Knowledge

Nibelungen Bridge (Regensburg)

Source 📝

20: 106:, at that time the only bridge across the Danube at Regensburg, with a new bridge go back to the late 19th century. The Stone Bridge was already overloaded by increased use (both city traffic and through traffic on two Imperial highways) but for unknown reasons the city hesitated. Meanwhile, several smaller bridges were built between the south bank of the river and the two islands (Upper and Lower Wöhrd) which lie within the city, but no additional bridge spanning the entire river. In 1926 a 206:
Nibelungen Bridge. In 1964 the city expanded the bridge from 2 to 4 lanes by eliminating the pedestrian and bicycle lanes. In 1997 this gradually proved to be a problem, since that year the Stone Bridge was closed to private traffic and thus the Nibelungen Bridge had to accommodate almost 50,000 vehicles per day. Increasing damage to the steel structure required heavy freight to avoid the bridge. Repairs were thus not worthwhile, so planning for a new bridge began in 2001.
76:. With the Pfaffenstein Bridge and the Schwabelweis Bridge, it is one of only three Danube bridges without load restrictions. The bridge is also important in plans for tram service in Regensburg, as part of the "service axis". As another traffic improvement measure, before the bridge was rebuilt, the streets leading to it at each end were widened. Continuation of this street widening and construction of another bridge over the 89:
Both are continuous beam construction with three longitudinal sections and a primary span width of 90 m. On the south bridge, the two edge spans are each 39.45 m wide; on the north bridge, 58.45 m. Each bridge section has dual superstructures of 15.4 m width and 3.2 m constant height with a single-cell box girder of composite construction and a diagonally braced cantilevered concrete deck.
543: 219:
closed for 4 weeks while the bridge pillars were extended 10 m and rails installed in preparation for shifting the old bridge. Buses were nonetheless able to continue to use the northern half of the bridge except on the moving day itself. Moving began on 8 August; on 30 August 2001, the entire length of the bridge reopened after the move.
185:
Germany". Work began with the north span, between the Lower Wöhrd and Weichs; work on the south span, between Weißenburgstraße and the Lower Wöhrd, began in summer 1936. In 1937 the north span opened to traffic and repairs immediately began on the Stone Bridge. On 18 June 1938, the south span and the
218:
of Regensburg, Hans Schaidinger, and the Bavarian Interior Minister, Günther Beckstein. The old bridge first had to be moved 8 m laterally so that traffic could continue to use it. Use of the bridge by traffic continued without further restrictions until July, when the eastbound lanes had to be
205:
Immediately after the end of the war, work began on clearing rubble and establishing ferry service between Weichs and the Lower Wöhrd to carry traffic; a pontoon bridge was later put in place. In 1950 a replacement bridge, only slightly changed from Fick's design, was opened to traffic and named the
88:
The bridge consists of two sections of similar design over the two arms of the Danube on either side of the Lower Wöhrd, one of the two islands within the city. The southern bridge has a total span length of 168.9 m and also crosses a port railway line. The northern bridge is 206.9 m long.
264:
On 11 July 2001, as part of the preparations for moving the 1950 bridge before its demolition, the eagle and the maidens were moved into storage. It was announced at the time that the city would find an appropriate use for the eagle, but as of 2008 it was still in storage, despite a 2003 invitation
140:
engineering firm of Gerhard & Zenns the structural design. A traffic count on the Stone Bridge on a Saturday in early 1934 counted 40,000 pedestrians, 14,500 cyclists, 5,500 vehicles of all kinds and 278 trams. The city therefore decided to bypass the Old City on the east, to build a new bridge
222:
Work began on the new western spans in August 2001 and was completed on 9 November 2002. Traffic was then redirected across the new half, and the old bridge was for the most part demolished or exploded. After all the rubble was cleared, construction of the eastern spans began and was completed in
250:, an extremely durable stone, for the eagle but was required to use granite. He began work over a year late; when the bridge was dedicated, the eagle was not yet ready and was ineptly added to the official photographs by retouching. When completed in 1939, the 9-metre eagle weighed 12  223:
April 2004. After the bridge was fully open to traffic, final tasks consisted of making permanent roadway markings and constructing pedestrian and bicycle paths on the west side; during construction there had not been space for these. All construction was complete in mid-June 2004.
