Valhall oil field

Source 📝

22: 104: 88: 521: 507: 341: 333: 111: 494:
The steel jacket for the PH platform was installed in June 2009, with the main deck and living quarters module added in July 2010 and the power from shore module becoming operational in June 2011. Production from the PH platform commenced in January 2013 and is expected to reach 65,000 barrels of oil
479:
The PH facility is an integrated processing and accommodation platform, with a power from shore module and bridges linking it to the existing Valhall platforms. The topsides weigh 18,500 tonnes, the jacket structure weighs 8,400 tonnes and there are 180 single cabins on the platform.
418:
The WP was installed in April 1996 and first oil production started in June the same year. WP has 19 well slots. A central location and spare available capacity make it possible for the Valhall complex to also receive oil and gas from several adjacent fields.
305:. Discovered in 1975, production began in 1982 and is expected to continue until 2050. Valhall is located in 70 metres of water. It produces from chalk in the Tor and Hod Formations of Late Cretaceous age. The reservoir depth is approximately 2 400 metres. 435:. The platform-based drilling rig's configuration allows for drilling and maintenance of wells on the new platform (24 wells total) and on the existing WP platform (19 wells total). The IP has integrated connections to the onshore operating centre. 450:
Initially about eight wells will be drilled from each platform. There is room for future water injection at either wellhead platform. The two wellhead platforms are powered from Valhall and monitored from the existing Valhall facilities via a
487:, with the deck constructed by Heerema. The ten-storey living quarters module was constructed by SLP Engineering, with Alphastrut supplying a lightweight aluminium support system. The steel jacket substructure was fabricated and installed by 461:
Drilling commenced on the South Flank by West Epsilon in October 2002 and continued until August 2003 when it moved to drill the North Flank. The South Flank started production 8 May 2003. While the North Flank came on stream 7 January 2004.
431:, bridge linked to the existing Valhall WP. Water injection is expected to increase oil recovery from 31% to 38%. The integrated topsides has water injection facilities, seawater and produced water treatment facilities and 409:
The RP (Ekofisk 2/4 G) was installed in April and June 1981. It received oil and gas from PCP through two 36.8 km long 20-inch diameter pipelines. It delivered the oil and gas to Ekofisk Tank to which it was bridge linked.
328:
The QP was built in 1979 and started being used in July 1981. It was bridge linked to PCP. It had accommodation for 208 people. This module is undergoing deconstruction at the demolition yard in Leirvik, NOR.
675: 470:
Due to subsidence of the field centre and a desire to operate more efficiently a new field centre is being developed for Valhall. The new field centre will probably extend the life of the field to 2050.
447:
platforms each equipped with 16 drilling slots and located about 6 km (one to the North and one to the South) from the existing Valhall Facilities where wellstreams will be processed.
579: 679: 320:
that are bridge-connected. There are also two unmanned flank platforms, one in the south and one in the north, both around 6 kilometres from the field centre.
219: 398: 286: 169: 583: 657: 732: 103: 711: 353:
