783: 701: 633: 614: 612: 557: 554: 549: 526: 521: 519: 512: 507: 505: 502: 495: 492: 483: 480: 471: 468: 459: 456: 447: 444: 435: 432: 423: 403: 383: 363: 355: 264: 211: 171: 169: 141: 120: 109: 103: 100: 57: 55: 41: 25: 12: 11: 5: 943: 933: 932: 927: 922: 917: 900: 899: 887: 884: 883: 881: 880: 875: 870: 864: 862: 858: 857: 855: 854: 849: 844: 838: 836: 830: 829: 827: 826: 818: 813: 808: 803: 797: 795: 785: 784: 782: 781: 776: 769: 762: 755: 748: 741: 734: 727: 720: 712: 710: 703: 702: 700: 699: 694: 692:Tren del Valle 689: 684: 679: 674: 669: 664: 659: 654: 649: 647:Belgrano Norte 643: 641: 635: 634: 611: 610: 603: 596: 588: 582: 581: 567: 553: 552:External links 550: 548: 545: 544: 543: 538: 532: 531: 517: 501: 498: 497: 496: 493: 486: 484: 481: 474: 472: 469: 462: 460: 457: 450: 448: 445: 438: 436: 433: 426: 422: 419: 418: 417: 414: 402: 399: 398: 397: 394: 382: 379: 378: 377: 374: 362: 359: 354: 351: 350: 349: 346: 343: 340: 337: 263: 260: 215: 214: 205: 201: 200: 197: 193: 192: 191:3 (TA, TB, TC) 189: 185: 184: 181: 177: 176: 166: 162: 161: 152: 148: 147: 143: 142: 139: 131: 130: 122: 121: 28: 26: 19: 9: 6: 4: 3: 2: 942: 931: 928: 926: 923: 921: 918: 916: 913: 912: 910: 897: 885: 879: 876: 874: 871: 869: 868:Córdoba Metro 866: 865: 863: 859: 853: 850: 848: 845: 843: 840: 839: 837: 835: 831: 824: 823: 819: 817: 814: 812: 809: 807: 804: 802: 799: 798: 796: 794: 790: 786: 780: 777: 774: 770: 767: 763: 760: 756: 753: 749: 746: 742: 739: 735: 732: 728: 725: 721: 718: 714: 713: 711: 708: 704: 698: 695: 693: 690: 688: 685: 683: 680: 678: 675: 673: 670: 668: 665: 663: 660: 658: 655: 653: 650: 648: 645: 644: 642: 640: 639:Commuter rail 636: 632: 628: 624: 618: 609: 604: 602: 597: 595: 590: 589: 586: 579: 575: 571: 568: 564: 563:Trolleymotion 560: 556: 555: 542: 539: 537: 536:Córdoba Metro 534: 533: 529: 518: 515: 504: 490: 485: 478: 473: 466: 461: 454: 449: 442: 437: 430: 425: 424: 415: 412: 411: 407: 395: 392: 391: 387: 375: 372: 371: 367: 358: 347: 344: 341: 338: 335: 334: 333: 330: 328: 324: 323:Belkommunmash 319: 312: 308: 305: 302: 297: 295: 291: 286: 280: 277: 273: 268: 259: 256: 254: 250: 246: 242: 238: 234: 230: 226: 224: 209: 206: 202: 198: 194: 190: 186: 182: 178: 167: 163: 160: 156: 153: 149: 144: 137: 132: 127: 118: 115: 107: 104:February 2019 96: 93: 89: 86: 82: 79: 75: 72: 68: 65: –  64: 60: 59:Find sources: 53: 49: 45: 39: 38: 34: 29:This article 27: 23: 18: 17: 841: 834:Trolleybuses 820: 652:Belgrano Sur 629:networks in 562: 514:Buses portal 356: 331: 320: 317: 298: 287: 284: 257: 245:capital city 220: 218: 212:(in Spanish) 110: 101: 91: 84: 77: 70: 58: 42:Please help 30: 707:Underground 239:network in 196:Operator(s) 909:Categories 789:Light rail 667:San Martín 572: and 547:References 223:trolleybus 172:1989-05-07 74:newspapers 672:Sarmiento 631:Argentina 253:Argentina 159:Argentina 146:Operation 31:does not 861:Projects 825:(closed) 816:Premetro 500:See also 221:Córdoba 852:Rosario 847:Mendoza 842:Córdoba 677:Urquiza 421:Gallery 262:History 241:Córdoba 229:Spanish 204:Website 170: ( 155:Córdoba 88:scholar 52:removed 37:sources 621:Urban 401:Line C 381:Line B 361:Line A 327:Trolza 301:ZiU-10 294:Trolza 272:ZiU-10 243:, the 225:system 210:TAMSE 188:Routes 180:Status 151:Locale 90:  83:  76:  69:  61:  793:Trams 709:lines 657:Mitre 353:Lines 290:ZiU-9 95:JSTOR 81:books 662:Roca 627:tram 625:and 623:rail 219:The 183:Open 165:Open 67:news 35:any 33:cite 576:at 296:). 276:LED 247:of 46:by 911:: 561:. 255:. 251:, 231:: 157:, 791:/ 607:e 600:t 593:v 565:. 227:( 174:) 117:) 111:( 106:) 102:( 92:· 85:· 78:· 71:· 54:. 40:.

Index


cite
sources
improve this article
adding citations to reliable sources
removed
"Trolleybuses in Córdoba"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message

Córdoba
Argentina
http://www.tam-se.com.ar/es
trolleybus
Spanish
public transport
Córdoba
capital city
Córdoba Province
Argentina

ZiU-10
LED
destination signs
ZiU-9
Trolza

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.