110:
was built between the Lower Wöhrd and the neighbourhood of Weichs, on the site of the north span of the Nibelungen Bridge. However, this alleviated the traffic problems only slightly because it could not be used by heavy vehicles.
56:. The current bridge, the third on the site, was erected in 2001–04 to replace a bridge erected in 1950 which was no longer adequate for traffic demands, and which had replaced a bridge built in 1938 and destroyed in 269:
and permitting nature to reclaim it by letting grass grow over it. Other ideas have included smashing it and reassembling it randomly, and a local entrepreneur once offered to buy it and put it in his garden.
189:
The bridge was designed by Roderich Fick, with engineering work by Gerhart & Zenns. Fick wanted the new concrete bridge to appear as slender and serene as possible to contrast with the Stone Bridge.
33: 261:, facing east, with the swastika omitted from the oak garland in its claws. It was frequently defaced with graffiti and painted various colours. The maidens were also placed on the new bridge. 186:
Frankenbrücke both opened, and on 16 July Minister Wagner ceremonially christened the bridge. Several thousand people attended the festivities and the fireworks that evening.
602: 459: 646: 336: 320: 68:
The 2004 Nibelungen Bridge has 6 lanes, two of them reserved exclusively for buses and taxis. It currently forms part of highways
661: 114:
In 1930, definite planning began for a new Danube crossing which could carry heavy traffic. Three possibilities were considered:
516: 238:
For the 1938 Adolf Hitler Bridge, Munich sculptor Albert Allman was commissioned to carve a group of maidens and a monumental
593: 442: 396: 157:, which was intensely interested in the Danube bridge. In summer 1935 it was agreed that costs would be shared between the 651: 484: 456: 539: 512: 419: 392: 265:
for proposals from well-known artists and an exhibit of the suggestions, which included wrapping it in the manner of
254:
and had cost RM18,000. In March 1940 it was installed at a semicircular lookout between the two parts of the bridge.
656: 641: 292:
A neighbourhood parking garage for almost 70 vehicles is located behind the south abutment of the current bridge.
230:
7.6 million by the need to acquire more steel because of a data entry error combined with underestimation.
60:. Carrying an average of 42,000 vehicles a day, it is one of the most important bridges in the Regensburg area. 258: 239: 124:
Constructing a new double-span bridge to extend Weißenburgstraße to Weichs (what became the Nibelungen Bridge)
555:
Nerdinger and Blohm, p. 94. According to Wittmann, the city refused to install it and it remained in storage.
289:
club, stood on the island next to the 1950 bridge; it was torn down during construction of the new bridge.
666: 121:
Constructing a new bridge at the Upper Wöhrd, supplementing or replacing a footbridge built there in 1901
423: 103: 534:, Regensburger Studien und Quellen zur Kulturgeschichte 1, Regensburg: Universitätsverlag, 1994, 343:, the final cost was RM5.7 million. This page has a picture of the eagle being removed in 2001. 194: 467: 118:
Extending the Iron Bridge (built in 1863) over the north arm of the Danube with a second span
564: 8: 153:
5.05 million, which led to a dispute between the city, the state of Bavaria and the
308: 247: 173:
and at the groundbreaking on 21 December 1935, the Bavarian Minister for the Interior,
73: 589: 535: 508: 415: 388: 278:
A fish market formed part of the 1950 bridge, but apparently did not exist for long.