The DP is situated centrally and has 30 well slots. The platform started operation on 17 December 1981 with the first covered
621: 313:
The field was originally developed with three facilities (QP, DP and PCP) but now the complex consists of five separate
65: 43: 36: 755: 765: 760: 700: 373:
per day. The platform is 65 metres high and weighs 21,000 tons. The oil production is piped to 2/4-J at the
558: 30: 580:"BP starts production from new Valhall platform in Norwegian North Sea | Media | Norway" 47: 607: 8: 455: 534: 639: 374: 432: 428: 749: 526: 512: 282: 184: 171: 317: 452: 370: 87: 640:"Alphastrut Flooring & Cable Management System Fitted In BP Valhall" 484: 676:"Valhall offshore platform contract to Aker Kvaerner - Aker Solutions" 488: 483:
Front-end engineering and design work was undertaken by Fabricom and
366: 302: 141: 444: 378: 520: 394: 386: 382: 354: 340: 332: 214: 204: 733:"Technical Drawings and Documentation of the Valhall Platforms" 365:
The PCP is built to process 168,000 barrels (26,700 m) of
298: 130: 397:. The platform also processes oil and gas that comes from the 390: 314: 602: 600: 474: 597: 369:
and 350 million cubic feet (9,900,000 m) of
712:
Norwegian Petroleum Directorate: Facts 2012 - Valhall
502: 438: 658:"Murray Metals to expand through Alphastrut deal" 622:"BP Valhall main deck leaves Heerema Zwijndrecht" 747: 422: 556: 557:ØYE GJERDE, KRISTIN; SANDBERG, FINN HARALD. 360: 443:The VFD consists of two identical unmanned 385:. The gas is transported directly via the 86: 413: 348: 323: 110: 66:Learn how and when to remove this message 574: 572: 339: 331: 29:This article includes a list of general 730: 748: 404: 569: 475:Production & Hotel (PH) Facility 15: 465: 13: 35:it lacks sufficient corresponding 14: 777: 716: 519: 505: 357:. It was bridge linked to PCP. 344:VALHALL-A Quarters Platform (QP) 336:VALHALL-A Quarters Platform (QP) 109: 102: 20: 701:"Valhall Oilfield – a timeline" 559:"Developing the Valhall centre" 439:Valhall Flank Development (VFD) 724: 693: 668: 650: 632: 614: 550: 308: 1: 739:. Norwegian Petroleum Museum. 608:"Valhall Oilfield, North Sea" 543: 423:Water Injection Platform (WP) 264:8,000 barrels per day (~4.0 185:56.278164000°N 3.395331000°E 7: 498: 10: 782: 361:Production Platform (PCP) 278: 261:Current production of oil 260: 255: 247: 239: 231: 226: 210: 200: 190:56.278164000; 3.395331000 163: 155: 147: 136: 126: 97: 85: 80: 297:is an oil field in the 92:Valhall A oil platforms 50:more precise citations. 414:Wellhead Platform (WP) 349:Drilling Platform (DP) 345: 337: 324:Quarters Platform (QP) 756:BP oil and gas fields 343: 335: 766:Oil fields in Norway 761:North Sea oil fields 731:FREMO MINGE, FILIP. 429:fixed steel platform 279:Producing formations 240:Start of development 405:Riser Platform (RP) 248:Start of production 181: /  118:Location of Valhall 644:www.alphastrut.com 535:List of oil fields 346: 338: 292: 291: 76: 75: 68: 773: 741: 740: 737:INDUSTRIMINNE.NO 728: 705: 704: 697: 691: 690: 688: 687: 678:. Archived from 672: 666: 665: 654: 648: 647: 636: 630: 629: 618: 612: 611: 604: 595: 594: 592: 591: 582:. Archived from 576: 567: 566: 563:INDUSTRIMINNE.NO 554: 529: 524: 523: 515: 510: 509: 508: 466:New field centre 433:power generation 387:Norpipe pipeline 270: 269: 196: 195: 193: 192: 191: 186: 182: 179: 178: 177: 174: 156:Offshore/onshore 113: 112: 106: 90: 78: 77: 71: 64: 60: 57: 51: 46:this article by 37:inline citations 24: 23: 16: 781: 780: 776: 775: 774: 