149:), and to fund both. In summer the cost of constructing both was estimated at almost 214:
On 3 March 2001, the foundation stone for the new Nibelungen Bridge was laid by the
69: 463: 384: 161:, the city, Bavaria and the Reichswehr, and preparations for construction began. 37: 107: 136:
Ministry of the Interior, was engaged to oversee architectural design and the
19: 635: 617: 604: 227: 142: 129: 77: 174: 158: 57: 532:
Stadt unterm Hakenkreuz: Kommunalpolitik in Regensburg während der NS-Zeit
242:. Allman had little experience as a monumental sculptor; he was known for 286: 215: 154: 150: 49: 177:, dedicated it "to the glory of the state, the glory of the Bavarian 44:) is a dual road bridge with two sections spanning both arms of the 439:
Probleme der bayerischen Verfassungsgeschichte. gesammelte Aufsätze
311:, Grassl Engineering, 18 September 2010, retrieved 3 February 2011. 243: 337:"Eine Provinzposse für Jahrzehnte: Der Regensburger Brückenadler" 266: 133: 53: 137: 128:
Firm plans for a new steel bridge were made in 1933. Architect
45: 437:
The dedication took place on November 23, 1950: Ernst Klebel,
251: 209: 182: 596:(Allegorical satire about the bridge eagle in poetic form) 257:
The eagle was mounted on the 1950 Nibelungen Bridge as a
193:
On 23 April 1945, the bridge was blown up to slow the
565:
Historisches: zum Regensburger Eishockey und zum EVR
381:
Bauen unterm Hakenkreuz: Architektur des Untergangs
226:The cost of the bridge was increased by at least 633: 210:Construction of the third bridge (2001–04) 412:Bauen im Nationalsozialismus: Bayern, 1933-1945 485:"Ein Tippfehler verteuert Brücke um Millionen" 323:, Max Bögl Construction, November 2004 (pdf) 80:are planned, but are unlikely to occur soon. 414:, Munich: Klinkhardt & Biermann, 1993, 375: 373: 571:, with picture of 1950 bridge and stadium. 363: 361: 359: 357: 355: 353: 351: 349: 410:Winfried Nerdinger and Katharina Blohm, 404: 370: 273: 18: 346: 647:Buildings and structures in Regensburg 634: 505:Denkmal: Erinnerung, Mahnung, Ärgernis 339:, Regensburg-digital.de, 16 May 2008 16:Road structure in Regensburg, Germany 23:The Nibelungen Bridge in Regensburg. 13: 578: 507:, Hamburg: Körber Stiftung, 1996, 283:Eisstadion an der Nibelungenbrücke 14: 678: 63: 588:. Regensburg: Buntehunde, 2008. 457:"Regensburger Brücke verschoben" 285:, former home of the Regensburg 197:advance, and largely destroyed. 558: 549: 524: 497: 83: 662:2004 establishments in Germany 478: 450: 431: 329: 314: 302: 200: 164: 1: 295: 48:at kilometre mark 2378.39 in 586:Die Geschichte von Adi Adler 546:, Allmann was paid RM30,000. 530:According to Helmut Halter, 233: 7: 335:According to Uli Wittmann, 321:Nibelungenbrücke Regensburg 97: 10: 683: 92: 652:Bridges completed in 2004 169:The bridge was named the 102:Plans to supplement the 657:Bridges over the Danube 642:Road bridges in Germany 441:, Munich: Beck, 1957, 281:From 1964 to 2001 the 41: 24: 618:49.02139°N 12.11306°E 274:Associated structures 22: 246:nudes. He requested 614: /  489:Süddeutsche Zeitung 468:Süddeutsche Zeitung 309:Project description 171:Adolf Hitler Bridge 132:, suggested by the 667:Bridges in Bavaria 623:49.02139; 12.11306 462:2011-07-17 at the 379:Helmut Weihsmann, 183:National Socialist 25: 594:978-3-934941-47-2 491:30 November 2001 181:and the glory of 29:Nibelungen Bridge 674: 629: 628: 626: 625: 624: 619: 615: 612: 611: 610: 607: 572: 570: 567:, EV Regensburg 562: 556: 553: 547: 528: 522: 521: 501: 495: 494: 482: 476: 474: 454: 448: 447: 435: 429: 428: 408: 402: 401: 377: 368: 365: 344: 342: 333: 327: 326: 318: 312: 306: 42:Nibelungenbrücke 36: 682: 681: 677: 676: 675: 673: 672: 671: 632: 631: 622: 620: 616: 613: 608: 605: 603: 601: 600: 581: 579:Further reading 576: 575: 568: 563: 559: 554: 550: 529: 525: 519: 502: 498: 492: 483: 479: 472: 464:Wayback Machine 455: 451: 445: 436: 432: 426: 409: 405: 399: 385:Promedia Verlag 378: 371: 366: 347: 340: 334: 330: 324: 319: 315: 307: 303: 298: 276: 236: 212: 203: 167: 100: 95: 86: 66: 32: 17: 12: 11: 5: 680: 670: 669: 664: 659: 654: 649: 644: 598: 597: 584:Helmut Hoehn. 580: 577: 574: 573: 557: 548: 523: 496: 477: 471:9 August 2001 449: 430: 403: 369: 345: 328: 313: 300: 299: 297: 294: 275: 272: 235: 232: 211: 208: 202: 199: 166: 163: 126: 125: 122: 119: 108:pontoon bridge 99: 96: 94: 91: 85: 82: 65: 64:Current bridge 62: 15: 9: 6: 4: 3: 2: 679: 668: 665: 663: 660: 658: 655: 653: 650: 648: 645: 643: 640: 639: 637: 630: 627: 595: 591: 587: 583: 582: 566: 561: 552: 545: 541: 540:3-9803470-6-0 537: 533: 527: 518: 514: 513:3-89684-303-6 510: 506: 503:Dirk Wegner, 500: 490: 486: 481: 475: 469: 465: 461: 458: 453: 444: 440: 434: 425: 421: 420:3-7814-0360-2 417: 413: 407: 398: 394: 393:3-85371-113-8 390: 386: 382: 376: 374: 364: 362: 360: 358: 356: 354: 352: 350: 338: 332: 322: 317: 310: 305: 301: 293: 290: 288: 284: 279: 271: 268: 262: 260: 259:federal eagle 255: 253: 249: 245: 241: 231: 229: 224: 220: 217: 207: 198: 196: 191: 187: 184: 180: 176: 172: 162: 160: 156: 152: 148: 147:Frankenbrücke 144: 139: 135: 131: 130:Roderich Fick 123: 120: 117: 116: 115: 112: 109: 105: 90: 81: 79: 75: 71: 61: 59: 55: 51: 47: 43: 39: 35: 30: 21: 599: 585: 560: 551: 531: 526: 504: 499: 488: 480: 470: 452: 438: 433: 411: 406: 380: 331: 316: 304: 291: 282: 280: 277: 263: 256: 237: 225: 221: 213: 204: 192: 188: 178: 175:Adolf Wagner 170: 168: 146: 127: 113: 104:Stone Bridge 101: 87: 84:Construction 67: 58:World War II 28: 26: 621: / 569:(in German) 520:(in German) 493:(in German) 473:(in German) 446:(in German) 427:(in German) 400:(in German) 341:(in German) 325:(in German) 201:1950 bridge 165:1938 bridge 143:River Regen 78:River Regen 636:Categories 383:, Vienna: 296:References 287:ice hockey 240:Nazi eagle 216:Lord Mayor 155:Reichswehr 50:Regensburg 609:12°6′47″E 606:49°1′17″N 367:Wittmann. 234:Sculpture 141:over the 34:‹See Tfd› 544:(German) 460:Archived 387:, 1998, 248:porphyry 244:art deco 134:Bavarian 98:Planning 267:Christo 179:Ostmark 93:History 54:Germany 592:  538:  511:  418:  397:p. 150 391:  252:tonnes 195:Allied 138:Munich 46:Danube 38:German 517:p. 61 443:p. 90 424:p. 94 159:Reich 145:(the 590:ISBN 536:ISBN 509:ISBN 416:ISBN 389:ISBN 72:and 27:The 74:B15 638:: 542:, 515:, 487:, 466:, 422:, 395:, 372:^ 348:^ 228:DM 151:ℛℳ 70:B8 52:, 40:: 31:(

Index


‹See Tfd›
German
Danube
Regensburg
Germany
World War II
B8
B15
River Regen
Stone Bridge
pontoon bridge
Roderich Fick
Bavarian
Munich
River Regen
ℛℳ
Reichswehr
Reich
Adolf Wagner
National Socialist
Allied
Lord Mayor
DM
Nazi eagle
art deco
porphyry
tonnes
federal eagle
Christo

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.