772: 771: 770: 746: 745: 744: 729: 725: 719: 709: 708: 699: 698: 694: 685: 683: 674: 673: 669: 656: 655: 651: 638: 637: 633: 626:hfg.heerema.com 620: 619: 615: 606: 605: 598: 589: 587: 578: 577: 570: 555: 551: 546: 540: 525: 518: 511: 506: 504: 501: 477: 468: 441: 425: 416: 407: 363: 351: 326: 311: 267: 265: 218: 189: 187: 183: 180: 175: 173:56°16′41.3904″N 172: 170: 168: 167: 122: 121: 120: 119: 116: 115: 114: 93: 72: 61: 55: 52: 42:Please help to 41: 25: 21: 12: 11: 5: 779: 769: 768: 763: 758: 743: 742: 722: 718: 717:External links 715: 707: 706: 692: 667: 662:HeraldScotland 649: 631: 613: 596: 568: 548: 547: 545: 542: 538: 537: 531: 530: 516: 500: 497: 476: 473: 467: 464: 440: 437: 424: 421: 415: 412: 406: 403: 375:Ekofisk Center 362: 359: 350: 347: 325: 322: 310: 307: 301:sector of the 290: 289: 280: 276: 275: 262: 258: 257: 253: 252: 249: 245: 244: 241: 237: 236: 233: 229: 228: 224: 223: 220:Pandion Energy 212: 208: 207: 202: 198: 197: 176:3°23′43.1916″E 165: 161: 160: 157: 153: 152: 149: 145: 144: 138: 134: 133: 128: 124: 123: 117: 108: 107: 101: 100: 99: 98: 95: 94: 91: 83: 82: 74: 73: 28: 26: 19: 9: 6: 4: 3: 2: 778: 767: 764: 762: 759: 757: 754: 753: 751: 738: 734: 727: 723: 721: 714: 713: 702: 696: 682:on 2015-02-26 681: 677: 671: 663: 659: 653: 645: 641: 635: 627: 623: 617: 609: 603: 601: 586:on 2015-02-26 585: 581: 575: 573: 564: 560: 553: 549: 541: 536: 533: 532: 528: 527:Energy portal 522: 517: 514: 513:Norway portal 503: 496: 492: 490: 486: 481: 472: 463: 459: 457: 454: 448: 446: 436: 434: 430: 427:The WIP is a 420: 411: 402: 400: 399:Hod oil field 396: 392: 388: 384: 380: 376: 372: 368: 358: 356: 342: 334: 330: 321: 319: 316: 306: 304: 300: 296: 288: 287:Hod Formation 284: 283:Tor Formation 281: 277: 273: 263: 259: 254: 250: 246: 242: 238: 234: 230: 227:Field history 225: 221: 216: 213: 209: 206: 203: 199: 194: 166: 162: 158: 154: 150: 146: 143: 139: 135: 132: 129: 125: 105: 96: 89: 84: 79: 70: 67: 59: 49: 45: 39: 38: 32: 27: 18: 17: 736: 726: 720: 710: 695: 684:. Retrieved 680:the original 670: 661: 652: 643: 634: 625: 616: 588:. Retrieved 584:the original 562: 552: 539: 493: 482: 478: 469: 460: 449: 442: 426: 417: 408: 377:and goes to 364: 352: 327: 312: 294: 293: 271: 62: 53: 34: 453:fiber optic 309:Development 188: / 164:Coordinates 48:introducing 750:Categories 686:2015-02-26 590:2015-02-26 544:References 485:Wood Group 274: t/a) 256:Production 56:April 2009 31:references 318:platforms 303:North Sea 299:Norwegian 232:Discovery 142:North Sea 499:See also 445:wellhead 379:Teesside 211:Partners 201:Operator 159:offshore 151:2/8,2/11 140:Central 137:Location 495:a day. 489:Kværner 395:Germany 383:England 355:derrick 295:Valhall 215:Aker BP 205:Aker BP 127:Country 81:Valhall 44:improve 131:Norway 33:, but 456:cable 391:Emden 315:steel 222:10.0% 217:90.0% 148:Block 251:1982 243:1981 235:1975 393:in 389:to 381:in 371:gas 367:oil 752:: 735:. 660:. 642:. 624:. 599:^ 571:^ 561:. 491:. 458:. 401:. 285:, 268:10 703:. 689:. 664:. 646:. 628:. 610:. 593:. 565:. 272:^ 266:× 69:) 63:( 58:) 54:( 40:.

Index

references
inline citations
improve
introducing
Learn how and when to remove this message

Valhall oil field is located in North Sea
Norway
North Sea
56°16′41.3904″N 3°23′43.1916″E / 56.278164000°N 3.395331000°E / 56.278164000; 3.395331000
Aker BP
Aker BP
Pandion Energy
Tor Formation
Hod Formation
Norwegian
North Sea
steel
platforms


derrick
oil
gas
Ekofisk Center
Teesside
England
Norpipe pipeline
Emden
Germany